Saudi Aramco Inspection Checklist

This document is a checklist for reviewing a contractor's Positive Material Identification (PMI) Program and testing procedure. The checklist ensures the contractor's program meets the minimum requirements outlined in Saudi Aramco specification SAES-A-206, including identifying PMI operators, required number of tests, acceptance criteria, records and reports, inspection requirements, and marking and coding. It also checks that the PMI testing method identifies the instruments and methods used, verifies operator qualifications, and specifies equipment calibration frequency and surface preparation of materials.

Uploaded by

MAZHARUL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views2 pages

Saudi Aramco Inspection Checklist

This document is a checklist for reviewing a contractor's Positive Material Identification (PMI) Program and testing procedure. The checklist ensures the contractor's program meets the minimum requirements outlined in Saudi Aramco specification SAES-A-206, including identifying PMI operators, required number of tests, acceptance criteria, records and reports, inspection requirements, and marking and coding. It also checks that the PMI testing method identifies the instruments and methods used, verifies operator qualifications, and specifies equipment calibration frequency and surface preparation of materials.

Uploaded by

MAZHARUL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAUDI ARAMCO ID/PIEU - 30-Nov-2017- REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.

00 30-Sep-17
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Positive Material Identification Program and
SAIC-L-2004 30-Nov-17 PIPING-
Testing Procedure
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A PMI Program & Testing procedure shall contain the elements listed below as minimum:

The procedure is identified and traceable to the project's updated list of


Project
quality documents.
Document
A1 (Note: Detailed requirement for document identification shall be listed as
Control
addition or supplementary to this checkpoint upon approval of the Project
Procedure
Document Control Procedure.)

B PMI program identifies the following, conforming to Sec. 7 of SAES-A-206 as follows:

SAES-A-206,
B1 Pre-approval of the PMI operators.
Para. 8.6

The PMI program covers the following:


 Alloy materials
 Shop and field-fabricated pressure-retaining components (base metal, SAES-A-206,
B2
welds and cladding) Para. 7.1
 Materials used for repair or replacement of pressure-retaining
components.

SAES-A-206,
B3 Required Number of PMI tests (Per Application) based on Scope.
Para. 7.4

SAES-A-206,
Elements of the basic alloy materials to be verified and shall be in
B4 Para. 7.5,
accordance with Table 2 of SAES-A-206.
Table - 2

SAES-A-206,
B5 PMI testing of Welding Consumables
Para. 7.7

SAES-A-206,
B6 Acceptance Criteria.
Sec. 10,

SAES-A-206,
B7 Rejection Procedures
Sec. 11

SAES-A-206,
B8 Records and Reports.
Sec. 12

SAES-A-206,
B9 Inspection requirements.
Sec. 13

SAES-A-206,
B10 Marking and color coding.
Sec. 14

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017- REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.00 30-Sep-17
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Positive Material Identification Program and
SAIC-L-2004 30-Nov-17 PIPING-
Testing Procedure
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

C The PMI Test Method shall contain the following as minimum:

Identified the instrument and method to be used suitable to test the SAES-A-206,
C1
applicable material specification. Par 9.2 to 9.4
SAES-A-206,
C2 Verification of operator's qualification prior to PMI testing.
Para. 9.5
SAES-A-206,
C3 Calibration/verification of equipment performance.
Para. 9.6
Specified frequency interval & calibration procedure for SAES-A-206,
C4
calibration/verification of the test equipment. Para. 9.6

SAES-A-206,
C5 Location of test on welds.
Para. 9.8

SAES-A-206,
C6 Surface Preparation of material to be tested.
Para. 9.9

REMARKS:

NOTES:

ATTACHMENTS:

REFERENCE DOCUMENTS: 1. SAES-A-206, Positive Material Identification, (5 May 2016)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use

You might also like