Inspection Checklist For Waterproofing Works

This document is an inspection checklist for waterproofing works that contains items to inspect including: 1) Surface is free from oil, grease, dirt and mortar stains, 2) Angle fillets, 3) Waterproofing material and upturn to walls, 4) Proper sequence of works, 5) Ponding tests for various areas like bathrooms, yards, balconies, pools, and flat roofs. The checklist is used to inspect and sign off on works before subsequent tasks and can note acceptance with conditions or require re-inspection if not acceptable.

Uploaded by

hishamndt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views

Inspection Checklist For Waterproofing Works

This document is an inspection checklist for waterproofing works that contains items to inspect including: 1) Surface is free from oil, grease, dirt and mortar stains, 2) Angle fillets, 3) Waterproofing material and upturn to walls, 4) Proper sequence of works, 5) Ponding tests for various areas like bathrooms, yards, balconies, pools, and flat roofs. The checklist is used to inspect and sign off on works before subsequent tasks and can note acceptance with conditions or require re-inspection if not acceptable.

Uploaded by

hishamndt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

INSPECTION CHECKLIST FOR WATERPROOFING WORKS

Element : Inspection Date :

Block / Phase : Sub-Contractor :

Units :

Inspection Re-inspection
Acceptibility Acceptibility
Item Description
( X or √ ) Date ( X or √ )
CONT CONS CONT CONS
Surface Free From Oil / Grease /
1.0 Dirt. Motar Stain

2.0 Angle Fillet


WORKS ABOVE TO COMPLETE AND INSPECTION SIGN - OFF PRIOR TO SUBSEQ

3.0 Waterproofing Material


Upturn to wall (300mm high at
4.0 Bath / Balcony / Yard)
WORKS ABOVE TO COMPLETE AND INSPECTION SIGN - OFF PRIOR TO SUBSEQ
Sequence of work
5.0 (Hacking after waterproofing)
Water ponding Test
( Water level / Touch-up after
6.0 Plumbing works)
7.0
Ponding Test :
11.1
Bathroom
(11.2
____________hr)
Dry Yard
(11.3
____________hr)
Balcony ( ____________hr)
11.4
Swimming Pool / Pond /
Plantex Box

( ____________hr)
11.5
Flat Roof
( ____________hr)

Status :

Accepted with condition to


Accepted rectify as comments

Request by Varifi
Participants
Contractor's Representative Consultant's
Name
Designation
Signature
Date
** N/A where Not Applicable and Add item (s) where as necessary
Attachment AR06
PROJECT :
ERPROOFING WORKS

actor :
( Company's Name )

e-inspection

Checking Method Remarks


Date

Cross line
Laser

Visual
N - OFF PRIOR TO SUBSEQUENT WORKS

Visual

Visual
N - OFF PRIOR TO SUBSEQUENT WORKS

Visual

Visual

Visual

Visual

Visual

Visual
Visual

Visual

ed with condition to Not acceptable. Re-


fy as comments inspection required

Varified / Approved by
Consultant's / Client's Representative