Quantity Check
Quantity Check
DETAILED ESTIMATE
F/Y: 2072/073
Weigh
Length Breadth Height
S.N. Description of Work No. t Kg / Quantity Unit Remarks
m m m
m Code
1 Dismantling of Dismentled
brickwork in cement mortar
including disposal of the debris
out of site .
North side 1 175.0 0.35 3.0 183.75
2 Earthwork in excavation in
hard/boulder mix soils in
foundation including 10m
hauling distance and 1.5 m. lift
all complete.
Foundation footing 77 1.2 1.20 1.125 124.74
In Fill wall 1 82.6 0.23 0.60 11.39
Footing 12mm dia 150 c/c both w 1386 1.500 0.888 1846.15
Col 12mm dia 308 3.100 0.888 847.86
8mm dia sti 1386 0.870 0.395 476.29
FoundationTie 6 187.240 0.888 997.61
8mm dia sti 1176 0.870 0.395 404.13
Top Tie 6 162.240 0.888 864.41
8mm dia sti 1176 0.870 0.395 404.13
Total 5840.58 Kg
1 1.00
15
Total 0.00
16
Total 0.00
17
Total 0.00
18
Total 0.00
19
Total 0.00
20
Total 0.00
21
Total 0.00
22
Total 0.00
23
Total 0.00
24
Total 0.00
25
Total 0.00
26
Total 0.00
27
Total 0.00
28
Total 0.00
29
Total 0.00
30
Total 0.00
31
Total 0.00
32
Total 0.00
33
Total 0.00
34
Total 0.00
35
Total 0.00
36
Total 0.00
37
Total 0.00
38
Total 0.00
39
Total 0.00
40
Total 0.00
41
Total 0.00
42
Total 0.00
43
Total 0.00
44
Total 0.00
45
Total 0.00
46
Total 0.00
47
Total 0.00
48
Total 0.00
49
Total 0.00
50
Total 0.00
51
Total 0.00
52
Total 0.00
53
Total 0.00
54
Total 0.00
of] kmfOn original file xf] . s[kof tkfO{sf] sfd o;
kmfO{ndf save gug'{ xf]nf . File save_as u/L cs}
. { gfddf save ug'{ xf]nf
x/]s cfO6dsf] hDdf nfO{ Name Box df uO{ gfd lbg'
xf]nf . Gffd lb+bf qt_(Code Number) u/L lbg'
. xf]nf
Abstract df Estimate sf] sequence df code
number lbg' xf]nf . Quantity sell df "=qt_(Code
. Number)" lbg' xf]nf
olb s'g} cfO6d ln:6 eGbf aflx/sf] lbg k/]df sf]8df *
lbg'xf]nf / Description, Unit / Unit rate df ;DjlGwt
. 8f6f lbg'xf]nf
0.485
476.29
404.13
404.13
1284.55
4556.03
49 1.500 1.00 73.50
Page 14 of 222
Government of Nepal
Ministry of Urban development
Department of Urban Development & Building Construction
BABAR MAHAL, KATHMANDU, NEPAL
Weigh
Length Breadth Height
Description of Work No. t Kg / Quantity Unit Remarks
m m m
m Code
Dismantling of Dismentled
brickwork in cement mortar
including disposal of the debris
1 out of site .
North side 1 159.0 0.35 3.0 166.95
Earthwork in excavation in
hard/boulder mix soils in
foundation including 10m
hauling distance and 1.5 m. lift
all complete.
2
Foundation footing 48 1.2 1.20 1.125 77.76
In Fill wall 1 58.4 0.23 0.60 8.05 158-42-48*1.2=58.4
1 43.25 0.8 0.8 27.68 42+1.25=43.25
Total 113.49 cum
`
Page 15 of 222
Total 3558.67 Kg
Page 16 of 222
sqm
Page 17 of 222
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Page 18 of 222
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Page 19 of 222
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Page 20 of 222
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Page 21 of 222
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Page 22 of 222
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Total 0.00
Page 23 of 222
158-42-48*1.2=58.4 0.485
175-60*12-42=61
Page 24 of 222
175-60*1.2=103
175-60*.23-42=119.20
158-42=116
296.91
17*.72+175-42=145.24
404.13
39.50
740.54 158-48*.23=(146.96)/.15 c/c=980 ~1000
2818.13
Page 25 of 222
3 Local flat brick soiling work with sand filling. m3 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 3185.34 60.00 191120.22 Err:509 Err:509
4 Pumping out of water from foundation or pit. m3 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 620.11 2500.00 1550270.00 Err:509 Err:509
Dry rubble masonry work in perfect line level
5 finish all complete. ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 106.35 4500.00 478575.00 Err:509 Err:509
Name of Contractor : Sailendra and sons construction Increase or decrease:.Estimate wrt Originnal cost in NRs: NRs. -2841352.33
Name of Consultant/ Office :DUDBC,Head Office, Kathmandu Percentage Increase or Decrease in Estimate: -92.270 % (+)
Original Cost Estimate in NRs. : 3079385.68 Increase or decrease in contract amount in NRs. : (+) NRs. 0.00
Original Contract Amount in NRs. : 0.00 Percentage of Increase or Decrease wrt Original Contract Amount : (+) #DIV/0!
Revised Cost Estimate in NRs. : 238033.35 Percentage Increase or Decrease in new contract amount wrt Original Estimated Amount :(+) -100.000
Revised Contract Amount in NRs. : 0.00 Budget Sanction for increased works (Govt/Foreign) :
S.N. Item Unit Original Cost Estimate in NRs. Revised Cost Estimate(till date) in %age Original Contract Amount New Contract Amount % Change in % Change in Remarks
NRs. Change of in NRs. after this Variation in Original Original
work NRs. Contract Estimated
Quantity Amount & Amount &
new contract revised estimated
amount after amount after this
this Variation Variation n NRs.
in NRs.
Unit Quantity Rate Amount Quantity Rate Amount Rate Amount Rate Amount
A CIVIL WORKS
1 Site Development work
NET TOTAL AMOUNT WITH VAT NRs. 3633675.10 NRs. 280879.36 NRs. 0.00 NRs. 0.00
Prepared By: Checked By: Certified & Recommended By: Approved By:
Ite
S.N. m Items No. Length T.Length Breadth Height Quantity Unit
(A) No. CIVIL WORKS
1 Site Development work
Earth work in Excavation in site
1 1.2 Same as 8th previous bill running Bill 3799.225 m3
Development
Earth work excavation in BM Soil on
2 2 Foundation Same as 8th previous bill running Bill 2533.707 m3
Side of ramp landing (way to 5th block) 1 1.78 1.77 0.60 0.90 0.96
1 2.38 2.37 0.60 0.90 1.28
Entrance Ramp
first step long wall 2 21.00 42.00 0.60 0.90 22.68
short wall 1 5.22 5.22 0.60 0.90 2.82
Total 2561.439 m3
3 3 Earth filling Work Same as 8th previous bill running Bill 3185.337 m3
4 4 150 mm thick stone soling in sand Same as 8th previous bill running Bill 516.920 m3
on block 5
upper level
room 4 6.85 27.40 6.85 0.15 28.15
passage 1 16.86 16.85 2.50 0.15 6.32
down level
room 6 6.85 41.10 6.85 0.15 42.23
passage 1 23.03 23.02 2.50 0.15 8.63
passage 1 13.70 13.70 2.50 0.15 5.14
wall 1 1.78 1.77 0.60 0.15 0.16
Entrance ramp
first step long wall 2 21.00 42.00 0.60 0.15 3.78
short wall 1 5.22 5.22 0.60 0.15 0.47
Waiting to lift zone 1 14.40 14.40 2.57 0.15 5.54
Ramp (Way to 5th block upper level) 1 7.20 7.20 2.57 0.15 2.77
Total 620.108 m3
5 5 Lean Concrete Base (1:3:6) Same as 8th previous bill running Bill 104.041 m3
Side of ramp landing (way to 5th block) 1 1.78 1.77 0.60 0.075 0.08
1 2.38 2.37 0.60 0.075 0.11
Entrance ramp
first step long wall 2 21.00 42.00 0.60 0.075 1.89
short wall 1 5.22 5.22 0.60 0.075 0.23
Total 106.350 m3
6 6 P.C.C. (1:2:4) Work Same as 8th previous bill running Bill 155.54 m3
Block 5
room 4 6.85 27.40 6.85 0.075 14.08
passage 1 16.86 16.85 2.50 0.075 3.16
down level
room 6 6.85 41.10 6.85 0.075 21.12
passage 1 23.03 23.02 2.50 0.075 4.32
passage 1 13.70 13.70 2.50 0.075 2.57
Block 1 & 3
Room 10 6.85 68.5 6.85 0.075
Passage 5 6.85 34.25 2.5 0.075
Room 6 6.85 41.1 6.85 0.075
Passage 3 6.85 20.55 2.5 0.075
block 4 1 24.86 24.86 16.12 0.075
block 2 1 19.53 19.52 15.10 0.075
1 24.86 24.86 15.89 0.075
1 6.33 6.32 6.85 0.075
1 19.45 19.45 2.70 0.075
ramp 1 1 14.40 14.40 2.57 0.15
ramp 2 1 7.20 7.20 2.57 0.15
Total 200.77 m3
6 7 Brick Masonary work ( 1:6 ) Same as 8th previous bill running Bill 885.30 m3
Block 5
Down level
pantry room 2 1.29 2.58 0.23 3.26 1.94
1 3.02 3.02 0.23 3.00 2.08
toilet 1 3.08 3.08 0.23 3.53 2.50
1 1.10 1.10 0.23 3.53 0.89
wall 8 6.61 52.84 0.23 2.95 35.85
4 6.61 26.42 0.23 3.53 21.42
1 4.57 4.57 0.23 3.53 3.71
4 6.61 26.44 0.23 2.95 17.94
2 6.61 13.22 0.23 3.53 10.72
1 9.98 9.98 0.23 3.53 8.09
1 4.52 4.52 0.23 2.95 3.07
2 1.67 3.33 0.23 3.53 2.70
1 4.41 4.40 0.23 2.95 2.99
2 2.99 5.98 0.23 3.53 4.85
1 4.77 4.77 0.23 3.53 3.87
1 4.55 4.55 0.23 3.53 3.69
1 2.38 2.37 0.23 3.53 1.92
brick pillar 5 0.46 2.30 0.46 2.95 3.12
5 0.23 1.15 0.23 3.53 0.93
window wall w1 5 2.00 10.00 0.23 0.90 2.07
w2 3 2.00 6.00 0.23 1.80 2.48
v 1 2.00 2.00 0.23 1.80 0.83
w4 1 0.60 0.60 0.23 0.90 0.12
lift area 2 3.37 6.74 0.23 3.53 5.46
2 2.20 4.40 0.23 3.53 3.57
stair 2 6.61 13.22 0.23 2.20 6.69
stair 1 6.61 6.61 0.10 0.90 0.59
future expantion wall
first step 1 1.78 1.77 0.60 0.25 0.27
1 2.38 2.37 0.60 0.25 0.36
second step 1 1.93 1.92 0.45 0.25 0.22
1 2.38 2.38 0.45 0.25 0.27
third step up to sill level 1 2.15 2.14 0.23 1.90 0.94
1 2.38 2.38 0.23 1.90 1.04
Deduction
D9 6 0.80 4.80 -0.23 2.95 -3.26
D5 5 1.20 6.00 -0.23 2.95 -4.07
D1 3 2.00 6.00 -0.23 2.95 -4.07
D4 1 1.50 1.50 -0.23 2.95 -1.02
D2 2 2.00 4.00 -0.23 2.95 -2.71
D6 2 1.00 2.00 -0.23 2.95 -1.36
D10 1 1.80 1.80 -0.23 2.95 -1.22
W2 1 2.00 2.00 -0.23 1.05 -0.48
W3 4 1.20 4.80 -0.23 1.85 -2.04
ramp
first step long wall 2 21.00 42.00 0.60 0.24 6.05
short wall 1 5.22 5.22 0.60 0.24 0.75
second step short wall 1 5.07 5.07 0.45 0.24 0.55
second step long wall 2 20.85 41.70 0.45 0.24 4.50
third step long wall 2 20.63 41.26 0.23 0.80 7.59
third step short wall 1 5.44 5.44 0.23 0.80 1.00
third step long wall 2 20.63 41.26 0.23 0.40 3.80
previous quintity -27.76
sill lintel -10.00
Total 1008.69 m3
Brick Masonary work With ( 1:4 )
8 Extra Same as 8th previous bill running Bill 85.35 m3
Cement mortar
On block -5
staff lokers long wall 1 6.83 6.83 0.10 3.53 2.41
staff lokers short wall 3 2.17 6.51 0.10 3.53 2.29
duct wall 1 1.55 1.55 0.10 3.53 0.55
sluice and bath room main wall 1 4.80 4.80 0.10 3.53 1.69
isolation and staff room wall 1 4.79 4.79 0.10 3.53 1.69
bath room 1 2.47 2.46 0.10 3.53 0.87
duct wall 1 1.32 1.31 0.10 3.53 0.46
isolation bed room 1 3.11 3.11 0.10 3.53 1.10
delevery room wall 1 4.57 4.56 0.10 3.53 1.61
pantry room 1 2.56 2.56 0.10 3.53 0.90
toilet wall 1 2.50 2.49 0.10 3.53 0.88
Wall for leaf 0.00
near grid 17 2 3.00 5.99 0.10 3.53 2.11
near grid 16 1 5.43 5.43 0.10 3.53 1.91
near grid 15 1 3.41 3.41 0.10 3.53 1.20
near grid 16 1 5.35 5.35 0.10 3.53 1.89
near grid 15 1 2.54 2.53 0.10 3.53 0.89
near grid 14 1 3.39 3.38 0.10 3.53 1.19
near grid 13 1 1.60 1.59 0.10 3.53 0.56
Deduction
D9 5 0.80 4.00 -0.10 2.95 -1.18
D5 1 1.20 1.20 -0.10 2.95 -0.35
V2 2 1.00 2.00 -0.10 0.45 -0.09
ramp 2 7.20 14.40 0.10 0.20 0.29
ramp 2 7.20 14.40 0.10 0.20 0.29
ramp 2 7.20 14.40 0.10 0.30 0.43
previous quintity -8.65
Total 100.27 M3
9 8 R.C.C. Work
10 8.1 P.C.C. 1:1.5:3 (M 20 ) Same as 8th previous bill running Bill 1331.55 m3
Lintel
5 1.60 8.00 0.23 0.15 0.28
w3 5 1.60 8.00 0.23 0.15 0.28
d5 11 1.80 19.80 0.23 0.15 0.68
w1 3 2.70 8.10 0.23 0.15 0.28
D1 4 2.70 10.80 0.23 0.15 0.37
D9 15 1.40 21.00 0.10 0.15 0.32
D9 7 1.40 9.80 0.23 0.15 0.34
D6 16 1.60 25.60 0.23 0.15 0.88
D7 11 1.60 17.60 0.23 0.15 0.61
D8 3 1.50 4.50 0.23 0.15 0.16
D2 1 2.60 2.60 0.23 0.15 0.09
D4 2 2.10 4.20 0.23 0.15 0.14
Sill band Block - 5
pantry room 2 1.29 2.58 0.23 0.075 0.04
1 3.02 3.02 0.23 0.075 0.05
toilet 1 3.08 3.08 0.23 0.075 0.05
1 1.10 1.10 0.23 0.075 0.02
wall 8 6.61 52.84 0.23 0.075 0.91
4 6.61 26.42 0.23 0.075 0.46
1 4.57 4.57 0.23 0.075 0.08
4 6.61 26.44 0.23 0.075 0.46
2 6.61 13.22 0.23 0.075 0.23
1 9.98 9.98 0.23 0.075 0.17
1 4.52 4.52 0.23 0.075 0.08
2 1.67 3.33 0.23 0.075 0.06
1 4.41 4.40 0.23 0.075 0.08
2 2.99 5.98 0.23 0.075 0.10
1 4.77 4.77 0.23 0.075 0.08
1 4.55 4.55 0.23 0.075 0.08
1 2.38 2.37 0.23 0.075 0.04
brick pillar 5 0.46 2.30 0.46 0.075 0.08
5 0.23 1.15 0.23 0.075 0.02
window wall w1 5 2.00 10.00 0.23 0.075 0.17
w2 3 2.00 6.00 0.23 0.075 0.10
v 1 2.00 2.00 0.23 0.075 0.03
w4 1 0.60 0.60 0.23 0.075 0.01
lift area 2 3.37 6.74 0.23 0.075 0.12
2 2.20 4.40 0.23 0.075 0.08
stair 2 6.61 13.22 0.23 0.075 0.23
stair 1 6.61 6.61 0.10 0.075 0.05
future expantion wall
first step 1 1.78 1.77 0.60 0.075 0.08
1 2.38 2.37 0.60 0.075 0.11
second step 1 1.93 1.92 0.45 0.075 0.06
1 2.38 2.38 0.45 0.075 0.08
third step up to sill level 1 2.15 2.14 0.23 0.075 0.04
1 2.38 2.38 0.23 0.075 0.04
Deduction
D9 6 0.80 4.80 -0.23 0.075 -0.08
D5 5 1.20 6.00 -0.23 0.075 -0.10
D1 3 2.00 6.00 -0.23 0.075 -0.10
D4 1 1.50 1.50 -0.23 0.075 -0.03
D2 2 2.00 4.00 -0.23 0.075 -0.07
D6 2 1.00 2.00 -0.23 0.075 -0.04
D10 1 1.80 1.80 -0.23 0.075 -0.03
W2 1 2.00 2.00 -0.23 0.075 -0.04
W3 4 1.20 4.80 -0.23 0.075 -0.08
1 6.83 6.83 0.10 0.075 0.05
3 2.17 6.51 0.10 0.075 0.05
1 1.55 1.55 0.10 0.075 0.01
1 4.80 4.80 0.10 0.075 0.04
1 4.79 4.79 0.10 0.075 0.04
1 3.58 3.58 0.10 0.075 0.03
1 2.47 2.46 0.10 0.075 0.02
1 1.32 1.31 0.10 0.075 0.01
1 3.11 3.11 0.10 0.075 0.02
1 4.57 4.56 0.10 0.075 0.03
1 2.56 2.56 0.10 0.075 0.02
1 2.50 2.49 0.10 0.075 0.02
wall for leaf (Voide) 0.00
2 3.00 5.99 0.10 0.075 0.04
1 5.43 5.43 0.10 0.075 0.04
1 3.41 3.41 0.10 0.075 0.03
1 5.35 5.35 0.10 0.075 0.04
1 2.54 2.53 0.10 0.075 0.02
1 3.39 3.38 0.10 0.075 0.03
1 1.60 1.59 0.10 0.075 0.01
deduction
D9 5 0.80 4.00 -0.10 0.075 -0.03
D5 1 1.20 1.20 -0.10 0.075 -0.01
V2 2 1.00 2.00 -0.10 0.075 -0.02
sunshed
W1 W2 2 5.95 11.90 0.75 0.075 0.67
W1 W1 15 5.95 89.25 0.75 0.075 5.02
W3 W4 18 3.75 67.50 0.75 0.075 3.80
W2 W2 2 5.95 11.90 0.75 0.075 0.67
W2 W4 1 4.55 4.55 0.75 0.075 0.26
W1 V 1 5.95 5.95 0.75 0.075 0.33
W1 W1 2 4.65 9.30 0.75 0.075 0.52
W1 W2 2 4.65 9.30 0.75 0.075 0.52
W2 W4 1 3.25 3.25 0.75 0.075 0.18
W1 V 1 4.65 4.65 0.75 0.075 0.26
Ramp 1 20.30 20.30 5.67 0.15 17.27
Lift
Base or mat 1 3.45 3.45 2.60 0.15 1.35
2 3.45 6.90 0.15 1.60 1.66
1 2.30 2.30 0.15 1.60 0.55
Beam 2 9.20 18.40 0.23 0.35 1.48
Total 1374.68 m3
11 8.2 P. C.C 1:1:2 ( M 25 ) Same as 8th previous bill running Bill 618.653 M3
12 8.3 Reinforcement works Same as 8th previous bill running Bill 302507.13 Kg
Lintel
12mm dia bars 20 1.60 32.00 0.890 28.48
w3 20 1.60 32.00 0.890 28.48
d5 44 1.80 79.20 0.890 70.48
w1 12 2.70 32.40 0.890 28.83
D1 16 2.70 43.20 0.890 38.44
D9 60 1.40 84.00 0.890 74.76
D9 28 1.40 39.20 0.890 34.88
D6 64 1.60 102.40 0.890 91.13
D7 44 1.60 70.40 0.890 62.65
D8 12 1.50 18.00 0.890 16.02
D2 4 2.60 10.40 0.890 9.25
D4 8 2.10 16.80 0.890 14.95
Stirrups 8 mm dia bars
59 0.79 46.61 0.395 18.41
w3 59 0.79 46.61 0.395 18.41
d5 143 0.79 112.97 0.395 44.62
w1 57 0.79 45.03 0.395 17.78
D1 76 0.79 60.04 0.395 23.71
D9 155 0.59 91.45 0.395 36.12
D9 73 0.91 66.43 0.395 26.23
D6 187 0.91 170.17 0.395 67.21
D7 129 0.91 117.39 0.395 46.36
D8 44 0.91 40.04 0.395 15.81
D2 19 0.91 17.29 0.395 6.82
D4 30 0.91 27.30 0.395 10.78
sill band 10 mm dia bars
pantry room 4 1.29 5.16 0.62 3.19
2 3.02 6.04 0.62 3.74
toilet 2 3.08 6.16 0.62 3.81
2 1.10 2.20 0.62 1.36
wall 16 6.61 105.68 0.62 65.52
8 6.61 52.84 0.62 32.76
2 4.57 9.14 0.62 5.66
8 6.61 52.88 0.62 32.78
4 6.61 26.44 0.62 16.39
2 9.98 19.96 0.62 12.37
2 4.52 9.04 0.62 5.60
4 1.67 6.66 0.62 4.12
2 4.41 8.81 0.62 5.46
4 2.99 11.96 0.62 7.41
2 4.77 9.54 0.62 5.91
2 4.55 9.10 0.62 5.64
2 2.38 4.75 0.62 2.94
brick pillar 10 0.46 4.60 0.62 2.85
10 0.23 2.30 0.62 1.42
window wall w1 10 2.00 20.00 0.62 12.40
w2 6 2.00 12.00 0.62 7.44
v 2 2.00 4.00 0.62 2.48
w4 2 0.60 1.20 0.62 0.74
lift area 4 3.37 13.48 0.62 8.35
4 2.20 8.80 0.62 5.45
stair 4 6.61 26.44 0.62 16.39
stair 2 6.61 13.22 0.62 8.19
future expantion wall
first step 2 1.78 3.55 0.62 2.20
2 2.38 4.75 0.62 2.94
second step 2 1.93 3.85 0.62 2.38
2 2.38 4.76 0.62 2.95
third step up to sill level 2 2.15 4.29 0.62 2.65
2 2.38 4.76 0.62 2.95
Deduction
D9 12 0.80 9.60 0.62 5.95
D5 10 1.20 12.00 0.62 7.44
D1 6 2.00 12.00 0.62 7.44
D4 2 1.50 3.00 0.62 1.86
D2 4 2.00 8.00 0.62 4.96
D6 4 1.00 4.00 0.62 2.48
D10 2 1.80 3.60 0.62 2.23
W2 2 2.00 4.00 0.62 2.48
W3 8 1.20 9.60 0.62 5.95
Lift zone
Mat for lift base/foundation (double net)
12mm dia ro @ 150mm C/C both way 48 2.75 132.00 0.89 117.48
distrubation 12mm dia @ 150 C/C both way 38 3.60 136.80 0.89 121.75
Vertical bar share wall 96 1.94 186.24 0.89 165.75
Vertical bar for share wall 38 1.94 73.72 0.89 65.61
Stirrups 8mm dia @ 150mm C/C 22 9.65 212.30 0.395 83.85
Beam
4no bar 4 9.65 38.60 0.89 34.35
Sitrrups @ 150mm c/c 66 1.00 66.00 0.395 26.07
Beam at sill level
4no bar 4 1.00 4.00 0.89 3.56
Sitrrups @ 150mm c/c 66 1.00 66.00 0.395 26.07
Total 309496.12 kg
13 8.4 Form works Same as 8th previous bill running Bill 9547.64 m2
lintel
side 5 1.60 8.00 0.3 2.40
w3 5 1.60 8.00 0.3 2.40
d5 11 1.80 19.80 0.3 5.94
w1 3 2.70 8.10 0.3 2.43
D1 4 2.70 10.80 0.3 3.24
D9 15 1.40 21.00 0.3 6.30
D9 7 1.40 9.80 0.3 2.94
D6 16 1.60 25.60 0.3 7.68
D7 11 1.60 17.60 0.3 5.28
D8 3 1.50 4.50 0.3 1.35
D2 1 2.60 2.60 0.3 0.78
D4 2 2.10 4.20 0.3 1.26
base 1 1.60 1.60 0.23 0.36
w3 1 1.60 1.60 0.23 0.36
d5 1.2 1.80 2.16 0.23 0.49
w1 2.1 2.70 5.67 0.23 1.30
D1 2.1 2.70 5.67 0.23 1.30
D9 0.8 1.40 1.12 0.10 0.11
D9 0.8 1.40 1.12 0.23 0.25
D6 1 1.60 1.60 0.23 0.36
D7 1 1.60 1.60 0.23 0.36
D8 0.9 1.50 1.35 0.23 0.31
D2 2 2.60 5.20 0.23 1.19
D4 2 2.10 4.20 0.23 0.96
sill band 0.00
pantry room 2 1.29 2.58 0.20 0.51
1 3.02 3.02 0.20 0.60
toilet 1 3.08 3.08 0.20 0.61
1 1.10 1.10 0.20 0.22
wall 8 6.61 52.84 0.20 10.56
4 6.61 26.42 0.20 5.28
1 4.57 4.57 0.20 0.91
4 6.61 26.44 0.20 5.28
2 6.61 13.22 0.20 2.64
1 9.98 9.98 0.20 1.99
1 4.52 4.52 0.20 0.90
2 1.67 3.33 0.20 0.66
1 4.41 4.40 0.20 0.88
2 2.99 5.98 0.20 1.19
1 4.77 4.77 0.20 0.95
1 4.55 4.55 0.20 0.91
1 2.38 2.37 0.20 0.47
brick pillar 5 0.46 2.30 0.20 0.46
5 0.23 1.15 0.20 0.23
window wall w1 5 2.00 10.00 0.20 2.00
w2 3 2.00 6.00 0.20 1.20
v 1 2.00 2.00 0.20 0.40
w4 1 0.60 0.60 0.20 0.12
lift area 2 3.37 6.74 0.20 1.34
2 2.20 4.40 0.20 0.88
stair 2 6.61 13.22 0.20 2.64
stair 1 6.61 6.61 0.20 1.32
future expantion wall
first step 1 1.78 1.77 0.20 0.35
1 2.38 2.37 0.20 0.47
second step 1 1.93 1.92 0.20 0.38
1 2.38 2.38 0.20 0.47
third step up to sill level 1 2.15 2.14 0.20 0.42
1 2.38 2.38 0.20 0.47
deduction
D9 6 0.80 4.80 -0.20 -0.96
D5 5 1.20 6.00 -0.20 -1.20
D1 3 2.00 6.00 -0.20 -1.20
D4 1 1.50 1.50 -0.20 -0.30
D2 2 2.00 4.00 -0.20 -0.80
D6 2 1.00 2.00 -0.20 -0.40
D10 1 1.80 1.80 -0.20 -0.36
W2 1 2.00 2.00 -0.20 -0.40
W3 4 1.20 4.80 -0.20 -0.96
1 6.83 6.83 0.20 1.36
3 2.17 6.51 0.20 1.30
1 1.55 1.55 0.20 0.31
1 4.80 4.80 0.20 0.96
1 4.79 4.79 0.20 0.95
1 3.58 3.58 0.20 0.71
1 2.47 2.46 0.20 0.49
1 1.32 1.31 0.20 0.26
1 3.11 3.11 0.20 0.62
1 4.57 4.56 0.20 0.91
1 2.56 2.56 0.20 0.51
1 2.50 2.49 0.20 0.49
wall for leaf
2 3.00 5.99 0.20 1.19
1 5.43 5.43 0.20 1.08
1 3.41 3.41 0.20 0.68
1 5.35 5.35 0.20 1.07
1 2.54 2.53 0.20 0.50
1 3.39 3.38 0.20 0.67
1 1.60 1.59 0.20 0.31
deduction
D9 5 0.80 4.00 -0.20 -0.80
D5 1 1.20 1.20 -0.20 -0.24
V2 2 1.00 2.00 -0.20 -0.40
for sun shed
W1 W2 2 4.65 9.30 0.65 6.04
W1 W1 15 4.65 69.75 0.65 45.33
W3 W4 18 2.45 44.10 0.65 28.66
W2 W2 2 4.65 9.30 0.65 6.04
W2 W4 1 3.25 3.25 0.65 2.11
W1 V 1 4.65 4.65 0.65 3.02
W1 W2 2 11.90 23.80 0.75 17.85
W1 W1 15 11.90 178.50 0.75 133.87
W3 W4 18 7.50 135.00 0.75 101.25
W2 W2 2 11.90 23.80 0.75 17.85
W2 W4 1 9.10 9.10 0.75 6.82
W1 V 1 11.90 11.90 0.75 8.92
wall 2 1.78 3.55 0.075 0.26
2 2.38 4.75 0.075 0.35
ramp
first step long wall 4 21.00 84.00 0.075 6.30
short wall 2 5.22 10.44 0.075 0.78
Left
Outer side 1 9.50 9.50 1.600 15.20
Inner side 1 8.60 8.60 1.600 13.76
Beam 2 9.65 19.30 0.500 9.65
Total 10075.11 m2
14 10 12.5 mm Thick Wall Plaster in 1:4 Same as 8th previous bill running Bill 3798.63 m2
Block 1
trratment room 1 12.64 12.64 3.53 44.55
consultartion examination room 1 15.96 15.96 3.53 56.25
consultartion examination room 1 21.52 21.52 3.53 75.85
dressing tr 1 17.44 17.44 3.53 61.47
immunization room 1 17.44 17.44 3.53 61.47
consultartion examination room 1 21.14 21.14 3.53 74.51
trratment room 1 21.24 21.24 3.53 74.87
reseption and registration room 1 11.30 11.30 3.53 39.83
clinical room 1 12.36 12.36 3.53 43.56
consultartion examination room 1 11.66 11.66 3.53 41.10
dental hy 1 12.54 12.54 3.53 44.20
treatment and minor sursary 1 17.68 17.68 3.53 62.32
consultartion examination room 1 17.70 17.70 3.53 62.39
cariography 1 17.74 17.74 3.53 62.53
consultartion examination room 1 17.48 17.48 3.53 61.61
consultation treatment room 1 17.64 17.64 3.53 62.18
toilet 2 13.54 27.08 3.53 95.45
room 1 10.30 10.30 3.53 36.30
family planing clinic 1 7.18 7.18 3.53 25.30
15 11 12.5 mm Thick Ceiling Plaster in 1:3 Plaster Same as 8th previous bill running Bill 1884.13 m2
block 1
trratment room 1 3.57 3.57 2.75 9.81
consultartion examination room 1 3.60 3.60 4.38 15.76
consultartion examination room 1 7.26 7.26 3.50 25.41
dressing tr 1 5.42 5.42 3.30 17.88
immunization room 1 5.42 5.42 3.30 17.88
consultartion examination room 1 3.37 3.37 7.20 24.26
trratment room 1 7.20 7.20 3.42 24.62
reseption and registration room 1 2.28 2.28 3.37 7.68
clinical room 1 2.78 2.78 3.40 9.45
consultartion examination room 1 3.55 3.55 2.28 8.09
dental hy 1 3.55 3.55 2.72 9.65
treatment and minor sursary 1 5.50 5.50 3.34 18.37
consultartion examination room 1 5.47 5.47 3.38 18.48
cariography 1 5.50 5.50 3.37 18.53
consultartion examination room 1 5.48 5.48 3.26 17.86
consultation treatment room 1 5.42 5.42 3.40 18.42
toilet 2 4.42 8.84 2.35 20.77
room 1 3.05 3.05 2.10 6.40
family planing clinic 1 7.18 7.18 7.18 51.55
16 16.1 Sand Filling Work Same as 8th previous bill running Bill 244.47
Block 5
room 4 6.85 27.40 6.85 0.15 28.15
passage 1 16.86 16.85 2.50 0.15 6.32
down level
room 6 6.85 41.10 6.85 0.15 42.23
passage 1 23.03 23.02 2.50 0.15 8.63
passage 1 13.70 13.70 2.50 0.15 5.14
total 334.94 M3
### Moisac flooring work
Block-1
Treatment room 1 3.57 3.57 2.75 9.81
Consultartion examination room 1 3.60 3.60 4.38 15.76
Consultartion examination room 1 7.26 7.26 3.50 25.41
Dressing tr 1 5.42 5.42 3.30 17.88
Immunization room 1 5.42 5.42 3.30 17.88
Consultartion examination room 1 3.37 3.37 7.20 24.26
Treatment room 1 7.20 7.20 3.42 24.62
Reseption and registration room 1 2.28 2.28 3.37 7.68
Clinical room 1 2.78 2.78 3.40 9.45
Consultartion examination room 1 3.55 3.55 2.28 8.09
Dental hy 1 3.55 3.55 2.72 9.65
Treatment and minor sursary 1 5.50 5.50 3.34 18.37
Consultartion examination room 1 5.47 5.47 3.38 18.48
Cariography 1 5.50 5.50 3.37 18.53
Consultartion examination room 1 5.48 5.48 3.26 17.86
Consultation treatment room 1 5.42 5.42 3.40 18.42
Block-2 0.00 0.00
sample collection room 1 2.90 2.90 3.20 9.28
open 1 4.65 4.65 3.96 18.41
open 1 5.70 5.70 4.72 26.90
1 6.20 6.20 4.57 28.33
dedution -2 0.60 -1.20 0.60 -0.72
lab 1 3.36 3.36 6.93 23.28
lab 1 3.40 3.40 6.93 23.56
x ray room 1 5.90 5.90 4.16 24.54
cariography 1 2.75 2.75 1.45 3.98
dark room 1 2.75 2.75 1.70 4.67
control room 1 2.75 2.75 1.30 3.57
staff room 1 4.73 4.73 3.25 15.37
emergency block 1 13.15 13.15 6.90 90.73
1 5.90 5.90 3.85 22.71
1 3.85 3.85 2.50 9.62
1 4.20 4.20 2.85 11.97
room 1 3.38 3.38 3.45 11.66
room 1 3.40 3.40 3.45 11.73
sluiceroom 1 3.32 3.32 1.80 5.97
1 1.11 1.11 1.18 1.30
scrup up 1 2.84 2.84 2.15 6.10
sub 1 3.80 3.80 2.08 7.90
0pen 1 9.45 9.45 7.60 71.82
dedution -5 0.60 -3.00 0.60 -1.80
Block-3 0.00 0.00
passage 1 5.75 5.75 4.10 23.57
nurse room 1 5.40 5.40 3.47 18.73
room 1 5.42 5.42 2.42 13.11
nurse change 1 2.60 2.60 2.48 6.44
1 1.65 1.65 2.24 3.69
1 1.87 1.87 2.15 4.02
doctors change 1 2.28 2.28 2.60 5.92
1 4.40 4.40 2.60 11.44
room 1 1.46 1.46 1.96 2.86
room 1 1.48 1.48 2.15 3.18
anestic store 1 4.07 4.07 3.31 13.47
doctors wo\rk 1 4.07 4.07 3.60 14.65
passage 1 17.04 17.04 2.42 41.23
scrup 1 2.76 2.76 2.06 5.68
dedution -1 0.60 -0.60 0.60 -0.36
nurse room 1 5.40 5.40 3.47 18.73
Block -4 0.00 0.00
bed ward 1 6.96 6.96 7.20 50.11
bed ward 1 6.90 6.90 7.10 48.99
bed ward 1 7.12 7.12 7.00 49.84
1 2.82 2.82 0.27 0.76
passage 1 21.83 21.83 2.54 55.44
treatment room 1 3.60 3.60 2.76 9.93
passage 1 7.22 7.22 1.25 9.02
pantry room 1 1.72 1.72 2.48 4.26
trotley 1 2.08 2.08 2.46 5.11
store room 1 2.92 2.92 2.45 7.15
nurse room 1 2.56 2.56 5.04 12.90
doctors 1 2.76 2.76 5.05 13.93
open 1 7.14 7.14 2.06 14.70
bed room 1 7.08 7.08 4.20 29.73
CSSD 1 6.81 6.81 4.40 29.96
clean sterile 1 6.92 6.92 3.20 22.14
clean sterile 1 3.75 3.75 1.96 7.35
dirty sterile 1 2.83 2.83 1.95 5.51
Block-5 0.00 0.00
open 1 4.45 4.45 2.52 11.21
auto clean room 1 4.55 4.55 2.37 10.78
delevery room 1 4.78 4.78 3.45 16.49
labor room 1 3.74 3.74 4.78 17.87
sluiceroom 1 3.48 3.48 2.23 7.76
Total 1320.33 M2
### Kota stone flooring
block 1
family planing clinic 1 7.18 7.18 7.18 51.55
Slab
Stair case slab along beam1 1 6.60 6.60 2.00 0.20
slab along beam2 1 6.55 6.54 2.00 0.20
slab along beam2 1 3.08 3.08 2.00 0.20
slab projection 1 2.76 2.76 0.52 0.20
Riser 1&2 25 2.00 50.00 0.02
Riser 3 10 1.00 10.00 0.02
slab pane 1 top 1 25.02 25.02 17.89 0.13
deduction for lift 1 2.59 2.59 3.37 -0.13
deduction 1 6.5 6.50 -7.20 0.13
Slab pane 2 down 1 17.86 17.85 15.00 0.13
5 1.00 5.00 0.10 0.10
Total
11 8.2 P. C.C 1:1:2 ( M 25 ) Same as 7th previous bill running Bill
primary beam
grid 14 1 15.49 15.48 0.35 0.75
grid 13 1 15.49 15.48 0.35 0.53
grid 11 1 15.49 15.48 0.35 0.53
grid 10 1 15.49 15.48 0.35 0.53
grid 9 1 15.49 15.48 0.35 0.53
grid L 1 22.03 22.02 0.35 0.53
grid m 1 22.03 22.02 0.35 0.53
grid n 1 22.03 22.02 0.35 0.53
grid 0 1 22.03 22.02 0.35 0.53
Secondary beam 0.00
acros grid 13 sidses 1 16.09 16.08 0.30 0.48
acros grid 11 sidses 1 13.2 13.20 0.30 0.48
acros grid 9 sidses 1 6.9 6.90 0.30 0.48
acros grid Msidses 1 15.43 15.42 0.30 0.48
Stair case Beam 0.00
Beam 1 1 6.95 6.95 0.35 0.45
Beam 2 1 6.90 6.89 0.35 0.45
Beam 3 1 7.08 7.08 0.35 0.45
primary beam 0.00
grid 15 1 13.20 13.20 0.35 0.53
grid 16 1 13.20 13.20 0.35 0.53
grid 17 1 13.20 13.20 0.35 0.53
grid L 1 15.46 15.45 0.35 0.53
grid m 1 15.46 15.45 0.35 0.53
grid n 1 15.46 15.45 0.35 0.53
Secondary beam 0.00
acros grid 16 sidses 1 13.70 13.70 0.30 0.48
acros grid 17 sidses 1 13.70 13.70 0.30 0.48
acros grid Msidses 1 15.01 15.00 0.30 0.48
acros grid Nsidses 1 15.01 15.00 0.30 0.48
Pillar 31 0.6 18.60 0.60 1.01
Total
12 8.3 Reinforcement works Same as 7th previous bill running Bill
Reinforcement Works of block 5
Staircase Beam -3
4 no. 20 mmdia bar 4 5.60 22.40 2.49
4 no. 20 mmdia bar 4 10.42 41.68 2.49
4 no. 20 mmdia bar 4 10.05 40.20 2.49
4 no. 20 mmdia bar 4 6.50 26.00 2.49
Lap length 10 1.30 13.00 2.49
Staircase Beam -2 0.00
4 no. 20 mmdia bar 4 9.85 39.40 2.49
4 no. 20 mmdia bar 4 7.20 28.80 2.49
4 no. 20 mmdia bar 4 5.95 23.80 2.49
4 no. 20 mmdia bar 4 9.85 39.40 2.49
Lap length 10 1.20 12.00 2.49
Staircase Beam -1 0.00
4 no. 20 mmdia bar 4 10.40 41.60 2.49
4 no. 20 mmdia bar 4 9.70 38.80 2.49
4 no. 20 mmdia bar 4 6.50 26.00 2.49
4 no. 20 mmdia bar 4 5.63 22.52 2.49
Lap length 10 1.20 12.00 2.49
Stirrups 0.00
large 212 1.95 413.40 0.39
Small 212 1.61 341.32 0.39
stair case slab 0.00
main bar(along beam 1) 29 8.70 252.30 0.89
distribution 84 2.45 205.80 0.89
cut piece 0.00
14 3.45 48.30 0.89
28 2.62 73.36 0.89
12 1.6 19.20 0.89
8 1.6 12.80 0.89
12 1.60 19.20 0.89
main bar(along beam 2) 28 9.10 254.80 0.89
distribution 88 2.45 215.60 0.89
From block -2 Stair 10 mm dia main bar 13 3.20 41.60 0.89
cut piece 0.00
14 3.40 47.60 0.89
14 3.60 50.40 0.89
14 2.30 32.20 0.89
main bar(along beam 3) 50 2.15 107.50 0.89
distribution 26 8.50 221.00 0.89
27 3.5 94.50 0.89
Stair case chair 32 0.62 19.84 0.61
primary beam 0.00
grid 14 for 0.00
20 dia 8nos 8 19.16 153.24 2.49
Lapping 8 1.20 9.60 2.49
2no 12mm sides bar 2 17.86 35.71 0.89
cut piece 20mm dia.2no. Bar 2 22.10 44.20 2.49
grid 13 for 20dia 8 nos. 8 19.16 153.24 2.49
Lapping 8 1.20 9.60 2.49
cut piece 20mm dia.4no. Bar 4 22.10 88.40 2.49
grid 11 for 20dia 8 nos. 8 19.16 153.24 2.49
Lapping 8 1.20 9.60 2.49
cut piece 20mm dia.2no. Bar 2 22.10 44.20 2.49
grid 10 for 20dia 8 nos. 8 19.16 153.24 2.49
Lapping 8 1.20 9.60 2.49
cut piece 20mm dia.2no. Bar 2 22.10 44.20 2.49
grid 9 for 20dia 8 nos. 8 22.76 182.04 2.49
Lapping 16 1.20 19.20 2.49
cut piece 20mm dia.2no. Bar 2 25.70 51.40 2.49
grid L 20 dia 8 nos 8 26.32 210.56 2.49
Lapping 0.00
cut piece 20mm dia.2no. Bar 2 30.40 60.80 2.49
grid M 20 dia 8 nos 8 28.72 229.76 2.49
Lapping 8 1.20 9.60 2.49
cut piece 20mm dia.4no. Bar 4 30.40 121.60 2.49
grid N 20 dia 8 nos 8 28.72 229.76 2.49
Lapping 16 1.20 19.20 2.49
cut piece 20mm dia.2no. Bar 2 30.40 60.80 2.49
grid O 20 dia 8 nos 8 26.32 210.56 2.49
Lapping 16 1.20 19.20 2.49
cut piece 20mm dia.2no. Bar 2 30.40 60.80 2.49
Stiirups 0.00
long 1196 1.95 2332.20 0.39
short 1196 1.61 1925.56 0.39
long 154 2.35 361.90 0.39
short 154 2.01 309.54 0.39
Secondary beam 0.00
acros grid 13 20 dia 8nos 8 19.66 157.24 2.49
Lapping 8 1.20 9.60 2.49
2no 12mm sides bar 2 17.86 35.71 0.89
acros grid 11 20 dia 8nos 8 16.80 134.40 2.49
Lapping 8 1.20 9.60 2.49
2no 12mm sides bar 2 15.00 30.00 0.89
acros grid 9 20 dia 8nos 8 9.50 76.00 2.49
Lapping 8 1.20 9.60 2.49
2no 12mm sides bar 2 7.80 15.60 0.89
acros grid M 20 dia 8nos 8 19.62 156.96 2.49
Lapping 8 1.20 9.60 2.49
2no 12mm sides bar 2 17.82 35.64 0.89
acros grid N 20 dia 8nos 8 11.45 91.60 2.49
Lapping 8 1.20 9.60 2.49
2no 12mm sides bar 2 10.05 20.10 0.89
Stirrups 0.00
long 750 1.75 1312.50 0.39
short 750 1.47 1102.50 0.39
slab 0.00
10 mm Dia. main bar 58 24.43 1416.65 0.61
10 mm Dia. main bar 78 18.02 1405.56 0.61
8mm Dia. Distribution bar 55.2 8.00 441.60 0.39
8mm Dia. Distribution bar 133 17.49 2325.50 0.39
cut piece 0.00
10 mm Dia. main bar 29 24.43 708.32 0.61
10 mm Dia. main bar 39 18.02 702.78 0.61
10 mm Dia. main bar 108 3.05 329.40 0.61
8mm Dia. Distribution bar 36 7.9 284.40 0.61
8mm Dia. Distribution bar 27.6 8.00 220.80 0.39
8mm Dia. Distribution bar 66.5 17.49 1162.75 0.39
8mm Dia. Distribution bar 53 1.20 63.60 0.39
8mm Dia. Distribution bar 79 1.80 142.20 0.39
8mm Dia. Distribution bar 79 2.50 197.50 0.39
8mm Dia. Distribution bar 27.6 8.00 220.80 0.39
Lap length 10 dia Distribution bar 204 0.60 122.40 0.61
Lap length 8mm dia Distribution bar 282.3 0.46 129.85 0.39
Lapping on pillar 0.00
C5 25mmdia 12no. 24 4.50 108.00 3.86
C3 25mm dia .12no. 96 4.50 432.00 3.86
C2 25mm dia.12 no 48 4.50 216.00 3.86
C1 25mm dia. 4no 8 4.50 36.00 3.86
C1 20mm dia.4no 16 4.20 67.20 2.49
Pillars Stirrups 0.00
large 100 2.25 225.00 0.39
small 200 1.75 350.00 0.39
20mm dia. pin rods 80 0.23 18.40 2.49
cantilever beam 0.00
8 no. 20 mmdia bar 8 4.56 36.44 2.49
Stirrups large 25 1.95 48.75 0.39
small 100 1.65 165.00 0.39
Chair rods for slab 150 0.80 120.00 0.61
Total
F/Y-066 - 067
h. Bill )
Quantity Unit
3799.225
2533.707 m3
3185.337 m3
516.920 m3
104.041 m3
155.540 m3
857.54 m3
9.74
-1.33
1.60
1.40
1.45
9.74
0.66
1.17
0.27
0.09
2.66
0.18
0.16
885.30 m3
76.70 m3
4.05
4.59
85.35 m3
1240.97 m3
2.64
2.62
1.23
0.29
1.12
0.22
55.94
-1.14
-5.85
33.47
0.05
1331.55 m3
541.143
4.04
2.84
2.84
2.84
2.84
4.05
4.05
4.05
4.05
0.00
2.29
1.88
0.98
2.20
0.00
1.09
1.09
1.12
0.00
2.43
2.43
2.43
2.84
2.84
2.84
0.00
1.97
1.97
2.16
2.16
11.22
618.65 m3
280401.93 Kg
55.77
103.78
100.09
64.74
32.37
98.10
71.71
59.26
98.10
29.88
103.58
96.61
64.74
56.07
29.88
161.22
133.11
224.26
182.93
42.93
65.20
17.06
11.37
17.06
226.48
191.64
36.97
0.00
42.31
44.80
28.62
95.55
196.44
84.00
12.10
381.56
23.90
31.78
110.05
381.56
23.90
220.11
381.56
23.90
110.05
381.56
23.90
110.05
453.27
47.80
127.98
524.29
151.39
572.10
23.90
302.78
572.10
47.80
151.39
524.29
47.80
151.39
0.00
909.55
750.96
141.14
120.72
0.00
391.52
23.90
31.78
334.65
23.90
26.70
189.24
23.90
13.88
390.83
23.90
31.71
228.08
23.90
17.88
511.87
429.97
0.00
864.15
857.39
172.22
906.94
432.07
428.69
200.93
173.48
86.11
453.47
24.80
55.45
77.02
86.11
74.66
50.64
416.66
1666.66
833.33
138.88
167.32
0.00
87.75
136.50
45.81
90.73
19.01
64.35
73.20
302507.13 kg
8816.08 m2
5.41
5.41
5.41
5.41
5.41
23.07
16.25
16.25
16.25
16.25
7.70
7.70
7.70
7.70
23.12
23.12
23.12
23.12
0.00
15.28
15.28
12.54
6.55
21.77
15.22
0.00
89.73
85.80
33.83
42.90
58.35
5.23
0.00
11.12
11.02
8.85
13.20
13.08
4.46
1.43
7.50
2.70
7.72
9.60
9547.64 m2
2425.58 m2
57.72
98.45
14.24
-15.60
-4.68
-4.68
9.75
8.32
68.15
-5.70
-4.20
98.45
-7.80
-11.70
-4.68
14.24
10.72
8.06
7.34
196.91
130.24
-23.40
-4.20
-2.34
-1.17
-11.40
24.04
2.53
5.07
8.90
11.50
14.14
0.00
135.42
130.24
139.41
-62.40
-1.28
-28.50
-1.95
22.90
16.35
32.56
164.28
131.86
-3.90
-4.20
-21.06
-8.19
-11.40
24.42
17.62
13.65
3798.63 m2
1884.13 m2
244.47 m2
Department of Urban Development And Building Construction
DIVISION OFFICE, Surkhet
A CIVIL WORKS
8 Extra Brick Masonary work With ( 1:4 ) Cement mortar m3 85.35 6778.67
9 8 R.C.C. Works
F/Y-066 - 067
Amount
379922.50
506741.40
191120.22
1292292.50
699930.00
879570.64
4051668.25
578532.36
8694641.62
5287859.39
18304706.43
2988411.32
455835.60
263778.20
317811.00
44892821.43
zx/L ljsf; tyf ejg lgdf{0f ljefu, l8lehg sfof{no, ;'v]{t
cfO{6d 5}7f}+
s||=;+= sfdsf] laj/0f PsfO{ /lgË
g+== l;d]G6 -Jofu_
lansf]
kl/df0f nfu]sf]
ACIVIL WORKS
1 4 150mm thick stone soling with sand m3 - -
0.22 mt /
2 5 75mm thick lean concrete (1:3:6) in foundatio m3 0.00 0.00
m3
0.32 mt /
3 6 P.C.C. (1:2:4) Work m3 0.00
m4
0.07 mt /
4 7 Brick Masonary work ( 1:6 ) m3 27.56 38.58
m3
5 Extra Brick Masonary work With ( 1:4 ) Cement mor m3 8.65 New rate of 2065/066
6 8 R.C.C. Works
0.40 mt /
7 8.1 P.C.C. for R.C.C(1:1.5:3) M 20 m3 90.59 724.68
m3
0.61 mt /
8 8.2 P.C.C. for R.C.C(1:1:2) M 25 m3 77.51 945.62
m3
hDdf ?= cIf]?kLM– sf] r]s g+= af6 k|fKt ePsf] egL ;xL ug]{
g sfof{no, ;'v]{t
0.47/m3 0.00 - - - -
0.445/m4 0.00
- - 0.425/m3 38.499 - - - -
- - 0.425/m3 32.942 - - - - - -
1050kg/1
- - - - - - - - 23210.460
000kg
10 kg per
- - - - - - 221.052
1000 kg
1.46/m3 20.047
1.28/m3 0.000
1.10/m3 0.000
15433.600 99.755 0.000 221.052 23210.460
2.05 450.00 130.00 34.00 14.40
31638.87 44889.77 0.00 7515.76 334230.62
Rs
=================
O{lGhgLo/
s}lkmot
701410.96
701410.96
=================
O{lGhgLo/
zx/L ljsf; tyf ejg lgdf{0f ljefu, l8lehg sfof{no, ;'v]{t
sfo{ ;DkGg k|ltj]bg
sfof{nosf] gfdM– lhNnf kz' ;]jf sfof{no, ;'v]{t
of]hgfsf] gfdM– 8fS6/ Sjf6/ dd{t ;'wf/ sfo{, lhNnf kz' ;]jf sfof{no , ;'v]{t
:yn M– jL/]Gb|gu/,;'v]{t
Oli6d]6sf] s"n c+sM– $@,($$.)@
vr{ ePsf] s"n c+s M– $@,!$).))
Oli6d]]6 adf]lhdsf]
l;=g+= sfdsf] laj/0f PsfO{
kl/df0f b/ hDdf d"No
1 12.5 mm Thick Cement sand Plaster with 1:4 ratio m2 65.26 119.29 7784.86
3 mm cement Punning Work m2 35.23 89.38 3148.85
Boulder Stone Soling Work m2 489.86 50.17 24576.27
Two Coat Enemal Paintig work over Primer m2 55.61 97.71 5434.04
2 #NAME? job 1.00 L.S. 1000.00
3 Site Clearance Before and after Construction job 1.00 L.S. 1000.00
TOTAL AMOUNT Rs. 42944.02
VAT 13 % Rs. 5582.72
GRAND TOTAL AMOUNT WITH VAT Rs. 48526.74
804.02
============ =================
of]hgf k|d'v
Department of Urban Development And Building Construction
DIVISION OFFICE, Surkhet
F/Y-066 - 067
Name of work :- 50 Bed Hospital Construction Work
Place :- Birendranagar - 3 , Kalagaon , Surkhet
A CIVIL WORKS
8 Extra Brick Masonary work With ( 1:4 ) Cement mor m3 76.70 6778.67 519903.65
9 8 R.C.C. Works
1 1.2 Earth work in Excavation in site Development Same as previous bill running Bill 3799.225
2 2 Earth work excavation in BM Soil on Foundation Same as Previous running Bill 2533.707 m3
3 3 Earth filling Work Same as Previous running Bill 3185.337 m3
4 4 150 mm thick stone soling in sand Same as Previous running Bill 339.004 m3
Block 2
1 19.53 19.52 15.10 0.15 44.20
1 24.86 24.86 15.89 0.15 59.25
1 6.33 6.32 6.85 0.15 6.49
1 19.45 19.45 2.70 0.15 7.88
Block 4 1 24.86 24.86 16.12 0.15 60.09
Total 516.92
5 5 Lean Concrete Base (1:3:6) Same previous running Bill 104.041 m3
6 6 P.C.C. (1:2:4) Work Same previous running Bill 66.580 m3
0.00
deduction sill band of block 4 -2 1.50 -3.00 0.10 0.10 -0.03
-1 3.03 -3.03 0.10 0.10 -0.03
-1 3.00 -3.00 0.10 0.10 -0.03
-1 7.50 -7.50 0.10 0.10 -0.08
-1 6.00 -6.00 0.10 0.10 -0.06
-1 6.14 -6.14 0.10 0.10 -0.06
-1 4.00 -4.00 0.10 0.10 -0.04
-1 3.90 -3.90 0.10 0.10 -0.04
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Grid 15
Top and bottom 20mm dia bar 8 no 8 17.81 142.48 2.46 350.50
Top end cut piece 20mm dia 4 3.60 14.40 2.46 35.42
Top middle cut piece 20mm dia 4 3.60 14.40 2.46 35.42
End top cut piece 20mm dia 4 2.00 8.00 2.46 19.68
Secondary beam between grid 15 - 16
Top and bottom 20mm dia bar 8 no 8 14.93 119.40 2.46 293.72
Cut piece
end top 20mm dia 4 2.40 9.60 2.46 23.61
Cut piece
end top 20mm dia 2 3.50 7.00 2.46 17.22
Cut piece
end top 20mm dia 4 5.40 21.60 2.46 53.13
Cut piece
end top 20mm dia 2 1.40 2.80 2.46 6.88
Slab
Bottom bar (panel 1)
Main bar 10mm dia 110 14.93 1641.75 0.62 1012.95
Duct bar
16mm dia 4 4.15 16.60 1.58 26.22
Pillar
Pillar 1
32mm dia 1 3.00 3.00 6.31 18.93
Pillar 2
25mm dia 1 4.20 4.20 3.85 16.17
Pillar 3
32mm dia 1 3.00 3.00 6.31 18.93
Pillar 4
32mm dia 1 3.40 3.40 6.31 21.45
Pillar 5
32mm dia 1 3.00 3.00 6.31 18.93
Pillar 6
25mm dia 1 4.60 4.60 3.85 17.71
Pillar 7
32mm dia 2 3.50 7.00 6.31 44.17
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Pillar 8
25mm dia 3 3.70 11.10 3.85 42.73
Pillar 9
32mm dia 1 3.00 3.00 6.31 18.93
Pillar 10
25mm dia 3 3.80 11.40 3.85 43.89
Pillar 11
25mm dia 2 3.30 6.60 3.85 25.41
Pillar 12
25mm dia 2 3.00 6.00 3.85 23.10
Pillar 13
25mm dia 2 3.40 6.80 3.85 26.18
Embedded sill band rod in pillar (block 1,2,3,4,5) 10 172 1.40 240.80 0.62 149.29
mm
Total 280401.93
Total 1884.13 m2
Total 244.47
zx/L ljsf; tyf ejg lgdf{0f ljefu, l8lehg sfof{no, ;'v]{t d=n]=k=kmf=g+= !^*
1 1.2 Earth work in Excavation in site Development Same as previous bill running Bill 3799.225
2 2 Earth work excavation in BM Soil on Foundation Same as Previous running Bill 2533.707 m3
Earthfilling of block 5
Total 3185.337 m3
3 4 150 mm thick stone soling with sand Same as Previous running Bill 203.502 m3
Block 1
Block 3
Front side veranda, foundation tie beam(Soling) 1 24.00 24 0.65 0.150 2.340
Total 339.004
Block 1 & 3
Total 66.580 m3
Block 1
Total 654.420 m3
Block 1
Total 38.990 m3
8 8 R.C.C. Work
Block 2
Slab
Front side veranda, foundation tie beam (1:1:2) 1 21.00 21.00 0.35 0.35 2.57
Deduction
East - West
Total 1221.905 m3
Block 2
North - South
East - West
North - South
East - West
Total 541.143 m3
Grid J
Top and bottom 20mm dia 8 no of bars Length 8 13.84 110.68 2.46 272.27
Stirrups(8mm dia)
Cut piece
Grid L
Top and bottom 20mm dia 8 no of bars Length 8 20.34 162.68 2.46 400.19
Stirrups(8mm dia)
Top and bottom 20mm dia 8 no of bars Length 16 17.50 280.00 2.46 688.80
Stirrups(8mm dia)
Grid M
Top and bottom 20mm dia 8 no of bars Length 8 20.35 162.80 2.46 400.48
Cut piece
Grid N
Top and bottom 20mm dia 8 no of bars Length 8 20.35 162.80 2.46 400.48
Stirrups(8mm dia)
Cut piece
Grid P, Q, R, S, T
Top and bottom 20mm dia 8 no of bars Length 40 18.95 758.00 2.46 1864.68
Cut piece
Grid P
Grid Q
Grid R
Grid S
Grid T
Top and bottom 20mm dia 8 no of bars Length 24 18.95 454.80 2.46 1118.80
Stirrups(8mm dia)
Verandah - Beam
Top and bottom 6no,16mm dia bar(Ld and length) 12 4.40 52.80 1.58 83.42
Long span
Top and bottom 6no, 16mm dia bar(Ld and length) 6 23.30 139.80 1.58 220.88
Porch
Cut piece
Stirrups(8mm dia)
Cut piece
Grid 8
Top and bottom 20mm dia 8 no of bars Length 8 48.90 391.20 2.46 962.35
Stirrups(8mm dia)
Cut piece
Top and bottom 20mm dia 8 no of bars Length 8 48.88 391.04 2.46 961.95
Stirrups(8mm dia)
Grid 6,5,2
Top and bottom 20mm dia 8 no of bars Length 24 28.00 672.00 2.46 1653.12
Stirrups(8mm dia)
Cut piece
Grid 6 and 5
Grid 2
Secondary beam
Top and bottom 20mm dia 8 no of bars Length 8 28.00 224.00 2.46 551.04
Stirrups(8mm dia)
Grid 3,4,7
Top and bottom 20mm dia 8 no of bars Length 24 22.32 535.68 2.46 1317.77
Stirrups(8mm dia)
Cut piece
Grid 7
Grid 3
Grid 4
Secondary beam
Top and bottom 20mm dia 8 no of bars Length 8 22.00 176.00 2.47 434.54
Stirrups(8mm dia)
Slab Details
1st panel
Bottom bar
Overlap of main bar(10mm dia bar) 156 1.60 249.60 0.61 152.25
Overlap of distribution bar(10mm dia bar) 125 1.70 212.50 0.61 129.62
For passage
Main bars 10mm dia bars 130 5.00 650.00 0.61 396.50
Main bar (N - S)(10mm dia bar) 270 1.40 378.00 0.61 230.58
Main bar (N - S)(10mm dia bar) 420 2.10 882.00 0.61 538.02
Main bar (E - W)(10mm dia bar) 316 2.10 663.60 0.61 404.79
Distribution bar (N - S) 8mm dia bars 156 11.55 1801.80 0.39 702.70
Deduction
distribution bar(E-W) 8mm dia bar -20 0.50 -10.00 0.40 -3.95
Bottom bar
Overlap of main bar(10mm dia bar) 200 2.25 450.00 0.61 274.50
Overlap of distribution bar(10mm dia bar) 125 2.25 281.25 0.61 171.56
For passage
Main bars 10mm dia bars 169 4.76 804.44 0.61 490.70
Main bar (N - S)(10mm dia bar) 316 1.65 521.40 0.61 318.05
Main bar (N - S)(10mm dia bar) 390 2.15 838.50 0.61 511.48
Main bar (E - W)(10mm dia bar) 360 2.10 756.00 0.61 461.16
Distribution bar (N - S) 8mm dia bars with overlap 73 10.80 788.40 0.39 307.47
Bottom bar
Pillars
Pillars No. 1
Pillar no. 2
Pillar no. 3
Pillar no.4
Pillar no.5
Pillar no.6
Pillar no.8
Pillar no.9
Pillar no.12
Pillar no.13
Pillar no.14
Pillar no.16
Pillar no.17
Pillar no.18
Pillar no.19
Pillar no.20
Pillar no.21
Pillar no.22
Pillar no.23
Pillar no.24
Pillar no 25
Pillar no 26
Pillar no 27
Pillar no 28
Pillar no 30
Pillar no 31
Pillar no 33
Pillar no 34
Pillar no 35
Pillar no 36
Pillar no 37
Pillar no 38
Foundation tiebeam
Strap Beam
Upper bars and lower bars(20 mm dia) 8 22.30 178.40 2.46 438.86
Upper bars and lower bars(16 mm dia) 8 2.70 21.60 1.58 34.12
DPC
Upper bars and lower bars(20 mm dia) 8 22.30 178.40 2.58 460.27
Upper bars and lower bars(16 mm dia) 8 2.70 21.60 2.46 53.13
267272.61 kg
Block - 2
wall inner side below veranda beam 8 0.35 2.80 0.28 0.77
Bottom Formwork
Primary Beam
North - South
East - west
Secondary beam
Side formwork
Primary Beam
North - South
East - west
Secondary beam
Slab
West cantilever side, side form (N-S) 1 6.50 6.50 0.13 0.81
Deduction
Total beam `
Total 8222.87 m2
Block 1
Block 3
Total 66.58 m3
A CIVIL WORKS
6 8 R.C.C. Works
2 1.2 Earth work in Excavation in site Development Same as previous bill running Bill 3799.225
3 2 Earth work excavation in BM Soil on Foundation Same as Previous running Bill 2533.707 m3
4 4 150mm thick stone soling with sand Same as Previous running Bill 203.502 m3
7 8 R.C.C. Work
Block 4
Total 1109.71 m3
Block 4
Primary beam
PCC for RCC beam (1:1:2) M25 (P,Q,R,S,T & 10,1 22 6.60 145.200 0.350 0.525 26.680
PCC for RCC beam (1:1:2) M25 ( 13,12) 5 2.25 11.250 0.350 0.525 2.067
PCC for RCC beam (1:1:2) M25 (P,Q) 4 3.81 15.240 0.350 0.525 2.800
Secondary Beam
PCC for RCC beam (1:1:2) M25 (north - south) 6 6.86 41.160 0.300 0.475 5.865
PCC for RCC beam (1:1:2) M25 (north - south) (B4 3 2.43 7.270 0.300 0.475 1.035
PCC for RCC beam (1:1:2) M25 (East - west) 2 4.06 8.120 0.300 0.475 1.157
PCC for RCC beam (1:1:2) M25 (East - west) 6 6.55 39.300 0.300 0.475 5.600
Total 427.516 m3
Block 4
East - West
Primary beam
Upper bars and lower bars(20 mm dia) 6 27.80 166.800 2.46 410.320
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Stirrups(8mm dia)
Side bar(12mm dia) (primary and secondary) 12 26.60 319.200 0.88 280.890
stirrups(8mm dia)
North - south
Primary beam
Extra bar
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Stirrups (Secondary beam 8mm dia) 360 1.78 640.800 0.39 249.910
Main bar slab (10 mm dia) East - West 116 26.70 3097.200 0.61 1889.290
Distribution bar (10 mm dia) North - South 168 18.00 3024.000 0.61 1844.640
Cut piece(10 mm dia) East - West 100 1.30 130.000 0.61 79.300
Cut piece(10 mm dia) North - South 350 1.40 490.000 0.61 298.900
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
8mm distribution bar (North - South) 280 3.10 868.000 0.39 338.520
lapping (8mm dia) East - West 174 0.48 83.520 0.39 32.570
lapping (10mm dia) East - West 348 0.48 167.040 0.61 101.890
lapping (10mm dia) North - South 168 0.60 100.800 0.61 61.480
Primary beam overlap 20mm dia (East - West) 6 1.25 7.500 2.46 18.450
Primary beam overlap 16mm dia (East - West) 3 0.95 2.850 1.58 4.500
Primary beam overlap 20mm dia (North - South) 40 1.25 50.000 2.46 123.000
Pillar Laping
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Lapping on Block1
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Total 223224.990 kg
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Block - 4
Primary beam
Secondary Beam
Total 6630.240 m2
Lapping on Block1
pillars no 13 ,4 -20mm dia. Bar 1 12.90 12.90 3.85 49.66
Checked By :-
Estimaded By :- Approved By :-
Department of Urban Development And Building Construction
DIVISION OFFICE, Surkhet
F/Y-064 - 065
Name of work :- 50 Bed Hospital Construction Work
Place :- Birendranagar - 3 , Kalagaon , Surkhet
A CIVIL WORKS
6 8 R.C.C. Works
2 1.2 Earth work in Excavation in site Development Same as previous bill rnning Bill 3799.225
3 2 Earth work excavation in BM Soil on Foundation Same as Previous rnning Bill 2533.707 m3
4 4 150mm thick stone soling with sand Same as Previous rnning Bill 203.502 m3
7 8 R.C.C. Work
Deduction
Beams
primary beam for long way -20 6.60 -132.00 0.35 0.125 -5.78
Secondary beam for long way 10 6.90 69.00 -0.30 0.125 -2.59
primary beam for short way 12 6.60 79.20 -0.35 0.125 -3.47
Secondary beam for short way 10 6.90 69.00 -0.30 0.125 -2.59
BLOCK 3
Deduction
primary beam for long way 12 6.60 79.20 -0.35 0.125 -3.47
Secondary beam for long way 6 6.90 41.40 -0.30 0.125 -1.56
primary beam for short way 8 6.60 52.80 -0.35 0.125 -2.31
Secondary beam for short way 6 6.90 41.40 -0.30 0.125 -1.56
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Primary Beam For Long Way 20 6.60 132.00 0.35 0.65 30.03
Secondary Beam For Long Way 10 6.90 69.00 0.30 0.60 12.42
Primary Beam For Short Way 12 6.60 79.20 0.35 0.65 18.01
Secondary Beam For Short Way 10 5.90 59.00 0.30 0.60 10.62
Deduction in cross point of Secondary beam 10 0.30 3.00 -0.30 0.60 -0.54
Primary Beam For Long Way 12 6.60 79.20 0.35 0.65 18.01
Secondary Beam For Long Way 6 6.90 41.40 0.30 0.60 7.45
Primary Beam For Short Way 8 6.60 52.80 0.35 0.65 12.01
Secondary Beam For Short Way 6 6.90 41.40 0.30 0.60 7.45
Deduction in cross point of Secondary beam 6 0.30 1.80 0.30 -0.60 -0.33
Total 375.832 m3
Block 1
Primary Beams
Grid 1,7,4,3( Top and Bottom Bar fo 20 mm dia,
32 38.30 1225.60 2.46 3014.97
LD=0.85m Both way
Cut Piece Grid 1 & 7,2-20mm Dia Edge section
8 2.5 20.00 2.46 49.20
Both Way
Cut Piece Grid 4,3,4 No-20mm Dia Edge section
16 2.80 44.80 2.46 110.20
Both Way
Cut Piece Grid 4,3,2 No-20mm Dia Mid section 4 35.20 140.80 2.46 346.36
Cut Piece Grid 1 & 7,2-20mm Dia Mid section 4 36.20 144.80 2.46 356.20
Grid 1,7,4,3( Lapping Rod of 20mm Dia) 32 5.40 172.80 2.46 425.08
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Grid A,B C,E,G & I (Top & Bottom 20mm Dia
48 19.40 931.20 2.46 2290.75
Bar LD=0.9m Both Way)
Cut Piece Grid A & I, 2 No.20 mm Dia Bar
8 2.88 23.04 2.46 56.67
Edge Section Both Way
Cut Piece Grid A & I, 2 No.16 mm Dia Bar Mid
4 13.80 55.20 1.58 87.21
Section
Cut Piece Grid B,C,E,G 4 No.20 mm Dia Bar
32 2.65 84.80 2.46 208.60
Edge Section Both Way
Cut Piece Grid B,C,E,G 4 No.20 mm Dia Bar
16 16.20 259.20 2.46 637.63
Mid Section
Grid B,C,E,G & A,I, 2 No.12 mm Dia side Bar 12 18.35 220.20 0.89 195.97
Lapping rod 10 mm Dia (Distribution Bar) 144 4.08 587.52 0.62 364.26
Lapping Rod 10 mm Dia (Main Bar) 292 1.95 569.40 0.62 353.02
Sunshead Two Way (Main Bar) 296 1.30 384.80 0.62 238.57
Bender Bar For Long Way 8mm Dia Bar 60 39.30 2358.00 0.39 919.62
Top Bar Cut Piece For Long Way 10 mm Dia Bar 1728 1.40 2419.20 0.62 1499.90
Top Bar Cut Piece For Long Way 10 mm Dia
288 4.80 1382.40 0.62 857.08
Bar (For Passage)
Bender Bar For Short Way 8mm Dia Bar 144 19.75 2844.00 0.39 1109.16
Top Bar Cut Piece For Short Way 10 mm Dia Bar 1440 1.40 2016.00 0.62 1249.92
Chair Rod 8mm dia Bar 600 0.50 300.00 0.39 117.00
Block 3
Primary Beams
Grid 9,10,11,13( Top and Bottom Bar for 20 mm
32 23.90 764.80 2.46 1881.40
dia, LD=0.85m Both way)
Cut Piece Grid 9,10,11,13(20mm Dia Continuous 16 25.5 408.00 2.46 1003.68
Grid 9,10,11,13( Lapping Rod of 20mm Dia) 32 8.00 256.00 2.46 629.76
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Sunshead Two Way (Main Bar) 222 1.30 288.60 0.62 178.93
Bender Bar For Long Way 10mm Dia Bar 86 26.60 2287.60 0.62 1418.31
Cut Piece For Long Way 10 mm Dia Bar 1068 1.40 1495.20 0.62 927.02
Cut Piece For Long Way 10 mm Dia Bar (For
178 5.55 987.90 0.62 612.49
Passage)
Bender Bar For Short Way 10mm Dia Bar 96 18.65 1790.40 0.62 1110.04
Cut Piece For Short Way 10 mm Dia Bar 684 1.40 957.60 0.62 593.71
Chair Rod 8mm dia Bar 320 0.35 112.00 0.39 43.68
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
pillars no. 2
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
For Block 1
For Block 2
For Block 4
For Block 5
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Piller Lapping 20 mm Dia for Grid C1,C2,C4 165 1.25 206.25 2.46 507.37
Total 203510.910 kg
Block - 1
Primary Beam For Long Way (base) 20 6.60 132.00 0.35 46.20
Primary Beam For Long Way (Depth both Sides) 40 6.60 264.00 0.525 138.60
Secondary Beam For Long Way (base) 10 6.90 69.00 0.30 20.70
secondary Beam For Long Way (Depth both Sides) 20 6.90 138.00 0.475 65.55
Primary Beam For Short Way (base) 12 6.60 79.20 0.35 27.72
Primary Beam For Short Way (Depth both Sides) 24 6.60 158.40 0.525 83.16
Primary Beam For passage (depth both sides) 12 2.00 24.00 0.525 12.60
Secondary Beam For Short Way (base) 10 5.90 59.00 0.30 17.70
Secondary Beam For Short Way (depth both side 20 5.90 118.00 0.475 56.05
Secondary Beam For passage (depth both sides) 10 2.30 23.00 0.475 10.92
In Block 3
primary beam for long way (base) 12 6.60 79.20 0.35 27.72
primary beam for long way (depth both sides) 24 6.60 158.40 0.650 102.96
Secondary beam for long way (base) 6 6.90 41.40 0.30 12.42
Secondary beam for long way (depth both sides 12 6.90 82.80 0.600 49.68
primary beam for short way (base) 8 6.60 52.80 0.35 18.48
primary beam for short way (depth both sides) 16 6.60 105.60 0.650 68.64
Secondary beam for short way (base) 6 6.90 41.40 0.30 12.42
Secondary beam for short way (depth both sid 12 6.90 82.80 0.600 49.68
Primary Beam For passage (depth both sides) 8 2.23 17.80 0.650 11.57
Checked By :-
Estimaded By :- Approved By :-
S.N. Item No. Items No. Length T.Length Breadth Height Quantity Unit
Secondary Beam For passage (depth both sides) 6 2.53 15.15 0.600 9.09
Total 5850.940 m2
Checked By :-
Estimaded By :- Approved By :-
zx/L ljsf; tyf ejg lgdf{0f ljefu, l8lehg sfof{no, ;'v]{t d=n]=k=kmf=g+= !^*
A CIVIL WORKS
6 8 R.C.C. Works
2 1.2 Earth work in Excavation in site Development Same as 1 st rnning Bill 3799.225
Total 2533.707 m3
4 4 150mm thick stone soling with sand Same as 1 st rnning Bill 197.248
Total 203.502 m3
Total 104.041 m3
6 7 Brick Masonary work ( 1:6 ) Same as 1 st and 2nd rnning Bill 412.716
4th Block
2nd Block
1st Block
Emergency strap beam above maonary 2 5.43 10.85 0.35 0.75 2.848
Pillar connection beam above masonary 1 6.75 6.75 0.35 0.75 1.771
Total 508.430 m3
7 8 R.C.C. Work
5th Block
3rd Block
1st Block
2nd Block
4th Block
Total 933.006 m3
Pillars above plinth beam 126 0.60 75.60 0.60 2.85 129.276
Emergency verandah pillar (Deduction 0.927) 2 0.60 1.20 0.60 5.15 3.708
Total 235.602 m3
Grid P,Q,R,S,T
Grid 10,11,12,13,14
Grid I
5th Block
4th Block
144501.830 kg
5th Block
3rd Block
1st Block
2nd Block
4th Block
3942.400 m2
2 1.2 Earth work in Excavation in site Development Same as 1 st rnning Bill 3799.225
4 4 150mm thick stone soling with sand Same as 1 st rnning Bill 197.248
5 5 75mm thick lean concrete (1:3:6) in foundation Same as 1 st rnning Bill 100.915
2nd block
Pillar no.101,
Pillar no.102
Pillar no.103,104,105
Pillar no.106
Pillar no.107,113
Pillar no.115,116,117,114
Pillar no.119
Pillar no.124,125,226,227
Pillar no.212,208
Pillar no.202,203,204
Pillar no.205
Pillar no.221,216,224,219
Pillar no.222,217,223,218
Total 412.716 m3
7 8 R.C.C. Work
8 8.1 R.C.C.For P.C.C.(1;1.5:3) M 20 Same as 1 st rnning Bill 425.28
F1
Rec. Portion 2 2.50 5.00 2.50 0.20 2.500
Trap.Portion 2 1.45 2.90 2.900
F2 5 no
Rec. Portion 5 3.00 15.00 3.00 0.20 9.000
Trap.Portion 5 2.50 12.50 12.500
F3,4 no
Rec. Portion 4 3.50 14.00 3.50 0.300 14.000
Trap.Portion 4 3.42 13.69 13.690
CF2,2no
Rec. Portion 2 5.60 11.20 3.60 0.300 11.200
Trap.Portion 2 5.29 10.58 10.580
CF6,2NO
Rec. Portion 2 6.45 12.90 3.60 0.300 13.932
Trap.Portion 2 6.06 12.11 12.110
CF8
Rec. Portion 1 6.00 6.00 3.60 0.300 6.480
Trap.Portion 1 5.65 5.65 5.650
CF12
Rec. Portion 1 5.36 5.36 3.70 0.300 5.949
Trap.Portion 1 5.21 5.20 5.200
CF13
Rec. Portion 1 4.15 4.15 3.60 0.300 4.482
Trap.Portion 1 4.31 4.30 4.300
T2Area=34.82m2 1 34.82 34.82 0.400 13.920
T3 Area=33.667 m2 1 33.67 33.66 0.400 13.460
T4Area=27.706m2 1 27.706 27.70 0.400 11.080
Foundation combined beams
CF1 1 5.000 5.00 0.40 0.250 0.500
CF2 7 5.60 39.20 0.50 0.20 3.920
CF3 1 5.60 5.60 0.40 0.25 0.560
CF4 2 5.60 11.20 0.50 0.40 2.240
CF6 2 6.45 12.90 0.60 0.20 1.548
CF7 1 5.25 5.25 0.40 0.25 0.525
CF8 1 6.00 6.00 0.50 0.20 0.600
CF9
One ways 3 5.00 15.00 0.40 0.40 2.400
Other ways 2 6.04 12.08 0.40 0.40 1.932
CF10 1 6.04 6.04 0.50 0.40 1.208
Pillars no.502,503,are in C2
4 -25mm dia .rods 8 8.85 70.80 3.85 272.580
4 -25mm dia .rods 8 8.70 69.60 3.85 267.960
4 -20mm dia .rods 8 8.65 69.20 2.46 170.230
Pillars no.504,236,are in C3
4 -25mm dia .rods 8 8.80 70.40 3.85 271.040
4 -25mm dia .rods 8 8.75 70.00 3.85 269.500
4 -25mm dia .rods 8 8.65 69.20 3.85 266.420
A CIVIL WORKS
6 8 R.C.C. Works
hDdf ?= cIf]?kLM– sf] r]s g+= af6 k|fKt ePsf] egL ;xL ug]{ 7]s]bf/sf] ;xLM–
S.N. Items Unit Quantity Unit Rate Amount
TOTAL 3294504.35
ABSTRACT OF COST
S.N. Items Unit Quantity Unit Rate Amount
3 R.C.C. Work
15 Sanitary Work
R) 1/2 "* 3/4 " mm dia GI Pipe Fittings job 1.00 L.S. 7500.00
16 Electricity Work
17 Site Clearance Before and after Constructio job 1.00 L.S. 3000.00
DETAILED ESTIMATE
S.N. Items No. Length T.Length Breadth Height Quantity Unit
1 Brick Masonary in 1:4 Cement sand mortar
L. wall 1 11.35 11.35 0.23 2.75 7.17
3 4.96 14.88 0.23 2.75 9.41
2 4.96 9.92 0.23 2.75 6.27
S.wall 4 2.27 9.08 0.23 2.75 5.74
1 2.27 2.27 0.10 2.75 0.62
2 6.96 13.92 0.23 2.75 8.80
2 3.00 6.00 0.23 2.75 3.79
2 3.49 6.98 0.23 2.75 4.41
2 4.02 8.04 0.23 2.75 5.08
0.5 4.49 2.24 0.23 1.38 0.70
1 1.45 1.45 0.23 1.38 0.45
Extra for pillar 12 0.12 1.44 0.12 2.75 0.47
3 0.35 1.05 0.12 2.75 0.34
Deduction Parapet wall -1 11.35 -11.35 0.23 0.70 -1.83
-2 10.12 -20.24 0.23 0.70 -3.26
Lintel Band ( 15 cm thick )
L. wall -1 11.35 -11.35 0.23 0.15 -0.40
-3 4.96 -14.88 0.23 0.15 -0.52
-2 4.96 -9.92 0.23 0.15 -0.35
S.wall -4 2.27 -9.08 0.23 0.15 -0.32
-2 6.96 -13.92 0.23 0.15 -0.49
-2 3.00 -6.00 0.23 0.15 -0.21
-2 3.49 -6.98 0.23 0.15 -0.25
-2 4.02 -8.04 0.23 0.15 -0.28
-1 4.49 -4.49 0.23 0.15 -0.16
-1 1.45 -1.45 0.23 0.15 -0.06
Tie Beam of Ceiling ( 25 cm thick ) L. wall -1 11.35 -11.35 0.23 0.25 -0.66
-3 4.96 -14.88 0.23 0.25 -0.86
-2 4.96 -9.92 0.23 0.25 -0.58
S.wall -4 2.27 -9.08 0.23 0.25 -0.53
-2 6.96 -13.92 0.23 0.25 -0.81
-2 3.00 -6.00 0.23 0.25 -0.35
-2 3.49 -6.98 0.23 0.25 -0.41
-2 4.02 -8.04 0.23 0.25 -0.47
-1 4.49 -4.49 0.23 0.25 -0.26