Develop an equation to calculate and then calculate the pressure at well 1, illustrated in Fig. 7.23, if
the well has flowed for 5 days at a flow rate of 200 STB/day.
Φ= 25% h = 30ft
cr = 30(10)-6 psi-1 µ = 0.5 cp
k = 50 md Bo = 1.32 bbl/STB r1
rw = 0.33 ft pi = 4000 psia r2
1) P1 by well 1
2) P2 due to Fault 1
P3
P2
1.19 1.86
Muhammad Haziq bin Yussof MKP201005
3) P3 due to Fault 2
4) Final Pressure
3650 3639
3600 3583
3550
Pwf
3525
3500
3450
3400
0.1 1.0 10.0 100.0 1000.0
Time
M = dx/dy = (y1-y2)/(x2-x1)
= (3639-3583)/(log1-log10)
= -56
P1hour = 3639
2) Find k
3) Find ct
Muhammad Haziq bin Yussof MKP201005
4) Find s
3700
Pwf versus time
3650
3600
3544
3550
Pwf
3525
3500
3450
3400
0.0 50.0 100.0 150.0 200.0
Time
M = dx/dy = (y1-y2)/(x2-x1)
= (3544-3525)/(log50-log100)
= -0.383
6) Find A
7) Find V
Muhammad Haziq bin Yussof MKP201005
Muhammad Haziq bin Yussof MKP201005
1) Find tp
tp = Np/q
= 361/195 x 24hrs
= 44.43 hrs
2) Calculate tp + Δt/ Δt
Δt pws tp + Δt/ Δt
0.5 2425 89.86
1.0 2880 45.43
2.0 3300 23.21
3.0 3315 15.81
4.0 3320 12.10
5.0 3324 9.88
6.0 3330 8.40
8.0 3337 6.55
10.0 3343 5.44
12.0 3347 4.70
14.0 3352 4.17
16.0 3353 3.77
18.0 3356 3.46
3) Draw Horner figure which is Pws versus log tp+Δt/Δt in a semi log paper and then find the slope
of figure
2800
2600
2400
2200
2000
1 10 100
time
M = dx/dy = (y1-y2)/(x2-x1)
Muhammad Haziq bin Yussof MKP201005
= (3324-3356)/log(3.46-10)
= -70.2psi
5) Find the P
pws vs time
4000
3800
3600
3400
3200
3000
pws
2800
2600
2400
2200
2000
1 10 100
time 45.43
P = 3400psi
6) Find the s
Muhammad Haziq bin Yussof MKP201005
*assume r=200ft
1) Pwf when t = 2.4hrs (0.1 day)
2500
t=1days
2480
2460
t=10 days
2440
2380
200 re
radius