0% found this document useful (0 votes)
212 views

4a. PDC - 55 MLD MPS - Rev1

The document provides design calculations for a receiving sump cum pump house for a 55 MLD sewage treatment plant. It includes calculations for the inlet chamber size, coarse screen chamber, and pump selection and sizing.

Uploaded by

epe civil1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views

4a. PDC - 55 MLD MPS - Rev1

The document provides design calculations for a receiving sump cum pump house for a 55 MLD sewage treatment plant. It includes calculations for the inlet chamber size, coarse screen chamber, and pump selection and sizing.

Uploaded by

epe civil1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

L&T Construction Public Health and Municipal

Water & Effluent Treatment IC - Wastewater BU Engineering Department


DOCUMENT NO. REV
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including LE160315-P-WW-SW-BE-2001 1
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied Works,
O&M for a period of 5 years complete, in Nellore Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET

Title : Design Calculations of Receiving sump cum pump house for 55 MLD STP, Allipuram. GJ

(A) References:

i Manual on Sewerage & Sewage Treatment, Third Edition- Revised and Updated, CPHEEO, Japan International Cooperation Agency, Nov 2013

ii Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Ministry of Urban Development, New Delhi, May 1999

Metcalf & Eddy, G.Tchobanglous, F.L Burton ad H.D. Stensel. (2003). Wastewater Engineering, Treatment and Reuse, Fourth Edition, McGraw Hill Education, p 139,
iii
ISBN: 0070418780

iv Tender Document, Addendum & Prebid clarifictions for Nellore District

(B) Design Criteria

Design Average Flow Rate : 55 MLD


: 55000 m3/d
: 2291.67 m3/hr
: 0.64 m3/s
Peak Factor : 2.25 As per CPHEEO manual

Peak Flow : 123.75 MLD


: 123750 m3/d
: 5156.25 m3/hr
: 1.43 m3/s
Dia. Of incomer sewer : 1400 mm As per Network Design

I/L of Incoming Sewer : 6.87 m As per Network Design

FGL at MPS : 13.20 m


Plinth Level of MPS : 13.80 m

1.0 INLET CHAMBER


Design peak flow rate : 1.433 m3/sec
Assumed detention period sec for peak
: 15
(As per NGRBA standard 12 sec for peak flow , However 15 sec is considered) flow
Volume of the Inlet Chamber : 21.50 m3
80% of Incoming Sewer
Assumed Depth of flow : 1.42 m diameter + 0.3m

Area Required for Inlet Chamber : 15.14 m2

Width of inlet tank (As per Screen chamber width & 0.2 m wall Tk) : 4.90 m
Length of the tank required : 3.10 m
Height of inlet chamber : 7.23 m

Volume of tank provided : 21.57 m3


Detention period provided : 15.05 sec Hence OK

Gate:
Width of gate : 1.4 m
Height of gate : 1.4 m
Velocity throgh gate : 0.73 m/sec
Head loss throgh gates considered, H = (V/C)^2 / 2g, Where, C = 0.6 and g = 9.81 : 0.08 m
Head loss through gates considered : 0.15 m

Provide Inlet Chamber of size 3.1 m Length x 4.9 m Width x 1.42 m Liquid Depth + 5.81 m Free Board

2 COARSE SCREEN CHAMBER


2a. MANUAL COARSE SCREEN
No. Screen : 2 Nos Each 50% of peak flow

Average Design Flow / screen : 0.319 m3/sec


Peak Design Flow / screen : 0.717 m3/sec
Velocity ahead of screen(Va) at average flow, Maximum : 0.6 m/sec
Velocity ahead of screen(Va) at peak flow, Maximum : 1.2 m/sec
Consider Design velocity at peak flow : 1.0 m/sec
Channel approach velocity at Average f/s)- Minimum : 0.3 m/sec
Clear spacing between bars, (o)as per NIT : 20 mm
Thickness of flat ( t ) : 12 mm

Clear area of Screen Channel, Ac= (Q / Vp) : 0.72 m2


Total Screen area , At =A * (( o + t ) / o)) : 1.147 m2
Assume liquid depth in channel : 1.00 m
Screen Width required : 1.147 m
Say : 1200 mm
: 1.20 m

Total width of opening, Wo =W / (o+t) : 37.50 Nos


Say : 38.00 Nos
Total no of bars, ( Wo + 1 ) : 39.00 Nos
Provided open screen area : 760.00 mm
0.76 m

Assume Angle of inclination as per NIT : 75 Degree As per NIT

Slant length of screen in submerged portion = Liquid depth at Upstrem / Sin


: 1.04 m
(1.0 / SIN (RADIAN(75)) (Angle of inclination)

Effective open screen Area : 0.79 m2


Velocity through screen at average flow : 0.40 m/sec
Hence Ok
Velocity through screen at peak flow : 0.91 m/sec
Hence Ok

Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2) : 0.0124 m


: 12.43 mm
Clogging / Choking Considered : 50 %
Velocity through screen at clogged screen, Vs : 1.822 m/sec
Head loss on 50% clogging, h2=0.0729 (Vs2-Va2) : 0.169 m
Head loss on 50% clogged screen : 169.00 mm Hence Ok

As per CPHEEO manual on


Sewerage & sewage treatment,
Headloss Considered for design : 300.00 mm Nov 2013, Part A, Page 5-31, Cl.
5.6.1.9

Construction Width of Screen chamber :


Effective screen width required : 1.20 m
Side margin required for the screen as per screen vendor
: 0.40 m
(Approx. 0.2m on either side)

Total construction width of screen chamber : 1.60 m

Construction Length of the screen chamber :


Upstream length of screen 1.5 x W : 1.80 m
Downstream Length of screen 2 x W : 2.40 m
Space required for belt conveyor and operation platform : 1.20 m
Total length of screen chamber : 5.40 m
Say, Length of screen : 6.00 m

Construction Depth of Screen chamber:


Liquid depth : 1.00 m
Free board : 5.93 m
Provide Mechanical Coarse Screen Chamber of size 6.0 m L x 1.6m W + 1.0m L.D + 6.13 m FB

2.b MANUAL COARSE SCREEN

No. Screen : 1 No For 50% of peak flow (Stand by)


L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including LE160315-P-WW-SW-BE-2001 1
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied Works,
O&M for a period of 5 years complete, in Nellore Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET

Title : Design Calculations of Receiving sump cum pump house for 55 MLD STP, Allipuram. GJ

Average Design Flow / screen : 0.319 m3/sec


Peak Design Flow / screen : 0.717 m3/sec
Velocity ahead of screen(Va) at average flow, Maximum : 0.6 m/sec
Velocity ahead of screen(Va) at peak flow, Maximum : 1.2 m/sec
Consider Design velocity at peak flow : 1.0 m/sec
Channel approach velocity at Average f/s)- Minimum : 0.3 m/sec
Clear spacing between bars, (o)as per NIT : 20 mm
Thickness of flat ( t ) : 10 mm

Clear area of Screen Channel, Ac= (Q / Vp) : 0.72 m2


Total Screen area , At =A * (( o + t ) / o)) : 1.075 m2
Assume liquid depth in channel : 1.00 m
Screen Width required : 1.075 m
Say : 1100 mm
: 1.10 m

Total width of opening, Wo =W / (o+t) : 36.67 Nos


Say : 37.00 Nos
Total no of bars, ( Wo + 1 ) : 38.00 Nos
Provided open screen area : 740 mm
0.74 m

Angle of inclination as per NIT : 45 Degree As per NIT

Slant length of screen in submerged portion = Liquid depth at Upstrem / Sin


: 1.41 m
(1.0 / SIN (RADIAN(45)) (Angle of inclination)

Effective open screen Area : 1.05 m2


Velocity through screen at average flow : 0.30 m/sec
Hence Ok
Velocity through screen at peak flow : 0.68 m/sec
Hence Ok

Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2) : 0.039 m


: 38.72 mm
Clogging / Choking Considered : 50 %
Velocity through screen at clogged screen, Vs : 1.370 m/sec
Head loss on 50% clogging, h2=0.0729 (Vs2-Va2) : 0.064 m
Head loss on 50% clogged screen : 63.83 mm Hence Ok

As per CPHEEO manual on


Sewerage & sewage treatment,
Headloss Considered for design : 300.00 mm Nov 2013, Part A, Page 5-31, Cl.
5.6.1.9

Construction Width of Screen chamber :


Effective screen width required : 1.10 m
Side margin required for the screen as per screen vendor
: 0.20 m
(Approx. 0.1m either side)
Total construction width of screen chamber : 1.30 m

Construction Length of the screen chamber :


Upstream length of screen 1.5 x W : 1.65 m
Downstream Length of screen 2 x W : 2.20 m
Space required for belt conveyor and operation platform : 1.20 m
Total length of screen chamber : 5.05 m
Say, Length of screen : 5.50 m

Construction Depth of Screen chamber:


Liquid depth : 1.00 m
Free board : 5.93 m

Provide Manual Coarse Screen Chamber of size 6.0 m L x 1.3 m W + 1.0 L.D + 6.13 m FB

3 WET WELL
Quantity of Flow (Ave) : 55000 m3/day
Peak Flow : 123750 m3/day
: 85.94 m3/min
As per the latest CPHEEO
Volume of the Wet well : (V=T x Q/4) m3 Manual Nov 2013, Clause 4.66,
Pg. 4-10

Q = Pumping rate in m3/min : 85.94 m3/min


T = Time for one pump cycle : 15 minutes
Volume Req. : 322.27 m3
Liquid Depth assumed : 1.61 m
: 200.16 m2
Diameter of the tank required : 15.96 m
Diameter of the tank provided : 16.00 m

Pump Submergence:
Submergence of the raw sewage pump (As per pump manufacturer) : 2.0 m

Free Board:
Total Free Board : 7.23 m

Total Depth of Wet Well : 10.84 m

Provide WET WELL of size 13 m dia x 1.61 m LD + 2.0 m Pump submergence + 7.43 m Free board

3.a RAW SEWAGE TRANSFER PUMP:


Average flow for 2032 : 530.9 lps
: 1911.24 m3/hr
Peak flow for 2032 : 1041.5 lps
: 3749.4 m3/hr
Average flow for 2047 : 627.39 lps
: 2258.60 m3/hr
Peak flow for 2047 : 1258.59 lps
: 4530.92 m3/hr
No. of installed pumps : 6 Nos
No. of working pumps : 4 Nos
No. of standby pumps : 2 Nos
Discharge capacity of each pump at 2032 : 937.35 m3/hr
Discharge capacity of each pump at 2047 : 1132.73 m3/hr
Provide Raw sewage transfer pump of capacity 937 m3/hr :

3.b PUMPING MAIN:


Total pumping flow (=937*4) : 3749.40 m3/hr
: 1.04 m3/sec
Velocity through pipe considered : 1.65 m/sec
Area of pipe required : 0.631 m2
Diameter of the pipe required : 0.896 m
Diameter of the pipe provided : 900 mm
MOC & Class of pipe : DI K9
L&T Construction Public Health and Municipal Engineering
Water & Effluent Treatment IC - Wastewater BU Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including LE160315-P-WW-SW-BE-2001 1
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied Works,
O&M for a period of 5 years complete, in Nellore Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET

Title : Design Calculations of Receiving sump cum pump house for 55 MLD STP, Allipuram. GJ

(A) References:

i Manual on Sewerage & Sewage Treatment, Third Edition- Revised and Updated, CPHEEO, Japan International Cooperation Agency, Nov 2013

ii Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Ministry of Urban Development, New Delhi, May 1999

Metcalf & Eddy, G.Tchobanglous, F.L Burton ad H.D. Stensel. (2003). Wastewater Engineering, Treatment and Reuse, Fourth Edition, McGraw Hill Education, p 139,
iii
ISBN: 0070418780

iv Tender Document, Addendum & Prebid clarifictions for Nellore District

(B) Design Criteria

Design Average Flow Rate : 55 MLD


: 55000 m3/d
: 2291.67 m3/hr
: 0.64 m3/s
Peak Factor : 2.25 As per CPHEEO manual

Peak Flow : 123.75 MLD


: 123750 m3/d
: 5156.25 m3/hr
: 1.43 m3/s
Dia. Of incomer sewer : 1400 mm As per Network Design

I/L of Incoming Sewer : 6.87 m As per Network Design

FGL at MPS : 13.20 m


Plinth Level of MPS : 13.80 m

1.0 INLET CHAMBER


Design peak flow rate : 1.433 m3/sec
Assumed detention period sec for peak
: 15
(As per NGRBA standard 12 sec for peak flow , However 15 sec is considered) flow
Volume of the Inlet Chamber : 21.50 m3
80% of Incoming Sewer
Assumed Depth of flow : 1.42 m diameter + 0.3m

Area Required for Inlet Chamber : 15.14 m2

Width of inlet tank (As per Screen chamber width & 0.2 m wall Tk) : 4.90 m
Length of the tank required : 3.10 m
Height of inlet chamber : 7.23 m

Volume of tank provided : 21.57 m3


Detention period provided : 15.05 sec Hence OK

Gate:
Width of gate : 1.4 m
Height of gate : 1.4 m
Velocity throgh gate : 0.73 m/sec
Head loss throgh gates considered, H = (V/C)^2 / 2g, Where, C = 0.6 and g = 9.81 : 0.08 m
Head loss through gates considered : 0.15 m

Provide Inlet Chamber of size 3.1 m Length x 4.9 m Width x 1.42 m Liquid Depth + 5.81 m Free Board

2 COARSE SCREEN CHAMBER


2a. MANUAL COARSE SCREEN
No. Screen : 2 Nos Each 50% of peak flow

Average Design Flow / screen : 0.319 m3/sec


Peak Design Flow / screen : 0.717 m3/sec
Velocity ahead of screen(Va) at average flow, Maximum : 0.6 m/sec
Velocity ahead of screen(Va) at peak flow, Maximum : 1.2 m/sec
L&T Construction Public Health and Municipal Engineering
Water & Effluent Treatment IC - Wastewater BU Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including LE160315-P-WW-SW-BE-2001 1
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied Works,
O&M for a period of 5 years complete, in Nellore Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET

Title : Design Calculations of Receiving sump cum pump house for 55 MLD STP, Allipuram. GJ

Consider Design velocity at peak flow : 1.0 m/sec


Channel approach velocity at Average f/s)- Minimum : 0.3 m/sec
Clear spacing between bars, (o)as per NIT : 20 mm
Thickness of flat ( t ) : 12 mm

Clear area of Screen Channel, Ac= (Q / Vp) : 0.72 m2


Total Screen area , At =A * (( o + t ) / o)) : 1.147 m2
Assume liquid depth in channel : 1.00 m
Screen Width required : 1.147 m
Say : 1200 mm
: 1.20 m

Total width of opening, Wo =W / (o+t) : 37.50 Nos


Say : 38.00 Nos
Total no of bars, ( Wo + 1 ) : 39.00 Nos
Provided open screen area : 760.00 mm
0.76 m

Assume Angle of inclination as per NIT : 75 Degree As per NIT

Slant length of screen in submerged portion = Liquid depth at Upstrem / Sin


: 1.04 m
(1.0 / SIN (RADIAN(75)) (Angle of inclination)

Effective open screen Area : 0.79 m2


Velocity through screen at average flow : 0.40 m/sec
Hence Ok
Velocity through screen at peak flow : 0.91 m/sec
Hence Ok

Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2) : 0.0124 m


: 12.43 mm
Clogging / Choking Considered : 50 %
Velocity through screen at clogged screen, Vs : 1.822 m/sec
Head loss on 50% clogging, h2=0.0729 (Vs 2-Va2) : 0.169 m
Head loss on 50% clogged screen : 169.00 mm Hence Ok

As per CPHEEO manual on


Sewerage & sewage treatment,
Headloss Considered for design : 300.00 mm Nov 2013, Part A, Page 5-31, Cl.
5.6.1.9

Construction Width of Screen chamber :


Effective screen width required : 1.20 m

Side margin required for the screen as per screen vendor


: 0.40 m
(Approx. 0.2m on either side)

Total construction width of screen chamber : 1.60 m

Construction Length of the screen chamber :


Upstream length of screen 1.5 x W : 1.80 m
Downstream Length of screen 2 x W : 2.40 m
Space required for belt conveyor and operation platform : 1.20 m
Total length of screen chamber : 5.40 m
Say, Length of screen : 6.00 m

Construction Depth of Screen chamber:


Liquid depth : 1.00 m
Free board : 5.93 m
Provide Mechanical Coarse Screen Chamber of size 6.0 m L x 1.6m W + 1.0m L.D + 6.13 m FB

2.b MANUAL COARSE SCREEN


L&T Construction Public Health and Municipal Engineering
Water & Effluent Treatment IC - Wastewater BU Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including LE160315-P-WW-SW-BE-2001 1
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied Works,
O&M for a period of 5 years complete, in Nellore Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET

Title : Design Calculations of Receiving sump cum pump house for 55 MLD STP, Allipuram. GJ

No. Screen : 1 No For 50% of peak flow (Stand by)

Average Design Flow / screen : 0.319 m /sec


3

Peak Design Flow / screen : 0.717 m3/sec


Velocity ahead of screen(Va) at average flow, Maximum : 0.6 m/sec
Velocity ahead of screen(Va) at peak flow, Maximum : 1.2 m/sec
Consider Design velocity at peak flow : 1.0 m/sec
Channel approach velocity at Average f/s)- Minimum : 0.3 m/sec
Clear spacing between bars, (o)as per NIT : 20 mm
Thickness of flat ( t ) : 10 mm

Clear area of Screen Channel, Ac= (Q / Vp) : 0.72 m2


Total Screen area , At =A * (( o + t ) / o)) : 1.075 m2
Assume liquid depth in channel : 1.00 m
Screen Width required : 1.075 m
Say : 1100 mm
: 1.10 m

Total width of opening, Wo =W / (o+t) : 36.67 Nos


Say : 37.00 Nos
Total no of bars, ( Wo + 1 ) : 38.00 Nos
Provided open screen area : 740 mm
0.74 m

Angle of inclination as per NIT : 45 Degree As per NIT

Slant length of screen in submerged portion = Liquid depth at Upstrem / Sin


: 1.41 m (Angle of inclination)
(1.0 / SIN (RADIAN(45))
Effective open screen Area : 1.05 m2
Velocity through screen at average flow : 0.30 m/sec
Hence Ok
Velocity through screen at peak flow : 0.68 m/sec
Hence Ok

Head loss thru screen in normal condition, h1=0.0729(Vs2-Va2) : 0.039 m


: 38.72 mm
Clogging / Choking Considered : 50 %
Velocity through screen at clogged screen, Vs : 1.370 m/sec
Head loss on 50% clogging, h2=0.0729 (Vs 2-Va2) : 0.064 m
Head loss on 50% clogged screen : 63.83 mm Hence Ok

As per CPHEEO manual on


Sewerage & sewage treatment,
Headloss Considered for design : 300.00 mm Nov 2013, Part A, Page 5-31, Cl.
5.6.1.9

Construction Width of Screen chamber :


Effective screen width required : 1.10 m
Side margin required for the screen as per screen vendor
: 0.20 m
(Approx. 0.1m either side)
Total construction width of screen chamber : 1.30 m

Construction Length of the screen chamber :


Upstream length of screen 1.5 x W : 1.65 m
Downstream Length of screen 2 x W : 2.20 m
Space required for belt conveyor and operation platform : 1.20 m
Total length of screen chamber : 5.05 m
Say, Length of screen : 5.50 m

Construction Depth of Screen chamber:


L&T Construction Public Health and Municipal Engineering
Water & Effluent Treatment IC - Wastewater BU Department

DOCUMENT NO. REV


Project : Construction of Decentralized Sewage Treatment Plants with any proven Technology including
receiving sumps cum pumping stations, Providing Sewer Network System in entire city including LE160315-P-WW-SW-BE-2001 1
construction of Conventional Manholes & Precast Manholes, House Sewer connections and Allied Works,
O&M for a period of 5 years complete, in Nellore Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET

Title : Design Calculations of Receiving sump cum pump house for 55 MLD STP, Allipuram. GJ

Liquid depth : 1.00 m


Free board : 5.93 m

Provide Manual Coarse Screen Chamber of size 6.0 m L x 1.3 m W + 1.0 L.D + 6.13 m FB

3 WET WELL
Quantity of Flow (Ave) : 55000 m3/day
Peak Flow : 123750 m3/day
: 85.94 m3/min
As per the latest CPHEEO
Volume of the Wet well : (V=T x Q/4) m3 Manual Nov 2013, Clause 4.66,
Pg. 4-10

Q = Pumping rate in m3/min : 85.94 m3/min


T = Time for one pump cycle : 15 minutes
Volume Req. : 322.27 m3
Liquid Depth assumed : 1.61 m
: 200.16 m2
Diameter of the tank required : 15.96 m
Diameter of the tank provided : 16.00 m

Pump Submergence:
Submergence of the raw sewage pump (As per pump manufacturer) : 2.0 m

Free Board:
Total Free Board : 7.23 m

Total Depth of Wet Well : 10.84 m

Provide WET WELL of size 13 m dia x 1.61 m LD + 2.0 m Pump submergence + 7.43 m Free board

3.a RAW SEWAGE TRANSFER PUMP:


Average flow for 2032 : 530.9 lps
: 1911.24 m3/hr
Peak flow for 2032 : 1041.5 lps
: 3749.4 m3/hr
Average flow for 2047 : 627.39 lps
: 2258.60 m3/hr
Peak flow for 2047 : 1258.59 lps
: 4530.92 m3/hr
No. of installed pumps : 6 Nos
No. of working pumps : 4 Nos
No. of standby pumps : 2 Nos
Discharge capacity of each pump at 2032 : 937.35 m3/hr
Discharge capacity of each pump at 2047 : 1132.73 m3/hr
Provide Raw sewage transfer pump of capacity 937 m /hr
3 :

3.b PUMPING MAIN:


Total pumping flow (=937*4) : 3749.40 m3/hr
: 1.04 m3/sec
Velocity through pipe considered : 1.65 m/sec
Area of pipe required : 0.631 m2
Diameter of the pipe required : 0.896 m
Diameter of the pipe provided : 900 mm
MOC & Class of pipe : DI K9