SOI JobAid Extract
SOI JobAid Extract
What is done:
To ensure that plans and standards meet objectives in DO-178B Annex A tables A-1, A-8, A-9, A-10, and that
the software will comply with other applicable software policy and guidance.
When Review Occurs
Shortly after completion of the software planning process, or any other necessary point. Plans and standards
may not be fully completed; however, they should be fairly mature prior to the review and under configuration
control.
Purpose
Determine if final compliance to all of the DO-178B objectives has been achieved and all open items
addressed/dispositioned.
Assess the Software Configuration Index, Software Life Cycle Environment Configuration Index, Software
Accomplishment Summary, and any other documents not previously reviewed.
When to Perform
When the software life cycle is completed, and the following items have been completed by the applicant (or when deemed
necessary):
Software conformity review has been performed
Software Accomplishment Summary and Configuration Indexes have been reviewed and are correct.
Formal signature process has been completed