Brigada Eskwela Action Plan

This document outlines the action plan for Brigada Eskwela Plus from May 15-20, 2017 at Calitcalit Elementary School in San Juan East District, Batangas, Philippines. The objectives are to prepare and improve school facilities, identify facilities needing repair, and facilitate implementation. Strategies include forming a committee, conducting meetings, prioritizing repairs, estimating costs, identifying donors, and communicating the plan. The targets are completing 80-100% of facility development and meeting 80-95% of implementation targets. Success will be determined by manifesting improvements and meeting targets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
646 views2 pages

Brigada Eskwela Action Plan

This document outlines the action plan for Brigada Eskwela Plus from May 15-20, 2017 at Calitcalit Elementary School in San Juan East District, Batangas, Philippines. The objectives are to prepare and improve school facilities, identify facilities needing repair, and facilitate implementation. Strategies include forming a committee, conducting meetings, prioritizing repairs, estimating costs, identifying donors, and communicating the plan. The targets are completing 80-100% of facility development and meeting 80-95% of implementation targets. Success will be determined by manifesting improvements and meeting targets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education
Region IV-A CALABARZON
DIVISION OF BATANGAS
SAN JUAN EAST DISTRICT
Calitcalit Elementary School

BRIGADA ESKWELA PLUS ACTION PLAN


May 15 – 20, 2017

Objectives Targets Strategies MOVs Persons involved Time Success Indicator


1.Prepare and improve
school facilities,painting, At the end of When the
signage and school Brigada Eskwela , 80 Prepare and designate a Designation letter Principal May 15- implementation will
ground % to 100% of the committee for the conduct of signed by the School School 20, 2017 have been manifested
projected physical Brigada Eskwela in school. Head. Development from 80% to 100%
facilities development planning Team based on the target
and beautification will
have been manifested.

 Conduct a meeting Principal


2. To identify and with the persons Attendance School May 8-
prioritize facilities and involve in the Minutes of the Development 12, 2017
equipment requiring Brigada Eskwela meeting planning Team
repair. with all year level Action Plan Year level advisers
advisers in List of priorities Brigada Committee
preparing the
Brigada Eskwela
Action Plan.
3. To facilitate the
implementation through  Make a listing of Minutes of the
the agreed scheme. priorities based on meeting and pictorials. If 80 to 95% of the
inspection targets for the
 Prepare projected cost implementation have
estimates been met.
 Identify potential Principal, Brigada May 8-
donors/ benefactors. Committee, SGC 12, 2017
 Conduct SGC/ PTA Implementation and PTA Board.
Board meeting with the Scheme.
Committee.
 Strategized scheme on
its projected Returned letters with
implementation acknowledgement
 Send communication to
the identified
benefactors.
 Send communication
and acknowledge early
pledges through letters

Prepared by:

AILEEN P. MANZANA
Assistant Brigada Coordinator
Noted:
MA. THERESA D. MACALALAD
Teacher-In_Charge