Calibration Procedureoxsas
Calibration Procedureoxsas
CALIBRATION PROCEDURE
OPERATION SETUP
↓
METHODS
↓
NEW
↓
CHANGE THE NEW METHOD NAME (EXP. RAWMEAL)
↓
PERIODIC TABLE
IN PERIODIC TABLE SELECT MORE THEN 10% HAS MAJOR ELEMENT, 0.5 TO
10% MINOR AND LESS THEN 0.5 HAS TRACES.
↓
METHOD HEADER
↓
Select OXIDE
↓
COMPONENTS
Change the display name for all the elements.
↓
SETTING UP SAMPLES
In this save and keep the windows open and again go to
↓
OPERATION SETUP
↓
1
SETTING UP SAMPLES
↓
2
CREATE FROM METHOD
↓
Category to user
Position no to 1 and validity period to 48
Chick UPD ALWAYS chick DO FULL UPDATE
Again click DUPLICATE
Enter the second sample name and position No. do the same upto your samples to be
completed.
↓
In open method windows at setting up samples box, select your TOP AND BOTTOM in
all element. SAVE AND CLOSED THE BOX.
2nd STEP
OPERATION SETUP
↓
CALIBRATION MVR
↓
In right side box directly come to down and select calibration STANDARD
Click right batten in mouse
NEW MATRIX
↓
2
RIGHT CLICK METHOD
↓
3
NEW SET OF CALIBRATION STANDARDS
Enter same method name
Right click EDITFROM METHOD select your methodOK
Enter all the samples name and chemical values-SAVEOK
IIIrd STEP
Then keep the samples in position and click GREEN ANALYSIS BOTTEN
After completing the SUS batch select calibration batch and run all calibration samples.
IVth STEP
OPERATION SETUP
↓
CALIBRATION –MVR
↓
Vth step.
3
↓
MANAGE SCT SAMPLES
4
↓