Apollo Proton Therapy & Cancer Care Hospital: Check Sheet For Installation of Plumbing

This document is a checklist for installing plumbing at Apollo Proton Therapy & Cancer Care Hospital. It lists 10 items to check including using approved materials, proper pipe sizing and drainage, appropriate fittings and supports, isolation and testing of piping, and installation of drain pans and safety devices. The checklist requires sign off from the preparer, quality assurance teams, and MEP contractor to ensure the plumbing meets specifications and codes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views1 page

Apollo Proton Therapy & Cancer Care Hospital: Check Sheet For Installation of Plumbing

This document is a checklist for installing plumbing at Apollo Proton Therapy & Cancer Care Hospital. It lists 10 items to check including using approved materials, proper pipe sizing and drainage, appropriate fittings and supports, isolation and testing of piping, and installation of drain pans and safety devices. The checklist requires sign off from the preparer, quality assurance teams, and MEP contractor to ensure the plumbing meets specifications and codes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

APOLLO PROTON THERAPY & CANCER CARE DOC NO: BSL/AHEL/ECL/PLUMBING -

HOSPITAL FORMAT No:


CHECK SHEET FOR INSTALLATION OF PLUMBING
Building Reference: Location:

Reference Drawing: Rev.:

S.NO. INSTALLATION CHECKS Approved Approved Ref


Remarks/Comm
make documents
01 Obtain work front clearance

02 Check plumbing installation was done as per schematic, as per approved plan
and as per specification.
-
03 Approved materials as per International Plumbing Code/TDC.
04 Check drainage units, proper size of main, branch, drain and vent. Supreme/
Ashirwad
05 Ensure whether appropriate fittings, Proper glue, mission bend, couplings,
-
support, ect. has been used.
06 Ensure sufficient Under-floor cleanout distance is available.
-
07 Ensure proper isolation of piping has done as test scheme.
-
08 Check all support span intervals and ensure rigidness of the support. Hi-tech/
Hilti
09 Ensure all fittings are properly connected without any linear / circular R brand/
misalignment. Zoloto/ Unik
10 Check drain pan, seismic straps, thermal expansion devices and pressure H- Guru/
relief valves were installed. Bourdan
REMARK:

Prepared BSL QA/QC (BSL) MEP (L&T) QA/QC (L&T) AHEL

NAME
DATE

SIGNATURE