0% found this document useful (0 votes)
83 views13 pages

Use of SCADA at Central Control Centre of Pakistan.: Group Members

The document discusses the use of SCADA systems at the National Power Control Center (NPCC) in Pakistan. The NPCC uses SCADA to monitor and control the country's power generation and transmission systems from a central location. Key objectives of the NPCC SCADA system include maintaining supply-demand balance, frequency and voltage control, and data collection. The SCADA system acquires data from remote terminal units located at power facilities via various communication mediums like satellite, microwave, and fiber optic networks. The NPCC control room oversees the SCADA computer systems, which monitor and control stations across Pakistan.

Uploaded by

MaMa Baloch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views13 pages

Use of SCADA at Central Control Centre of Pakistan.: Group Members

The document discusses the use of SCADA systems at the National Power Control Center (NPCC) in Pakistan. The NPCC uses SCADA to monitor and control the country's power generation and transmission systems from a central location. Key objectives of the NPCC SCADA system include maintaining supply-demand balance, frequency and voltage control, and data collection. The SCADA system acquires data from remote terminal units located at power facilities via various communication mediums like satellite, microwave, and fiber optic networks. The NPCC control room oversees the SCADA computer systems, which monitor and control stations across Pakistan.

Uploaded by

MaMa Baloch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Use of SCADA at Central Control Centre

of Pakistan.
Group Members:
➢ Muhammad Ibrahim
➢ Bilal Ahmed Khattak
What is SCADA?
 The acronym SCADA stands for Supervisory
Control and Data Acquisition.
 The primary purpose of SCADA is to monitor,
control and alarm plant or regional operating
systems from a central location.
 SCADA systems are combination of computers,
controllers, instruments; actuators, networks and
interfaces that manage the control of automated and
allow analysis of those system by data collection
and processing.
National Power Control Central (NPCC):
 National Power Control Center (NPCC) is part of National
Transmission and Dispatch Company (NTDC) located in
Islamabad, Pakistan. It was established in 1990.
 NPCC is control center of NTDC and is responsible for
operation of generation and transmission system.
 NPCC is responsible for operation, monitoring of
generation , both primary and secondary transmission
system and coordination with all Power sector stake
holders ( i.e. NTDC head and field offices, DISCOs,
GENCOs, CPPA-G & IPPs)
Objectives of NPCC SCADA System:
Functions NPCC SCADA System:
 Maintaining balance between Supply & Demand
 Frequency and voltage control
 Operational Control of Power Network
 Maintaining security & reliability of network
 Month-wise Energy Estimation
 Emergent shutdowns in case of abnormal
situations..
 Collection of system data and preparation of
reports
NPCC Control Room:
SCADA Data acquisition System (NPCC)

 Data acquisition in SCADA used to access and control


information or data from the equipment being controlled and
monitored.
 The data accessed are then forwarded onto at elementary system
ready for transfer to the different sites.
 They can be analog and digital information gathered by sensors,
such as flow meter, ammeter, etc.
 It can also be data to control equipment such as actuators, relays,
valves, motors, etc.
 SCADA computers at NPCC regularly monitor the complete
status of power system through Remote Terminal Units (RTUs),
located at each power system.
SCADA Communication Medias (NPCC)
 Communication
is of primary importance for a
SCADA system at NPCC.
 Poor
communication results in errors or lost
messages.
 A systemcannot function properly without reliable
and adequate communication channels.
 NPCC uses the various communication systems
media; ranging from satellite, to microwave, to
fiber optic, PTCL, Mobile and to cable TV circuits.
SCADA Communication Medias (NPCC)
Computer Systems Used By SCADA
(NPCC):
 Two computer systems are used by National Power Control Centers.
 One is at NPCC Islamabad, which is used for NCC Islamabad and also for
Regional Control Center North.
 One Computer System is doing its operations at Regional Control Center
Jamshoro.
 Computers at NPCC/RCC are of 1980’s technology having primary memory of
4Mega Bytes and secondary memory (H.D) of 340 Mega Bytes. Both the
systems are linked via six channels through Wapda’s Analogue microwave
system.
 Computer Systems are basically the hardware used at the control station
(room).Basically, it comprises of the personal computer (PC) complete with the
attached peripheral (connected) devices including the monitor, the printers,
data loggers & mimic panel (having lamp & analog outputs).
Stations Controlled and Monitored SCADA (NPCC):
References:

 https://www.researchgate.net/publication/332378880_SCADA_Based_
Power_Management_and_Distribution_System_Prototype_for_Pakistan
_Scenario
 https://www.npcc.com.pk/
 https://www.scribd.com/doc/47363761/Status-of-SCADA-System-in-
Pakistan
 https://pdfs.semanticscholar.org/ae26/5db48ced80a3975d63ec9a2e4
9700c334e0d.pdf

You might also like