Irrigation Department: Government of Kerala

The document provides details required for an indent for structural design of a checkdam cum bridge project. It requests information on project location, officials, proposed structure details, soil investigation reports, and other engineering documents required for review.

Uploaded by

shivanandarcot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views3 pages

Irrigation Department: Government of Kerala

The document provides details required for an indent for structural design of a checkdam cum bridge project. It requests information on project location, officials, proposed structure details, soil investigation reports, and other engineering documents required for review.

Uploaded by

shivanandarcot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Irrigation Department

Government of Kerala
INDENT FOR STRUCTURAL DESIGN TO IDRB

CHECKDAM CUM BRIDGE


1* Name of work
2* Date
3* IP address
A General Details and Location of Work
1* Location
2* Latitude
3* Longitude
4* Name of river/stream/ canal
5* Altitude from mean sea level
6* District
7* Taluk
8* Assembly constituency
9* Village
10* Panchayath/Muncipality/Corporation

B Details of Officials Furnishing the Indent


1* Assistant Engineer Office
Name
2* Assistant Executive Engineer Office
Name
3* Executive Engineer Office
Name
4* Superintending Engineer Office
Name
5* Chief Engineer Office
Name
C Nature of the proposed strcuture
1* Height of proposed structure
D Details of Gauge station
1* Name of the nearest rain guage station
2* Name of the nearest river guage station
E Hydraulic Data
1* Distance of site from the sea coast
Depth of availability of rock in the river(to
2*
provide economical foundation)
3 Flow nature of river /stream
Whether river /stream confines within banks
4
during floods
5* Mean width of river/stream at site
6 Low water level
7* a High flood level
b 2018 Flood Level
c 2019 Flood Level
d Ordinary flood level
8 Maximum flood discharge
9 Corresponding stream velocity
Catchment area(in case of small
10*
streams/thodu)
11* * Bed level (mean)
12* * Bed slope(mean)
F Superstructure
Loading for the bridge to be designed for class
1*
A,class AA,tractor way etc

2* Proposed clear road width over the bridge

3* Whether double lane or single lane

4 Proposed width of foot paths if necessary

5 Levels of approach roads

Proposed formation level of the road over the


6
bridge at the center
Gradient if any, in the road formation along the
7
length of the bridge
Is the proposed bridge submersible at high
8*
flood level
9 Number of spans recommended

10 Size of the span recommended

G General details
What arrangements exist for crossing the river/canal at present
1* a)During monsoon
b)During dry season
Is the proposed alignment of the bridge skew /
2*
normal to the stream
a* If skew give the angle of skew
Are there any bridges existing on the stream
3
500m U/S or D/S
If so their positions are marked on the site
4 plan(distance from the proposed structure shall
clearly be marked
H Soil Investigation details
Name of the agency with date conducting the
1*
soil investigation report and bore hole test
Detailed soil investigation report with bore hole
2* details,specifying all soil parameters including
SBC of foundation soil
Bore hole location layoutwith at least two cross
3*
section in the river bed for narrow streams
I Checklist
1* Location plan
2* Cross section of the Structure
3 Contour Survey plan
4* Longitudinal section
Detailed soil investigation report with bore hole
details,specifying all soil parameters of
5*
foundation and specific recommendation of soil
consultant
Proposal drawing of the bridge showing the
general arrangement on the cross section at
6*
the site with all important levels,details of
foundation,substructure
List of existing check dams at upstream side up
7 to 1 km including their distance from the
proposed site
List of existing check dams /regulators at
8 downstream side up to 2 km including their
distance from the proposed site
Cross section of river/stream at site including
9*
banks with levels properly marked
Cross section of river/stream at site including
10* banks with levels properly marked(at 15.00m
intervals for 60m upstream of site)
Cross section of river/stream at site including
11* banks with levels properly marked(at 15.00m
intervals for 60m downstream of site)
12* Site plan showing flow direction of the river
13* Bore hole location layout
a No. of bore holes investigated at cross section
at site(at least two in the river bed for narrow
streams)

Scheme report giving details of scope of work,


14*
AS etc
(*) Indicated fields are mandatory