The document provides specifications for the fabrication of seamless pipes for pipelines to transport sour effluent for the South Pars Gas Field Development project in phases 9 and 10. It references specification RP-6340S 999 1300 0074 Rev. 5 and adds clarifications and amendments. Key points include specifying steel grades of API 5L Grade B or X65, pipe lengths in single or double random configurations, and hydrotest pressures to induce 90% of minimum yield strength in the pipe material. Mill certificates must meet EN 10204 3.1.B requirements rather than DIN 50 049.

Uploaded by

SALMAN PAKI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views61 pages

RP 6340S 999 1300 0074 Rev.5 Specification, Fabrication of S

The document provides specifications for the fabrication of seamless pipes for pipelines to transport sour effluent for the South Pars Gas Field Development project in phases 9 and 10. It references specification RP-6340S 999 1300 0074 Rev. 5 and adds clarifications and amendments. Key points include specifying steel grades of API 5L Grade B or X65, pipe lengths in single or double random configurations, and hydrotest pressures to induce 90% of minimum yield strength in the pipe material. Mill certificates must meet EN 10204 3.1.B requirements rather than DIN 50 049.

Uploaded by

SALMAN PAKI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 61

Fabrication of Seamless Pipes

for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

FABRICATION OF SEAMLESS PIPES

FOR PIPELINES

(SOUR EFFLUENT)

FWEL CONTRACT No : 1-14-16601

CONTRACT NO. : POGC-760-81-156

PROJECT : SOUTH PARS GAS FIELD DEVELOPMENT


(PHASES 9&10)

COMPANY : NATIONAL IRANIAN OIL COMPANY

SITE : ASSALUYEH / SOUTH PARS GAS FIELD


PERSIAN GULF, IRAN

5 30/09/04 Approved for Construction OIEC


4 27/11/03 Issued for FEED Package FWEL D. Pass D. Pass
3 12/11/03 Issued for FEED Package FWEL D. Pass D. Pass D. Pass
2 21/10/03 Final Issue FWEL D. Pass D. Pass D. Pass
1 26/08/03 Issued for Company Review FWEL D. Pass D. Pass D. Pass
0 08/12/00 JC JOUY P RAULET F DUROT
CONTRACTOR’s
REV. DATE DESCRIPTION ORIG. PRPD CHKD APP’D
APP’D

South Pars Gas Field Development (Phases 9 & 10) Page 1 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

TABULATION OF REVISED PAGES

PAGE REV. 1 Rev. 2 Rev. 3 Rev. 4 Rev. 5


1
2
3
4 X X X X
5 X
6 X X
7 X X
8 X
9 X X X
10

South Pars Gas Field Development (Phases 9 & 10) Page 2 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

CONTENTS

 GENERAL STATEMENT
 ADDENDUM
 TEP GENERAL SPECIFICATION N° SP - STR - 533 Rev. 1

South Pars Gas Field Development (Phases 9 & 10) Page 3 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

GENERAL STATEMENT

The attached TOTAL EXPLORATION PRODUCTION (TEP) General Specification n° SP - STR - 533 Rev. 1 is
confirmed as the Project Specification, except as amended herein, and renumbered/reissued as specification n° RP
6340S 999 1300 0074 Rev. 5 for SOUTH PARS PHASES 9 & 10 Project. 5

This specification is defined as the so-called “Project Particular Specification” (P.P.S.).

South Pars Gas Field Development (Phases 9 & 10) Page 4 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

ADDENDUM

The following items refer to the attached TEP General Specification n° SP - STR - 533 Rev. 1. The clauses set out
below shall modify or replace the existing clauses in the original specification as noted.

GENERAL COMMENTS
• The following terms which are used in this general Job Specification are deleted and replaced by :
- Engineering company by contractor : shall mean the party which has entered under a Contract
Agreement with the POGC for the design, engineering, procurement and construction of the
Onshore Facilities regarding the South Pars Field Development Project, Phases 9 & 10.
- TOTAL CFP : shall be read as POGC or his nominated Representative.
- Manufacturer : shall mean any person, firm or company which manufacture or supply equipment or
services for the performance of any item of the work.
- Work : shall mean works and / or services entrusted by contractor under the Contract with
POGC.

2. PARTICULAR SPECIFICATION
2.1 General
• Steel grade shall be API 5L Grade B or API 5L X65.
1
The base material of all pipes shall have a good behavior to arrest a long running shear fracture.

2.2 Line pipe Data sheet (summary)


• Refer to “Piping Classes” G03P2 and G05P4

2.3 Mother pipes for hot bends


• Pipe is not intended to be bent, so bending tests are not required.

5.1 General Requirements


• Bending tests are not required.

South Pars Gas Field Development (Phases 9 & 10) Page 5 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

5.4 Pipe Manufacture 3


Add new fourth sentence as follows;
“API 5L pipe shall be non expanded, except for final sizing where cold expansion is acceptable so long as
expansion does not exceed 1.5% of pipe outside diameter.”

5.6.1 Destructive and non-destructive tests


d) Impact test temperature is given in Appendix 1
i) Pipe is not intended for reeling, so strain ageing testing is not required.
j) Pipe is not intended for reeling so bend test is not required.
k) Pipe is not intended for reeling so ring flattening test is not required
l) Pipe is not intended for reeling so longitudinal test after strain ageing is not required.

5.6.5 Induction bending tests


Induction bending test is not required (see paragraph 2.3).

5.9.5 Unit Length 3


Delete this paragraph and replace with the following;
“Pipe shall be supplied in the following lengths;
½” to 6” Nominal Diameter : single random length 6m (min. length 5.33m, max. length 6.86m)
8” and larger Nominal Diameter ; double random length 12m (min. length 10.67m, max. length 13.72m)
Jointers made by welding two pipe sections to produce the specified pipe length are not permitted.”

6. MILL HYDROSTATING TESTING


The hydrotest pressure shall be as per required in the general specification in order to get a hoop
stress of 90% of the minimum specified yield strength of the pipe material. Test pressure shall be held for not 1
less than 5 seconds.
Refer to table of Appendix 1.

South Pars Gas Field Development (Phases 9 & 10) Page 6 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

7.2 Pipe production test and inspection


b) Impact tests (charpy V notch test)
Impact test temperature is stated in Appendix 1.
c) Strain ageing test
Strain ageing test is not required.
d) Hardness test
The reading of the Rockwell B or Vickers hardness measurement shall not exceed
96HRB or 225 HV.
f) Strain ageing test
strain ageing test is not required.

7.3 Mill certificates


Pipes shall be supplied with a 3.1. B certificate according to EN 10204 in place of DIN 50 049 std.

9. MARKING OF PIPES
e) Delete “On the outside of the pipe, at one end ------- pipe length” and replace with “Each pipe shall be
clearly identified by means of markings with indelible paint markings on the external surface of each pipe
end with the following minimum information;
- Manufacturer’s name or mark
- Steel grade
- Specified dimension (O.D x W.T) 1

- Heat Number
- Pipe Number
- Pipe Length
However, the other data such as COMPANY’S name and purchase order number shall be marked on the
material test certificate”

h) Alternatively a bar code system, placed inside both ends of the pipe, may be implemented to ease pipe
identification.

i) Manufacturing date shall be identified on the external surface of each pipe. 3

South Pars Gas Field Development (Phases 9 & 10) Page 7 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

j) The following shall be noted on each pipe; 3


- R.T. where a radiographic inspection has been performed.
- H.T. when a heat treatment operation has been performed.

10. PROTECTION OF BEVELS


All pipes shall be supplied with bevelled ends and shall be fitted with bevel protectors.

11. STORAGE OF PIPES 3


Add a new fourth sentence as follows;
“Carbon steel pipes shall be protected by the manufacturer’s standard anticorrosive coating system. The
coating must be easily removed on site by brushing or cleaning with a solvent.”

12 DOCUMENTATION
b) Upon completion of pipe production :
• A pipe list with sequential numbers of produced pipes related to heat numbers shall also
be supplied.
• Pipe lists of shipments.
• Histogram data are required.
• The complete pipe history system (PHS) in CD ROM.
Supplier shall provide POGC with at least one (1) original and three (3) copies plus one (1) CD
ROM of the production report.

South Pars Gas Field Development (Phases 9 & 10) Page 8 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

14 FABRICATION PIPE HISTORY SYSTEM (PHS)


The supplier shall provide Company with a computerized fabrication pipe history. In accordance
with the requirements of particular specification LINE PIPE MATERIAL TRACKING SYSTEM.
Detailed possibilities are to be supplied by Supplier at bid stage.
APPENDIX A - Referenced documents
• Applicable API Spec 5L shall be to the 42nd Edition, 2000. 4
• NACE standards shall be the following revisions :
– TM0 284 - 96
– TM0 177 - 96
– MR0 175 -97
• Euronorm / European standard
– EN 10204 - Types of Inspection Documents.
APPENDIX E – Specification for Sulphide Stress Corrosion Cracking Tests (S.S.C.C. Tests) for Line 4
Pipe and Welds
E.5 Delete test duration of “30days (720 hours)” and replace with test duration of “72 hours”.
E.7 Delete test duration of “30days” and replace with “72 hours”.

South Pars Gas Field Development (Phases 9 & 10) Page 9 of 10


Fabrication of Seamless Pipes
for Pipelines
(Sour Effluent)
LG/ OIEC/ IOEC
CONSORTIUM
Doc. No. : RP-6340S-999-1300-0074-5 Rev. No. : 5 Class : 1

APPENDIX 1 LINE PIPE DATA SHEET SUMMARY

PIPELINE SECTION ONSHORE PIPELINE 1


DESIGN DESIGN DESIGN DESIGN DESIGN
FACTOR FACTOR FACTOR FACTOR FACTOR
0.6 0.6 0.6 0.4 0.4
EFFLUENT SOUR GAS SOUR GAS SOUR GAS SOUR GAS SOUR GAS
API STEEL GRADE GRADE B X65 X65 X65 X65
OD NOMINAL (MM) 1” 10” 12” 6” 10”
(33.4mm) (273mm) (323.8mm) (168.3mm) (273mm)
2
ID NOMINAL (MM) 20.7mm 247.6mm 298.4mm 139.7mm 236.5mm
CORROSION ALLOWANCE 3mm 3mm 3mm 5mm 5mm
(MM)
WT NOMINAL (MM) 6.35mm 12.7mm 12.7mm 14.27mm 18.26mm 2
(CA included)
WT TOLERANCES (MM) 5.71-7.30 12.57-14.61 12.57-14.61 12.84-16.41 16.43-21.00 2
LENGTH ACCORDING TO Refer to Refer to Refer to Refer to Refer to
Requisition Requisition Requisition Requisition Requisition
DESIGN TEMPERATURE 0°C 0°C 0°C 0°C 0°C
(STEEL) Min. (STEADY FLOW)
IMPACT TEST
MINI AVERAGE 45 Joules 45 Joules 45 Joules 45 Joules 45 Joules
MINI SINGLE 37 Joules 37 Joules 37 Joules 37 Joules 37 Joules
TEST TEMPERATURE -29°C -29°C -29°C -29°C -29°C
DWTT NA NA NA NA NA
SHEAR AREA MIN
TEST TEMPERATURE
SSCC / HIC TEST No Yes Yes Yes Yes
PWHT TEST No No No No No
MILL HYDROSTATIC 826 375 316 683 539 2
TEST PRESSURE (min) - 90%
MSYS

South Pars Gas Field Development (Phases 9 & 10) Page 10 of 10