PVsyst - Simulation Repor
PVsyst - Simulation Repor
PVsyst TRIAL
Project: October compound
Variant: New simulation variant
No 3D scene defined, no shadings
System power: 10.00 kWp
Madīnat as Sādis min Uktūbar - Egypt
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.2.4
VC0, Simulation date:
29/08/21 14:25
with v7.2.4
Project summary
Geographical Site Situation Project settings
Madīnat as Sādis min Uktūbar Latitude 29.98 °N Albedo 0.20
Egypt Longitude 30.95 °E
Altitude 195 m
PVsyst TRIAL
Time zone UTC+2
Meteo data
Madīnat as Sādis min Uktūbar
Meteonorm 8.0 (1996-2015), Sat=30% - Synthetic
System summary
Grid-Connected System No 3D scene defined, no shadings
System information
PVsyst TRIAL
PV Array Inverters
Nb. of modules 20 units Nb. of units 1 Unit
Pnom total 10.00 kWp Pnom total 10.00 kWac
Pnom ratio 1.000
Results summary
Produced Energy 15.77 MWh/year Specific production 1577 kWh/kWp/year Perf. Ratio PR 80.97 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
PVsyst TRIAL
Special graphs 6
PVsyst TRIAL
29/08/21 PVsyst Evaluation mode Page 2/6
Project: October compound
Variant: New simulation variant
PVsyst V7.2.4
VC0, Simulation date:
29/08/21 14:25
with v7.2.4
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
PVsyst TRIAL
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 5/0° Diffuse Perez, Meteonorm
Circumsolar separate
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model TSM-DE18M-(II)-500 Model Sunny Boy 10000TL U-208
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 500 Wp Unit Nom. Power 10.00 kWac
Number of PV modules 20 units Number of inverters 1 units
PVsyst TRIAL
Nominal (STC)
Modules
At operating cond. (50°C)
Pmpp
U mpp
I mpp
10.00
2 Strings x 10
9.10 kWp
390 V
23 A
kWp
In series
Total power
Operating voltage
Pnom ratio (DC:AC)
10.0
300-480
1.00
kWac
V
Array losses
PVsyst TRIAL
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 3.0 % Module temperature according to irradiance Global array res. 276 mΩ
Uc (const) 29.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
LID - Light Induced Degradation Module Quality Loss Module mismatch losses
Loss Fraction 2.0 % Loss Fraction -0.8 % Loss Fraction 2.0 % at MPP
PVsyst TRIAL
Unavailability of the system
Time fraction 2.0 %
7.3 days,
System losses
3 periods
PVsyst V7.2.4
VC0, Simulation date:
29/08/21 14:25
with v7.2.4
Main results
System Production
Produced Energy 15.77 MWh/year Specific production 1577 kWh/kWp/year
Performance Ratio PR 80.97 %
PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR
PVsyst TRIAL
January
GlobHor
kWh/m²
95.5
DiffHor
kWh/m²
44.71
Balances and main results
T_Amb
°C
14.14
GlobInc
kWh/m²
103.6
GlobEff
kWh/m²
96.6
EArray
MWh
0.907
E_Grid
MWh
0.797
PR
ratio
0.770
February 106.2 52.71 15.60 112.5 105.8 0.984 0.961 0.855
March 156.5 74.20 18.59 162.5 153.9 1.403 1.372 0.845
April 184.3 84.36 21.70 188.0 178.4 1.602 1.569 0.834
May 212.5 90.36 25.86 213.6 203.3 1.785 1.746 0.817
June 220.8 83.17 28.19 220.5 209.8 1.825 1.669 0.757
July 220.1 81.02 29.84 220.4 209.8 1.811 1.760 0.798
August 200.8 83.32 29.87 203.5 193.2 1.675 1.641 0.806
PVsyst TRIAL
September 168.2 67.58 27.63 173.8 164.5 1.444 1.412 0.813
October 135.3 62.38 24.47 142.6 134.4 1.204 1.103 0.773
November 101.1 37.48 19.66 109.7 102.8 0.941 0.917 0.837
December 88.7 37.79 15.84 97.2 90.5 0.844 0.823 0.846
Year 1890.1 799.10 22.66 1947.8 1843.1 16.425 15.770 0.810
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
29/08/21 PVsyst Evaluation mode Page 4/6
Project: October compound
Variant: New simulation variant
PVsyst V7.2.4
VC0, Simulation date:
29/08/21 14:25
with v7.2.4
Loss diagram
1890 kWh/m² Global horizontal irradiation
+3.1% Global incident in coll. plane
PVsyst TRIAL
-2.45% IAM factor on global
PVsyst TRIAL
-2.10% Mismatch loss, modules and strings
PVsyst TRIAL
-1.79% System unavailability
15.77 MWh Energy injected into grid
PVsyst TRIAL
29/08/21 PVsyst Evaluation mode Page 5/6
Project: October compound
Variant: New simulation variant
PVsyst V7.2.4
VC0, Simulation date:
29/08/21 14:25
with v7.2.4
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
29/08/21 PVsyst Evaluation mode Page 6/6