Risk Assessment Manual Sliding Gate

The document provides a risk assessment for the supply and installation of a manual sliding gate. It identifies 4 key activities: 1) manual handling, 2) using electric power tools and equipment, 3) site cleaning, and 4) painting work. For each activity, it lists potential hazards, consequences, existing control measures, risk rating, additional control measures needed, and the acceptability of residual risk. The risk assessment finds that with proper training, use of personal protective equipment, lock out/tag out procedures, supervision, and other additional control measures, the residual risks of all activities are acceptable.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
791 views

Risk Assessment Manual Sliding Gate

The document provides a risk assessment for the supply and installation of a manual sliding gate. It identifies 4 key activities: 1) manual handling, 2) using electric power tools and equipment, 3) site cleaning, and 4) painting work. For each activity, it lists potential hazards, consequences, existing control measures, risk rating, additional control measures needed, and the acceptability of residual risk. The risk assessment finds that with proper training, use of personal protective equipment, lock out/tag out procedures, supervision, and other additional control measures, the residual risks of all activities are acceptable.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RISK ASSESSMENT

Process: Supply & Installation of Manual Sliding Gate Location : Yas Marina Date 25-07-21

Risk Index Residual Risk

Risk Rating

Risk Rating
Likelihood

Likelihood
Sl No Activity Hazard/Impact Consequences Existing Control Measures

Severity

Severity
Additional Control Measures Acceptability of Risk

Personal injury • Trained persons should


Trapping hands / • Provide Manual handling
Ergonomics problem perform the job.
Fingers techniques to the
Manual • Musculoskeletal • Workers wear the right
Between the material employees. • Ensure Tool
1 handling desorders • gloves for the job 3 3 9 2 2 4 Acceptable
Repetitive box talks are conducted •
cuts, bruises, sprains, • Use proper PPEs during job.
movements Ensure the Use of hand
tears, small fractures, • Ensure Entry and extits areas
trolley if needed
muscle strain,back pain are free from storage

• Ensure Lock Out / Tag Out


• Tool Box Talks
procedure followed
• PPE Inspection
• Ensure all the tools &
• Double insulated hand
equipment are using accoring
tools and powertools are
to manufacture instrction
Using Electric used
Electric shock, Noise, Fire,Burns, Death •All electrical operating
2 power ,Hand tools 3 5 15 • Adequate supervision • 2 3 6 Acceptable
Vibration Personal injury, equipmment should be proper
and equipment. Work rests fitted with a
grounded.
gap<3mm between the
•Ensure Task specific PPE's are
edge of the work rest &
used ( Hard hat,safety
the wheel
shoe,gloves,goggles, Ear
protection etc.)

• Maintain good housekeeping


at all times
• Clean up spills/leaks instantly
     Regular follow up
• Properly route cables and
• Sharp object to ensure work place
• Personal injury extension cords
3 Site Cleaning • Falling Object 3 3 9 clean and tidy 2 2 4 Acceptable
• Property damage • Do not leave tools scattered
• Manual Handling • Maintain close
around the work place supervision
• Follow waste management
and ensure timely removal of
waste from site

• As a general rule, avoid skin


and eye contact by wearing
overalls, gloves, goggles, and
air mask etc. • Spillage on
skin should immediately be
removed by thorough washing
with water and soap or
suitable cleaner.
• Paint & fume • Eye & skin respirator, • using of Proper pp
4 Painting Work • Eye should be flushed with 3 3 9 2 2 4 Acceptable
inhalation irritation explorer equipments.
fresh water. Avoid inhalation
of vapours and paint mist by
wearing suitable air mask. In
the event of ingestion and eye
contact, seek medical
attention immediately. •
Local safety regulations should
be followed.

Risk Index Matrix

4
Prepared by Mohammed Samad Approved by RASHID ABOOBACKER