0% found this document useful (0 votes)
42 views4 pages

P1 SH1 P2 SH2 P3: Persons Saw Horses

Uploaded by

vvinaybhardwaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views4 pages

P1 SH1 P2 SH2 P3: Persons Saw Horses

Uploaded by

vvinaybhardwaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Persons Saw horses Operation

P1 SH1 OP1
P2 SH2 OP2
P3 OP3
OP4
OP5
Operation Time
Place joist on saw horses 15
Measure correct length (23 feet) 5 15 5
Mark cutting line for circular saw 5 P1, P2 P1,P2
Trim joist to correct length 20 SH1 SH1
Stack trimmed joist in a designated
20 OP1 OP2
area
Bottleneck (P3, SH2)

p3 100
SH2 66.6
Total bottleneck 166.6

Cost of bottleneck 283.25


Schedule (Time view)

5 15 5 20 5 20
P3 P3
SH1 SH1
OP3 OP4
P1,P2
SH2 Bottleneck (P1, P2, SH2)
OP1, OP2
p1+p2 P1,P2
50 SH1 Bottleneck (P1, P2)
SH2 OP5
16.65 P3
total bottleneck SH2 Bottleneck (P3)
66.65 OP3, OP4
P1+P2 P1,P2
10 SH2
OP5
40
Labour cost per hour 300 5
Machine cost per hour 200 3.333333