SAUDI ARABIAN OIL COMPANY
SA COMMUNITY SERVICES
Saudi Aramco Compound
HAWTAH, Saudi Arabia
Apgoa got |
Sel rare
SCOPE OF WORK
:
OF
5
-_ PURCHASE AND INSTALLATION OF WALK-IN CHILER FE
ae AND FREEZER, HAWTAH. i
Mane E
‘CoRR ig
JULY 2021
wi Aramco: Compan Gensel Use E
FREEZER, HAWTAH woai98) | $K-202001 a wo
fupacadhch: Company Generallise savovanasia | UENO | 28 |i ‘SAUDI ARABIAN OIL COMPANY .
j
GENERAL SERVICES CONTRACT
This project shall be carried out in accordance with all relevant sections
Of the MID-FORM Contract (MFC) - Lump sum, the following Sections, All
5 Relevant Drawings, Standards, Specification and any document referred to
i therein.
i
i
A~ GENERAL REQUIREMENTS
FI
i E
8 TABLE OF CONTENT
: 1.0 GENERAL e
3 2.0 BID SUBMISSION E
ae 3.0 MATERIALS F
4.0 STANDARDS, CODES AND SPECIFICATIONS i
E
5.0 SITE EXAMINATION B
a 2
rn F
late F
a E
“BERATIONS
5
Saudi Aramco; Company General Uss E
| soos GPa owarre|nanraa] woex]| eenwmawa [eveno | wevno |e
3 | PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [=> : 2
FREEZER, HAWTAR A | Sk-202001 & | 00
5 Tannen | otSAUD! ARABIAN OIL COMPANY
MMs.
lf
1.0
GENERAL
1
1.2
13
14
15
16
17
18
19
All WORK shall be performed in good workmanship and safely manner in
accordance with SAUDI ARAMCO Construction Safety Manual and in
relevant General Instruction and SAUDI ARAMCO Standards.
All work shall be executed in strict compliance accordance with the Scope
‘of Work and all relevant Drawing(s).
All Work shown on the Drawing(s) and not included in the Scope of Work
shall be deemed to be included in the work.
All WORK included in the Scope of Work and not shown on the Drawing(s)
shall be included in the WORK.
Any Conflict between the Scope of Work and the Drawings(s) shall be
referred immediately to the SAUDI ARAMCO Project Engineer.
CONTRACTOR is held responsible to complete the project conforming in
all respects to the details and requirements of this Scope of Work as
shown in the Drawings and all applicable Saudi ARAMCO Codes and
Standards.
It is the intent of the Scope of Work to generally describe the major
‘components of the WORK. It shall not be construed to be an itemized
listing of each element of the WORK or procedure for the construction of
the entire project. CONTRACTOR shall include all works necessary for
the proper completion of the project ready for efficient operation
The documents forming the Contract are to be taken as mutually
explanatory of one another and shall be read as a whole. Anything
‘mentioned in the Scope of Work and not shown in the Drawings, or shown
in the Drawings not mentioned in the Scope of Work, shall be of like effect
as if shown or mentioned in both. CONTRACTOR shall promptly refer any
conflict, discrepancy or inconsistency of information between the
documents to the SAUD! ARAMCO Project Engineer, who shall promptly
make a determination in writing within the bid clarification period. Following
award, any adjustment by CONTRACTOR without such determination
shall be at its own risk and expense.
This construction scope of work describes only the technical content of
activities required to construct additional walk-in chiller and freezer.
Details contained therein must be read in conjunction with other contract
documents to obtain complete understanding of the full requirements of
the MID-FORM CONTRACT-LUMPSUM.
CONTRACTOR is responsible for the transportation, food and provide
accommodation to their personnel outside the camp.
Saudi Aramco: Company General Use
‘SCOPE OF WORK owervre [Law no] woe] onawnano. | swrvo. | REVNO.
z -Doc
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND) wae35] a | sK-202001 2 | 0
of
‘sauoranaaia | 20060 aSAUDI ARABIAN OIL COMPANY
i
3 24
22
F
i
23
i
i
2 24
a
“ane 5 34
fh
2.0 BID SUBMISSION
CONTRACTOR shall submit a Lump Sum Bid to supply all labor,
permanent, temporary and expendable materials and equipment including
spare parts required for the completion of the works, unless otherwise
shown on the Bid Drawings and/or described in the Scope of Work and
other Contract Documents,
Prior to submission of Bid, CONTRACTOR should obtain clarification of
all questions which may have arisen as to intent of the Scope of Work, or
any conflict between the Drawings and the Scope of Work or with the
actual site conditions, including possible obstructions during construction
or anything that would prevent or hinders progress of the WORK as.
described in Section 1.9 above.
CONTRACTOR acknowledge that (1) it has fully understood all
requirements to satisfactorily complete the WORK, (2) it had the
‘opportunity to request clarification prior to submitting the Bid as described
in Paragraph 1.2 above, and (3) that the Bid include all the cost of
‘completing the project and all incidental costs or cost of unforeseen
works.
Any failure of the CONTRACTOR to take the actions required and
acknowledged in this Solicitation Provision will not relieve the
CONTRACTOR from responsibilty for estimating properly the difficulty and
cost of successfully performing the WORK or for proceeding to
successfully perform the WORK without additional cost to SAUDI
ARAMCO,
3.0 MATERIALS
CONTRACTOR shall supply all_ permanent, temporary and expendable
materials, equipment and articles including spare parts necessary to
complete the WORK unless specifically described in this Scope of Work,
SSE RT TAT ETT TS BOTT OTT TTT
F
meen and shall be supplied from a source approved by SAUDI ARAMCO and
a meet all relevant SAUDI ARAMCO Standards and Specifications.
“OPERATIONS
3.2 All materials supplied by the CONTRACTOR shall be supplied from a
source approved by Saudi ARAMCO and meet all relevant Saudi
——— ARAMCO Standards and Specifications.
g: 3.3 CONTRACTOR shall submit, prior to procurement, samples of proposed
: eis materials to be used; samples shall be submitted together with the
ae manufacturer's technical data and installation manual, for the study and
| approval of the Saudi ARAMCO Project Engineer.
be
bigee 3.4 Materials will be taken to site only as required and will not be stockpiled at
es g gs the site.
og ‘Saudi Arumea: Compan: Gsneral Use
sHEes SCOPE OF WORK ovanre|rumva[ wor] sewers. [rom [reve
21 £0 & PURCHASE & INSTALLATION OF WALKIN CHILLER AND | DOC [37755 5
H i 2 9 FREEZER, RAWTAH 35] a | sk-202001 + | we
fuliadby Company Generali Tavormaon | AWE 5SAUDI ARABIAN OIL COMPANY
‘OPERATIONS
3.5 The CONTRACTOR shall plan availability of all materials in advance. The
CONTRACTOR shall be responsible for any delays caused due to lack of
availability of CONTRACTOR supplied materials.
3
4.0 STANDARDS, CODES & SPECIFICATIONS
441 CONTRACTOR shall comply with all Codes and Standards specified in
this section and other standards applicable to the work and governed by
applicable organization standards.
ASHRAE American Society of Heating, Refrigerating & Air
Conditioning Engineers
ARI Air Conditioning & Refrigeration Institute
SAMSS
NEMA National Electrical Manufacturer Association
NESC National Electrical Safety Code
NFPA 70 National Electrical Code (NEC)
upc Uniform Plumbing Code
SASO Saudi Arabian Standards Association
4.2 CONTRACTOR shall perform the work in accordance with approved
edition of the following Saudi Aramco Standards & Specification and
industry codes & standards.
SACSM SAUDI ARAMCO Construction Safety Manual
SAES Saudi Aramco Engineering Standard
34-SAMSS-820 _ Instrument Control Cabinets ~ Indoor
SAES-K-001 Saudi Aramco HVAC Standard
‘SAES-K-100 ‘SAUDI ARAMCO Mechanical (HVAC) Code
‘SAES-M-100 ‘Saudi Aramco Building Code
‘SAES-B-001 Saudi Aramco Fire and Safety
SAES-P-100 Basic Power System Design Criteria
SAES-P-101 Regulated Vendors List for Electrical Equipment
SAES-P-113 Motors and Generators
SAES-P-104 Wiring Methods and Materials
SAES-P-111 Grounding
SAES-P-114 Power System and Equipment Protection
sui Ammen: Company General U
RK ‘wo.rere| muantno] woex | _ORAWNGNO. | SHTNO.| REVAO.
PASI ISTUATION OF WALNTGHTIER AND | DOC Fesers | ox 2200 To
‘Company Geneval savoranasa | -028Wo 28SAUDI ARABIAN OIL COMPANY
Lv
ea ED
“OPERATIONS
|
§
3
c
SAES-J-902, Electrical System for Instrumentation
Grounding Connection and Details, Ground rod to
Bp-esoaz2 Ground Grid
G.1.002.100 Work Permit System
4.3. Inthe event of conflict between the above Codes and Standards the more
stringent shall govern.
5.0 SITE EXAMINATION
54 Location
Confine use of site to portion indicated on the plan unless otherwise
authorized by the SAUDI ARAMCO Project Engineer and required by
Contract Documents to perform work outside the area.
5.2 Inspection of Site
5.3 CONTRACTOR shall be held to have examined site before starting work
and to have satisfied himself as to conditions under which he will be
obligated to perform the work. No extra payments will be allowed for
claims for additional work that could have been determined by such
inspection.
END OF GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 PROJECT SUMMARY
3.0 SPECIFIC REQUIREMENTS
4.0 DRAWINGS
5.0 CIVIL/ STRUCTURAL
6.0 MECHANICAL / HVAC.
iE
au Arama: Compan: Generals
SCOPE OF WORK wearrs| rears et] _mwene STO.
, FRGUSE & ISTALATION OF WALKINGHILERAND | POC Traeie] q | sxc amnon ¢
any. Lt savoranaeia | 2278Wo aSAUDI ARABIAN OIL COMPANY
7.0 ELECTRICAL
8.0 INSTRUMENTATION
9.0 TESTING, ADJUSTING AND BALANCING
10.0 FINAL INSPECTION AND COMMISSIONING
11.0 PROJECT COORDINATOR AND WORK SCHEDULE
12.0 TECHNICAL REQUIREMENTS
4.0 INTRODUCTION
44
1.2
a
_ MMe
yn. yn 1.3
Pfr
This Scope of Work must be read in conjunction with the drawings as listed
in Section 3.1 of this Scope of Work.
It is the intent of this Scope of Work to generally describe only the major
components of the work. It shall not be construed to be an itemized listing
of each element of the work or procedure for the construction of the entire
project. All works shown on the drawings shall be performed though not
specifically described herein.
Unless otherwise stated all materials to be used in this project shall be as
described in Section 8.0 “Technical Requirements” of this Scope of Work
and subject for approval by the Saudi ARAMCO Project Engineer.
Noy CONTRACTOR shall:
“OPERATIONS 14
Held responsible to complete the project conforming in all respects to the
details and requirements of this Scope of Work, applicable Saudi ARAMCO
Codes and Standards, Saudi ARAMCO Construction Safety Manual.
ls
TO RERRSOTTTN FLOR FART SAL BE CHT OH
=
23 1.5 Visit the sites prior to bid submission in orderto conduct field
ag investigations, verify the accuracy of SOW and actual site conditions, do
Eble actual measurements and gather data
ates
i 1.6 Clarify all gray areas and inaccuracies found between the drawings, scope
and site conditions. Any doubt shall be reported in writing to CAD before
RK owareelranve ron] owmeve [eee
IRCHASE & INSTALLATION OF WALK-IN CHILLER AND | DOC [5755
2 FREEZER, HAWTAH 35! A | SK-202001 Z 6
asia wun | 28SAUDI ARABIAN OIL COMPANY
3 17
i
18
; 19
i
° 4.40
2
5 141
ie
= 4.12
Lv
aa eS
SSL
‘OPERATIONS
=|
;
bid submission. Failure to do so will hold the contractor responsible for any
extra costs that may arise in order for that certain work item to be closed.
All work in conjunction with this installation shall meet the provisions of this
scope of work, and all applicable SAUDI ARAMCO Engineering Standards.
Review of the material submittals by the Saudi Aramco is for purpose of tracking
the work and contract administration, and shall not relieve the contractor of
responsibility for any deviation from the contract documents, or providing
‘equipment and/or vendor services by the contract documents where were omitted
from the material submittals
It is the sole responsibility of the Contractor to supervise the project as per the
contract agreement.
Only personnel skilled in their respective discipline shall perform the work.
‘Workmanship shall conform to Saudi Aramco Standards. Project Engineer has the
sole authority to determine whether the completed work is satisfactory or not. If in
his assessments any material has not been properly installed or finished, the
contractor shall replace the material wherever required and reinstall them in a
manner entirely satisfactory to the project Engineer without any additional cost to
‘Saudi Aramco.
The contractor shall be responsible for any equipment or installation damaged
caused by his employees, (this includes roads and finished surfaces), during
construction and shall reinstate, replace or repair as directed by the Project
Engineer.
HIP, Execution Plan and material submittals MUST be submitted within a week
upon official project awarding.
2.0 PROJECT SUMMARY
2.1 The scope of work includes the installation of new walk-in chiller
and freezer with structural steel sunshade, _ concrete
footings/pedestals, anchor bolts in Dining hall/Kitchen in Building #
501 complete with the associated piping, accessories, electrical
and instrumentation, The use of appropriate equipment should
apply in this work to ensure proper safety procedures are executed
for this work.
2.2 Electrical works, instrument cabling and installation of other related
electrical devices are indicated in item 6.0 of this scope of works.
Electrical materials used shall be UL or CE approved.
Saudi Aramso: Company Gmc Use
TRA THE DOOEAT
SCOPE OF WORK. owe.77e|punrno] woex] omamnvono,_[wrno | avn
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND DOC Faas
8 FREEZER, HAWTAH v5] a | sk-202001 =| oo
1 General ise suites | mone 28SAUDI ARABIAN OIL COMPANY
3.0 SPECIFIC REQUIREMENTS
3.1.1 CONTRACTOR shall meet with the Saudi ARAMCO Project
Engineer to establish an overall schedule for construction and to
facilitate the required arrangements with least amount of disruption
to the Proponent.
a
ls
3.2Safety Requirements
3.2.1 Without limiting the generality of the application of the SAUDI
ARAMCO Construction Safety Manual (CSM) and other SAUDI
ARAMCO Safety Standards, the Safety Requirements shall include
but not necessarily be limited to the following:
3.2.2 SAUDI ARAMCO Responsibility
3.2.2.1 Saudi ARAMCO Project Engineer in coordination with the
Proponent Organization shall communicate general and
site- safety standards and information to the
CONTRACTOR before beginning on-site work activities.
2
5
E
E
ls
ql
3.2.2.2 Immediately SAUDI ARAMCO Project Engineer shall
conduct joint hazard identification tour with the
CONTRACTOR with the participation of SAUD! ARAMCO.
q FE
11 Proponent Organization (SAPO), Loss Prevention [2
acne Department (LPD), Environmental Protection Department |é
—"Ms_ and other SAUDI ARAMCO agencies as required fe
ENR 3.2.2.3 SAUDI ARAMCO Project Engineer and the SAPO shall LE
Spy ensure that all safety requirements are strictly enforced. IS
=p 5
a 3.2.2.4 SAUDI ARAMCO Project Engineer and Saudi ARAMCO |?
AT Safety Coordinator(s) are responsible for informing |f
ERT CONTRACTOR of Safety Infractions and requirements for |&
- remedial actions and disciplinary actions, e
ig
“OPERATIONS 3.2.3. CONTRACTOR Responsibility
3.2.3.1 CONTRACTOR has overall responsibility for a full time
zo safety in and out of the Work Site in accordance to the
Bs applicable requirements of the SAUD! ARAMCO CSM,
fg Volume 1 Contractor Safety Administrative Requirements
Baie (CSAR) and Volume 2 — Work Site Safety Manual
(WSS).
3.2.3.2 Site Safety Staff
E
2
Saudi Arumeo: Compoany General Lise
owervee| rtawrno] osx | orawneno. | sirno.| aevno. [2
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [73 z
2 FREEZER, HAWTAH ”95) A | SK-202001 & @
ae zapiaeawan | wo 2SAUDI ARABIAN OIL COMPANY
32.3.2.1 CONTRACTOR shall provide full time and qualified
site safety staff in accordance to the requirements
of Volume | Paragraph 4.5 of the SAUDI ARAMCO
CSM or as otherwise required by the SAUDI
ARAMCO Project Engineer during Job Explanation
Meeting.
3.23.3. Safety Meetings
3.2.3.3.1 CONTRACTOR shall conduct daily pre job
(toolbox) craft safety meetings with their personnel
to address job-specific safety issues prior to
beginning a different work activity, which shall also
include a review of the applicable section of the
approved HIP.
3.23.32 CONTRACTOR shall conduct weekly safety
meetings in the native language(s) of the
personnel, The safety meeting shall be no shorter
than 15 minutes and shall cover, but not limited to,
work hazards and related job procedures as well as
a review/update of the HIP.
5 3.2.3.4 Personnel Protective Equipment (PPE)
tt 3.2.3.41 CONTRACTOR shall provide all required Safety
exoneen Harness and proper PPE that meets SAUDI
— Ne ARAMCO specification to its employees in
accordance with Volume | Paragraph 4.8 and
Volume II Paragraph 3.0 of the SAUDI ARAMCO.
CSM.
3.2.3.5 Work Permit
‘congaETON 3.2.3.5.1 CONTRACTOR shall obtain and complete all
required Work Permits in accordance with Volume |
= Paragraph 4.12 and Volume Il, Part | Paragraph 4,
OPERATIONS: of the SAUD! ARAMCO CSM as per the minimum
guidelines and responsibilities set forth in SAUDI
_ ARAMCO General Instruction manual, GI 2.100
af "Work Permit System".
zi 3.2.3.5.2. CONTRACTOR Work Permit Receiver shall have a
5 valid SAUDI ARAMCO Receiver Certificate issued
by Loss Prevention indicating and duly signed by
the SAPO division _headisuperintendent.
Receiver(s) with signed certificate from other
organizationfacility shall not be used at different
e
5
2
8
iE
ui nay General Us iE
Sarre ower] rawrvo] eonx] emnwnane [errno [evn
BURGHASE INSTALLATION OF WALK-INGHILLER AND | DOC > aD
‘2 FREEZER, HAWTAH A ‘SK-202001 at oo
ae saan | 3SAUDI ARABIAN OIL COMPANY
_MMG
“OPERATIONS
organization unless the responsible SAPO
superintendent signs a reissued certificate that
reflects the new organization.
3.2.3.6 Jobsite Safety Logbook (JSL)
3.2.3.8.1 CONTRACTOR shall provide hardbound JSL_at
site for safety comments from Saudi ARAMCO
Safety Coordinators and LPD Safety
Representatives and Proponent Organization
Representatives.
3.2.3.6.2 Copy of minutes of safety meeting and toolbox
meetings should be attached to the JSL for
inspection.
3.2.3.6.3 CONTRACTOR is subject to the requirements of
G1. 5.002 Loss Prevention Policy Implementation.
3.2.3.7 Work During Hot Weather (Heat Stress)
3.2.3.7.1 CONTRACTOR management is responsible for
managing their employees work so as to avoid and
prevent heat related illnesses.
3.2.3.7.2 Heat Stress management shall be the responsibilty
of the CONTRACTOR thus CONTRACTOR shall
conduct a thorough heat stress evaluation to
identify task and conditions that present a potential
heat stress hazard, and subsequently develop and
implement a heat stress management program in
accordance with Volume | Paragraph 4.17 of the
SAUDI ARAMCO CSM.
3.2.3.8 Hazard Identification Plan (HIP)
3.2.3.8.1 Before start of any Work Site activities,
CONTRACTOR shall submit Job Specific Hazard
Identification Plan (HIP) to SAUDI ARAMCO
Project Engineer for review and subsequent
approval by appropriate SAUDI ARAMCO.
Agencies. The HIP shall be developed and
approved in accordance with Volume | Paragraph
6.0 of the SAUDI ARAMCO CSM and shall add all
requirements as’ per joint hazard identification tour
described in Paragraph 3.2.1.2 above.
Saudi Aramew: Conan: Gsnergl Us
le
ls
E
‘SCOPE OF WORK one [puwrne] woe] oraveneno, | servo. [nevno. [E
PURCHASE & INSTALLATION OF WALK-IN CHILLERAND | DOC [= a
2 FREEZER, HAWTAH “35! A | SK-202001 | oo
eT waunianaan | 2 28SAUDI ARABIAN OIL COMPANY
32.3.8.2 CONTRACTOR shall implement and adhere to the
specific HIP.
3.2.3.8.3 CONTRACTOR shall change or amend the HIP
accordingly when conditions change, new hazards
are introduced and/or the scope of work changes.
S
3.2.3.9 Medical
3.2.3.9.1 CONTRACTOR shall provide medical care for its
personnel in accordance to the requirements of
Volume | Paragraph 9.0 of the SAUDI ARAMCO
CSM and the SAUDI ARAMCO Minimum Medical
Standards Requirements (MMSR) Manual.
3.2.3.9.2 CONTRACTOR shall provide First Aid at the Work
Site which is the immediate help provided to injured
or seriously ill personnel prior to arrival of
professional medical assistance.
* CONTRACTOR shall provide and
maintain adequate First Aid
supplies for its personnel per
SAUDI ARAMCO _ General
Instructions Manual, Gl 150.002
“Heart Saver First Aid with CPR
er and AED Training"
= * CONTRACTOR shall provide
i adequate number of personnel at
: the work Site who are trained and
cERTFED certified in First Aid and BLS,
including those in charge of First
wel? Aid supplies.
Sano] 3.2.3.10 Safety Barriers and Project Signs
3.2.3.10.1Before proceeding with the ~— WORK,
Sa ao CONTRACTOR shall erect temporary barricades
35 e .
g: and warning tapes for protection and the safety of
3 the general public throughout construction period,
Bee as required. Remove same upon completion of the
~ tas project or as directed by the Saudi ARAMCO
Project Engineer.
Saudi Aramco: Compan: General Us
‘wo.rves| pLaxTwo] WOEX] —_ORAWNGNO. | ENO. | REUANO,
\
I
| RRSERMSTAOTON OF WAINCHTLERANO] -DOC a
| 2 FREEZER, HAWTAH ¥95) A | SK-202001 2 | oe
Gauoranaaa | 20H 2SAUDI ARABIAN OIL COMPANY,
_ MMs.
LQ
‘OPERATIONS
|
* As and when required by the Work |=
Site conditions, CONTRACTOR
shall erect temporary fence
(obscured) with lockable
pedestrian and vehicle gates
around the construction site.
* Barricades shall be clearly marked
with flagging. Barricades shall
have protective lighting, when
necessary.
3.2.3.11 Fire Protection and Preventions
3.2.3.111CONTRACTOR shall provide appropriate and
adequate firefighting equipment (portable fire
extinguisher(s), hoses or appropriate water
storage).
3.2.3.11.2CONTRACTOR designated site personnel shall be
trained in the use of firefighting equipment to be
used in the Work Site
3.2.3.12 Housekeeping
3.2.3.12.CONTRACTOR shall dispose all_construction
debris or solid waste generated during this project
in approved landfill in accordance to the
requirements of SAUDI ARAMCO Engineering
Standard, SAES-S-007. Collection, storage and
disposal of all nonhazardous and hazardous waste
shall be in accordance with SAUDI ARAMCO
General Instructions, Gl 430.001. Alll Class Il and
Class Ill waste as per SAES 007 are to be
disposed of to the nearest approved SAUDI
ARAMCO Landill Area.
Required SAP EH&S Waste Manifest
shall be prepared, completed and
approved prior to any hazardous
waste disposal at either an authorized
Company or approved
CONTRACTOR disposal site (land
audi Aran: Company Gene! Us
SCOPE OF WORK one |uarno] noe] orwwneno | arwo.| revno. [2
PURCHASE & INSTALLATION OF WALK-IN CHILLERAND | DOC [—- 3
[A See awa A | ‘skeanzoe of | 00
binbadk c. a waunarana | 2 28SAUDI ARABIAN OIL COMPANY
‘OPERATIONS
|
VERIFICATION.
_MMe
4
poe
disposal, land treatment or
incinerators).
3.2.3.12.2CONTRACTOR shall ensure that trash and debris
are properly collected and disposed of daily.
Provide adequate amount of trash receptacles in
the Work Site
3.2.3.12.3Refuse trash and garbage shall only be disposed of
at approved site designated by SAUDI ARAMCO or
local municipality.
3.2.3.13 Emergency Response
3.2.3.13.1CONTRACTOR shall provide appropriate
emergency rescue equipment _(breathing
apparatus, full body harness and life-line, basket
stretcher) during excavation work as applicable.
3,2.3.13.2Edge Protection, Markers and Fixed Lighting
3.2.3.13.2.1 CONTRACTOR shall provide edge
protections, markers and fixed lighting as
necessary in accordance to the
applicable requirements of Volume ll,
Part Il Paragraph 1.11 of the SAUDI
ARAMCO.
3.2.3.14 Food, accommodation & transportation:
3.2.3.14.1CONTRACTOR is the responsible to provide food,
accommodation to their employees during to
execution until the completion of the project.
3.3All WORK shown in the drawings listed in Paragraph 4.0 hereinafter but not
described or specified in this Scope of Work and vice versa shall be
considered part of the WORK.
3.4Before doing any WORK, CONTRACTOR shall verify all measurements at the
construction area for their accuracy. No extra charge or compensation will be
allowed on account of differences in actual dimensions and measurements.
3.5All areas in the vicinity of WORK shall be protected from damage. Any item
that is damaged or marred as a direct or indirect result of the WORK shall be
restored to its original state by the CONTRACTOR. Any items which cannot be
removed shall be protected against the effects of the work and any water
damage or mechanical defect.
saudi Aramco: Compan General Use
E
le
‘SCOPE OF WORK ‘worvre| rlawrno] woex | _onawweno | swrwo.| revno. |Z
PURCHASE & INSTALLATION OF WALK-IN CHILLERAND | -DOC [o7.5
eae ala | sxamor | # | gg
eciiaararil Savoranawa | -O7EWo 23SAUDI ARABIAN OIL COMPANY,
‘3.6Keep the area of WORK clean and orderly at all times, as directed and to the
satisfaction of the Saudi ARAMCO Project Engineer.
3.7No WORK shall be considered complete unless inspected and approved by
the Saudi ARAMCO Project Engineer in conformance with the drawing(s),
Scope of Work and all Saudi ARAMCO Codes, Standards and Specifications.
3.8Upon completion of WORK, cart away all unused materials, containers, debris,
etc., as directed by the Saudi ARAMCO Project Engineer.
4.0 DRAWINGS
4.1 Project Drawings
4.1.1 The following Drawings are referenced as part of this contract. The
contractor is expected to thoroughly familiarize himself with the work
site and with the Drawings and Technical Specifications. Any
discrepancies must be brought to the attention of the Saudi Aramco
engineer immediately. Do not proceed with any work where there is
a known discrepancy until written direction is received from the
Saudi Aramco engineer.
z
z
4.2. As-Built Drawings
4.2.1 Upon Completion of all works, submit one set of “As Built” Drawings
aon to Saudi Aramco Project Engineer. These Drawings shall indicate all
deviations from the contract Drawings and shall include dimensions,
quantities, materials and products used in the construction with
vendors name, address and contact phone numbers.
“As Built” Drawings shall be prepared from records kept up on a
daily basis throughout the duration of the project. The “As Built”
records shall be subjected for examination of Saudi ARAMCO
Project Engineer, signed and concurred prior to the submission of
ena the Contractor's Final Invoice.
we 422 Any SUB-CONTRACTOR performing work under these
‘OPERATIONS
&
5
i
specifications and project Drawings shall provide two sets of “As
Built” marked up print outs to the prime CONTRACTOR periodically
as required by the prime CONTRACTOR,
i 5.0 CIVILISTRUCTURAL
e
E
FE
5.1Demolition Works:
The CONTRACTOR shall,
A
ul Aramco: Conpoans General Use
-boc y
(CHILLER AND. woes] a | sK-202001 =
of | 00
savoraraan | 2SWO |_28i SAUDI ARABIAN OIL COMPANY i
2 5.1.1 Demolish the existing floor slab at new location of walk-in chiller and |:
i freezer including excavation works. le
5 5.1.2 Demolish the existing garbage room having an area of 14 square
3 meters.
5.1.3. Demolish the existing perimeter wall having an area of 34 square
meters.
5.1.4 Demolish the existing step concrete landing having a volume of 1.5
: cubic meters.
i 5.1.5. Clean thoroughly the floor upon completion of demolition E
2
3 5.2 New Works —Concrete Structure: ie
The CONTRACTOR shall; H
z 5.2.1. Excavate and remove compacted sand/marl ready for constrcution fz
3 of reinforced concrete foundations/footings/pedestal/slabs. E
i 622 Construct new foundation including the slabs of the in the walk-in E
a chiller and freezer. Ensure that the new base frame and the Air is
q Cooled Freezer and Chiller unit will properly seat, levelled and a
Tome bolted, maintain proper clearance for the piping. ie
MM
= 5.23 Backfill with 150mm thick 95% density compacted marl for e
Fn reinforced concrete foundations/footings/slabs. e
wv e
q 5.2.4 Concrete Works: 3
Tare i
BY 5.2.4.1 Place concrete in accordance with SAES-Q-001, chapter [&
ge 8, and as herein specified. B
Teen FT
5.2.4.2 Construct reinforced concrete Foundations /footings/slabs |
= Pedestal for walk-in chiller and freezer. ‘4
‘OPERATIONS H
5.2.4.2.1 Provide 6 mil polyethylene sheet vapor barrier i
3: 5.2.4.2.2 Pour 50mm thick lean concrete prior to the |:
i 2 Construction of concrete footing. 8
£ e
Bae 5.2.4.2.3 Apply two (2) coats of bituminous paint to all |é
Z Reinforced concrete exposed to earth before
Backfilling
qui Aramco: Company General Us
SCOPE OF WORK oven [ouwrvo] noe] orawmnene. | sitno.
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [37 => 16
REEZER, HAWTAH A ‘SK-202001 Pe 00
bated c c Taunranaan | FO 4SAUDI ARABIAN OIL COMPANY
2
3
wee
‘OPERATIONS
324.24 Construct 4000 psi, reinforced concrete
Foundations/pedestals with Sched. 60 Reinforcing
Bars. (See attached detail Drawing)
Note: Contractor shall provide concrete cylinder
and
Rebar testing result from the third party
Testing laboratories. Testing should
Witness by the project engineer.
5.2.4.2.5 Concrete shall be consolidated thoroughly by use
of Mechanical vibrators in accordance with SAES-
Q.001, chapter 8.
5.2.4.2.6 Limit the time of vibrating consolidation to prevent
Bringing an excess of fine aggregate to the surface,
Curing and protection of concrete shall be in
accordance with SAES-Q-001, chapter 11
:
:
E
5.2.5 Protect all building components from grout spillage, water or any
damage occurring during the construction of this concrete pad
works
5.2.6 The floor shall be thoroughly cleaned upon completion of the
concrete pad and grouting operations as part of housekeeping
procedure
5.2.7 Contractor to apply epoxy paint to existing and new concrete
foundation. Color should be matching the existing foundation
The CONTRACTOR shall;
6.3.1 Supply, fabricate and install structural column, SHS 200 x 8mm,
ASTM-A36 (Hot dipped galvanized), 400mm x 400mm x 20mm base
plate ASTM A36 (Hot dipped galvanized), 20mm ® x 450mm rod
ASTM A36 w/ double nut and single washer (Hot dipped galvanized)
including accessories to complete the job. See attached drawing
details.
5.3.2 Supply, fabricate and install purlins, RHS 150x50x6 ASTM-A36 (Hot
dipped galvanized) including accessories to complete the job. See
attached drawing details.
5.3.3 Supply, fabricate and install roof structure, SHS 160mm x 8mm
ASTM-A36 (Hot dipped galvanized), SHS 100mm x 8mm ASTM-
A36 (Hot dipped galvanized) bracing including steel deck: P3615
URCHASE & INSTALLATION OF WALK-IN CHILLER AND | DOC [>> 19
A | SK-202001
of | 00
Gaupraniea | ORO 28SAUDI ARABIAN OIL COMPANY
~
b
716
7.4.1 Contractor shall verify the existing conditions at site. Switch off, lock-
out and tag all related power supply before start of any work. Power
supply isolation shall comply with the requirements of G. |. 6. 012
“Isolation, Lock-out and Use of Hold Tags”.
Before conducting any electrical work, the Contractor shall obtain
work permit, take all necessary precautions and make sure to keep
the site a safe and clean working environment
All works to be performed shall be properly coordinated to the
proponent, Loss Prevention Division, Fire Department and the
Building Occupants that will be affected during the performance of
the replacement work.
Work procedures, Hazard Identification Plan and schedule of
activities shall be submitted to the proponent and Area Safety
Coordination Group for review before performing any electrical
works
Contractor's electrician should have a valid Saudi Aramco Electrical
Hazard Recognition (EHR) Certificate to perform any work on
electrical equipment at higher than 240Volts.
The Contractor shall be responsible to clean-up all waste materials
during demolition works and coordinate with Saudi Aramco Project
Engineer/Representative for proper waste disposal.
enonece 7.2 NEW Works
_Mme.
7.2.2
OPERATIONS
FF
7.24
ireanion
7.2.5
_—_________________ Sut Aramso: Company General
Contractor shall
Ensure that all electrical works shall be performed in accordance
with the Saudi Aramco Engineering Standards in force at the time of
bidding, including, but not limited to, the latest issue of the National
Electrical Code and National Electrical Manufacturers Association
standards and recommendation.
See to it that all materials used shall comply with the requirements
of Saudi Aramco Material System Specification (SAMSS) or
equivalent. The CONTRACTOR shall verify site location and
condition of work area, conduct inspection and check possible
obstruction to new location. Notify the Saudi Aramco Project
Engineer for any discrepancy prior to execute the work.
Plan and coordinate the installation to eliminate interference with
other trades. Where interferences occur, the Saudi Aramco
Representative shall decide which items must be relocated.
Provide all necessary fittings, boxes, conduit bodies and supporting
materials required for a planned and neat installation even if not
indicated in the drawing
‘SCOPE OF WORK _ Dwarvee| antno] woex| —_oRAMNGNO. | SHINO. | REVO,
z -Doc
IRGUSE & INSTALLATION OF WALKIN CHILLER AND wee] a | sx-2oz001 20
. of | 00
ibibo ca Pee Savoraraain | 207EW0 28SAUDI ARABIAN OIL COMPANY
_Mme
‘OPERATIONS
|
veriricarion
7.2.6 Confirm that no sharp & rough edges in any metallic installation,
particularly where cable tends to be pulled. Where a conduit enters
box, fitting, or other enclosure, a bushing shall be provided to
protect the wire from abrasion unless the design of the box, fitting, or
enclosure is such as to afford equivalent protection
7.2.7 Ensure that all exposed metallic materials are protected from
corrosion. Galvanization paint is required to restore corrosion
protection requirement whenever cutting, filing or bolt tightening is
performed
7.2.8 Perform cable test prior to termination to guarantee the acceptability
of cables before placing into service. Test results shall be recorded
in a test plan and test equipment to be used shall have a valid
calibration certificate at the time of testing. The same shall be
submitted to the Saudi Aramco Engineer/representative.
7.29 Color-code each conductor entering every box, cabinet, panelboard,
through and wire way with a heat-shrinkable type or Scotch No. 35
color-coding tape.
Power cables shall follow the color coding for phase identification as
per SAES-P-104 section 6.11.3.
7.2.10 Be responsible for the cable schedule and cable routing. Cables at
termination points shall be identified by the use of permanently
embossed wire markers of the heat-shrinkable or slip-on type based
on the cable schedule.
7.2.11 Perform the continuity and insulation test for the electrical motor
driving the pump before putting into service. Test data should be
recorded in a test plan and all values must be acceptable against
the standard recommended values before motor energization.
7.2.12 Install systems, materials, and equipment level and plumb, parallel
and perpendicular to other equipment systems and components.
7.2.13 Install electrical equipment to facilitate servicing, maintenance, and
repair or replacement of equipment components. As much as
practical, connect equipment for ease of disconnecting, with minimal
interference with other installations.
7.2.14 Ensure that the new equipment shall have the electrical rating as
specified in the drawings and scope of work. Whenever new
equipment with higher rating shall be provided, contractor shall be
responsible in upgrading the system at no cost against Saudi
Aramco,
7.2.15 Whenever necessary, provide materials and accessories even if not
mentioned in the Scope of Works or not reflected from the drawings
when deemed as required in order for the replaced equipment to
operate safely and without a glitch.
:
;
:
udi ea: General Us
a
IRCH! INSTALLATION OF WALK-IN .DOC
ECE oma | Bee a | aan | 2 | og
i y Wu ‘sauorARAsia | JOEWO a_ ms
wv
=p ED
HMA
mn
SAUDI ARABIAN OIL COMPANY
7.2.16 Install new breaker for Chiller 40A, 220V 100AF NEMA 4X, Fusible |
Heavy Duty Disconnect Switches beside each new Chiller. Unistrut
channel structural supports of Hot-Dipped galvanized material shall
be provided as well to support and provide a rigid installation.
7.2.17 Install new breaker for Freezer 40A, 220V 100AF NEMA 4X, Fusible
Heavy Duty Disconnect Switches beside each new Chiller. Unistrut
channel structural supports of Hot-Dipped galvanized material shall
be provided as well to support and provide a rigid installation.
7.2.18 Install new contactor with for Chiller 30A, 3 poles 220 V coil. Install
overload relay range 5-25 amp.
7.2.19 Install new contactor with for Freezer 50A, 3 poles 220 V coil. Install
overload relay range 10-30 amp
7.2.20 Saw cut excavate trench for new chiller feeder cable(s) installation.
Trench depth and dimensions shall follow the SAES requirement for
a specified voltage and its finished surface shall be restored to
original or better after the cables have been laid.
7.2.21 Assure that new cable trench route shall be carefully planned and
studied by the contractor to avoid electrical service disturbance with
other loads. When deemed as necessary, Ground Penetrating
Radar shall be used to detect the existence of live conductors in
possible pathways. Cables shall be rerouted when necessary.
7.2.22 Lay out new cable 8AWG x 3-1/C or 6mm? Cu. (10AWG) chiller,
THHN-2 cable, rated 0.6/1 kV to ground + 4-1/C 10mm? (BAWG)
grounding cable from the panel board to the new chiller.
7.2.23 Lay out new cable 8AWG x 3-1/C or 10mm? Cu. (AWG) freezer,
THHN-2 cable, rated 0.6/1 kV to ground + 4-1/C 10mm? (8 AWG)
grounding cable from the panel board to the new freezer.
7.2.24 Install and layout new 2 x 2° Flexible Liquid tight Metallic Conduit,
conduit fittings and support, and connect to the new chiller electrical
compartment.
7.2.25 Ensure that protective relay setting of Chiller and Freezer upstream
protective relay devices in the panel board matches the new load
configuration.
7.2.26 Guarantee that all materials to be used shall be ULL. listed or
approved equal.
ud Aramco: Company Gens Us
RK owervee| Lanta] woe] oRAWWGHO. | SHTNO | REVO
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [>7=> 22
2 FREEZER, HAWTAH
A | SK-202001
of | 00
8: ‘SAUDI ARABIAN OIL COMPANY
g 7.2.27 Reconnect existing grounding conductor to the metal frame of the _ |
E new Chiller and other accessories. When it is not found in the new
z installation, new grounding conductor that shall be connected to the
3 grounding grid shall be provided.
F 7.2.28 Functional test shall be conducted on the equipment with the
presence of Saudi Aramco Project Engineer/Representative. Any
defective installation and deficiencies found and required for the
operation of the chiller shall be immediately and properly rectified by
the contractor without additional cost to Saudi Aramco. All test
results must be submitted thereafter.
5 8.0 INSTRUMENTATION
2 -NIA
9.0 TESTING, ADJUSTING AND BALANCING
9.1 Testing, Adjusting and Balancing works shall be carried out by a Certified
5 Saudi Aramco contractor.
3 9.2Testing, Adjusting and Balancing shall be conducted in accordance with
: SAES-K-001, Section 6.0 (Testing, Adjusting and Balancing).
5
9.3Test the refrigeration system on the chiller and freezer equipment shown on
J project drawings and record the actual readings.
nie 9.4Sound and Vibration test is required in accordance with SAES A-112.
Bese 40.0 FINAL INSPECTION AND COMMISSIONING
A 10.1 Final Inspection
ae 10.1.1 Before the final inspection takes place, all tests required by this
mA ‘scope of work or by the project engineer must be completed and
‘conga accepted by the Saudi Aramco Engineer.
10.1.2 The Contractor will request the final inspection at least one week in
aa advance. The request will be in writing and must include a statement
certifying that the job is substantially complete and ready for final
inspection.
=
3 10.1.3 Any items found to be deficient will be included in a punch list
g 3 prepared by the Saudi Aramco Engineer. The Contractor is
3 encouraged to have adequate manpower available during the final
2.8 inspection so that minor discrepancies can be corrected on the spot
|
and not included on the punch list.
10.1.1 All punch list items must be corrected within two weeks after the
contractor receives the official punch list. The Contractor and
Si rams: Coppa Grp se
SCOPE OF WORK rcnrr|ranro[ vee] eeamore, [enae [een
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | DOC [5/35
FREEZER, HAWTAH 735] a | SK-202001 BT oo
any. m Tamara | oaSAUDI ARABIAN OIL COMPANY,
_MMG
Lv
i
Fh
‘OPERATIONS
fubatabeh cy G wavoraraaa | 20180. | 28
the Saudi Aramco engineer will jointly inspect each completed
punch list item to verify correction.
10.2 Commissioning
10.2.1 CONTRACTOR shall arrange with the vendor to
assis/participate for the complete testing & commissioning of
the new equipment
10.2.2CONTRACTOR shall submit all tests reports for review and
approval during the testing and commissioning.
10.3 Warranty
10.3.1 CONTRACTOR shall provide a minimum 3year warranty of the
equipment after hand-over of the project
14.0 PROJECT COORDINATION AND WORK SCHEDULE
14.1. The work will be executed in an operational facility. The CONTRACTOR
will be required to pay maximum attention to ensure smooth project
execution. Shutdown or isolation any operating equipment shall be
coordinated to Saudi Aramco Representative and approved by Operation &
Proponent.
14.2. The project will be executed with no or minimum disruption to the facility
operation or activity. Contractor might be asked to work two shift schedules
after Normal Working hours, on the weekends and holidays.
11.3 CONTRACTOR work schedule shall change subject to the demands of
Saudi Aramco and their need to coordinate the work with other activities.
12.0 TECHNICAL REQUIREMENTS
12.1. MECHANICAL / HVAC
12.1.1 Freezer
Brand / Model Any
Cooling Capacity _3.59Kw
Room range temp. 10 ~-19.
Refrigerant R404
Power Supply 208/120 Volt 60Hz/ 3PH.
12.1.2 Chiller
Brand / Model Any
Cooling Capacity 2.62Kw
Room range temp. +1~ +6,
Refrigerant R404
Power Supply 208/120 Volt 60Hz/ 3PH
Saud uns Croan Gn
ls
I
A
FE
5
i
‘SCOPE OF WORK fowervee tanta] woe] onawncno. | survo. | revno. |!
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | “DOC [735 24
202001
A | SK-202001 24 | 0SAUDI ARABIAN OIL COMPANY
12.1.3
SRT
12.1.4
=
Other chiller and freezer requirements and specifications:
Factory assembled, single-piece chassis, air-cooled chiller unit
Contained within the unit cabinet shall be all factory wiring,
refrigerant piping, controls, refrigerant charge (R404), and
special features required prior to field start-up.
Unit will be having Microprocessor based controls capable of
controlling and providing safety to the chiller. Frame shall be of
heavy-gage, painted galvanized steel. Cabinet shall be
galvanized steel casing with a baked enamel powder or pre-
painted finish. Cabinet shall be capable of withstanding 500-hr
salt spray test in accordance with the ASTM B-117 Standard.
Condenser fans shall be direct-driven and rpm shall conform to
manufacturer requirements, shrouded-axial type, and shall be
statically and dynamically balanced with inherent corrosion
resistance. A\ir shall be discharged vertically upward. Fans shall
be protected by steel wire safety guards. Fan Motor shall be
protected by motor temperature sensors.
Chiller and freezer shall have a maximum water-side pressure of
300 psig. Chiller and Freezer shall have a cooler drain and vent.
Low-ambient protection: unit shall have factory-installed cooler
heater. Refrigerant circuit components shall include replaceable
core filter drier, moisture indicating sight glass, electronic
expansion device, and suction/discharge service valves/ports for
charging of refrigerant or checking refrigerant pressures.
Flexible Rubber Coupling: Rubber expansion joints shall be of
duck and rubber construction with full - faced integral duck.
Expansion joints shall be internally reinforced and furnished
complete with steel retaining rings and capable of operating at a
temperature of 20°F through 240°F and a pressure ranging from
16" Hg vacuum through 214 psi (15 kg/cm2) working pressure
Anti-Vibration Pad: Elastomeric, cross-ribbed design, % in,
standard size, 50 Ib/sq. in. maximum loading capacity
Manufacturer Reference- Mason Industries Inc. or approved
equal
12.2 ELECTRICAL
ie
B
12.2.4 Cable: 8AWG x 3-1/C or 6mm? Cu. (10 AWG) chiller, THHN-
2;crosslinked polyethylene abrasion, moisture, and heat resistant
insulation; Annealed copper per ASTM B3; Class B stranding per
jausdi Aramco: Company General Use.
SCOPE OF WORK Onarr7|puvo] woex] _ommwmone, | enna | avn
PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [275
| CrREEZER, nAWTArI 95) A | SK-202001 FT oo
i del corpergiomacl Tauern | 2 orSAUDI ARABIAN OIL COMPANY
_Mme
ev
OPERATIONS
3
veriricarion
12.2.2
12.2.3
12.24
12.2.5
12.2.6
12.2.7
12.2.8
12.2.9
ASTM B68, 90° C in WETIDRY location; UL Listed as per
standard 44. Suitable separator over the conductor is preferred.
Grounding: 10mm? single core; Soft Annealed Copper, Class 2
stranded conductor; Thermoplastic PVC insulation(green/yellow); 90
deg. C; Heat Resistant;
Conduit: PVC Externally Coated Rigid Steel Conduit and Fittings:
2.0°; shall be as per ANSIC80.1, NPT Threaded, hot-dip
galvanized and PVC coated per NEMA RNI (with minimum
thickness of PVC. 40mils)
Conduit: Flexible Liquidtight; 2.0"; steel; zinc electroplated; with
gray extruded PVC outer jacket; oil resistant and liquid-tight; suitable
for 0 deg. to 105 deg.; conforms to UL STD 360.
Connector: 2°; Flexible liquid-tight conduit steel fittings only; 40
mil gray PVC exterior coating; 2 mil urethane interior coating;
Sealing sleeves on all conduit openings; with external grounding lug;
straight; with male thread and locknut.
Body, Conduit: 2°@; Urethane coating on interior and exterior; 40
mil PVC coating is bonded to the exterior; Pressure ceiling sleeves
on all threaded hubs; with encapsulated stainless steel screws for
covers ; elbow shape; with input threaded CND hubs; with cover
Body, Conduit: Type LB; 2°; Urethane coating on interior and
exterior, 40 mil PVC coating is bonded to the exterior; Pressure
ceiling sleeves on all threaded hubs; with encapsulated stainless
steel screws for covers ; elbow shape; with input threaded CND
hubs; with cover;
Bushing, Conduit: 2.0" 9; rigid, threaded NPT, zinc electroplated
with Insulated throat, stee! or malleable iron, Ul-467, 514,insulated
grounding, with insulated throat, with tin plated alum lay in grounding
lug connector and plated steel screw, 150 Deg C temp rating.
Tie: Cable; 1.6-31.8 mm (1/16 to 1-3/4 In) dia. Range, 198.4 mm
(7.81 In) long, 3.2 mm (1/8 In) width, nylon, 206N (50 Ib) tensile,
self-locking, No.10 mounting hole, -40 to 85°C (-40 to 185°F),
outdoor, black, Mil-23190, Ci-1, cable strap & clamp, 100/pk
12.2.10 Tape Electrical Insulation: insulating, roll, 19.1 Mm (3/4 In)
width 0.18 Mm (0.007 In) thick , 20.12 M (66 Ft) long, vinyl plastic,
color coding
E
E
E
B
z
ie
fe
iS
iE
E
5
Saudi rum: Company Gent Use
‘ SCOPE OF WORK overve[ranra[ nen] eewmene [one [vo
3 [PURCHASER INSTALLATION OF WALK-INCHIMIERAND | -DOC J,
5 2 8 FREEZER, RAWTAH 24738! a | sk-202001 ae
peepee wueawon [ne eiSAUDI ARABIAN OIL COMPANY
12.2.11 Metal Framing Parts:
Unistrut: For Structural Framing and Support Systems; steel;
Galvanized; with clamp std pipe type; with bolt and nut; 1” in size.
12.2.12 Heavy Duty Disconnect Safety Switch, 100A, 220 VAC
maximum, 3 Pole, GE brand or approved equal)
Visible switch blades with positive "OFF" indication
Quick-make, quick break operating mechanism
Dual cover interlock
Color coded “ON” — “OFF” indicator handle
Cover padlock hasp and handle lock "OFF" provision for
multiple padlocks
+ Non-Fusible type
* — Horsepower rated for motor applications
* Enclosure: NEMA 4X (stainless steel! Type 316)
12.2.13 Terminal Lug: size 240-500mm?, Two- hole, Vertical Two-Barrel
Lug; Dual barrel provides termination of two conductors; Tin-plated
to inhibit corrosion; Inspection window to visually assure full
conductor insertion; UL Listed and CSA Certified for use up to 600 V
and UL temperature rated 90°C
J 12.2.14 Recommended Vendors: A
‘one 12.2.14.1.1_ WESCOSA i
— "Me Tel, #: 810-0234 x 349 | Fax #: 03-847-1967 l2
“Te 12.2.14.1.2 Riyadh Cables ie
Tel. #: 858-0637 Ext. 332 | Fax #: 857-8459 H
CERTEED 12.2.14.1.3 Abdulkarim Trading (GE distributor) B
Ma Tel.#: 834-3485; Fax #: 832-2466
fel) 12.2.14.1.4 A. Abunayyan (GE distributor)
Teen Tel.#: 833-2177 | Fax #: 833-2923 Ext.108
‘OPERATIONS
lf
veriricarion
END OF SCOPE OF WORK> E
a Acanc: Compu Gn 5
SCOPE OF WORK ann [romo[ven] emma [oro [am |?
roo wen | POC Fv] g | seaman | 27 | og
* of
Lint mapa anal Sain — [RS ctSAUDI ARABIAN OIL COMPANY
DSCraE
nonce
_MMG
Lv
CERTIEED
‘OPERATIONS
|
[=
i
i
i
Saudi Aramco: C
se
iS
ig
eS
iS
ORANG HO.
E
F
SCOPE OF WORK.
PURCHASE & INSTALLATION OF WALK-1
(CHILLER AND
FREEZER, HAWTAH
waa735| Aq
SK-202001
Broo
SAUOLARABIA
od
of | 00
pany LL