0% found this document useful (0 votes)
208 views

SOW

Scope of work

Uploaded by

Reehan Aslam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
208 views

SOW

Scope of work

Uploaded by

Reehan Aslam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 28
SAUDI ARABIAN OIL COMPANY SA COMMUNITY SERVICES Saudi Aramco Compound HAWTAH, Saudi Arabia Apgoa got | Sel rare SCOPE OF WORK : OF 5 -_ PURCHASE AND INSTALLATION OF WALK-IN CHILER FE ae AND FREEZER, HAWTAH. i Mane E ‘CoRR ig JULY 2021 wi Aramco: Compan Gensel Use E FREEZER, HAWTAH woai98) | $K-202001 a wo fupacadhch: Company Generallise savovanasia | UENO | 28 | i ‘SAUDI ARABIAN OIL COMPANY . j GENERAL SERVICES CONTRACT This project shall be carried out in accordance with all relevant sections Of the MID-FORM Contract (MFC) - Lump sum, the following Sections, All 5 Relevant Drawings, Standards, Specification and any document referred to i therein. i i A~ GENERAL REQUIREMENTS FI i E 8 TABLE OF CONTENT : 1.0 GENERAL e 3 2.0 BID SUBMISSION E ae 3.0 MATERIALS F 4.0 STANDARDS, CODES AND SPECIFICATIONS i E 5.0 SITE EXAMINATION B a 2 rn F late F a E “BERATIONS 5 Saudi Aramco; Company General Uss E | soos GPa owarre|nanraa] woex]| eenwmawa [eveno | wevno |e 3 | PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [=> : 2 FREEZER, HAWTAR A | Sk-202001 & | 00 5 Tannen | ot SAUD! ARABIAN OIL COMPANY MMs. lf 1.0 GENERAL 1 1.2 13 14 15 16 17 18 19 All WORK shall be performed in good workmanship and safely manner in accordance with SAUDI ARAMCO Construction Safety Manual and in relevant General Instruction and SAUDI ARAMCO Standards. All work shall be executed in strict compliance accordance with the Scope ‘of Work and all relevant Drawing(s). All Work shown on the Drawing(s) and not included in the Scope of Work shall be deemed to be included in the work. All WORK included in the Scope of Work and not shown on the Drawing(s) shall be included in the WORK. Any Conflict between the Scope of Work and the Drawings(s) shall be referred immediately to the SAUDI ARAMCO Project Engineer. CONTRACTOR is held responsible to complete the project conforming in all respects to the details and requirements of this Scope of Work as shown in the Drawings and all applicable Saudi ARAMCO Codes and Standards. It is the intent of the Scope of Work to generally describe the major ‘components of the WORK. It shall not be construed to be an itemized listing of each element of the WORK or procedure for the construction of the entire project. CONTRACTOR shall include all works necessary for the proper completion of the project ready for efficient operation The documents forming the Contract are to be taken as mutually explanatory of one another and shall be read as a whole. Anything ‘mentioned in the Scope of Work and not shown in the Drawings, or shown in the Drawings not mentioned in the Scope of Work, shall be of like effect as if shown or mentioned in both. CONTRACTOR shall promptly refer any conflict, discrepancy or inconsistency of information between the documents to the SAUD! ARAMCO Project Engineer, who shall promptly make a determination in writing within the bid clarification period. Following award, any adjustment by CONTRACTOR without such determination shall be at its own risk and expense. This construction scope of work describes only the technical content of activities required to construct additional walk-in chiller and freezer. Details contained therein must be read in conjunction with other contract documents to obtain complete understanding of the full requirements of the MID-FORM CONTRACT-LUMPSUM. CONTRACTOR is responsible for the transportation, food and provide accommodation to their personnel outside the camp. Saudi Aramco: Company General Use ‘SCOPE OF WORK owervre [Law no] woe] onawnano. | swrvo. | REVNO. z -Doc PURCHASE & INSTALLATION OF WALK-IN CHILLER AND) wae35] a | sK-202001 2 | 0 of ‘sauoranaaia | 20060 a SAUDI ARABIAN OIL COMPANY i 3 24 22 F i 23 i i 2 24 a “ane 5 34 fh 2.0 BID SUBMISSION CONTRACTOR shall submit a Lump Sum Bid to supply all labor, permanent, temporary and expendable materials and equipment including spare parts required for the completion of the works, unless otherwise shown on the Bid Drawings and/or described in the Scope of Work and other Contract Documents, Prior to submission of Bid, CONTRACTOR should obtain clarification of all questions which may have arisen as to intent of the Scope of Work, or any conflict between the Drawings and the Scope of Work or with the actual site conditions, including possible obstructions during construction or anything that would prevent or hinders progress of the WORK as. described in Section 1.9 above. CONTRACTOR acknowledge that (1) it has fully understood all requirements to satisfactorily complete the WORK, (2) it had the ‘opportunity to request clarification prior to submitting the Bid as described in Paragraph 1.2 above, and (3) that the Bid include all the cost of ‘completing the project and all incidental costs or cost of unforeseen works. Any failure of the CONTRACTOR to take the actions required and acknowledged in this Solicitation Provision will not relieve the CONTRACTOR from responsibilty for estimating properly the difficulty and cost of successfully performing the WORK or for proceeding to successfully perform the WORK without additional cost to SAUDI ARAMCO, 3.0 MATERIALS CONTRACTOR shall supply all_ permanent, temporary and expendable materials, equipment and articles including spare parts necessary to complete the WORK unless specifically described in this Scope of Work, SSE RT TAT ETT TS BOTT OTT TTT F meen and shall be supplied from a source approved by SAUDI ARAMCO and a meet all relevant SAUDI ARAMCO Standards and Specifications. “OPERATIONS 3.2 All materials supplied by the CONTRACTOR shall be supplied from a source approved by Saudi ARAMCO and meet all relevant Saudi ——— ARAMCO Standards and Specifications. g: 3.3 CONTRACTOR shall submit, prior to procurement, samples of proposed : eis materials to be used; samples shall be submitted together with the ae manufacturer's technical data and installation manual, for the study and | approval of the Saudi ARAMCO Project Engineer. be bigee 3.4 Materials will be taken to site only as required and will not be stockpiled at es g gs the site. og ‘Saudi Arumea: Compan: Gsneral Use sHEes SCOPE OF WORK ovanre|rumva[ wor] sewers. [rom [reve 21 £0 & PURCHASE & INSTALLATION OF WALKIN CHILLER AND | DOC [37755 5 H i 2 9 FREEZER, RAWTAH 35] a | sk-202001 + | we fuliadby Company Generali Tavormaon | AWE 5 SAUDI ARABIAN OIL COMPANY ‘OPERATIONS 3.5 The CONTRACTOR shall plan availability of all materials in advance. The CONTRACTOR shall be responsible for any delays caused due to lack of availability of CONTRACTOR supplied materials. 3 4.0 STANDARDS, CODES & SPECIFICATIONS 441 CONTRACTOR shall comply with all Codes and Standards specified in this section and other standards applicable to the work and governed by applicable organization standards. ASHRAE American Society of Heating, Refrigerating & Air Conditioning Engineers ARI Air Conditioning & Refrigeration Institute SAMSS NEMA National Electrical Manufacturer Association NESC National Electrical Safety Code NFPA 70 National Electrical Code (NEC) upc Uniform Plumbing Code SASO Saudi Arabian Standards Association 4.2 CONTRACTOR shall perform the work in accordance with approved edition of the following Saudi Aramco Standards & Specification and industry codes & standards. SACSM SAUDI ARAMCO Construction Safety Manual SAES Saudi Aramco Engineering Standard 34-SAMSS-820 _ Instrument Control Cabinets ~ Indoor SAES-K-001 Saudi Aramco HVAC Standard ‘SAES-K-100 ‘SAUDI ARAMCO Mechanical (HVAC) Code ‘SAES-M-100 ‘Saudi Aramco Building Code ‘SAES-B-001 Saudi Aramco Fire and Safety SAES-P-100 Basic Power System Design Criteria SAES-P-101 Regulated Vendors List for Electrical Equipment SAES-P-113 Motors and Generators SAES-P-104 Wiring Methods and Materials SAES-P-111 Grounding SAES-P-114 Power System and Equipment Protection sui Ammen: Company General U RK ‘wo.rere| muantno] woex | _ORAWNGNO. | SHTNO.| REVAO. PASI ISTUATION OF WALNTGHTIER AND | DOC Fesers | ox 2200 To ‘Company Geneval savoranasa | -028Wo 28 SAUDI ARABIAN OIL COMPANY Lv ea ED “OPERATIONS | § 3 c SAES-J-902, Electrical System for Instrumentation Grounding Connection and Details, Ground rod to Bp-esoaz2 Ground Grid G.1.002.100 Work Permit System 4.3. Inthe event of conflict between the above Codes and Standards the more stringent shall govern. 5.0 SITE EXAMINATION 54 Location Confine use of site to portion indicated on the plan unless otherwise authorized by the SAUDI ARAMCO Project Engineer and required by Contract Documents to perform work outside the area. 5.2 Inspection of Site 5.3 CONTRACTOR shall be held to have examined site before starting work and to have satisfied himself as to conditions under which he will be obligated to perform the work. No extra payments will be allowed for claims for additional work that could have been determined by such inspection. END OF GENERAL REQUIREMENTS TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 PROJECT SUMMARY 3.0 SPECIFIC REQUIREMENTS 4.0 DRAWINGS 5.0 CIVIL/ STRUCTURAL 6.0 MECHANICAL / HVAC. iE au Arama: Compan: Generals SCOPE OF WORK wearrs| rears et] _mwene STO. , FRGUSE & ISTALATION OF WALKINGHILERAND | POC Traeie] q | sxc amnon ¢ any. Lt savoranaeia | 2278Wo a SAUDI ARABIAN OIL COMPANY 7.0 ELECTRICAL 8.0 INSTRUMENTATION 9.0 TESTING, ADJUSTING AND BALANCING 10.0 FINAL INSPECTION AND COMMISSIONING 11.0 PROJECT COORDINATOR AND WORK SCHEDULE 12.0 TECHNICAL REQUIREMENTS 4.0 INTRODUCTION 44 1.2 a _ MMe yn. yn 1.3 Pfr This Scope of Work must be read in conjunction with the drawings as listed in Section 3.1 of this Scope of Work. It is the intent of this Scope of Work to generally describe only the major components of the work. It shall not be construed to be an itemized listing of each element of the work or procedure for the construction of the entire project. All works shown on the drawings shall be performed though not specifically described herein. Unless otherwise stated all materials to be used in this project shall be as described in Section 8.0 “Technical Requirements” of this Scope of Work and subject for approval by the Saudi ARAMCO Project Engineer. Noy CONTRACTOR shall: “OPERATIONS 14 Held responsible to complete the project conforming in all respects to the details and requirements of this Scope of Work, applicable Saudi ARAMCO Codes and Standards, Saudi ARAMCO Construction Safety Manual. ls TO RERRSOTTTN FLOR FART SAL BE CHT OH = 23 1.5 Visit the sites prior to bid submission in orderto conduct field ag investigations, verify the accuracy of SOW and actual site conditions, do Eble actual measurements and gather data ates i 1.6 Clarify all gray areas and inaccuracies found between the drawings, scope and site conditions. Any doubt shall be reported in writing to CAD before RK owareelranve ron] owmeve [eee IRCHASE & INSTALLATION OF WALK-IN CHILLER AND | DOC [5755 2 FREEZER, HAWTAH 35! A | SK-202001 Z 6 asia wun | 28 SAUDI ARABIAN OIL COMPANY 3 17 i 18 ; 19 i ° 4.40 2 5 141 ie = 4.12 Lv aa eS SSL ‘OPERATIONS =| ; bid submission. Failure to do so will hold the contractor responsible for any extra costs that may arise in order for that certain work item to be closed. All work in conjunction with this installation shall meet the provisions of this scope of work, and all applicable SAUDI ARAMCO Engineering Standards. Review of the material submittals by the Saudi Aramco is for purpose of tracking the work and contract administration, and shall not relieve the contractor of responsibility for any deviation from the contract documents, or providing ‘equipment and/or vendor services by the contract documents where were omitted from the material submittals It is the sole responsibility of the Contractor to supervise the project as per the contract agreement. Only personnel skilled in their respective discipline shall perform the work. ‘Workmanship shall conform to Saudi Aramco Standards. Project Engineer has the sole authority to determine whether the completed work is satisfactory or not. If in his assessments any material has not been properly installed or finished, the contractor shall replace the material wherever required and reinstall them in a manner entirely satisfactory to the project Engineer without any additional cost to ‘Saudi Aramco. The contractor shall be responsible for any equipment or installation damaged caused by his employees, (this includes roads and finished surfaces), during construction and shall reinstate, replace or repair as directed by the Project Engineer. HIP, Execution Plan and material submittals MUST be submitted within a week upon official project awarding. 2.0 PROJECT SUMMARY 2.1 The scope of work includes the installation of new walk-in chiller and freezer with structural steel sunshade, _ concrete footings/pedestals, anchor bolts in Dining hall/Kitchen in Building # 501 complete with the associated piping, accessories, electrical and instrumentation, The use of appropriate equipment should apply in this work to ensure proper safety procedures are executed for this work. 2.2 Electrical works, instrument cabling and installation of other related electrical devices are indicated in item 6.0 of this scope of works. Electrical materials used shall be UL or CE approved. Saudi Aramso: Company Gmc Use TRA THE DOOEAT SCOPE OF WORK. owe.77e|punrno] woex] omamnvono,_[wrno | avn PURCHASE & INSTALLATION OF WALK-IN CHILLER AND DOC Faas 8 FREEZER, HAWTAH v5] a | sk-202001 =| oo 1 General ise suites | mone 28 SAUDI ARABIAN OIL COMPANY 3.0 SPECIFIC REQUIREMENTS 3.1.1 CONTRACTOR shall meet with the Saudi ARAMCO Project Engineer to establish an overall schedule for construction and to facilitate the required arrangements with least amount of disruption to the Proponent. a ls 3.2Safety Requirements 3.2.1 Without limiting the generality of the application of the SAUDI ARAMCO Construction Safety Manual (CSM) and other SAUDI ARAMCO Safety Standards, the Safety Requirements shall include but not necessarily be limited to the following: 3.2.2 SAUDI ARAMCO Responsibility 3.2.2.1 Saudi ARAMCO Project Engineer in coordination with the Proponent Organization shall communicate general and site- safety standards and information to the CONTRACTOR before beginning on-site work activities. 2 5 E E ls ql 3.2.2.2 Immediately SAUDI ARAMCO Project Engineer shall conduct joint hazard identification tour with the CONTRACTOR with the participation of SAUD! ARAMCO. q FE 11 Proponent Organization (SAPO), Loss Prevention [2 acne Department (LPD), Environmental Protection Department |é —"Ms_ and other SAUDI ARAMCO agencies as required fe ENR 3.2.2.3 SAUDI ARAMCO Project Engineer and the SAPO shall LE Spy ensure that all safety requirements are strictly enforced. IS =p 5 a 3.2.2.4 SAUDI ARAMCO Project Engineer and Saudi ARAMCO |? AT Safety Coordinator(s) are responsible for informing |f ERT CONTRACTOR of Safety Infractions and requirements for |& - remedial actions and disciplinary actions, e ig “OPERATIONS 3.2.3. CONTRACTOR Responsibility 3.2.3.1 CONTRACTOR has overall responsibility for a full time zo safety in and out of the Work Site in accordance to the Bs applicable requirements of the SAUD! ARAMCO CSM, fg Volume 1 Contractor Safety Administrative Requirements Baie (CSAR) and Volume 2 — Work Site Safety Manual (WSS). 3.2.3.2 Site Safety Staff E 2 Saudi Arumeo: Compoany General Lise owervee| rtawrno] osx | orawneno. | sirno.| aevno. [2 PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [73 z 2 FREEZER, HAWTAH ”95) A | SK-202001 & @ ae zapiaeawan | wo 2 SAUDI ARABIAN OIL COMPANY 32.3.2.1 CONTRACTOR shall provide full time and qualified site safety staff in accordance to the requirements of Volume | Paragraph 4.5 of the SAUDI ARAMCO CSM or as otherwise required by the SAUDI ARAMCO Project Engineer during Job Explanation Meeting. 3.23.3. Safety Meetings 3.2.3.3.1 CONTRACTOR shall conduct daily pre job (toolbox) craft safety meetings with their personnel to address job-specific safety issues prior to beginning a different work activity, which shall also include a review of the applicable section of the approved HIP. 3.23.32 CONTRACTOR shall conduct weekly safety meetings in the native language(s) of the personnel, The safety meeting shall be no shorter than 15 minutes and shall cover, but not limited to, work hazards and related job procedures as well as a review/update of the HIP. 5 3.2.3.4 Personnel Protective Equipment (PPE) tt 3.2.3.41 CONTRACTOR shall provide all required Safety exoneen Harness and proper PPE that meets SAUDI — Ne ARAMCO specification to its employees in accordance with Volume | Paragraph 4.8 and Volume II Paragraph 3.0 of the SAUDI ARAMCO. CSM. 3.2.3.5 Work Permit ‘congaETON 3.2.3.5.1 CONTRACTOR shall obtain and complete all required Work Permits in accordance with Volume | = Paragraph 4.12 and Volume Il, Part | Paragraph 4, OPERATIONS: of the SAUD! ARAMCO CSM as per the minimum guidelines and responsibilities set forth in SAUDI _ ARAMCO General Instruction manual, GI 2.100 af "Work Permit System". zi 3.2.3.5.2. CONTRACTOR Work Permit Receiver shall have a 5 valid SAUDI ARAMCO Receiver Certificate issued by Loss Prevention indicating and duly signed by the SAPO division _headisuperintendent. Receiver(s) with signed certificate from other organizationfacility shall not be used at different e 5 2 8 iE ui nay General Us iE Sarre ower] rawrvo] eonx] emnwnane [errno [evn BURGHASE INSTALLATION OF WALK-INGHILLER AND | DOC > aD ‘2 FREEZER, HAWTAH A ‘SK-202001 at oo ae saan | 3 SAUDI ARABIAN OIL COMPANY _MMG “OPERATIONS organization unless the responsible SAPO superintendent signs a reissued certificate that reflects the new organization. 3.2.3.6 Jobsite Safety Logbook (JSL) 3.2.3.8.1 CONTRACTOR shall provide hardbound JSL_at site for safety comments from Saudi ARAMCO Safety Coordinators and LPD Safety Representatives and Proponent Organization Representatives. 3.2.3.6.2 Copy of minutes of safety meeting and toolbox meetings should be attached to the JSL for inspection. 3.2.3.6.3 CONTRACTOR is subject to the requirements of G1. 5.002 Loss Prevention Policy Implementation. 3.2.3.7 Work During Hot Weather (Heat Stress) 3.2.3.7.1 CONTRACTOR management is responsible for managing their employees work so as to avoid and prevent heat related illnesses. 3.2.3.7.2 Heat Stress management shall be the responsibilty of the CONTRACTOR thus CONTRACTOR shall conduct a thorough heat stress evaluation to identify task and conditions that present a potential heat stress hazard, and subsequently develop and implement a heat stress management program in accordance with Volume | Paragraph 4.17 of the SAUDI ARAMCO CSM. 3.2.3.8 Hazard Identification Plan (HIP) 3.2.3.8.1 Before start of any Work Site activities, CONTRACTOR shall submit Job Specific Hazard Identification Plan (HIP) to SAUDI ARAMCO Project Engineer for review and subsequent approval by appropriate SAUDI ARAMCO. Agencies. The HIP shall be developed and approved in accordance with Volume | Paragraph 6.0 of the SAUDI ARAMCO CSM and shall add all requirements as’ per joint hazard identification tour described in Paragraph 3.2.1.2 above. Saudi Aramew: Conan: Gsnergl Us le ls E ‘SCOPE OF WORK one [puwrne] woe] oraveneno, | servo. [nevno. [E PURCHASE & INSTALLATION OF WALK-IN CHILLERAND | DOC [= a 2 FREEZER, HAWTAH “35! A | SK-202001 | oo eT waunianaan | 2 28 SAUDI ARABIAN OIL COMPANY 32.3.8.2 CONTRACTOR shall implement and adhere to the specific HIP. 3.2.3.8.3 CONTRACTOR shall change or amend the HIP accordingly when conditions change, new hazards are introduced and/or the scope of work changes. S 3.2.3.9 Medical 3.2.3.9.1 CONTRACTOR shall provide medical care for its personnel in accordance to the requirements of Volume | Paragraph 9.0 of the SAUDI ARAMCO CSM and the SAUDI ARAMCO Minimum Medical Standards Requirements (MMSR) Manual. 3.2.3.9.2 CONTRACTOR shall provide First Aid at the Work Site which is the immediate help provided to injured or seriously ill personnel prior to arrival of professional medical assistance. * CONTRACTOR shall provide and maintain adequate First Aid supplies for its personnel per SAUDI ARAMCO _ General Instructions Manual, Gl 150.002 “Heart Saver First Aid with CPR er and AED Training" = * CONTRACTOR shall provide i adequate number of personnel at : the work Site who are trained and cERTFED certified in First Aid and BLS, including those in charge of First wel? Aid supplies. Sano] 3.2.3.10 Safety Barriers and Project Signs 3.2.3.10.1Before proceeding with the ~— WORK, Sa ao CONTRACTOR shall erect temporary barricades 35 e . g: and warning tapes for protection and the safety of 3 the general public throughout construction period, Bee as required. Remove same upon completion of the ~ tas project or as directed by the Saudi ARAMCO Project Engineer. Saudi Aramco: Compan: General Us ‘wo.rves| pLaxTwo] WOEX] —_ORAWNGNO. | ENO. | REUANO, \ I | RRSERMSTAOTON OF WAINCHTLERANO] -DOC a | 2 FREEZER, HAWTAH ¥95) A | SK-202001 2 | oe Gauoranaaa | 20H 2 SAUDI ARABIAN OIL COMPANY, _ MMs. LQ ‘OPERATIONS | * As and when required by the Work |= Site conditions, CONTRACTOR shall erect temporary fence (obscured) with lockable pedestrian and vehicle gates around the construction site. * Barricades shall be clearly marked with flagging. Barricades shall have protective lighting, when necessary. 3.2.3.11 Fire Protection and Preventions 3.2.3.111CONTRACTOR shall provide appropriate and adequate firefighting equipment (portable fire extinguisher(s), hoses or appropriate water storage). 3.2.3.11.2CONTRACTOR designated site personnel shall be trained in the use of firefighting equipment to be used in the Work Site 3.2.3.12 Housekeeping 3.2.3.12.CONTRACTOR shall dispose all_construction debris or solid waste generated during this project in approved landfill in accordance to the requirements of SAUDI ARAMCO Engineering Standard, SAES-S-007. Collection, storage and disposal of all nonhazardous and hazardous waste shall be in accordance with SAUDI ARAMCO General Instructions, Gl 430.001. Alll Class Il and Class Ill waste as per SAES 007 are to be disposed of to the nearest approved SAUDI ARAMCO Landill Area. Required SAP EH&S Waste Manifest shall be prepared, completed and approved prior to any hazardous waste disposal at either an authorized Company or approved CONTRACTOR disposal site (land audi Aran: Company Gene! Us SCOPE OF WORK one |uarno] noe] orwwneno | arwo.| revno. [2 PURCHASE & INSTALLATION OF WALK-IN CHILLERAND | DOC [—- 3 [A See awa A | ‘skeanzoe of | 00 binbadk c. a waunarana | 2 28 SAUDI ARABIAN OIL COMPANY ‘OPERATIONS | VERIFICATION. _MMe 4 poe disposal, land treatment or incinerators). 3.2.3.12.2CONTRACTOR shall ensure that trash and debris are properly collected and disposed of daily. Provide adequate amount of trash receptacles in the Work Site 3.2.3.12.3Refuse trash and garbage shall only be disposed of at approved site designated by SAUDI ARAMCO or local municipality. 3.2.3.13 Emergency Response 3.2.3.13.1CONTRACTOR shall provide appropriate emergency rescue equipment _(breathing apparatus, full body harness and life-line, basket stretcher) during excavation work as applicable. 3,2.3.13.2Edge Protection, Markers and Fixed Lighting 3.2.3.13.2.1 CONTRACTOR shall provide edge protections, markers and fixed lighting as necessary in accordance to the applicable requirements of Volume ll, Part Il Paragraph 1.11 of the SAUDI ARAMCO. 3.2.3.14 Food, accommodation & transportation: 3.2.3.14.1CONTRACTOR is the responsible to provide food, accommodation to their employees during to execution until the completion of the project. 3.3All WORK shown in the drawings listed in Paragraph 4.0 hereinafter but not described or specified in this Scope of Work and vice versa shall be considered part of the WORK. 3.4Before doing any WORK, CONTRACTOR shall verify all measurements at the construction area for their accuracy. No extra charge or compensation will be allowed on account of differences in actual dimensions and measurements. 3.5All areas in the vicinity of WORK shall be protected from damage. Any item that is damaged or marred as a direct or indirect result of the WORK shall be restored to its original state by the CONTRACTOR. Any items which cannot be removed shall be protected against the effects of the work and any water damage or mechanical defect. saudi Aramco: Compan General Use E le ‘SCOPE OF WORK ‘worvre| rlawrno] woex | _onawweno | swrwo.| revno. |Z PURCHASE & INSTALLATION OF WALK-IN CHILLERAND | -DOC [o7.5 eae ala | sxamor | # | gg eciiaararil Savoranawa | -O7EWo 23 SAUDI ARABIAN OIL COMPANY, ‘3.6Keep the area of WORK clean and orderly at all times, as directed and to the satisfaction of the Saudi ARAMCO Project Engineer. 3.7No WORK shall be considered complete unless inspected and approved by the Saudi ARAMCO Project Engineer in conformance with the drawing(s), Scope of Work and all Saudi ARAMCO Codes, Standards and Specifications. 3.8Upon completion of WORK, cart away all unused materials, containers, debris, etc., as directed by the Saudi ARAMCO Project Engineer. 4.0 DRAWINGS 4.1 Project Drawings 4.1.1 The following Drawings are referenced as part of this contract. The contractor is expected to thoroughly familiarize himself with the work site and with the Drawings and Technical Specifications. Any discrepancies must be brought to the attention of the Saudi Aramco engineer immediately. Do not proceed with any work where there is a known discrepancy until written direction is received from the Saudi Aramco engineer. z z 4.2. As-Built Drawings 4.2.1 Upon Completion of all works, submit one set of “As Built” Drawings aon to Saudi Aramco Project Engineer. These Drawings shall indicate all deviations from the contract Drawings and shall include dimensions, quantities, materials and products used in the construction with vendors name, address and contact phone numbers. “As Built” Drawings shall be prepared from records kept up on a daily basis throughout the duration of the project. The “As Built” records shall be subjected for examination of Saudi ARAMCO Project Engineer, signed and concurred prior to the submission of ena the Contractor's Final Invoice. we 422 Any SUB-CONTRACTOR performing work under these ‘OPERATIONS & 5 i specifications and project Drawings shall provide two sets of “As Built” marked up print outs to the prime CONTRACTOR periodically as required by the prime CONTRACTOR, i 5.0 CIVILISTRUCTURAL e E FE 5.1Demolition Works: The CONTRACTOR shall, A ul Aramco: Conpoans General Use -boc y (CHILLER AND. woes] a | sK-202001 = of | 00 savoraraan | 2SWO |_28 i SAUDI ARABIAN OIL COMPANY i 2 5.1.1 Demolish the existing floor slab at new location of walk-in chiller and |: i freezer including excavation works. le 5 5.1.2 Demolish the existing garbage room having an area of 14 square 3 meters. 5.1.3. Demolish the existing perimeter wall having an area of 34 square meters. 5.1.4 Demolish the existing step concrete landing having a volume of 1.5 : cubic meters. i 5.1.5. Clean thoroughly the floor upon completion of demolition E 2 3 5.2 New Works —Concrete Structure: ie The CONTRACTOR shall; H z 5.2.1. Excavate and remove compacted sand/marl ready for constrcution fz 3 of reinforced concrete foundations/footings/pedestal/slabs. E i 622 Construct new foundation including the slabs of the in the walk-in E a chiller and freezer. Ensure that the new base frame and the Air is q Cooled Freezer and Chiller unit will properly seat, levelled and a Tome bolted, maintain proper clearance for the piping. ie MM = 5.23 Backfill with 150mm thick 95% density compacted marl for e Fn reinforced concrete foundations/footings/slabs. e wv e q 5.2.4 Concrete Works: 3 Tare i BY 5.2.4.1 Place concrete in accordance with SAES-Q-001, chapter [& ge 8, and as herein specified. B Teen FT 5.2.4.2 Construct reinforced concrete Foundations /footings/slabs | = Pedestal for walk-in chiller and freezer. ‘4 ‘OPERATIONS H 5.2.4.2.1 Provide 6 mil polyethylene sheet vapor barrier i 3: 5.2.4.2.2 Pour 50mm thick lean concrete prior to the |: i 2 Construction of concrete footing. 8 £ e Bae 5.2.4.2.3 Apply two (2) coats of bituminous paint to all |é Z Reinforced concrete exposed to earth before Backfilling qui Aramco: Company General Us SCOPE OF WORK oven [ouwrvo] noe] orawmnene. | sitno. PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [37 => 16 REEZER, HAWTAH A ‘SK-202001 Pe 00 bated c c Taunranaan | FO 4 SAUDI ARABIAN OIL COMPANY 2 3 wee ‘OPERATIONS 324.24 Construct 4000 psi, reinforced concrete Foundations/pedestals with Sched. 60 Reinforcing Bars. (See attached detail Drawing) Note: Contractor shall provide concrete cylinder and Rebar testing result from the third party Testing laboratories. Testing should Witness by the project engineer. 5.2.4.2.5 Concrete shall be consolidated thoroughly by use of Mechanical vibrators in accordance with SAES- Q.001, chapter 8. 5.2.4.2.6 Limit the time of vibrating consolidation to prevent Bringing an excess of fine aggregate to the surface, Curing and protection of concrete shall be in accordance with SAES-Q-001, chapter 11 : : E 5.2.5 Protect all building components from grout spillage, water or any damage occurring during the construction of this concrete pad works 5.2.6 The floor shall be thoroughly cleaned upon completion of the concrete pad and grouting operations as part of housekeeping procedure 5.2.7 Contractor to apply epoxy paint to existing and new concrete foundation. Color should be matching the existing foundation The CONTRACTOR shall; 6.3.1 Supply, fabricate and install structural column, SHS 200 x 8mm, ASTM-A36 (Hot dipped galvanized), 400mm x 400mm x 20mm base plate ASTM A36 (Hot dipped galvanized), 20mm ® x 450mm rod ASTM A36 w/ double nut and single washer (Hot dipped galvanized) including accessories to complete the job. See attached drawing details. 5.3.2 Supply, fabricate and install purlins, RHS 150x50x6 ASTM-A36 (Hot dipped galvanized) including accessories to complete the job. See attached drawing details. 5.3.3 Supply, fabricate and install roof structure, SHS 160mm x 8mm ASTM-A36 (Hot dipped galvanized), SHS 100mm x 8mm ASTM- A36 (Hot dipped galvanized) bracing including steel deck: P3615 URCHASE & INSTALLATION OF WALK-IN CHILLER AND | DOC [>> 19 A | SK-202001 of | 00 Gaupraniea | ORO 28 SAUDI ARABIAN OIL COMPANY ~ b 716 7.4.1 Contractor shall verify the existing conditions at site. Switch off, lock- out and tag all related power supply before start of any work. Power supply isolation shall comply with the requirements of G. |. 6. 012 “Isolation, Lock-out and Use of Hold Tags”. Before conducting any electrical work, the Contractor shall obtain work permit, take all necessary precautions and make sure to keep the site a safe and clean working environment All works to be performed shall be properly coordinated to the proponent, Loss Prevention Division, Fire Department and the Building Occupants that will be affected during the performance of the replacement work. Work procedures, Hazard Identification Plan and schedule of activities shall be submitted to the proponent and Area Safety Coordination Group for review before performing any electrical works Contractor's electrician should have a valid Saudi Aramco Electrical Hazard Recognition (EHR) Certificate to perform any work on electrical equipment at higher than 240Volts. The Contractor shall be responsible to clean-up all waste materials during demolition works and coordinate with Saudi Aramco Project Engineer/Representative for proper waste disposal. enonece 7.2 NEW Works _Mme. 7.2.2 OPERATIONS FF 7.24 ireanion 7.2.5 _—_________________ Sut Aramso: Company General Contractor shall Ensure that all electrical works shall be performed in accordance with the Saudi Aramco Engineering Standards in force at the time of bidding, including, but not limited to, the latest issue of the National Electrical Code and National Electrical Manufacturers Association standards and recommendation. See to it that all materials used shall comply with the requirements of Saudi Aramco Material System Specification (SAMSS) or equivalent. The CONTRACTOR shall verify site location and condition of work area, conduct inspection and check possible obstruction to new location. Notify the Saudi Aramco Project Engineer for any discrepancy prior to execute the work. Plan and coordinate the installation to eliminate interference with other trades. Where interferences occur, the Saudi Aramco Representative shall decide which items must be relocated. Provide all necessary fittings, boxes, conduit bodies and supporting materials required for a planned and neat installation even if not indicated in the drawing ‘SCOPE OF WORK _ Dwarvee| antno] woex| —_oRAMNGNO. | SHINO. | REVO, z -Doc IRGUSE & INSTALLATION OF WALKIN CHILLER AND wee] a | sx-2oz001 20 . of | 00 ibibo ca Pee Savoraraain | 207EW0 28 SAUDI ARABIAN OIL COMPANY _Mme ‘OPERATIONS | veriricarion 7.2.6 Confirm that no sharp & rough edges in any metallic installation, particularly where cable tends to be pulled. Where a conduit enters box, fitting, or other enclosure, a bushing shall be provided to protect the wire from abrasion unless the design of the box, fitting, or enclosure is such as to afford equivalent protection 7.2.7 Ensure that all exposed metallic materials are protected from corrosion. Galvanization paint is required to restore corrosion protection requirement whenever cutting, filing or bolt tightening is performed 7.2.8 Perform cable test prior to termination to guarantee the acceptability of cables before placing into service. Test results shall be recorded in a test plan and test equipment to be used shall have a valid calibration certificate at the time of testing. The same shall be submitted to the Saudi Aramco Engineer/representative. 7.29 Color-code each conductor entering every box, cabinet, panelboard, through and wire way with a heat-shrinkable type or Scotch No. 35 color-coding tape. Power cables shall follow the color coding for phase identification as per SAES-P-104 section 6.11.3. 7.2.10 Be responsible for the cable schedule and cable routing. Cables at termination points shall be identified by the use of permanently embossed wire markers of the heat-shrinkable or slip-on type based on the cable schedule. 7.2.11 Perform the continuity and insulation test for the electrical motor driving the pump before putting into service. Test data should be recorded in a test plan and all values must be acceptable against the standard recommended values before motor energization. 7.2.12 Install systems, materials, and equipment level and plumb, parallel and perpendicular to other equipment systems and components. 7.2.13 Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimal interference with other installations. 7.2.14 Ensure that the new equipment shall have the electrical rating as specified in the drawings and scope of work. Whenever new equipment with higher rating shall be provided, contractor shall be responsible in upgrading the system at no cost against Saudi Aramco, 7.2.15 Whenever necessary, provide materials and accessories even if not mentioned in the Scope of Works or not reflected from the drawings when deemed as required in order for the replaced equipment to operate safely and without a glitch. : ; : udi ea: General Us a IRCH! INSTALLATION OF WALK-IN .DOC ECE oma | Bee a | aan | 2 | og i y Wu ‘sauorARAsia | JOEWO a _ ms wv =p ED HMA mn SAUDI ARABIAN OIL COMPANY 7.2.16 Install new breaker for Chiller 40A, 220V 100AF NEMA 4X, Fusible | Heavy Duty Disconnect Switches beside each new Chiller. Unistrut channel structural supports of Hot-Dipped galvanized material shall be provided as well to support and provide a rigid installation. 7.2.17 Install new breaker for Freezer 40A, 220V 100AF NEMA 4X, Fusible Heavy Duty Disconnect Switches beside each new Chiller. Unistrut channel structural supports of Hot-Dipped galvanized material shall be provided as well to support and provide a rigid installation. 7.2.18 Install new contactor with for Chiller 30A, 3 poles 220 V coil. Install overload relay range 5-25 amp. 7.2.19 Install new contactor with for Freezer 50A, 3 poles 220 V coil. Install overload relay range 10-30 amp 7.2.20 Saw cut excavate trench for new chiller feeder cable(s) installation. Trench depth and dimensions shall follow the SAES requirement for a specified voltage and its finished surface shall be restored to original or better after the cables have been laid. 7.2.21 Assure that new cable trench route shall be carefully planned and studied by the contractor to avoid electrical service disturbance with other loads. When deemed as necessary, Ground Penetrating Radar shall be used to detect the existence of live conductors in possible pathways. Cables shall be rerouted when necessary. 7.2.22 Lay out new cable 8AWG x 3-1/C or 6mm? Cu. (10AWG) chiller, THHN-2 cable, rated 0.6/1 kV to ground + 4-1/C 10mm? (BAWG) grounding cable from the panel board to the new chiller. 7.2.23 Lay out new cable 8AWG x 3-1/C or 10mm? Cu. (AWG) freezer, THHN-2 cable, rated 0.6/1 kV to ground + 4-1/C 10mm? (8 AWG) grounding cable from the panel board to the new freezer. 7.2.24 Install and layout new 2 x 2° Flexible Liquid tight Metallic Conduit, conduit fittings and support, and connect to the new chiller electrical compartment. 7.2.25 Ensure that protective relay setting of Chiller and Freezer upstream protective relay devices in the panel board matches the new load configuration. 7.2.26 Guarantee that all materials to be used shall be ULL. listed or approved equal. ud Aramco: Company Gens Us RK owervee| Lanta] woe] oRAWWGHO. | SHTNO | REVO PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [>7=> 22 2 FREEZER, HAWTAH A | SK-202001 of | 00 8 : ‘SAUDI ARABIAN OIL COMPANY g 7.2.27 Reconnect existing grounding conductor to the metal frame of the _ | E new Chiller and other accessories. When it is not found in the new z installation, new grounding conductor that shall be connected to the 3 grounding grid shall be provided. F 7.2.28 Functional test shall be conducted on the equipment with the presence of Saudi Aramco Project Engineer/Representative. Any defective installation and deficiencies found and required for the operation of the chiller shall be immediately and properly rectified by the contractor without additional cost to Saudi Aramco. All test results must be submitted thereafter. 5 8.0 INSTRUMENTATION 2 -NIA 9.0 TESTING, ADJUSTING AND BALANCING 9.1 Testing, Adjusting and Balancing works shall be carried out by a Certified 5 Saudi Aramco contractor. 3 9.2Testing, Adjusting and Balancing shall be conducted in accordance with : SAES-K-001, Section 6.0 (Testing, Adjusting and Balancing). 5 9.3Test the refrigeration system on the chiller and freezer equipment shown on J project drawings and record the actual readings. nie 9.4Sound and Vibration test is required in accordance with SAES A-112. Bese 40.0 FINAL INSPECTION AND COMMISSIONING A 10.1 Final Inspection ae 10.1.1 Before the final inspection takes place, all tests required by this mA ‘scope of work or by the project engineer must be completed and ‘conga accepted by the Saudi Aramco Engineer. 10.1.2 The Contractor will request the final inspection at least one week in aa advance. The request will be in writing and must include a statement certifying that the job is substantially complete and ready for final inspection. = 3 10.1.3 Any items found to be deficient will be included in a punch list g 3 prepared by the Saudi Aramco Engineer. The Contractor is 3 encouraged to have adequate manpower available during the final 2.8 inspection so that minor discrepancies can be corrected on the spot | and not included on the punch list. 10.1.1 All punch list items must be corrected within two weeks after the contractor receives the official punch list. The Contractor and Si rams: Coppa Grp se SCOPE OF WORK rcnrr|ranro[ vee] eeamore, [enae [een PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | DOC [5/35 FREEZER, HAWTAH 735] a | SK-202001 BT oo any. m Tamara | oa SAUDI ARABIAN OIL COMPANY, _MMG Lv i Fh ‘OPERATIONS fubatabeh cy G wavoraraaa | 20180. | 28 the Saudi Aramco engineer will jointly inspect each completed punch list item to verify correction. 10.2 Commissioning 10.2.1 CONTRACTOR shall arrange with the vendor to assis/participate for the complete testing & commissioning of the new equipment 10.2.2CONTRACTOR shall submit all tests reports for review and approval during the testing and commissioning. 10.3 Warranty 10.3.1 CONTRACTOR shall provide a minimum 3year warranty of the equipment after hand-over of the project 14.0 PROJECT COORDINATION AND WORK SCHEDULE 14.1. The work will be executed in an operational facility. The CONTRACTOR will be required to pay maximum attention to ensure smooth project execution. Shutdown or isolation any operating equipment shall be coordinated to Saudi Aramco Representative and approved by Operation & Proponent. 14.2. The project will be executed with no or minimum disruption to the facility operation or activity. Contractor might be asked to work two shift schedules after Normal Working hours, on the weekends and holidays. 11.3 CONTRACTOR work schedule shall change subject to the demands of Saudi Aramco and their need to coordinate the work with other activities. 12.0 TECHNICAL REQUIREMENTS 12.1. MECHANICAL / HVAC 12.1.1 Freezer Brand / Model Any Cooling Capacity _3.59Kw Room range temp. 10 ~-19. Refrigerant R404 Power Supply 208/120 Volt 60Hz/ 3PH. 12.1.2 Chiller Brand / Model Any Cooling Capacity 2.62Kw Room range temp. +1~ +6, Refrigerant R404 Power Supply 208/120 Volt 60Hz/ 3PH Saud uns Croan Gn ls I A FE 5 i ‘SCOPE OF WORK fowervee tanta] woe] onawncno. | survo. | revno. |! PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | “DOC [735 24 202001 A | SK-202001 24 | 0 SAUDI ARABIAN OIL COMPANY 12.1.3 SRT 12.1.4 = Other chiller and freezer requirements and specifications: Factory assembled, single-piece chassis, air-cooled chiller unit Contained within the unit cabinet shall be all factory wiring, refrigerant piping, controls, refrigerant charge (R404), and special features required prior to field start-up. Unit will be having Microprocessor based controls capable of controlling and providing safety to the chiller. Frame shall be of heavy-gage, painted galvanized steel. Cabinet shall be galvanized steel casing with a baked enamel powder or pre- painted finish. Cabinet shall be capable of withstanding 500-hr salt spray test in accordance with the ASTM B-117 Standard. Condenser fans shall be direct-driven and rpm shall conform to manufacturer requirements, shrouded-axial type, and shall be statically and dynamically balanced with inherent corrosion resistance. A\ir shall be discharged vertically upward. Fans shall be protected by steel wire safety guards. Fan Motor shall be protected by motor temperature sensors. Chiller and freezer shall have a maximum water-side pressure of 300 psig. Chiller and Freezer shall have a cooler drain and vent. Low-ambient protection: unit shall have factory-installed cooler heater. Refrigerant circuit components shall include replaceable core filter drier, moisture indicating sight glass, electronic expansion device, and suction/discharge service valves/ports for charging of refrigerant or checking refrigerant pressures. Flexible Rubber Coupling: Rubber expansion joints shall be of duck and rubber construction with full - faced integral duck. Expansion joints shall be internally reinforced and furnished complete with steel retaining rings and capable of operating at a temperature of 20°F through 240°F and a pressure ranging from 16" Hg vacuum through 214 psi (15 kg/cm2) working pressure Anti-Vibration Pad: Elastomeric, cross-ribbed design, % in, standard size, 50 Ib/sq. in. maximum loading capacity Manufacturer Reference- Mason Industries Inc. or approved equal 12.2 ELECTRICAL ie B 12.2.4 Cable: 8AWG x 3-1/C or 6mm? Cu. (10 AWG) chiller, THHN- 2;crosslinked polyethylene abrasion, moisture, and heat resistant insulation; Annealed copper per ASTM B3; Class B stranding per jausdi Aramco: Company General Use. SCOPE OF WORK Onarr7|puvo] woex] _ommwmone, | enna | avn PURCHASE & INSTALLATION OF WALK-IN CHILLER AND | -DOC [275 | CrREEZER, nAWTArI 95) A | SK-202001 FT oo i del corpergiomacl Tauern | 2 or SAUDI ARABIAN OIL COMPANY _Mme ev OPERATIONS 3 veriricarion 12.2.2 12.2.3 12.24 12.2.5 12.2.6 12.2.7 12.2.8 12.2.9 ASTM B68, 90° C in WETIDRY location; UL Listed as per standard 44. Suitable separator over the conductor is preferred. Grounding: 10mm? single core; Soft Annealed Copper, Class 2 stranded conductor; Thermoplastic PVC insulation(green/yellow); 90 deg. C; Heat Resistant; Conduit: PVC Externally Coated Rigid Steel Conduit and Fittings: 2.0°; shall be as per ANSIC80.1, NPT Threaded, hot-dip galvanized and PVC coated per NEMA RNI (with minimum thickness of PVC. 40mils) Conduit: Flexible Liquidtight; 2.0"; steel; zinc electroplated; with gray extruded PVC outer jacket; oil resistant and liquid-tight; suitable for 0 deg. to 105 deg.; conforms to UL STD 360. Connector: 2°; Flexible liquid-tight conduit steel fittings only; 40 mil gray PVC exterior coating; 2 mil urethane interior coating; Sealing sleeves on all conduit openings; with external grounding lug; straight; with male thread and locknut. Body, Conduit: 2°@; Urethane coating on interior and exterior; 40 mil PVC coating is bonded to the exterior; Pressure ceiling sleeves on all threaded hubs; with encapsulated stainless steel screws for covers ; elbow shape; with input threaded CND hubs; with cover Body, Conduit: Type LB; 2°; Urethane coating on interior and exterior, 40 mil PVC coating is bonded to the exterior; Pressure ceiling sleeves on all threaded hubs; with encapsulated stainless steel screws for covers ; elbow shape; with input threaded CND hubs; with cover; Bushing, Conduit: 2.0" 9; rigid, threaded NPT, zinc electroplated with Insulated throat, stee! or malleable iron, Ul-467, 514,insulated grounding, with insulated throat, with tin plated alum lay in grounding lug connector and plated steel screw, 150 Deg C temp rating. Tie: Cable; 1.6-31.8 mm (1/16 to 1-3/4 In) dia. Range, 198.4 mm (7.81 In) long, 3.2 mm (1/8 In) width, nylon, 206N (50 Ib) tensile, self-locking, No.10 mounting hole, -40 to 85°C (-40 to 185°F), outdoor, black, Mil-23190, Ci-1, cable strap & clamp, 100/pk 12.2.10 Tape Electrical Insulation: insulating, roll, 19.1 Mm (3/4 In) width 0.18 Mm (0.007 In) thick , 20.12 M (66 Ft) long, vinyl plastic, color coding E E E B z ie fe iS iE E 5 Saudi rum: Company Gent Use ‘ SCOPE OF WORK overve[ranra[ nen] eewmene [one [vo 3 [PURCHASER INSTALLATION OF WALK-INCHIMIERAND | -DOC J, 5 2 8 FREEZER, RAWTAH 24738! a | sk-202001 ae peepee wueawon [ne ei SAUDI ARABIAN OIL COMPANY 12.2.11 Metal Framing Parts: Unistrut: For Structural Framing and Support Systems; steel; Galvanized; with clamp std pipe type; with bolt and nut; 1” in size. 12.2.12 Heavy Duty Disconnect Safety Switch, 100A, 220 VAC maximum, 3 Pole, GE brand or approved equal) Visible switch blades with positive "OFF" indication Quick-make, quick break operating mechanism Dual cover interlock Color coded “ON” — “OFF” indicator handle Cover padlock hasp and handle lock "OFF" provision for multiple padlocks + Non-Fusible type * — Horsepower rated for motor applications * Enclosure: NEMA 4X (stainless steel! Type 316) 12.2.13 Terminal Lug: size 240-500mm?, Two- hole, Vertical Two-Barrel Lug; Dual barrel provides termination of two conductors; Tin-plated to inhibit corrosion; Inspection window to visually assure full conductor insertion; UL Listed and CSA Certified for use up to 600 V and UL temperature rated 90°C J 12.2.14 Recommended Vendors: A ‘one 12.2.14.1.1_ WESCOSA i — "Me Tel, #: 810-0234 x 349 | Fax #: 03-847-1967 l2 “Te 12.2.14.1.2 Riyadh Cables ie Tel. #: 858-0637 Ext. 332 | Fax #: 857-8459 H CERTEED 12.2.14.1.3 Abdulkarim Trading (GE distributor) B Ma Tel.#: 834-3485; Fax #: 832-2466 fel) 12.2.14.1.4 A. Abunayyan (GE distributor) Teen Tel.#: 833-2177 | Fax #: 833-2923 Ext.108 ‘OPERATIONS lf veriricarion END OF SCOPE OF WORK> E a Acanc: Compu Gn 5 SCOPE OF WORK ann [romo[ven] emma [oro [am |? roo wen | POC Fv] g | seaman | 27 | og * of Lint mapa anal Sain — [RS ct SAUDI ARABIAN OIL COMPANY DSCraE nonce _MMG Lv CERTIEED ‘OPERATIONS | [= i i i Saudi Aramco: C se iS ig eS iS ORANG HO. E F SCOPE OF WORK. PURCHASE & INSTALLATION OF WALK-1 (CHILLER AND FREEZER, HAWTAH waa735| Aq SK-202001 Broo SAUOLARABIA od of | 00 pany LL

You might also like