The document outlines the key result areas, specific objectives, key performance measures, action plans, expected deliverables, and responsible units for various projects of the Department of Public Works and Highways (DPWH) including pedestrian overpasses/underpasses, highway construction, and strengthening flood management functions. The objectives are to allow uninterrupted pedestrian movement, improve traffic safety and capacity, repair road damage, improve flood control structures and measures, and provide effective flood control. The action plans include installing accessible pedestrian signals, constructing pedestrian lanes and road widening, training personnel on flood control engineering, and creating mechanisms to develop flood control technology. The expected deliverables are safer crossing of highways for all individuals and preventing accidents while

Uploaded by

CJ Hernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
174 views3 pages

Template Action Plan

The document outlines the key result areas, specific objectives, key performance measures, action plans, expected deliverables, and responsible units for various projects of the Department of Public Works and Highways (DPWH) including pedestrian overpasses/underpasses, highway construction, and strengthening flood management functions. The objectives are to allow uninterrupted pedestrian movement, improve traffic safety and capacity, repair road damage, improve flood control structures and measures, and provide effective flood control. The action plans include installing accessible pedestrian signals, constructing pedestrian lanes and road widening, training personnel on flood control engineering, and creating mechanisms to develop flood control technology. The expected deliverables are safer crossing of highways for all individuals and preventing accidents while

Uploaded by

CJ Hernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

1

Name: C-Jay C. Hernandez

Year & Section: BSED 1-ENGLISH

Department of Public Works and Highways (DPWH)

General Objectives:

Key Result Area Specific Objectives Key Performance Action Plan Expected Deliverable Responsible Units
Measure

PEDESTRIAN *Allow for the *Install a more *must accommodate *persons may have an *DPWH Officers and
OVERPASSES/UNDER uninterrupted flow of pedestrian-activated all persons and deal to easy way on how to Construction
PASSES pedestrian movement signal that is make feel at ease for cross on highways and personnel
separate from vehicle accessible to all every individual making sure that they
traffic pedestrians are all safe

* provide complete *Creating more *must accommodate *people may ensure *DPWH Officers and
separation of pedestrian lane that all person and prevent their safety and they Construction
pedestrians from may separate person in sudden accident. can across to the road personnel
motor vehicle traffic, in different vehicle easily.

HIGHWAY *To improve traffic *constructing road *making a wide range *hassle-free for *DPWH Officers and
CONSTRUCTION safety and capacity widening and clearing of high ways to prevent travelers while taking Construction
traffic and not on the road personnel
consuming time while
travelling

*To repair the existing *making some *making sure that all *motorist can ride *DPWH Officers and
2
damage in different renovation to different road or highways will safely and accident can Construction
roads highway roads be safe for all travelers prevent personnel
while they are riding in
preventing different
accident.

STRENTHENING THE *To improved *A sufficient number *Training on Planning * participants who *DPWH Officers and
FLOOD effectiveness of flood of personnel of DPWH and Design of Flood have completed the Personnel in the Cental
MANAGEMENT control and sabo are trained on flood Control Structures above courses will be agency.
FUNCTION structures and other control and sabo continuously
*Training on
measures engineering monitored to identify
Maintenance of Flood
their progress and
Control and Drainage
other needs in their
Structures
respective
jurisdictions.

*To provide more *creates the internal *To find out proper *to make an end in the *DPWH Officers and
effective and mechanism to sustain ways and means for flood control problem Personnel in the Cental
appropriately the development of solution of the major or to sustain the agency.
designed flood control technology and issues arising from or development of
and sabo organization in the in connection with the flood control and
structures/facilities field of flood control flood control. sabo engineering
and sabo engineering.