6.1 Introduction
As the design phase is completed, the systems analyst begins to focus on the tasks associated
with building the system, ensuring that it performs as designed and developing documentation
for the system. Programmers will carry out the time-consuming and costly task of writing
programs, while the systems analyst prepares plans for a variety of tests that will verify that the
system performs as expected. The final phase in the SDLC (System Development Life Cycle) is
the implementation phase, during which the system is actually built (or purchased, in the case of
a packaged software design). The implementation phase consists of developing and testing the
We tried to discuss issues that are highly essential for the successful implementation, such as,
installation of the new system, selection of the most suitable conversion approach, preparing the
organization and the users to adapt to the new system, and ensuring that the system is supported
after it is put into production. Our activities have been organized around six generic
1. Business requirement and proposed solution: - this is the phase where core business
requirements are analyzed and developed the detail of the business process. And also, we
functionally specifying how the system will operate and the project team converts the
business requirements for the system into system requirements that describe the technical
developed by setting up its parameters and tables with the values defined in the phases
above.
5. System Implementation: -In this phase, the system is implemented and it becomes
operational.
6. System support and maintenance: - This phase deals with post-Implementation period
Frontend Technologies
Frontend technologies are those which are used to develop the web content of the system that
either the seller or the buyers interact with. It is an interface between the user and backend of
the system. In developing the system, we have used HTML, CSS, JavaScript, Ajax and
HTML (Hyper Text Markup Language): is the main markup language we used for
creating static web pages and other information that can be displayed in a web browser.
CSS (Cascading Style Sheets): used for describing the presentation semantics (the look
Bootstrap: Bootstrap is the most popular CSS Framework for developing responsive and
mobile-first websites.
Ajax (Asynchronous JavaScript and XML): used to send and receive data to and from
Backend Technologies
Backend technologies is part of the code where we design it to specify how the frontend
PHP: Hypertext Preprocessor (PHP) used for dynamically generated web pages as per
client request.
MySQL: used for accessing querying, updating, and managing data in databases.
Server: XAMPP server in order to host the website on the local machine.
Notepad++
GitHub
We have used environments like Apache and web browsers for deploying this project.
Apache: is a free web server and it is easy to customize environments, fast, reliable, and
highly secure.
Web browsers: in order to test and display the logics we have programmed.
quality of the product or service under test or it is the process of validity and verifying
Tests must be carefully planned because the cost of fixing one major bug after the system
is installed can easily exceed the annual salary of a programmer. A test plan contains
several tests that examine different aspects of the system. A test, in turn, specifies several
A program is not considered finished until it has passed its testing. For this reason,
programming and testing are tightly coupled. Testing is frequently the primary focus of
the systems analysts as the system is being constructed. The analysts must resist the
temptation to rush into testing as soon as the very first program module is complete,
however. Spontaneously testing different events and possibilities without spending time
overlooked. If an error does occur, it may be difficult to reproduce the exact sequence of
events that cause it. Instead, testing must be performed and documented systematically so
that the project team always knows what has and has not been tested.
Test Planning
Testing starts with the tester’s developing a test plan that defines a series of tests that
will be conducted. Figure 6.1 shows a typical test plan form. A test plan often has 20 to
30 pages, with a separate page for each individual test in the plan. Each individual test
has a specific objective, describes a set of very specific test cases to examine, and defines
the expected results and the actual results observed. The test objective is taken directly
from the program specification or from the program source code. It is impossible to test
every possible combination of input and situation; there are simply too many possible
combinations. A really good test would include a test case with nonsensical, but
acceptance tests. Although each application system is different, most errors are found
during integration and system testing (Figure 6
Figure 1:
Figure 6.1 Test Plan
Unit Tests
Unit tests focus on one unit—a program or a program module that performs a specific function
that can be tested. The purpose of a unit test is to ensure that the module or program performs its
function as defined in the program specification. Unit testing is performed after the programmer
has developed and tested the code and believes it to be error free. These tests are based strictly
on the program specification and may discover errors resulting from the programmer’s
misinterpretation of the specifications. Unit tests are often conducted by the systems analyst or,
sometimes, by the programmer who developed the unit. There are two approaches to unit testing:
black-box and white-box (Figure 12-5). Black-box testing is the most commonly used. In this
case, the test plan is developed directly from the program specification: Each item in the program
specification becomes a test, and several test cases are developed for it. White-box testing is
reserved for special circumstances in which the tester wants to review the actual program code,
3.reservation
Test Case ID Reservation
Test Location Reservation page
Features to be Used Validity and completeness the Input data
Input Data User and property data
Test Cases Description the system checks that reservation info is
Reservation.
Expectation output Pass
Result Pass
4.appointment Test
Test Case ID Appointment Test
Test Location Appointment page
Features to be Used Validity and completeness the Input data
valid. The
sales schedule list and assign an appointment to
the customer
Expectation output Pass
Result Pass
Integration tests assess whether a set of modules or programs that must work together do so
without error. They ensure that the interfaces and linkages between different parts of the system
work properly. At this point, the modules have passed their individual unit tests, so the focus
now is on the flow of control among modules and on the data exchanged among them.
Integration testing follows the same general procedures as unit testing: the tester develops a test
plan that has a series of tests. Integration testing is often done by a set of programmers and/or
systems analysts. There are four approaches to integration testing: user interface testing, use
scenario testing, data flow testing, and system interface testing. Most projects use all four
approaches.
Figure 6-5. Integration testing for login module and forget password module
Table 6-6. Integration testing for registration module and login module
Page
Test Case Location Property Add and Gallery Page
Test Case Description The authorized employee will add, edit or delete
Figure 6-7. Integration testing for Property Add module and Gallery module
System tests are usually conducted by the systems analysts to ensure that all modules and
programs work together without error. System testing is similar to integration testing but is much
broader in scope. Whereas integration testing focuses on whether the modules work together
without error, system tests examine how well the system meets business requirements and its
usability, security, and performance under heavy load It also tests the system’s documentation.
Source
System Testing Requirements System design, For normal This test ensures that
software.
Documentation Help system, For normal Analysts spot-check or check
testing: tests the procedures, system testing every item on every page in
Software applications are not standalone systems. They are increasingly the result of the
network. Informally, the term software deployment refers to all the activities that make a
software system available to its users. Different hardware and software will be used to install and
deploy our system. In this section we will list out the software and hard ware requirements to
deploy the system. As described in the deployment model of our design the system will be
deployed based on the concept of three-tier architecture. We do have three nodes each having
specific functionality. These are the client computer, web server computer and database server
Hardware requirements
3 GB RAM
70 GB or more
Software requirements
• All office locations will have an always-on network connection to enable real-time database updates.
XAMPP/WAMP server
PHP
Web-browsers
7. CONCLUSION AND RECOMMENDATION
7.1 Conclusion
In this chapter, the team members have addressed the major Object-Oriented Design artifacts in
order to bridge the gap between analysis and implementation, which are class type architecture,
class modeling, collaboration modeling, component modeling, deployment modeling, user
interface design, and other design artifacts. These designs provide a clear understanding of
the relationship between a different component, data flow, and task or activity these components.
In second chapter, we discuss major implementation issues such as: technologies used (hardware,
software, and designing tools), compatibility issues, testing, testing procedures and deployment
processes. The project team tried to define how the system should be built, if the system is going
to be operational and used by the user. Consideration is given to ensure that the system meets
quality standards by detecting and fixing errors as soon as possible.
7.2 Recommendation
As an extension of this system, we recommend the following to be considered.
The current situation related to transfer money using E-mobile is only allowed little
amount money (10000 birrs). With kind of money is not relevant to build payment system in
this project. In the future, if the problem is solved, the system must
be modified to adopt the solution.
Our system is very friendly, it does not require significant training. But still, the system
user(Gift real estate employee) needs some training to be familiar with the system.
To be successful in implementing the system, an organization and its management must clearly
understand the implementation process. To continue in the marketplace as a competitive
organization needs to integrate the system with suppliers and partners.
References
Dennis, Wixom,Tegarden. (2012). System Analysis & Design. An Object -Oriented Approach with UML
5th
Edition. Wiley.
Ian, S. (2009). Software Engineering. In Software Engineering (p. 790). london: pearson
publishing.
Department of Electrical and Computer Engineering University of Waterloo, Waterloo. (2008).
Software Testing and Quality Assurance. In Software Testing and Quality Assurance (p. 648).
Hoboken, New Jersey: John
Wiley & Sons, Inc., publication.
Scott, A. (2001). Object Premier 3rd edition.