HSE CODE OF PRACTICE

1. All excavated pits shall be barricaded and barricade to be maintained till the backfilling is done.
Safe approach shall be ensured into every excavation.
2. Adequate illumination at workplace shall be ensured before starting the job at night.
3. All the dangerous moving parts of the portable / fixed machinery being used shall be
adequately guarded.
4. Ladders being used at site shall be adequately secured at bottom and top. Ladders shall not be
used as work platforms.

I have read all the contents given above / I was explained all the contents given above listing the HSE
code of practice to be followed and I understand the requirements.

Note: Subcontractors shall be informed of these requirements before awarding work order.
HSEO may further incorporate site specific HSE requirements in this document.