Guidelines of Central Electricity Authority (CEA)
Guidelines of Central Electricity Authority (CEA)
installation capacity;
water;
any;
about 0.2 km
(required if any).
per
project.
2
per 100 MW considering 50% of ash utilization.
plant area (say 5 to 10 km away). In case of nonavailability of low lying ash pond area at one
proximity is considered.
MW.
coal-bearing area.
following:
airport;
installations;
disposal
Source-http://www.gisdevelopment.net/application/utility/power/pdf/ma04103.pdf
http://www.rvunl.com/STPS.pdf
http://www.rvunl.com/STPS.pdf