Meep Fisipol
Meep Fisipol
SCOPE BY PLN
LOKASI
SYSTEM CT - VT
345 kVA
TM
TRAFO 400 kVA A A A KEC : SIDOTOPO
kWh meter Hz V KOTA : MAGELANG
SCOPE BY PLN
SISTEM OPERASI
BREAKER
B Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
A B C D
PLN ON 1 1 1 0 KONSULTAN PERENCANA
PLN OFF 0 0 1 1
FIRE 0 0 0 1
PKG
GENSET A A A
Hz V
D G
D JUDUL GAMBAR SKALA
LAK 01 01
BEBAN TERPASANG (W) BEBAN MAXIMUM DALAM (W)
LANTAI BASEMENT
LANTAI 1
LOKASI
PP.1 Penerangan, Kotak Kontak 10.609 10.609 0,70 7.426 7.426 -
LANTAI 2
MENGETAHUI DAN MENYETUJUI
PP.2 Penerangan, Kotak Kontak 12.886 12.886 0,70 9.020 9.020 -
PEJABAT PEMBUAT KOMITMEN
PAC 2 Tata Udara 19.728 0,85 16.769 - -
LANTAI 3
LANTAI 4
Penerangan, Kotak Kontak Dr. Jaka Isgiyarta, M.Si., CA, Akt
PP.4 10.639 10.639 0,70 7.447 7.447 -
NIP 19680121 199303 1 001
PAC 4 Tata Udara 18.308 0,85 15.562 - -
KONSULTAN PERENCANA
Lift Lift -1 7.599 7.599 7.599 1,25 9.499 9.499 9.499
TABEL BEBAN
NTS LEMBAR
TANGGAL KODE
NO. GAMBAR
LAK 01 02
S-DP - 1
SUB DISTRIBUTION PANEL GEDUNG PENERANGAN
PEKERJAAN
A A A
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
TOTAL
WATT
1.016
LAK 01 03
PEKERJAAN
LOKASI
LAMPU DOWNLIGHT TL LED EXHAUS FAN S KONTAK S KONTAK
DOWNLIGHT DOWNLIGHT EXIT LAMP RM BEBAN
BARET LED OUTBOW BAMBU 40 CFM DINDING LANTAI
LED 12W LED 8W LED 3 WATT LED 2x18W KEC : SIDOTOPO
14 W LED 12W 1x18W 30 W 200W 200W WATT
KOTA : MAGELANG
EXIT R S T
MENGETAHUI DAN MENYETUJUI
KONSULTAN PERENCANA
JUMLAH
LAK 01 04
PEKERJAAN
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
JUMLAH
LAK 01 05
PEKERJAAN
KONSULTAN PERENCANA
JUMLAH
LAK 01 06
PEKERJAAN
LOKASI
LAMPU TL LED EXHAUS FAN S KONTAK S KONTAK
DOWNLIGHT DOWNLIGHT
BARET LED
EXIT LAMP RM
BAMBU 40 CFM DINDING LANTAI BEBAN
LED 12W LED 8W
14 W
LED 3 WATT LED 2x18W
1x18W 30 W 200W 200W WATT KEC : SIDOTOPO
KOTA : MAGELANG
EXIT R S T
MENGETAHUI DAN MENYETUJUI
KONSULTAN PERENCANA
JUMLAH
LAK 01 07
PEKERJAAN
AC SPLITE
WALL MOUNTED BEBAN LOKASI
(BTUH) WATT
R S T KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
JUMLAH
LAK 01 08
PEKERJAAN
AC SPLITE
WALL MOUNTED BEBAN
(BTUH) WATT
R S T LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
JUMLAH
LAK 01 09
PEKERJAAN
AC SPLITE
WALL MOUNTED BEBAN
(BTUH) WATT
LOKASI
R S T
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
JUMLAH
LAK 01 06
PEKERJAAN
AC SPLITE
WALL MOUNTED BEBAN
(BTUH) WATT
R S T
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
JUMLAH
LAK 01 11
LAMPU TL LED S KONTAK
DOWNLIGHT AC SPLITE BEBAN
BARET LED BAMBU DINDING
LED 8W 1 PK
14 W 1x18W 200W WATT
R S T
PEKERJAAN
JUMLAH
LOKASI
KEC : SIDOTOPO
WIRING DIAGRAM P. ATAP KOTA : MAGELANG
Skala : NTS
PP - ELK
PANEL POWER ELEKTRONIKA LANTAI DASAR (ELEKTRONIKA)
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
A A A
LAK 01 12
BEBAN
WATT
R S T
PEKERJAAN
JUMLAH
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
R S T
LAMPU
TAMAN
BEBAN JUDUL GAMBAR SKALA
LED 19W WATT
LAK 01 13
1
1
3 3
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
2 2
2 2
2 2 2 2 2 2
2 2
2 2
KE L1
EXIT
6 6 6 6 6 6 6
1 1 1 2 2 2 3 3 3 4 4 4
6 6
1 1 1 2 2 2
3 3 3 4 4 4
6 1 1 1 2 2 2 6
3 3 3 4 4 4
5 5 5 5 5 5 5 5 5 5
6 6
5 5 DARI L2
5 5 5 5
5
5 5 5 5 4
5 5
5 5
6 6
5 5
5 5 5 5 4
5 5
KE L2
KE L2
3
6 6 6 6 6 6 6
6 6 6
EXIT
6 6 6
6 6 6 6
1 1
1 1 2 2 2 2 2 2 2
1 1
1 1 2 2 2 2 2 2 2
6 6
1 1
1 1 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
3 3
DARI L1 DARI L2
5 5 5 5
5 3 3 4
4 4 4
5 5
6 6
5 5 4
5 4
KE L4
KE L3 4 4
3
6 6 6
EXIT
6 6 6 6
1 1 1 2 2 2 3 3 3 4 4 4
3 3 3
1 1 1 2 2 2 4 4 4
6 6
3 3 3
1 1 1 2 2 2
4 4 4
5 5 5 5 5 5 5 5 5 5
5
5
DARI L2 DARI L3
5 5 5 5
5
5 5 5 5 5
5 5
5 5
5 5
6 6
5 5
5 5
5 5 5
KE L4 5
5
6 6 6
EXIT
6 6 6 6
1 1 1 2 2 2 3 3 3 4 4 4
6 6
1 1 1 2 2 2 3 3 3 4 4 4
1 1 1 2 2 2 3 3 3 4 4 4
5 5 5 5 5 5 5 5 5
5
5
DARI L3 DARI L1
5 5 5 5
5
5 5 5 5 5
5 5
5 5
6 6
5 5
5 5
5 5 5
5 5 5
5
KE L2
KE ATAP
6 6 6 6
EXIT
DARI L4
1 1 1
1 1
EXIT
3 3
2 2
3 3
3
3 3
3 3
3
EXIT
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
PP.BS
DENAH INSTALASI
KOTAK - KONTAK 1 : 125
LANTAI BASEMENT
LAK 03 01
7 11
7 8 8 13
11
11 13 13
7 7 8 8
7 7 8 8
12 12 12
PEKERJAAN
13
9 9 10 10
12 12 12 13
9 9 10 10
LOKASI
14 15
15 15
14
KONSULTAN PERENCANA
15
PP.1 PAC.1 14
DENAH INSTALASI
KOTAK - KONTAK 1 : 125
LANTAI 2
LAK 03 02
11 11 11 11 11 12 12 12 12 12
7 7 8 9 PEKERJAAN
10
7 8
10
13
LOKASI
10
KEC : SIDOTOPO
7 8
KOTA : MAGELANG
10
14
9 9 MENGETAHUI DAN MENYETUJUI
KONSULTAN PERENCANA
18 15 15
18
17 17
17 17
16 16
14
PP.2 PAC.2 16 16
DENAH INSTALASI
KOTAK - KONTAK 1 : 125
LANTAI 3
LAK 03 03
PEKERJAAN
7 9 10
8
7 8 9 10
9 10
7 8
LOKASI
KEC : SIDOTOPO
8 9 10
7 KOTA : MAGELANG
KONSULTAN PERENCANA
11 13
11
12 12 13 13
13
11
12
PP.4 PAC.4 12 13
DENAH INSTALASI
KOTAK - KONTAK 1 : 125
LANTAI 4
LAK 03 02
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
2
TENAGA AHLI NAMA TT
2
P. ATAP
DENAH INSTALASI
KOTAK - KONTAK 1 : 125
LANTAI ATAP
LAK 03 05
PEKERJAAN
KE GROUNDING KE GROUNDING
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
KE GROUNDING KE GROUNDING
JUDUL GAMBAR SKALA
LEMBAR
TANGGAL KODE
NO. GAMBAR
LAK 04 01
PEKERJAAN
PERTANAHAN PERTANAHAN
PROTEKSI PETIR PROTEKSI PETIR
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
PERTANAHAN
POWER HOUSE
PERTANAHAN
PROTEKSI PETIR
PERTANAHAN
PROTEKSI PETIR
PERTANAHAN PERTANAHAN
LAL LAK
LEMBAR
TANGGAL KODE
NO. GAMBAR
LAK 04 02
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
LAK 04 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
LAK 04 04
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
LAK 04 05
PEKERJAAN
X X
TB-FA 4
LOKASI
P TB-FA 3
KEC : SIDOTOPO
X KOTA : MAGELANG
P
TB-FA 2 MENGETAHUI DAN MENYETUJUI
TB-FA 1
P
KONSULTAN PERENCANA
TB-FA BS
JUMLAH UNIT
SKEMATIK DIAGRAM
FIRE ALARM
SKALA NTS LEMBAR
TANGGAL KODE
NO. GAMBAR
LAL 01 01
PEKERJAAN
R R R R
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
R R R
KONSULTAN PERENCANA
R R R
EOL
S
DENAH INSTALASI
FIRE ALARM 1 : 125
LANTAI BASEMENT
LAL 01 02
S
S
S
S S
PEKERJAAN
S
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
R R
DENAH INSTALASI
FIRE ALARM 1 : 125
LANTAI 2
LAL 01 03
PEKERJAAN
S S S
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
EOL
R R R R
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
S S
DENAH INSTALASI
FIRE ALARM 1 : 125
LANTAI 3
LAL 01 04
PEKERJAAN
S S S S LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
P B X
S S S
DENAH INSTALASI
FIRE ALARM 1 : 125
LANTAI 4
LAL 01 05
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
DENAH INSTALASI
FIRE ALARM 1 : 125
LANTAI ATAP
LAL 01 06
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
EQUALIZER
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
SKEMATIK DIAGRAM
TATA SUARA
SKALA NTS LEMBAR
TANGGAL KODE
NO. GAMBAR
LAL 02 01
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
TATA SUARA 1 : 125
LANTAI BASEMENT
LAL 02 02
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
TATA SUARA 1 : 125
LANTAI 2
LAL 02 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
TATA SUARA 1 : 125
LANTAI 3
LAL 02 04
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
TATA SUARA 1 : 125
LANTAI 4
LAL 02 05
PEKERJAAN
ONU 24 FE
ONU 24 FE ONU 24 FE
ONU 24 FE
LSA
LSA
LSA
LSA
LSA
LSA
LSA
LSA
x3 3X KABEL UTP DALAM PIPA CONDUIT 20 mm
LSA
LSA
LSA
LSA
DALAM PIPA CONDUIT 20 mm 2X KABEL UTP
x2 LOKASI
KEC : SIDOTOPO
3X KABEL UTP
KOTA : MAGELANG
x21 21X KABEL UTP x3
x3 3X KABEL UTP DALAM PIPA CONDUIT 20 mm
DALAM PIPA CONDUIT 20 mm
4X KABEL UTP MENGETAHUI DAN MENYETUJUI
x4
SKEMATIK DIAGRAM
DATA & TELEPON
SKALA NTS LEMBAR
TANGGAL KODE
NO. GAMBAR
LAL 03 01
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
DATA & TELEPON 1 : 125
LANTAI BASEMENT
LAL 03 02
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
ODP-L1
KAP. 24 CH
DENAH INSTALASI
DATA & TELEPON 1 : 125
LANTAI 2
LAL 03 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
ODP-L2
KAP. 24 CH
DENAH INSTALASI
DATA & TELEPON 1 : 125
LANTAI 3
LAL 03 04
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
ODP-L4
KAP. 24 CH
DENAH INSTALASI
DATA & TELEPON 1 : 125
LANTAI 4
LAL 03 05
PEKERJAAN
LED TV
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KE PABX
KE FIRE ALARM
KE SOUND SYSTEM
TENAGA AHLI NAMA TT
KE MATV
KE RAK DATA
CADANGAN
DI RUANG SERVER
CONTROL BOX
MAX EARTH. RESISTANCE 1
JUDUL GAMBAR SKALA
LAL 04 01
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
DENAH INSTALASI
IP CCTV 1 : 125
LANTAI BASEMENT
LAL 04 02
PEKERJAAN
KEC : SIDOTOPO
KOTA : MAGELANG
kabel UTP cat 6
kabel UTP cat 6 LEWAT TRAY KABEL kabel UTP cat 6
MENGETAHUI DAN MENYETUJUI
LEWAT TRAY KABEL LEWAT TRAY KABEL
KONSULTAN PERENCANA
DENAH INSTALASI
IP CCTV 1 : 125
LANTAI 2
LAL 04 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
IP CCTV 1 : 125
LANTAI 3
LAL 04 04
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
DENAH INSTALASI
IP CCTV 1 : 125
LANTAI 4
LAL 04 05
ATAP
LANTAI 4
PEKERJAAN
10 4
3
PG FS
6
7
2 1
8 9
LANTAI 3
1. SPRINKLER RISER PIPE
2. DRAIN PIPE
3. BRANCH VALVE WITH INDICATING/
SUPERVISORY/TAMPER SWITCH
4. WATER FLOW SWITCH SUPERVISORY
5. BRANCH PIPE
6. TEST VALVE
7. SIGHT GLASS
8. UNION
9. DRAIN PIPE
10. PRESSURE GAUGE
660 200
- KUNCI PENGAMAN
- HYDRANT TWO WAY TYPE
- BALL VALVE
HYDRANT
LOKASI
TUTUP PLAT BESI + RANGKA
TEBAL : 2 mm
DICAT ANTI KARAT
1500 400
- KUNCI PENGAMAN
KEC : SIDOTOPO
KOTA : MAGELANG
CHECK VALVE 500 150
1500
10
GEMBOK
SEAMESE CONNECTION - SC HYDRANT BOX TYPE OUT DOOR & HYDRANT PILLAR
MENGETAHUI DAN MENYETUJUI
BASEMEN
LEMBAR
TANGGAL KODE
NO. GAMBAR
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
BCV
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
BCV
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
BCV
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
SIMBOL KETERANGAN
PIPA HIDRAN BS SCH 40 JUDUL GAMBAR SKALA
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
BCV
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
SIMBOL KETERANGAN
JUDUL GAMBAR SKALA
PIPA HIDRAN BS SCH 40
PIPA SPRINKLER BS SCH 40
PIPA DRAIN BS SCH 40
GATE VALVE PN 16
INDOOR HYDRANT BOX ( IHB )
FIRE EXTINGUISHER
BCV BRANCH CONTROL VALVE
SPRINKLER HEAD, PENDANT TANGGAL KODE
LEMBAR
NO. GAMBAR
SPRINKLER HEAD, UP RIGHT
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
BCV
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
SIMBOL KETERANGAN
PIPA HIDRAN BS SCH 40 JUDUL GAMBAR SKALA
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
LEMBAR
TANGGAL KODE
NO. GAMBAR
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KETERANGAN
Dr. Jaka Isgiyarta, M.Si., CA, Akt
GWT GROUND WATER TANK NIP 19680121 199303 1 001
RWT RAW WATER TANK
SOL SOLENOID VALVE
KONSULTAN PERENCANA
NO NORMALLY OPEN
NC NORMALLY CLOSE
BP BOOSTER PUMP
BFV BUTTERFLI VALVE
FLV FLOATING VALVE
D DRAIN
SKEMATIK DIAGRAM
AIR BERSIH NTS
GEDUNG
SKEMATIK DIAGRAM AIR BERSIH
SKALA NTS
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 01 01
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
1/2"
3/4" 3/4" Dr. Jaka Isgiyarta, M.Si., CA, Akt
1/2" NIP 19680121 199303 1 001
1/2"
3/4"
1" 1"
1/2"
1 1/4"
1/2" 1/2"
1/2" 1/2"
1"
1"
3/4" 3/4"
1/2" 1/2"
1/2" 1/2" 1/2" 1/2" TENAGA AHLI NAMA TT
3/4"
3/4"
3/4"
3/4" 3/4"
1/2" 1/2" 1/2" 1/2"
3/4" 3/4"
1/2"
DENAH INSTALASI
AIR BERSIH 1:125
DENAH INSTALASI AIR BERSIH LANTAI 1
LANTAI 1
SKALA 1 : 125
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 01 02
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
1/2"
3/4" 3/4"
Dr. Jaka Isgiyarta, M.Si., CA, Akt
1/2" NIP 19680121 199303 1 001
1/2"
3/4"
3/4" 1/2"
KONSULTAN PERENCANA
1" 1"
1/2"
1 1/4"
1/2" 1/2"
1/2" 1/2"
1"
1"
3/4"
3/4"
3/4" 3/4"
1/2" 1/2" 1/2" 1/2"
3/4" 3/4"
1/2"
DENAH INSTALASI
AIR BERSIH 1:125
DENAH INSTALASI AIR BERSIH LANTAI 2
LANTAI 2
SKALA 1 : 125
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 01 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
3/4"
3/4" 1/2"
1" 1"
1/2"
1 1/4"
1/2" 1/2"
1/2" 1/2"
1"
1"
3/4"
3/4" 3/4"
3/4"
3/4" 3/4"
1/2"
DENAH INSTALASI
AIR BERSIH 1:125
DENAH INSTALASI AIR BERSIH LANTAI 3
LANTAI 3
SKALA 1 : 125
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 01 04
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
3/4"
3/4" 1/2"
1" 1"
1/2"
1 1/4"
1/2" 1/2"
1/2" 1/2"
1"
1"
3/4"
3/4" 3/4"
3/4"
3/4" 3/4"
1/2"
DENAH INSTALASI
AIR BERSIH 1:125
DENAH INSTALASI AIR BERSIH LANTAI 4
LANTAI 4
SKALA 1 : 125
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 01 05
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
DENAH INSTALASI
AIR BERSIH 1:600
DENAH INSTALASI AIR BERSIH SITE PLAN
SITEPLAN
SKALA 1 : 600
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 01 06
VT
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
KETERANGAN
CD CLOSED DUDUK
FD FLOOR DRAIN
JW JET WASHER JUDUL GAMBAR SKALA
UR URINOIR
WS WASTAFEL
16 M3
KZ KITCHEN ZINK
AIR BEKAS SKEMATIK DIAGRAM NTS
AIR BEKAS, KOTOR, &
AIR KOTOR
VENT
VENT
SKEMATIK DIAGRAM
AIR BEKAS, KOTOR, & VENT
SKALA NTS LEMBAR
TANGGAL KODE
NO. GAMBAR
LAL 03 01
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
SIMBOL KETERANGAN
CD CLOSED DUDUK
FD FLOOR DRAIN
CO CLEAN OUT
DENAH INSTALASI
WS
SW
WASTAFEL
AIR BEKAS, KOTOR, & 1 : 125
AIR KOTOR
WW AIR BEKAS
VENT
VT VENT LANTAI BASEMENT
LAL 03 02
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
WS CD
FD
CO
TENAGA AHLI NAMA TT
SIMBOL KETERANGAN
FD FLOOR DRAIN
CO CLEAN OUT
WS WASTAFEL
DENAH INSTALASI
SW AIR KOTOR AIR BEKAS, KOTOR, & 1 : 125
WW AIR BEKAS
VENT
VT
LANTAI 1
VENT
LAL 03 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
WS CD
CO
SIMBOL KETERANGAN
CD CLOSED DUDUK
DENAH INSTALASI
FD FLOOR DRAIN AIR BEKAS, KOTOR, & 1 : 125
VENT
CO CLEAN OUT
LANTAI 2
WS WASTAFEL
SW AIR KOTOR
DENAH INSTALASI AIR BEKAS, KOTOR, & VENT
WW AIR BEKAS
LANTAI 2
VT VENT SKALA 1 : 125 LEMBAR
TANGGAL KODE
NO. GAMBAR
LAL 03 03
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
WS
FD
WS CD
CO
CD CD
FD FD WS
CO CO
CD
CD WS
FD FD
CD CD
CO
SIMBOL KETERANGAN
DENAH INSTALASI
CD CLOSED DUDUK
AIR BEKAS, KOTOR, & 1 : 125
FD FLOOR DRAIN
CO CLEAN OUT
VENT
WS WASTAFEL
LANTAI 3
SW AIR KOTOR
WW AIR BEKAS
DENAH INSTALASI AIR BEKAS, VT VENT
LANTAI
KOTOR,3& VENT
SKALA 1 : 125 LEMBAR
TANGGAL KODE
NO. GAMBAR
LAL 03 04
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
WS
FD
WS CD
CO
CD CD
FD FD WS
CO CO
CD
CD WS
FD FD
CD CD
CO
JUDUL GAMBAR SKALA
SIMBOL KETERANGAN
CD CLOSED DUDUK
DENAH INSTALASI
FD FLOOR DRAIN
CO CLEAN OUT
AIR BEKAS, KOTOR, & 1 : 125
WS WASTAFEL VENT
SW AIR KOTOR LANTAI 4
WW AIR BEKAS
VT VENT
LAL 03 06
PEKERJAAN
LOKASI
RD 4" RD 4" RD 4" RD 4" RD 4"
KEC : SIDOTOPO
KOTA : MAGELANG
FD 3" FD 3" FD 3" FD 3" FD 3"
4"
4"
4"
4"
4"
4"
4"
4"
4"
PAH
PAH
PAH
PAH
PAH
PAH
PAH
PAH
PAH
PAH
FD 3" FD 3" FD 3" FD 3" FD 3"
KONSULTAN PERENCANA
SKEMATIK DIAGRAM
INSTALASI AIR HUJAN
SKALA NTS
LEMBAR
TANGGAL KODE
NO. GAMBAR
PL 03 01
PEKERJAAN
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
KONSULTAN PERENCANA
PL 03 02
FD 3" FD 3" FD 3" FD 3" FD 3"
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
PEKERJAAN
4"
4"
3"
3"
PAH
PAH
FD
FD
LOKASI
KEC : SIDOTOPO
KOTA : MAGELANG
4"
PAH
PAH
Dr. Jaka Isgiyarta, M.Si., CA, Akt
AIR KOTOR NIP 19680121 199303 1 001
KONSULTAN PERENCANA
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
FD 3" FD 3" FD 3" FD 3" FD 3"
PL 03 03
FD 3" FD 3" FD 3" FD 3" FD 3"
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
PEKERJAAN
4"
4"
3"
3"
LOKASI
PAH
PAH
FD
FD
KEC : SIDOTOPO
KOTA : MAGELANG
4"
PAH
PAH
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
AIR KOTOR
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
FD 3" FD 3" FD 3" FD 3" FD 3"
JUDUL GAMBAR SKALA
PL 03 04
FD 3" FD 3" FD 3" FD 3" FD 3"
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
PEKERJAAN
LOKASI
4"
4"
3"
3"
PAH
PAH
FD
FD
KEC : SIDOTOPO
KOTA : MAGELANG
4"
PAH
PAH
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
AIR KOTOR
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
JUDUL GAMBAR SKALA
FD 3" FD 3" FD 3" FD 3" FD 3"
PL 03 05
FD 3" FD 3" FD 3" FD 3" FD 3"
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
PEKERJAAN
LOKASI
4"
4"
3"
3"
PAH
PAH
FD
FD
KEC : SIDOTOPO
KOTA : MAGELANG
4"
PAH
PAH
Dr. Jaka Isgiyarta, M.Si., CA, Akt
NIP 19680121 199303 1 001
KONSULTAN PERENCANA
AIR KOTOR
PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4" PAH 4"
FD 3" FD 3" FD 3" FD 3" FD 3" JUDUL GAMBAR SKALA
PL 03 06