4.1 Division of Works
4.1 Division of Works
DIVISION OF WORKS
No. DESCRIPTION
1 GENERAL
1-1 Bond
(1) Advance payment
(2) Performance Bond
(3) Retention Bond
1-2 Insurance
(1) Erection All Risk Insurance
(2) Marine Insurance for Project Cargo
(3) Marine Insurance for None-Project Cargo
(4) Third Party Liability Insurance
(5) Worker's Compensation Insurance
(6) Automobile Liability Insurance
(7) Insurance for Construction Equipment
(8) Insurance of temporary facilities, tools, non-commercial cargo, construction and testing
(9) Documentations for insurance claim
(10) Any Other Insurance - Required by Law and / or which the Sub-contractor
Desirable for Carrying out the Work
1-4 Taxes
(1) Corporate Tax
(2) Sales Tax
(3) Expatriate Personal Income Tax
(4) Local Employee's Personal Incomes Tax and Social insurance, if any.
(5) Import Tax and Duty
(6) Others (if any)
1-5 Coordination
(1) General / Commercial Coordination
(2) Technical / Engineering Coordination
(3) Coordination with Local Authorities & other concerned parties
2 GENERAL SUPPLIES
2.4 Water
a For Flydro test
b For Chemical Cleaning
c For Steam Blow out
d For Flushing
e For Commissioning
f For Site office
g For Construction
h For Accommodation
2.5 Fuel
a Initial filling and up to Taking over by Owner
b For construction
c For commissioning
2.8 Electricity
a For Construction
b For Site office
c For Storage
d For Accommodation
e DG set for Construction and Accommodation
3 ENGINEERING
4.1 Erection
a Co-ordination for Equipment Delivery and Erection
b Control of Work force including supervision
c Work force
d Work schedule preparation
e Monitor and report on work schedule
f Quality Control
g Technical advisors (vendor representative)
h Erection report
i Co-ordination between Sub-contractor and others
4.6 Pre-Commissioning
a Management of Commissioning team
b Technical Direction to work force
c Schedule preparation
d Monitor and report
e Test Report
- Erection / Installation
-Pre-commissioning
f Tests during Pre-commissioning
-Test Equipment
-Test Engineers
-Work force
-Instrument calibration
4.8 Commissioning
a Test Equipment
b Test Engineers
c Work force
5 TRANSPORTATION
5.1 Transportation
a Delivery of Project Cargo and Components from Port of Export to
Port of Unloading
b Delivery of Project Cargo and Components from Port of Import to
to Project Site / Storage area
c For Other materials / equipments
5.3 Demurrage
a Due to fault of Transporter for Project Cargo / Components
b Due to fault of Receiver (Sub-contractor)
5.6 Transportation / Handling of Equipments / Materials from Storage area to erection point
5.8 Removal of any obstruction / widening & strengthening of Access roads (if required)
during transportation within the Project area, Storage area, Storage area to
erection point (for all cargoes)
6.6 Storing, supervising, maintaining, watching, securing at site for all Equipments and materials
7.3 Workshop
7.7 Provision of Local Labor facilities such as Toilets, shelters, canteen, smoking rooms and other
required facilities
7.12 Provision of Fire temporary Fighting equipments for Office, Storage and Construction Area
8.7 Overall Project area Boundary Fencing, Main Gate and Security
8.8 Guard blouse, Guard for Office, Construction and Storage area
8.10 Maintaining and guarding facilities for equipments and materials up to taking over by Owner
8.11 Temporary work permit, staying permit and any other local permits as required by Local Law
8.12 Necessary work permit, visa and other permits as per local law to bring in overseas staff / personnel
9.3 Safety appliances like helmets, shoes, welding mask, goggles etc
X
X
X
*lx *1 : For CLIENTs Equipment only
X X For each own
X X For each own
X X For each own
X X For each own
*2x *2 : Contractor's provided only
X X For each own
X X For each own
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X if required
X
X
X
X
X
X
X
X
X
X
X
X
X X For Each own
X
X X For Each own
X
X
X
X
*lx X For Owner approval, if required, for assist to Contractor
*lx X *1 for Assist to Contractor
X
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
*lx X *1 for Assist to Contractor
X
*lx X *1 for Assist to Contractor
X
X
*lx X *1 For Assist to CLIENT
X
X
X
X
X
X *2 x *2 For Assist to CLIENT
X
X
X
X *2 x *2 Contractor need to supply the Work Force
X
X
X
X
X
X
X
X
X as assistance
X
X as assistance
X as assistance
X
X
X
X Xl) 1) Contractor to be handle the container according to Employer
X trailer to be arranged by Employer
X x 2) 2) Contractor need to support to Employer.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X For Each Own
X
X
X
X
X
DIVISION OF WORKS
PART II - Detailed PROVISIONS for temporary works
No. DESCRIPTION
1.3 Accomodation
(1) Furnitures
(2) Telephone
(3) Electric Power Distribution
a. Equipment with Spare Parts
1) Transformers
2) D/B, Switch Device
3) Measuring Device
4) D/G
5) Foundation
6)Fence
7) Any Other
b. Cabling and Wiring Materials
1) Cable and Wire
2) Connection Materials
3) Supporting Materials
4) Cable and Wire Conduit Materials
5) Earth Connection
6) Any Other
c. Charge of Electric Power
(4) Toilet
(5) Sewage Treatment Facilities
(6) Drainage
(7) Potable Water
a. Equipment with Spare Parts
1) Tank
2) Pump
3) Strainer
4) Measuring Device
5) Foundation
6) Any Other
b. Piping and Fitting
1) Pipe
2) Valve
3) Fitting
4) Supporting Materials
5) Any Other
1.10 Electrical Power Distribution for Construction, Storage Yard, Guard House and Ware house
1.17 Temporary Lighting at Construction / Storage and other all required areas
2.4 Reports
(1) Site Organization Chart
(2) Erection Schedule (Planning and Actual)
a. Master Schedule
b. Daily Schedule
c. Weekly Schedule
d. Monthly Schedule
e. Three Month ahead Schedule
(3) Manpower Schedule
a. Estimated Monthly Schedule and three month Schedule
b. Actual (Daily and Weekly)
c. Actual (Monthly)
(4) Inspection and Test Reports
(5) Photographs for Monthly Progress reports with explanation
(6) Sub-contractor's employee list
(7) Tools and Heavy Equipment
a. Schedule and providing of Heavy Equipment
b. Maintenance, Condition Report of Tools and Equipments
c. Tools and Heavy Equipment List
(8) Returnable Cargo List
(9) Plant Equipment, Tolols, Material Status Report
(10) Safety Report
(11) Damage / Accident Report
(12) Erection Report
(13) Testing Report
(14) Other Records and Reports reasonably requested by Contractor
3.8 Prequalification and Final qualification of Test Piece for WQT for all materials
3.16 Supporting Materials such as Steel Channels, Angles, Beams, Plates for fixing
5.2 Earthing
a. Buried earthing mesh (including risers to terminal point)
b. Earhing Rods
c. Earthing Connection to all equipments / materials
d. Earthwork (including excavation, backfilling, compaction)
e. Any other reasonably required for completion of works
f. Lightning Arrestor works (including connection to the buried earth mesh)
5.5 Instrument Installation including impuls tubing, piping and stantion installation
a. Hanger and supports for tubing and piping (including fabrication)
b. Temporary piping for Hydrotest (including supports)
c. Pre treatment and Post Treatment for Welding
d. NDT
e. Surface preparation of pipes, tubings for painting
f. Prefabrication and installation of pipes and tubes, including Pressure test
g. Painting of piping, tubing and supports
h. Thermal Insulation for piping and tubing
i. Instrument Installation
j. Stantion Installation
k. Calibration works for permanent instruments
1. Any other reasonably required for completion of works
5.9 Lighting
a. Lamp facilities (indoor / outdoor)
b. Fixture of Lamps (indoor / outdoor)
c. Conducing, cabling, wiring, supporting etc
d. DB's, Panels, switcboxes, switches, control devices etc
e. Street Lighting (together with local control boxes)
f. Yard Lighting (together with local control boxes)
g. Aviation Warning Lighting (together with local control boxes)
h. Any other reasonably required for completion of works
X If necessary
X
X
X
X X
X
X
X
X
X X
X
*lx X *1 For Assist to Contractor
X
X
X
X
X
X
X
X
X
X
X
X
X
X if required.
X If required.
X If required.
X
X
X *) Only for Electrical Work
If applicable
X