Guidelines For Minor Project Implementation & Design
Guidelines For Minor Project Implementation & Design
1. Every student shall undertake the Minor Project in semester III and IV.
2. Every student shall work on an approved project, a group of 03/04 students (maximum) shall be
3. The group members may be from different programme to support the interdisciplinary functioning.
4. The students have to identify the problem by discussion with various stakeholders, site visits,
5. Collect the sufficient data and survey to establish the criticality of the problem to be solved.
8. Select and justify one of the solutions identified based on the feasibility, affordability and ease of
use.
11. All Submission and Assessment have to done through Moodle only. No other mean is accepted. Late
submission should not be consider until genuine reasons.
1st week- (10th SEPT. 17th SEPT.) Allotment of Project Guides, Max 4 students per group
2nd week-(18th SEPT. – 24th SEPT) Introduction to domain, Selection of project topic
3rd week- (1st OCT. – 8th OCT.) Introduction to Engineering Ethics (Quiz 5marks)Mentor
4th week – (8th OCT. -15st OCT) 15TH OCT. Review-I (10 marks) Internal Expert Panel
5th week- (16th OCT – 22nd OCT) Introduction to research publication, plagiarism
6th week – (23rd OCT -29th OCT) Submission of 5 research paper literature review. (5marks)Mentor
7th week-(1st NOV. - 5th NOV.) 5th NOV. Review-II (10 marks) Internal Expert Panel
8th week – (6th NOV. -12th NOV.) Guidelines for project report & PPT to the students
9th week – (13th NOV.- 19th NOV.) Draft PPT & Project report submission through LMS
10th week – (20 th NOV – 26th NOV) Project report & PPT Submission.
11th week-(27th NOV -3rd DEC.) 3rd DEC Final Review –III (10marks) Internal Expert Panel
12th week-(4th DEC - 10th DEC) 10th DEC April External Minor Project review (10marks)
13th week-(11th DEC -15th DEC) Submission of IA Marks
(MINOR PROJECT IMPLEMENTATION) (JAN 22 to MAY 22)
1st week- (3rd JAN - 7th JAN) Introduction to IPR, Quiz-I IPR (5marks) Mentor
2nd week-(8th JAN – 14th JAN) How to check patent, Share video links Mentor
3rd week- (15th JAN – 21st JAN) 21th JAN Review-I (configuration of model) (10 marks) Internal Expert Panel
4th week - (29th JAN -04th FEB) Submission of Patent Abstract, (5marks) Mentor
5th week- (05th FEB - 11th FEB) Solution Implementation, configuration overview
6th week (18th FEB -25th FEB) Presentation, discussion and doubt clearing
7th week-(26th FEB - 4th March) Trouble shooting of project
8th week (5th MAR-11th MAR) 11th MARCH 22 Review-II (10 Marks) – (Validation & testing) Internal
Expert Panel
9th week – (12th MAR - 18th MAR) Trouble shooting of project
10th week –(19th MAR -25th MAR) Draft PPT & Project report submission through LMS
11th week-(26th MAR -1st APR) 01st April Review –III Project report Submission. (10marks) Internal
Expert Panel
12th week-(2nd APR-8th APR) 8th APRIL External Minor Project review (10marks)
*****************************************************