सं./No. ERPC/COM-I/REA/2021-22/550 िदनांक / Date: 04.08.2021
To: As per list enclosed / सेवा म: (संल सूची के अनुसार)
Sub.: Provisional Regional Energy Accounting (REA) of Eastern Region for the month
of July, 2021.
Sir,
Please find enclosed a copy of the ABT based Provisional Energy Account for the
month of July,2021. The last instalment of input data from ERLDC has been received on
02.08.2021.
Constituents are requested to intimate any discrepancy / error within 60 days from
the date of issue of this provisional REA. In case of any discrepancy / error, the provisional
REA would be revised based on re-examination, final decision and confirmation. In case no
communication is received from any of the constituents indicating mistakes / discrepancy,
the provisional REA as issued, would be treated as final.
Encl.: As above
(S.Kejriwal)
SE (Comml)
DISTRIBUTION LIST
1) Chief Engineer,(Commercial), Bihar State Power Holding Company Ltd., Vidyut Bhavan, Bailey Road, Patna-
800021 (FAX:0612 2227557).
2) Chief Engineer (Commercial), Damodar Valley Corporation, DVC Tower, VIP Road, Kolkata-700054
3) Chief Engineer (COMML. & REVENUE), Jharkhand Urja Vikas Nigam Ltd, HEC Engineering Building, Dhurva,
Ranchi-834002 (FAX : 0651 2400799 / 2490486 ).
4) Addl. Chief Engineer (SLDC/EHV), Deptt. of Power,Govt. of Sikkim, Kazi Road, Gangtok-737101
5) Chief Engineer (PTR), West Bengal State Electricity Distribution Company Limited, Bidyut Bhavan, 8 th Floor,
Bidhannagar, Kolkata-700091 (FAX : 033 2334 5862)
6) General Manager (Commercial), NTPC Ltd., Loknayak Jaiprakash Bhawan, Dakbunglow Chowk, Patna-
800001(FAX: 0612 2230035 / 2224287 )
7) Regional Executive Director (East-II), 3rd Floor, OCHC Building (New), 24, Janpath, Bhubaneswar – 751001
8) CEO, Bhartiya Rail Bijlee Company Ltd.,1st Floor , Vidyut Bhavan, Bailey Road, Patna-800001( Fax 0612-
2504007)
9) Addl. General Manager (Commercial), ERTS-I, POWERGRID, Boring Road, Alankar Place, Patna-800001.
10) Addl. General Manager (Commercial), ERTS-II, POWERGRID, CF-17, Action Area-1C, New Town,Rajarhat, Kolkata
-700156
11) Chief Engineer ( Commercial ), NHPC Ltd., NHPC Office Complex, Sector-33, Faridabad, Haryana - 121003,
( TELEFAX : 0129 2278358)
12) Executive Director, ERLDC, 14 Golf Club Road, Kolkata-700033 (FAX: 033 2423 3648)
13) Sr. General Manager (PP), GRIDCO, 4th Floor, Vidyut Bhavan, Saheed Nagar, Bhubaneswar-751007
14) Member Secretary,WRPC, MIDC Area, Marol, Andheri(E), Mumbai-400093 (FAX : 022 2837 0193 ).
15) Member Secretary,NRPC,Katwaria Sarai,18A SJSS Marg,New Delhi-16 (FAX 01126865206 ).
16) Member Secretary, SRPC, 29, Race Course Road,Banglore-560009 (FAX : 080 2259343 ).
17) Member Secretary, NERPC, NERPC Complex, Dong Parmaw, Lapalang, Shillong-793006, Meghalaya
18) Chief Engineer (Commercial), M.P. Power Management Co. Ltd., Shakti Bhawan, Vidyut Nagar, Rampur, Jabalpur-
482008 (Fax No. 0761-2661884)
19) Chief Engineer(PP), MSEDCL, Prakashgarh, 4th Floor, Bandra(East), Mumbai- 400051.
20) Chief Engineer.(Commercial), CSEB, Dandania, Post Sunder Nagar, Raipur-492013.
21) Executive Engineer, Electricity Department, Administration of Dadra and Nager Haveli, SILVASSA, Via. VAPI,
PIN : 396 230.
22) Executive Engineer, Electricity Department, Administration of Daman & Diu, Power House Building, Nani
Daman – 396 210.
23) Executive Engineer Division-III, Electricity Department, Government of Goa, Curti, Ponda- Goa
24) General Manager, Energy Accounts Dept., UPPCL, Shakti Bhawan Extn., 14Ashok Marg, Lucknow-226001.
25) Chief Engineer(Comml & Survey Wing), Power Dev.Deptt.,Govt. of J&K, GLADNI, Narval Bala, Jammu-180006.
26) Chief Engineer , Rajasthan Power Procurement Centre, Bidyut Bhavan, Janpath, Jaipur.
27) General Manager (SLDC), SLDC building,,Minto Road,New Delhi-110002.(FAX-011-2322-1012)
28) Director (Interstate Billing), PSEB, 220 Kv Grid S/s, The Mall, Patiala-147001.
29) Chief Engineer (SO&Commercial), HVPNL .,Shakti Bhawan,Sector-6,Panch kula-134109.
30) GM (Commercial-Tariff), ASEB, Bijulee Bhawan, Paltan Bazar, Guwahati- 781001.
31) Chief Engineer (Power ), Deptt. of Power, Govt. of Nagaland, Kohima –797 001.
32) Member (Technical) MeSEB, Lumjingshai, Short Round Road, Shillong.
33) Chief General Manager (RT & C), OPTCL, Janpath, Bhubaneswar-751022.(Tel FAX-0674 2542 120)
34) Vice President (CS-CB), PTC India Limited, 2nd Floor, NBCC Tower, 15, Bikaji Cama Place, New Delhi –110065
35) Executive Director(Finance), Gujarat Urja Vikas Nigam Ltd., Sardar Patel Vidyut Bhavan, Race Course, Vadodara –
390007.
36) Chief G. M., Uttrakhand Power Corp. Ltd., Urja Bhawan, Kanwali Road, Dehradun - 248006.
37) Superintending Engineer(E), UT of Chandigarh, 5th Floor, New Addl. Office Bldg., Sector-9D, Chandigarh-
160 009.
38) Chief Engineer (System Operation), Himachal Pradesh State Electricity Board, Vidyut Bhawan, Kumar House
Complex , Block-II, Shimla-171004.
39) S.E.-I, Electricity Department, N0.137, NSC Bose Salai, Puducherry-605001.
40) AGM(BD / P&S), NVVNL, NTPC BHAWAN, Core-7, Scope Complex, 7,Institutional Area, Lodhi Road, New Delhi –
110 003 (FAX 011 24367201)
41) AVP (Power Sales), STERLITE Energy Limited.,1st Floor, City Mart, Commercial Complex, Baramunda,
Bhubaneswar ORISSA, PIN-751003 ( FAX : 0674-2354221-6610342 )
42) AGM (Commercial), KBUNL, Kanti , Muzaffarpur Dist –Bihar 843130 ( Fax: +91- 06223-267310).
Page No. 1 / 14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
FSTPS STAGE-I&II FSTPS STAGE-III KhSTPS STAGE-I KhSTPS STAGE-II TSTPS STAGE-I
S.No NTPC POWER STATIONS
(3X200+2X500) (1X500) (4X210) (3X500) (2X500)
PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK
1 Installed Capacity (MW) : 1600 500 840 1500 1000
2 Normative AUX as per CERC Tariff Order 2019-24(%) : 6.78125 6.25000 9.00000 6.25000 7.05000
3 Ex-Bus Normative Capacity at 100% availability (MW) : 1491.50 468.75 764.40 1406.25 929.50
4 Average DC for the month (ex-bus) in MW: 1260.11 1258.16 445.00 442.77 515.14 510.12 1411.85 1408.59 893.81 885.08
5 Plant Availability Factor for Month - PAFM ( %): 84.486 84.356 94.933 94.457 67.392 66.735 100.398 100.166 96.160 95.221
6 Cumulative DC (FY:2020-21) up to the preceeding month of season (%): 0.000 0.000 0.000 0.000 0.000 0.000 101.143 99.357 0.000 0.000
7 Cumulative DC (FY:2020-21) including the current month of season --PAFY (%): 84.486 84.356 94.933 94.457 67.392 66.735 100.765 99.768 96.160 95.221
8 Total Schduled Generation for the current month (MWH) : 126224.849 518320.462 46688.796 188862.739 63159.162 277597.614 167140.349 730171.815 107232.302 481443.638
9 Total Schduled Generation Excluding STOA/IER Exchange (MWH) : 125911.437 517661.515 46484.396 188571.784 63157.612 277597.614 167140.349 730171.815 107222.302 481418.938
10 Cumulative Schduled Ex-bus Generation upto the preceding month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 163436.420 733020.197 0.000 0.000
11 Cumulative Schduled Ex-bus Generation including the current month (MWH) : 125911.437 517661.515 46484.396 188571.784 63157.612 277597.614 330576.769 1463192.012 107222.302 481418.938
12 Plant Load Factor for the current month ( % ) : 68.250 56.051 80.325 64.985 66.634 58.574 95.851 83.747 93.037 83.542
13 Cumulative Plant Load Factor including the current month ( % ) : 68.250 56.051 80.325 64.985 66.634 58.574 96.343 85.286 93.037 83.542
14 Cumulative Norm. Scheduled Energy beyond which incentive payable (MWH) : 157204.100 786020.500 49406.250 247031.250 80567.760 402838.800 291656.250 1458281.250 97969.300 489846.500
15 Net Energy Scheduled to Virtual Anciliary Entity (VAE) for the month: -213.495 212.465 -202.675 -140.655 168.518 301.493 924.025 2456.905 146.948 -165.598
16 Net Energy Scheduled to Virtual SCED Entity for the month(*): -4943.805 -576.725 -808.535 4226.635 1705.003 12941.218 8377.438 32813.543 1184.390 24810.940
17 Cumulative Scheduled Generation to be con. for incentive upto preceding month 0.000 0.000 0.000 0.000 0.000 0.000 156877.805 689731.372 0.000 0.000
18 Cumulative Scheduled Generation to be considered for incentive upto current month 131068.737 518025.775 47495.606 184485.804 61284.092 264354.904 314716.692 1384632.740 105890.965 456773.596
19 Cumulative Energy eligible for incentive including current month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 23060.441 0.000 7921.665 0.000
20 Cumulative Energy eligible for incentive upto preceding month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 13440.305 0.000 0.000 0.000
21 Energy eligible for incentive in the current month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 9620.136 0.000 7921.665 0.000
SE (Comml)
Page No. 2 / 14
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
BARH STPS STAGE-II BRBCL MTPS STAGE-II Darlipalli STPS-I Nabinagar STPP
S.No NTPC POWER STATIONS
(2X660) (3X250) (2X195) (1X800) (2X660)
PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK
1 Installed Capacity (MW) : 1320 750 390 800 1320
2 Normative AUX as per CERC Tariff Order 2019-24(%) : 6.25000 9.00000 9.00000 6.25000 6.25000
3 Ex-Bus Normative Capacity at 100% availability (MW) : 1237.50 682.50 354.90 750.00 1237.50
4 Average DC for the month (ex-bus) in MW: 1299.00 1299.00 480.41 484.47 275.54 267.47 766.55 763.96 704.51 690.33
5 Plant Availability Factor for Month - PAFM ( %): 104.970 104.970 70.390 70.985 77.639 75.364 102.207 101.862 88.242 86.466
6 Cumulative DC (FY:2019-20) up to the preceeding month (%): 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
7 Cumulative DC (FY:2019-20) including the current month --PAFY (%): 104.970 104.970 70.390 70.985 77.639 75.364 102.207 101.862 88.242 86.466
8 Total Schduled Generation for the current month (MWH) : 123606.316 508168.912 57824.712 254977.561 33441.927 140940.609 91394.996 455177.607 83462.712 347869.358
9 Total Schduled Generation Excluding STOA/IER Exchange (MWH) : 123349.491 508001.737 57824.712 254977.561 33441.927 140940.609 91394.996 455177.607 83462.712 347869.358
10 Cumulative Schduled Ex-bus Generation upto the preceding month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
11 Cumulative Schduled Ex-bus Generation including the current month (MWH) : 123349.491 508001.737 57824.712 254977.561 33441.927 140940.609 91394.996 455177.607 83462.712 347869.358
12 Plant Load Factor for the current month ( % ) : 80.552 66.233 68.326 60.257 75.991 64.053 98.274 97.888 84.306 70.277
13 Cumulative Plant Load Factor including the current month ( % ) : 80.552 66.233 68.326 60.257 75.991 64.053 98.274 97.888 84.306 70.277
14 Cumulative Norm. Scheduled Energy beyond which incentive payable (MWH) : 130432.500 652162.500 71935.500 359677.500 37406.460 187032.300 79050.000 395250.000 14356515.938 14356515.938
15 Net Energy Scheduled to Virtual Anciliary Entity (VAE) for the month: -3308.598 -44276.743 61.993 -10851.973 980.968 1307.873 9.840 17.280 0.000 -8657.330
16 Net Energy Scheduled to Virtual SCED Entity for the month(*): -17473.895 -81490.625 -764.983 -28470.728 1705.698 1450.093 58.725 4330.185 342.983 -17985.923
17 Cumulative Scheduled Generation to be con. for incentive upto preceding month 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
18 Cumulative Scheduled Generation to be considered for incentive upto current month 144131.984 633769.105 58527.702 294300.261 30755.262 138182.644 91326.431 450830.142 83119.730 374512.611
19 Cumulative Energy eligible for incentive including current month (MWH) : 13699.484 0.000 0.000 0.000 0.000 0.000 12276.431 55580.142 0.000 0.000
20 Cumulative Energy eligible for incentive upto preceding month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
21 Energy eligible for incentive in the current month ( MWH ) : 13699.484 0.000 0.000 0.000 0.000 0.000 12276.431 55580.142 0.000 0.000
SE (Comml)
Note:
1. FSTPP Stg-III capacity of 475 MW has been considered w.e.f 00.00 hrs of 01.12.2019 as per ERPC share allocation order dated 29.11.19.
2. Darlipalli STPS-I , Unit #1 (800 MW) has been declared under Commercial Operation w.e.f 00.00 hrs of 01.03.2020
3. CERC (Terms & Conditions of tariff) Regulations 2019-24 have been full fledgely implemented w.e.f 01.04.2020 such as peak and off-peak accounting.
4. High Demand Season (HDS) for Eastern Region would be July,August & September,2020 for F.Y-20-21.
5. Major share allocation of Kshtpp-II STPP is with Northern Region,therefore it would follow the seasonal and hours(peak & offpeak) pattern of NR.
High Demand Season (HDS) for Northern Region is for the months June,July & August,2020 for F.Y-20-21.
6.Un allocated capacity of 25 MW from FSTPP-III has been allocated to Gujarat w.e.f 23.02.2021 for 5 years.Therefore at present total capacity
of FSTPP Stg-III has been tied up.
7.Surrendered Share of Sikkim in Farakka-I&II ,Kahalgaon I & II,TSTPP-I & Darlipalli STPS have been allocated to Guajarat w.e.f 20.03.2021
as per MoP 22-302/1/2 dated 19.03.2021
NPGC Unit#2 of 660 MW has been commissioned on 00:00 hrs of 23.07.2021
Eastern Region High Demand & Low Demand Seasons and the hours of Peak and Off-Peak periods during a day declared by ERLDC
Apr-21
May-21
Jun-21 Jun-21
Jul-21 Jul-21
Aug-21
Sep-21
F.Y 2021-22
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Page No. 3/14
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
ER:
BIHAR # 31.397866 46912.928 236732.406 46234.761 210052.555 1119605.860 958640.082 0.000
JHARKHAND 8.574292 13575.648 63883.283 13239.850 59131.561 305741.331 273239.372 0.000
ODISHA 13.630000 20543.123 102588.245 12430.556 41973.550 486023.879 297389.841 115730.456
ODISHA (COAL POWER - AFTAB) 0.099049 837.469 4163.346 674.385 2341.222 19739.170 14361.783 2416.512
ODISHA (COAL POWER - DADRI) 0.082937
ODISHA (COAL POWER - Rajasthan) 0.275736
ODISHA (COAL POWER - Faridabad) 0.095840
WEST BENGAL 31.930000 48124.866 240325.947 40542.830 118849.861 1138572.446 719878.121 247908.458
West Bengal (COAL POWER - Rajasthan) 0.919117 1385.292 6917.872 924.544 2707.537 32774.233 17630.980 10227.118
SIKKIM 0.000000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SUB-TOTAL 87.004837 131379.326 654611.099 114046.926 435056.286 3102456.919 2281140.179
SR:
TELANGANA (NSM-II) 0.751558 1132.748 5656.714 487.847 2687.451 26799.349 19058.634 3720.813
TAMILNADU 1.290000 1944.287 9709.379 1653.360 6521.310 45999.327 46996.940 0.000
SUB-TOTAL 2.041558 3077.035 15366.093 2141.207 9208.761 72798.676 66055.574
NR:
UTTAR PRADESH 2.080000 3134.974 15655.433 3305.787 19680.343 74169.455 62866.704 177.333
HARYANA 0.690000 1039.967 5193.389 771.229 3540.225 24604.290 18506.542 2407.105
RAJASTHAN 0.690000 1039.967 5193.389 723.437 2619.453 24604.290 15924.590 4989.057
J&K 0.850000 1281.119 6397.653 1281.119 6316.301 30309.632 29834.395 0.000
DELHI 1.390000 2095.007 10462.044 1629.416 6888.236 49565.165 33133.804 8996.586
SUB-TOTAL 5.700000 8591.034 42901.908 7710.988 39044.558 203252.832 160266.035
WR:
GUJARAT 1.630000 2456.734 12268.440 2148.072 11262.319 58123.177 73968.026 0.000
NER :
ASSAM 2.455737 3752.159 19253.646 3585.372 15441.569 90825.265 74790.878 2410.597
ASSAM (COAL POWER - Rajasthan) 0.091912
MEGHALAYA 0.000000
NAGALAND 0.429803 249.480 3629.491 225.535 3380.618 15327.109 14822.239 0.000
ARUNACHAL PRADESH 0.191917 411.717 1324.646 411.717 1324.646 6847.704 6756.730 0.000
MIZORAM 0.141736 327.920 954.939 327.920 954.939 5058.034 4990.451 0.000
SUB-TOTAL 3.311105 4741.276 25162.722 4550.544 21101.772 118058.112 101360.298
NVVN POWER - A/C BPDB 0.312500 471.000 2352.078 471.000 2352.078 11143.247 10998.438 0.000
SE (Comml)
Page No. 4/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SR:
TELANGANA (NSM-II) 0.733930 389.480 1935.777 166.043 965.378 9281.897 6632.497 1257.115
SUB-TOTAL 0.733930 389.480 1935.777 166.043 965.378 9281.897 6632.497
WR:
GUJARAT 5.000000 2653.388 13187.750 1506.131 8858.787 63234.203 52973.054 776.019
SUB-TOTAL 5.000000 2653.388 13187.750 1506.131 8858.787 63234.203 52973.054
NER :
ASSAM (COAL POWER - Rajasthan) 0.091912 48.776 242.423 48.776 240.699 1162.397 1175.707 0.000
SUB-TOTAL 0.091912 48.776 242.423 48.776 240.699 1162.397 1175.707
SE (Comml)
Page No. 5 / 14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SR:
TELANGANA (NSM-II) 0.683572 436.649 2161.969 429.682 1812.227 12809.758 12830.870 0.000
TAMILNADU 0.700000 447.143 2213.927 445.305 1913.174 13122.815 16533.440 0.000
SUB-TOTAL 1.383572 883.792 4375.896 874.987 3725.401 25932.573 29364.310
NR:
UTTAR PRADESH 9.120000 5825.628 28844.303 5677.123 22226.400 170971.521 136633.518 8692.275
HARYANA 3.040000 1941.876 9614.768 1634.833 6655.233 56990.507 48165.761 276.170
RAJASTHAN 3.040000 1941.876 9614.768 1834.263 7484.569 56990.507 49988.817 0.000
J&K 3.680000 2350.692 11638.929 2350.692 11504.469 68988.508 68854.048 0.000
DELHI 6.070000 3877.364 19197.908 3448.492 14847.556 113793.545 91058.235 5666.278
SUB-TOTAL 24.950000 15937.436 78910.676 14945.403 62718.227 467734.588 394700.379
WR:
GUJARAT 1.550000 990.101 4902.266 690.489 5087.577 4864.916 33164.273 0.000
NER :
ASSAM 2.108380 1405.614 6959.586 1394.153 6058.950 41240.575 37893.015 0.000
ASSAM (COAL POWER - Rajasthan) 0.092104
NAGALAND 0.425332 270.141 1345.220 263.604 1291.600 7967.121 7873.693 0.000
ARUNACHAL PRADESH 0.192147 122.739 607.713 122.739 607.713 3600.393 3600.393 0.000
MIZORAM 0.141905 90.645 448.810 90.645 448.810 2658.910 2658.910 0.000
SUB-TOTAL 2.959868 1889.139 14263.595 1871.141 8407.073 55466.999 52026.011
NVVN POWER - A/C BPDB 1.192958 762.032 3773.031 762.032 3773.031 22355.365 22355.365 0.000
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SR:
TELANGANA (NSM-II) 0.763112 1282.834 6404.399 1279.079 5851.395 30702.408 32733.434 0.000
SUB-TOTAL 0.763112 1282.834 6404.399 1279.079 5851.395 30702.408 32733.434 0.000
WR:
CHHATTISGARH 2.000000 3362.113 16784.951 2436.288 11267.322 80466.325 67878.694 517.682
GUJARAT 9.730000 16356.677 81658.788 11519.387 53562.901 391468.665 338809.634 0.000
MADHYA PRADESH 4.930000 8287.607 41374.905 9735.372 46492.982 198349.488 181488.341 0.000
MAHARASTRA 9.870000 16592.025 82833.734 16248.680 74953.897 397101.307 389948.507 0.000
DADRA & NAGAR HAVELI 0.200000 336.211 1678.495 336.211 1678.495 8046.632 8043.117 0.000
DAMAN & DIU 0.130000 218.537 1091.022 218.537 1091.022 5230.311 5230.311 0.000
SUB-TOTAL 26.860000 45153.170 225421.895 40494.475 189046.619 1080662.728 991398.604
NR:
UTTAR PRADESH 16.730000 28124.071 140406.117 28240.740 105569.221 673100.797 540051.473 32084.204
HARYANA 4.580000 7699.238 38437.538 6959.986 28823.614 184267.882 157635.785 0.000
RAJASTHAN 7.110000 11952.310 59670.502 11584.924 46538.785 286057.783 249079.400 0.000
J&K 5.560000 9346.673 46662.164 9346.673 46067.032 223696.380 223101.248 0.000
HIMACHAL PRADESH 1.530000 2572.016 12840.488 1960.838 9353.527 61556.737 46823.193 5500.033
DELHI 10.490000 17634.280 88037.069 16458.321 72776.184 422045.866 351331.444 7407.542
PUNJAB 8.020000 13482.071 67307.655 11706.431 56728.058 322669.960 301402.348 0.000
UTTARAKHAND 1.870000 3143.575 15693.929 2557.341 10918.486 75236.012 55484.902 8465.708
CHANDIGARH 0.200000 336.211 1678.495 336.211 1678.495 8046.632 8046.632 0.000
SUB-TOTAL 56.090000 94290.445 470733.957 89151.465 378453.402 2256678.049 1932956.425
NER :
ASSAM 5.093479 8716.934 43518.268 8710.474 40218.694 208624.676 186451.849 0.000
ASSAM (COAL POWER - Rajasthan) 0.091912
SUB-TOTAL 5.185391 8716.934 43518.268 8710.474 40218.694 208624.676 186451.849
NVVN POWER - A/C BPDB 1.333333 2241.408 11189.965 2241.408 11189.965 53644.201 53644.201 0.000
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SR:
ANDHRA PRADESH 0.000000
TELANGANA (NSM-II) 0.712870 765.533 3812.975 763.601 3566.514 16811.520 16417.116 0.000
KARNATAKA 0.000000
TAMILNADU 0.850000 912.794 4546.451 910.819 4408.950 20045.438 19901.916 0.000
KERALA 0.000000
PONDICHERRY 0.000000
SUB-TOTAL 1.562870 1678.327 8359.426 1674.420 7975.464 36856.958 36319.032
WR:
GUJARAT 2.400000 2577.300 12837.038 2014.977 9507.667 56598.888 48577.563 0.000
NER :
ASSAM 2.095419 2287.381 11757.039 2261.412 9632.443 51574.318 49106.635 0.000
ASSAM (COAL POWER - Rajasthan) 0.091912
MEGHALAYA 0.000000
NAGALAND 0.424823 169.959 2522.350 169.717 2445.715 9987.202 9895.993 0.000
ARUNACHAL PRADESH 0.196898 292.879 971.341 292.879 971.341 4635.387 4635.387 0.000
MIZORAM 0.141736 233.642 676.292 233.642 676.292 3334.507 3334.507 0.000
SUB-TOTAL 2.950788 2983.861 15927.022 2957.650 13725.791 69531.414 66972.522
NVVN POWER - A/C BPDB 1.500000 1610.813 8023.148 1610.813 8023.148 35374.305 35374.305 0.000
SE (Comml)
Page No. 8/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SR:
TELANGANA (NSM-II) 0.678453 1041.086 5205.431 465.850 1767.129 23901.654 13668.655 6647.751
SUB-TOTAL 0.678453 1041.086 5205.431 465.850 1767.129 23901.654 13668.655
POWERGRID (ALIPURDUAR) 0.113636 174.376 871.880 137.394 696.777 4413.980 2452.815 1299.068
SE (Comml)
Page No. 9/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
BRBCL (3X250)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SE (Comml)
Page No. 10/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
SR:
TELANGANA (NSM-II) 0.279 94.237 456.253 198.880 365.468 2628.312 2630.408 0.000
SUB-TOTAL 0.279 94.237 456.253 198.880 365.468 2628.312 2630.408
SE (Comml)
Page No. 11/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES
NR:
Uttar Pradesh 11.412 9566.359 46858.207 9272.858 31912.039 203107.488 155287.522 17353.843
SUB-TOTAL 11.412 9566.359 46858.207 9272.858 31912.039 203107.488 155287.522
SE (Comml)
Page No. 12/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
WR:
GUJARAT 1.750 1599.413 7965.606 1589.569 7965.606 32724.431 32880.502 0.000
SE (Comml)
Page No. 13/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA
REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)
1 Installed Capacity ( MW ) : 60
SE (Comml)
Page No. 14/14
SE (Comml)
ANNEXURE
SHARE SHARE
ALLOCATION ALLOCATION DRAWAL DRAWAL
NAME OF OF OF SCHUDULE SCHUDULE
POWER STATION CURRENT MONTH CURRENT MONTH
SE (Comml)