1. The document is a provisional regional energy accounting report for Eastern Region for the month of July 2021. 2. It provides information on plant-wise scheduled generation and availability for NTPC power stations in Eastern Region including FSTPS Stage I&II, FSTPS Stage III, KhSTPS Stage I, KhSTPS Stage II, and TSTPS Stage I. 3. Constituents are requested to report any discrepancies within 60 days, after which the provisional report will be considered final.

Uploaded by

Sanjay Satyajit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views

Tel No.:033-24239659/9651 FAX No.:033-24239652/53 Web

1. The document is a provisional regional energy accounting report for Eastern Region for the month of July 2021. 2. It provides information on plant-wise scheduled generation and availability for NTPC power stations in Eastern Region including FSTPS Stage I&II, FSTPS Stage III, KhSTPS Stage I, KhSTPS Stage II, and TSTPS Stage I. 3. Constituents are requested to report any discrepancies within 60 days, after which the provisional report will be considered final.

Uploaded by

Sanjay Satyajit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

Tel No.:033-24239659/9651 FAX No.:033-24239652/53 Web: www.erpc.gov.

in

---------------------------------------------------------------------------------------------------
सं./No. ERPC/COM-I/REA/2021-22/550 िदनांक / Date: 04.08.2021
To: As per list enclosed / सेवा म: (संल सूची के अनुसार)

Sub.: Provisional Regional Energy Accounting (REA) of Eastern Region for the month
of July, 2021.

िवषय: पूव े के July, 2021 का अ थायी े ीय उजा लेखा |

Sir,
Please find enclosed a copy of the ABT based Provisional Energy Account for the
month of July,2021. The last instalment of input data from ERLDC has been received on
02.08.2021.

Constituents are requested to intimate any discrepancy / error within 60 days from
the date of issue of this provisional REA. In case of any discrepancy / error, the provisional
REA would be revised based on re-examination, final decision and confirmation. In case no
communication is received from any of the constituents indicating mistakes / discrepancy,
the provisional REA as issued, would be treated as final.

संघ के सद ों से यह अनुरोध िकया जाता है के अ थायी े ीय उजा लेखा के कािशत होने


की ितिथ से 60 िदनों के भीतर िकसी भी असंगित / ु िट की सूचना दे | असंगित / ुिट की प र थित म
अ थायी े ीय उजा लेखा को पुन: परी ण अंितम िनणय एवं संपुि के आधार पर प रशोिधत िकया जाएगा |
यिद संघ के सद ों से िकसी तरह की दोष / असं गित का सूचना ा नहीं होता है , तो जारी िकये गए
अ थायी े ीय उजा लेखा को ही अंितम माना जाएगा |

This issues with approval of Member Secretary.

Encl.: As above

Yours faithfully, / भवदीय

(S.Kejriwal)
SE (Comml)
DISTRIBUTION LIST

1) Chief Engineer,(Commercial), Bihar State Power Holding Company Ltd., Vidyut Bhavan, Bailey Road, Patna-
800021 (FAX:0612 2227557).
2) Chief Engineer (Commercial), Damodar Valley Corporation, DVC Tower, VIP Road, Kolkata-700054
3) Chief Engineer (COMML. & REVENUE), Jharkhand Urja Vikas Nigam Ltd, HEC Engineering Building, Dhurva,
Ranchi-834002 (FAX : 0651 2400799 / 2490486 ).
4) Addl. Chief Engineer (SLDC/EHV), Deptt. of Power,Govt. of Sikkim, Kazi Road, Gangtok-737101
5) Chief Engineer (PTR), West Bengal State Electricity Distribution Company Limited, Bidyut Bhavan, 8 th Floor,
Bidhannagar, Kolkata-700091 (FAX : 033 2334 5862)
6) General Manager (Commercial), NTPC Ltd., Loknayak Jaiprakash Bhawan, Dakbunglow Chowk, Patna-
800001(FAX: 0612 2230035 / 2224287 )
7) Regional Executive Director (East-II), 3rd Floor, OCHC Building (New), 24, Janpath, Bhubaneswar – 751001
8) CEO, Bhartiya Rail Bijlee Company Ltd.,1st Floor , Vidyut Bhavan, Bailey Road, Patna-800001( Fax 0612-
2504007)
9) Addl. General Manager (Commercial), ERTS-I, POWERGRID, Boring Road, Alankar Place, Patna-800001.
10) Addl. General Manager (Commercial), ERTS-II, POWERGRID, CF-17, Action Area-1C, New Town,Rajarhat, Kolkata
-700156
11) Chief Engineer ( Commercial ), NHPC Ltd., NHPC Office Complex, Sector-33, Faridabad, Haryana - 121003,
( TELEFAX : 0129 2278358)
12) Executive Director, ERLDC, 14 Golf Club Road, Kolkata-700033 (FAX: 033 2423 3648)
13) Sr. General Manager (PP), GRIDCO, 4th Floor, Vidyut Bhavan, Saheed Nagar, Bhubaneswar-751007
14) Member Secretary,WRPC, MIDC Area, Marol, Andheri(E), Mumbai-400093 (FAX : 022 2837 0193 ).
15) Member Secretary,NRPC,Katwaria Sarai,18A SJSS Marg,New Delhi-16 (FAX 01126865206 ).
16) Member Secretary, SRPC, 29, Race Course Road,Banglore-560009 (FAX : 080 2259343 ).
17) Member Secretary, NERPC, NERPC Complex, Dong Parmaw, Lapalang, Shillong-793006, Meghalaya
18) Chief Engineer (Commercial), M.P. Power Management Co. Ltd., Shakti Bhawan, Vidyut Nagar, Rampur, Jabalpur-
482008 (Fax No. 0761-2661884)
19) Chief Engineer(PP), MSEDCL, Prakashgarh, 4th Floor, Bandra(East), Mumbai- 400051.
20) Chief Engineer.(Commercial), CSEB, Dandania, Post Sunder Nagar, Raipur-492013.
21) Executive Engineer, Electricity Department, Administration of Dadra and Nager Haveli, SILVASSA, Via. VAPI,
PIN : 396 230.
22) Executive Engineer, Electricity Department, Administration of Daman & Diu, Power House Building, Nani
Daman – 396 210.
23) Executive Engineer Division-III, Electricity Department, Government of Goa, Curti, Ponda- Goa
24) General Manager, Energy Accounts Dept., UPPCL, Shakti Bhawan Extn., 14Ashok Marg, Lucknow-226001.
25) Chief Engineer(Comml & Survey Wing), Power Dev.Deptt.,Govt. of J&K, GLADNI, Narval Bala, Jammu-180006.
26) Chief Engineer , Rajasthan Power Procurement Centre, Bidyut Bhavan, Janpath, Jaipur.
27) General Manager (SLDC), SLDC building,,Minto Road,New Delhi-110002.(FAX-011-2322-1012)
28) Director (Interstate Billing), PSEB, 220 Kv Grid S/s, The Mall, Patiala-147001.
29) Chief Engineer (SO&Commercial), HVPNL .,Shakti Bhawan,Sector-6,Panch kula-134109.
30) GM (Commercial-Tariff), ASEB, Bijulee Bhawan, Paltan Bazar, Guwahati- 781001.
31) Chief Engineer (Power ), Deptt. of Power, Govt. of Nagaland, Kohima –797 001.
32) Member (Technical) MeSEB, Lumjingshai, Short Round Road, Shillong.
33) Chief General Manager (RT & C), OPTCL, Janpath, Bhubaneswar-751022.(Tel FAX-0674 2542 120)
34) Vice President (CS-CB), PTC India Limited, 2nd Floor, NBCC Tower, 15, Bikaji Cama Place, New Delhi –110065
35) Executive Director(Finance), Gujarat Urja Vikas Nigam Ltd., Sardar Patel Vidyut Bhavan, Race Course, Vadodara –
390007.
36) Chief G. M., Uttrakhand Power Corp. Ltd., Urja Bhawan, Kanwali Road, Dehradun - 248006.
37) Superintending Engineer(E), UT of Chandigarh, 5th Floor, New Addl. Office Bldg., Sector-9D, Chandigarh-
160 009.
38) Chief Engineer (System Operation), Himachal Pradesh State Electricity Board, Vidyut Bhawan, Kumar House
Complex , Block-II, Shimla-171004.
39) S.E.-I, Electricity Department, N0.137, NSC Bose Salai, Puducherry-605001.
40) AGM(BD / P&S), NVVNL, NTPC BHAWAN, Core-7, Scope Complex, 7,Institutional Area, Lodhi Road, New Delhi –
110 003 (FAX 011 24367201)
41) AVP (Power Sales), STERLITE Energy Limited.,1st Floor, City Mart, Commercial Complex, Baramunda,
Bhubaneswar ORISSA, PIN-751003 ( FAX : 0674-2354221-6610342 )
42) AGM (Commercial), KBUNL, Kanti , Muzaffarpur Dist –Bihar 843130 ( Fax: +91- 06223-267310).
Page No. 1 / 14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

FSTPS STAGE-I&II FSTPS STAGE-III KhSTPS STAGE-I KhSTPS STAGE-II TSTPS STAGE-I
S.No NTPC POWER STATIONS
(3X200+2X500) (1X500) (4X210) (3X500) (2X500)
PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK
1 Installed Capacity (MW) : 1600 500 840 1500 1000

1a Allocated Installed Capacity (MW) 1600 500 840 1500 1000

2 Normative AUX as per CERC Tariff Order 2019-24(%) : 6.78125 6.25000 9.00000 6.25000 7.05000

3 Ex-Bus Normative Capacity at 100% availability (MW) : 1491.50 468.75 764.40 1406.25 929.50

4 Average DC for the month (ex-bus) in MW: 1260.11 1258.16 445.00 442.77 515.14 510.12 1411.85 1408.59 893.81 885.08

5 Plant Availability Factor for Month - PAFM ( %): 84.486 84.356 94.933 94.457 67.392 66.735 100.398 100.166 96.160 95.221

6 Cumulative DC (FY:2020-21) up to the preceeding month of season (%): 0.000 0.000 0.000 0.000 0.000 0.000 101.143 99.357 0.000 0.000

7 Cumulative DC (FY:2020-21) including the current month of season --PAFY (%): 84.486 84.356 94.933 94.457 67.392 66.735 100.765 99.768 96.160 95.221

8 Total Schduled Generation for the current month (MWH) : 126224.849 518320.462 46688.796 188862.739 63159.162 277597.614 167140.349 730171.815 107232.302 481443.638

9 Total Schduled Generation Excluding STOA/IER Exchange (MWH) : 125911.437 517661.515 46484.396 188571.784 63157.612 277597.614 167140.349 730171.815 107222.302 481418.938

10 Cumulative Schduled Ex-bus Generation upto the preceding month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 163436.420 733020.197 0.000 0.000

11 Cumulative Schduled Ex-bus Generation including the current month (MWH) : 125911.437 517661.515 46484.396 188571.784 63157.612 277597.614 330576.769 1463192.012 107222.302 481418.938

12 Plant Load Factor for the current month ( % ) : 68.250 56.051 80.325 64.985 66.634 58.574 95.851 83.747 93.037 83.542

13 Cumulative Plant Load Factor including the current month ( % ) : 68.250 56.051 80.325 64.985 66.634 58.574 96.343 85.286 93.037 83.542

14 Cumulative Norm. Scheduled Energy beyond which incentive payable (MWH) : 157204.100 786020.500 49406.250 247031.250 80567.760 402838.800 291656.250 1458281.250 97969.300 489846.500

15 Net Energy Scheduled to Virtual Anciliary Entity (VAE) for the month: -213.495 212.465 -202.675 -140.655 168.518 301.493 924.025 2456.905 146.948 -165.598

16 Net Energy Scheduled to Virtual SCED Entity for the month(*): -4943.805 -576.725 -808.535 4226.635 1705.003 12941.218 8377.438 32813.543 1184.390 24810.940

17 Cumulative Scheduled Generation to be con. for incentive upto preceding month 0.000 0.000 0.000 0.000 0.000 0.000 156877.805 689731.372 0.000 0.000

18 Cumulative Scheduled Generation to be considered for incentive upto current month 131068.737 518025.775 47495.606 184485.804 61284.092 264354.904 314716.692 1384632.740 105890.965 456773.596

19 Cumulative Energy eligible for incentive including current month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 23060.441 0.000 7921.665 0.000

20 Cumulative Energy eligible for incentive upto preceding month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 13440.305 0.000 0.000 0.000

21 Energy eligible for incentive in the current month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 9620.136 0.000 7921.665 0.000

SE (Comml)
Page No. 2 / 14

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

BARH STPS STAGE-II BRBCL MTPS STAGE-II Darlipalli STPS-I Nabinagar STPP
S.No NTPC POWER STATIONS
(2X660) (3X250) (2X195) (1X800) (2X660)
PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK PEAK OFF_PEAK
1 Installed Capacity (MW) : 1320 750 390 800 1320

1a Allocated Installed Capacity (MW) 1320 750 390 800 1320

2 Normative AUX as per CERC Tariff Order 2019-24(%) : 6.25000 9.00000 9.00000 6.25000 6.25000

3 Ex-Bus Normative Capacity at 100% availability (MW) : 1237.50 682.50 354.90 750.00 1237.50

4 Average DC for the month (ex-bus) in MW: 1299.00 1299.00 480.41 484.47 275.54 267.47 766.55 763.96 704.51 690.33

5 Plant Availability Factor for Month - PAFM ( %): 104.970 104.970 70.390 70.985 77.639 75.364 102.207 101.862 88.242 86.466

6 Cumulative DC (FY:2019-20) up to the preceeding month (%): 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

7 Cumulative DC (FY:2019-20) including the current month --PAFY (%): 104.970 104.970 70.390 70.985 77.639 75.364 102.207 101.862 88.242 86.466

8 Total Schduled Generation for the current month (MWH) : 123606.316 508168.912 57824.712 254977.561 33441.927 140940.609 91394.996 455177.607 83462.712 347869.358

9 Total Schduled Generation Excluding STOA/IER Exchange (MWH) : 123349.491 508001.737 57824.712 254977.561 33441.927 140940.609 91394.996 455177.607 83462.712 347869.358

10 Cumulative Schduled Ex-bus Generation upto the preceding month (MWH) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

11 Cumulative Schduled Ex-bus Generation including the current month (MWH) : 123349.491 508001.737 57824.712 254977.561 33441.927 140940.609 91394.996 455177.607 83462.712 347869.358

12 Plant Load Factor for the current month ( % ) : 80.552 66.233 68.326 60.257 75.991 64.053 98.274 97.888 84.306 70.277

13 Cumulative Plant Load Factor including the current month ( % ) : 80.552 66.233 68.326 60.257 75.991 64.053 98.274 97.888 84.306 70.277

14 Cumulative Norm. Scheduled Energy beyond which incentive payable (MWH) : 130432.500 652162.500 71935.500 359677.500 37406.460 187032.300 79050.000 395250.000 14356515.938 14356515.938

15 Net Energy Scheduled to Virtual Anciliary Entity (VAE) for the month: -3308.598 -44276.743 61.993 -10851.973 980.968 1307.873 9.840 17.280 0.000 -8657.330

16 Net Energy Scheduled to Virtual SCED Entity for the month(*): -17473.895 -81490.625 -764.983 -28470.728 1705.698 1450.093 58.725 4330.185 342.983 -17985.923

17 Cumulative Scheduled Generation to be con. for incentive upto preceding month 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

18 Cumulative Scheduled Generation to be considered for incentive upto current month 144131.984 633769.105 58527.702 294300.261 30755.262 138182.644 91326.431 450830.142 83119.730 374512.611

19 Cumulative Energy eligible for incentive including current month (MWH) : 13699.484 0.000 0.000 0.000 0.000 0.000 12276.431 55580.142 0.000 0.000

20 Cumulative Energy eligible for incentive upto preceding month ( MWH ) : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

21 Energy eligible for incentive in the current month ( MWH ) : 13699.484 0.000 0.000 0.000 0.000 0.000 12276.431 55580.142 0.000 0.000

SE (Comml)
Note:
1. FSTPP Stg-III capacity of 475 MW has been considered w.e.f 00.00 hrs of 01.12.2019 as per ERPC share allocation order dated 29.11.19.
2. Darlipalli STPS-I , Unit #1 (800 MW) has been declared under Commercial Operation w.e.f 00.00 hrs of 01.03.2020
3. CERC (Terms & Conditions of tariff) Regulations 2019-24 have been full fledgely implemented w.e.f 01.04.2020 such as peak and off-peak accounting.
4. High Demand Season (HDS) for Eastern Region would be July,August & September,2020 for F.Y-20-21.
5. Major share allocation of Kshtpp-II STPP is with Northern Region,therefore it would follow the seasonal and hours(peak & offpeak) pattern of NR.
High Demand Season (HDS) for Northern Region is for the months June,July & August,2020 for F.Y-20-21.
6.Un allocated capacity of 25 MW from FSTPP-III has been allocated to Gujarat w.e.f 23.02.2021 for 5 years.Therefore at present total capacity
of FSTPP Stg-III has been tied up.
7.Surrendered Share of Sikkim in Farakka-I&II ,Kahalgaon I & II,TSTPP-I & Darlipalli STPS have been allocated to Guajarat w.e.f 20.03.2021
as per MoP 22-302/1/2 dated 19.03.2021
NPGC Unit#2 of 660 MW has been commissioned on 00:00 hrs of 23.07.2021
Eastern Region High Demand & Low Demand Seasons and the hours of Peak and Off-Peak periods during a day declared by ERLDC

High Demand Low Demand High Demand


YEAR
Season of ER Season of ER Season of NR

Apr-21
May-21
Jun-21 Jun-21
Jul-21 Jul-21
Aug-21
Sep-21
F.Y 2021-22
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Page No. 3/14

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

FSTPS STAGE-I&II (3X200+2X500)


ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)

ER:
BIHAR # 31.397866 46912.928 236732.406 46234.761 210052.555 1119605.860 958640.082 0.000
JHARKHAND 8.574292 13575.648 63883.283 13239.850 59131.561 305741.331 273239.372 0.000
ODISHA 13.630000 20543.123 102588.245 12430.556 41973.550 486023.879 297389.841 115730.456
ODISHA (COAL POWER - AFTAB) 0.099049 837.469 4163.346 674.385 2341.222 19739.170 14361.783 2416.512
ODISHA (COAL POWER - DADRI) 0.082937
ODISHA (COAL POWER - Rajasthan) 0.275736
ODISHA (COAL POWER - Faridabad) 0.095840
WEST BENGAL 31.930000 48124.866 240325.947 40542.830 118849.861 1138572.446 719878.121 247908.458
West Bengal (COAL POWER - Rajasthan) 0.919117 1385.292 6917.872 924.544 2707.537 32774.233 17630.980 10227.118
SIKKIM 0.000000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SUB-TOTAL 87.004837 131379.326 654611.099 114046.926 435056.286 3102456.919 2281140.179

SR:
TELANGANA (NSM-II) 0.751558 1132.748 5656.714 487.847 2687.451 26799.349 19058.634 3720.813
TAMILNADU 1.290000 1944.287 9709.379 1653.360 6521.310 45999.327 46996.940 0.000
SUB-TOTAL 2.041558 3077.035 15366.093 2141.207 9208.761 72798.676 66055.574

NR:
UTTAR PRADESH 2.080000 3134.974 15655.433 3305.787 19680.343 74169.455 62866.704 177.333
HARYANA 0.690000 1039.967 5193.389 771.229 3540.225 24604.290 18506.542 2407.105
RAJASTHAN 0.690000 1039.967 5193.389 723.437 2619.453 24604.290 15924.590 4989.057
J&K 0.850000 1281.119 6397.653 1281.119 6316.301 30309.632 29834.395 0.000
DELHI 1.390000 2095.007 10462.044 1629.416 6888.236 49565.165 33133.804 8996.586
SUB-TOTAL 5.700000 8591.034 42901.908 7710.988 39044.558 203252.832 160266.035

WR:
GUJARAT 1.630000 2456.734 12268.440 2148.072 11262.319 58123.177 73968.026 0.000

NER :
ASSAM 2.455737 3752.159 19253.646 3585.372 15441.569 90825.265 74790.878 2410.597
ASSAM (COAL POWER - Rajasthan) 0.091912
MEGHALAYA 0.000000
NAGALAND 0.429803 249.480 3629.491 225.535 3380.618 15327.109 14822.239 0.000
ARUNACHAL PRADESH 0.191917 411.717 1324.646 411.717 1324.646 6847.704 6756.730 0.000
MIZORAM 0.141736 327.920 954.939 327.920 954.939 5058.034 4990.451 0.000
SUB-TOTAL 3.311105 4741.276 25162.722 4550.544 21101.772 118058.112 101360.298

NVVN POWER - A/C BPDB 0.312500 471.000 2352.078 471.000 2352.078 11143.247 10998.438 0.000

VSCED(UP) 2158.345 13633.695 74507.150


VSCED(DOWN) 7102.150 14210.420 83593.320
VAE (UP) 320.345 2226.625 9140.030
VAE (DOWN) 533.840 2014.160 29953.470
GRAND TOTAL 100.000000 150716.405 752662.340 125911.437 517661.514 3565832.963 2663888.940

# Please refer to Annexure

SE (Comml)
Page No. 4/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

FSTPS STAGE-III (1X500)


CAPACITY CHARGES, INCENTIVE, IF ANY & ENERGY CHARGES BILLING

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 21.517874 11419.052 56754.468 11287.519 51933.477 272133.116 250603.678 0.000
JHARKHAND 16.948474 8994.174 44702.448 8875.784 42818.255 214344.645 202176.909 0.000
ODISHA 16.620000 8819.860 43836.081 5818.617 19380.359 210190.486 143538.705 35123.208
ODISHA (COAL POWER - DADRI) 0.162663 281.128 1397.250 225.158 816.481 6699.701 5225.617 469.129
ODISHA (COAL POWER - Rajasthan) 0.183824
ODISHA (COAL POWER - Raj-II SunTech) 0.091912
ODISHA (COAL POWER - Faridabad) 0.091354
WEST BENGAL 37.638940 19974.139 99274.586 19105.485 58143.206 476013.663 347557.381 57054.233
West Bengal (COAL POWER - Rajasthan) 0.643382 487.755 2424.217 462.092 1329.163 11623.926 7666.459 2213.878
West Bengal (COAL POWER- Raj-II SunTech) 0.275735
SIKKIM 0.000000
SUB-TOTAL 94.174158 49976.108 248389.050 45774.655 174420.941 1191005.537 956768.749

SR:
TELANGANA (NSM-II) 0.733930 389.480 1935.777 166.043 965.378 9281.897 6632.497 1257.115
SUB-TOTAL 0.733930 389.480 1935.777 166.043 965.378 9281.897 6632.497

WR:
GUJARAT 5.000000 2653.388 13187.750 1506.131 8858.787 63234.203 52973.054 776.019
SUB-TOTAL 5.000000 2653.388 13187.750 1506.131 8858.787 63234.203 52973.054
NER :

ASSAM (COAL POWER - Rajasthan) 0.091912 48.776 242.423 48.776 240.699 1162.397 1175.707 0.000
SUB-TOTAL 0.091912 48.776 242.423 48.776 240.699 1162.397 1175.707

VSCED(UP) 1603.695 8757.535 55052.630


VSCED(DOWN) 2412.230 4530.900 32822.580
VAE (UP) 181.760 625.930 1565.270
VAE (DOWN) 384.435 766.585 6140.130
GRAND TOTAL 100.000000 53067.752 263755.000 46484.395 188571.785 1264684.034 1035205.197

# Please refer to Annexure

SE (Comml)
Page No. 5 / 14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

KhSTPS STAGE-I (4X210)


ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 41.872575 26747.154 132432.591 26481.425 125935.494 784926.935 746616.420 0.000
JHARKHAND 3.204922 2047.224 10136.375 2057.250 10311.792 60069.235 59249.215 0.000
DVC 0.000000
ODISHA 15.240000 9734.931 48200.348 8758.682 22489.101 285702.410 217522.081 25324.968
ODISHA (COAL POWER - DADRI) 0.082440 342.398 1695.308 309.268 1032.994 10044.775 8271.530 266.529
ODISHA (COAL POWER - AFTAB) 0.098455
ODISHA (COAL POWER - Rajasthan) 0.276311
ODISHA (COAL POWER - Faridabad) 0.078817
WEST BENGAL 6.070000 3877.364 19197.908 3871.500 17884.808 113793.545 108148.864 0.000
West Bengal (COAL POWER - Rajasthan) 0.921034 588.334 2913.003 585.870 2612.887 17259.658 15990.173 0.000
SIKKIM 0.000000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SUB-TOTAL 67.844554 43337.405 214575.533 42063.995 180267.076 1271796.558 1155798.283

SR:
TELANGANA (NSM-II) 0.683572 436.649 2161.969 429.682 1812.227 12809.758 12830.870 0.000
TAMILNADU 0.700000 447.143 2213.927 445.305 1913.174 13122.815 16533.440 0.000
SUB-TOTAL 1.383572 883.792 4375.896 874.987 3725.401 25932.573 29364.310

NR:
UTTAR PRADESH 9.120000 5825.628 28844.303 5677.123 22226.400 170971.521 136633.518 8692.275
HARYANA 3.040000 1941.876 9614.768 1634.833 6655.233 56990.507 48165.761 276.170
RAJASTHAN 3.040000 1941.876 9614.768 1834.263 7484.569 56990.507 49988.817 0.000
J&K 3.680000 2350.692 11638.929 2350.692 11504.469 68988.508 68854.048 0.000
DELHI 6.070000 3877.364 19197.908 3448.492 14847.556 113793.545 91058.235 5666.278
SUB-TOTAL 24.950000 15937.436 78910.676 14945.403 62718.227 467734.588 394700.379

WR:
GUJARAT 1.550000 990.101 4902.266 690.489 5087.577 4864.916 33164.273 0.000

NER :
ASSAM 2.108380 1405.614 6959.586 1394.153 6058.950 41240.575 37893.015 0.000
ASSAM (COAL POWER - Rajasthan) 0.092104
NAGALAND 0.425332 270.141 1345.220 263.604 1291.600 7967.121 7873.693 0.000
ARUNACHAL PRADESH 0.192147 122.739 607.713 122.739 607.713 3600.393 3600.393 0.000
MIZORAM 0.141905 90.645 448.810 90.645 448.810 2658.910 2658.910 0.000
SUB-TOTAL 2.959868 1889.139 14263.595 1871.141 8407.073 55466.999 52026.011

POWERGRID(PUSAULI) 0.119048 76.045 376.519 76.045 376.519 2342.438 2342.438 0.000

NVVN POWER - A/C BPDB 1.192958 762.032 3773.031 762.032 3773.031 22355.365 22355.365 0.000

VSCED(UP) 1903.433 17040.738 76056.000


VSCED(DOWN) 198.430 4099.520 25838.120
VAE (UP) 168.518 1663.413 8125.250
VAE (DOWN) 0.000 1361.920 5840.620
GRAND TOTAL 100.000000 63875.950 321177.516 63157.612 277597.614 1850493.437 1742253.569

# Please refer to Annexure


SE (Comml)
Page No. 6/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

KhSTPS STAGE-II (3X500)


ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 4.979865 8371.433 41793.396 8281.851 39861.149 200355.716 192235.522 0.000
JHARKHAND 1.248565 2098.908 10478.552 2233.605 12570.312 50233.719 61314.923 0.000
ODISHA 2.050000 3446.165 17204.575 3056.336 7725.351 82477.982 61129.589 8976.696
ODISHA (COAL POWER - AFTAB) 0.106629 959.239 4788.889 851.570 2880.722 22957.724 18486.956 1027.109
ODISHA (COAL POWER - DADRI) 0.089285
ODISHA (COAL POWER - Rajasthan) 0.275736
ODISHA (COAL POWER - Faridabad) 0.098967
West Bengal (COAL POWER - Rajasthan) 0.919117 1545.087 7713.667 1538.625 7103.757 36978.984 35193.079 0.000
SIKKIM 0.000000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SUB-TOTAL 9.768164 16420.832 81979.079 15961.987 70141.291 393004.125 368360.069

SR:
TELANGANA (NSM-II) 0.763112 1282.834 6404.399 1279.079 5851.395 30702.408 32733.434 0.000
SUB-TOTAL 0.763112 1282.834 6404.399 1279.079 5851.395 30702.408 32733.434 0.000

WR:
CHHATTISGARH 2.000000 3362.113 16784.951 2436.288 11267.322 80466.325 67878.694 517.682
GUJARAT 9.730000 16356.677 81658.788 11519.387 53562.901 391468.665 338809.634 0.000
MADHYA PRADESH 4.930000 8287.607 41374.905 9735.372 46492.982 198349.488 181488.341 0.000
MAHARASTRA 9.870000 16592.025 82833.734 16248.680 74953.897 397101.307 389948.507 0.000
DADRA & NAGAR HAVELI 0.200000 336.211 1678.495 336.211 1678.495 8046.632 8043.117 0.000
DAMAN & DIU 0.130000 218.537 1091.022 218.537 1091.022 5230.311 5230.311 0.000
SUB-TOTAL 26.860000 45153.170 225421.895 40494.475 189046.619 1080662.728 991398.604

NR:
UTTAR PRADESH 16.730000 28124.071 140406.117 28240.740 105569.221 673100.797 540051.473 32084.204
HARYANA 4.580000 7699.238 38437.538 6959.986 28823.614 184267.882 157635.785 0.000
RAJASTHAN 7.110000 11952.310 59670.502 11584.924 46538.785 286057.783 249079.400 0.000
J&K 5.560000 9346.673 46662.164 9346.673 46067.032 223696.380 223101.248 0.000
HIMACHAL PRADESH 1.530000 2572.016 12840.488 1960.838 9353.527 61556.737 46823.193 5500.033
DELHI 10.490000 17634.280 88037.069 16458.321 72776.184 422045.866 351331.444 7407.542
PUNJAB 8.020000 13482.071 67307.655 11706.431 56728.058 322669.960 301402.348 0.000
UTTARAKHAND 1.870000 3143.575 15693.929 2557.341 10918.486 75236.012 55484.902 8465.708
CHANDIGARH 0.200000 336.211 1678.495 336.211 1678.495 8046.632 8046.632 0.000
SUB-TOTAL 56.090000 94290.445 470733.957 89151.465 378453.402 2256678.049 1932956.425

NER :
ASSAM 5.093479 8716.934 43518.268 8710.474 40218.694 208624.676 186451.849 0.000
ASSAM (COAL POWER - Rajasthan) 0.091912
SUB-TOTAL 5.185391 8716.934 43518.268 8710.474 40218.694 208624.676 186451.849

NVVN POWER - A/C BPDB 1.333333 2241.408 11189.965 2241.408 11189.965 53644.201 53644.201 0.000

VSCED(UP) 8413.733 39775.678 204445.050


VSCED(DOWN) 36.295 6962.135 41320.890
VAE (UP) 924.025 4008.815 7165.150
VAE (DOWN) 0.000 1551.910 1551.910
GRAND TOTAL 100.000000 168106.000 795729.295 167140.351 730171.814 4023316.187 3734281.982

# Please refer to Annexure


SE (Comml)
Page No. 7/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

TSTPS STAGE-I (2X500)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 41.245379 43999.199 220909.845 43735.421 214922.602 972721.245 943775.385 0.000
JHARKHAND 7.667664 8699.975 40548.068 8673.641 39888.677 180810.322 177828.108 0.000
DVC 0.200000 214.775 1069.753 214.775 929.870 4716.575 3600.204 408.885
ODISHA 31.800000 34149.225 170090.747 33572.655 108327.694 749935.245 639539.014 0.000
ODISHA (COAL POWER - AFTAB) 0.099049 586.619 2908.543 559.208 2218.247 12833.641 11634.502 0.000
ODISHA (COAL POWER - DADRI) 0.082937
ODISHA (COAL POWER - Rajasthan) 0.275736
ODISHA (COAL POWER - Faridabad) 0.086460
WEST BENGAL 9.210000 9890.389 49262.131 9890.389 46630.127 217198.227 209421.550 0.000
West Bengal (COAL POWER - Rajasthan) 0.919117 987.017 4916.142 987.017 4624.307 21675.417 20849.133 0.000
SIKKIM 0.000000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SUB-TOTAL 91.586342 98527.199 489705.229 97633.106 417541.524 2159890.672 2006647.896

SR:
ANDHRA PRADESH 0.000000
TELANGANA (NSM-II) 0.712870 765.533 3812.975 763.601 3566.514 16811.520 16417.116 0.000
KARNATAKA 0.000000
TAMILNADU 0.850000 912.794 4546.451 910.819 4408.950 20045.438 19901.916 0.000
KERALA 0.000000
PONDICHERRY 0.000000
SUB-TOTAL 1.562870 1678.327 8359.426 1674.420 7975.464 36856.958 36319.032

WR:
GUJARAT 2.400000 2577.300 12837.038 2014.977 9507.667 56598.888 48577.563 0.000

NER :
ASSAM 2.095419 2287.381 11757.039 2261.412 9632.443 51574.318 49106.635 0.000
ASSAM (COAL POWER - Rajasthan) 0.091912
MEGHALAYA 0.000000
NAGALAND 0.424823 169.959 2522.350 169.717 2445.715 9987.202 9895.993 0.000
ARUNACHAL PRADESH 0.196898 292.879 971.341 292.879 971.341 4635.387 4635.387 0.000
MIZORAM 0.141736 233.642 676.292 233.642 676.292 3334.507 3334.507 0.000
SUB-TOTAL 2.950788 2983.861 15927.022 2957.650 13725.791 69531.414 66972.522

NVVN POWER - A/C BPDB 1.500000 1610.813 8023.148 1610.813 8023.148 35374.305 35374.305 0.000

VSCED(UP) 1305.398 31957.863 76220.090


VSCED(DOWN) 121.008 7146.923 39944.390
VAE (UP) 146.948 1580.553 1897.840
VAE (DOWN) 0.000 1746.150 1746.150
GRAND TOTAL 100.000000 107377.500 534851.863 107222.304 481418.937 2358252.237 2230318.708

# Please refer to Annexure

SE (Comml)
Page No. 8/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

BARH STPS STAGE-II (2X660)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 90.803247 139337.579 696687.897 131018.238 571917.441 3201091.111 2648005.344 72922.101
JHARKHAND 7.086512 10874.253 54371.263 10487.796 49278.306 249821.143 216323.039 0.000
ODISHA 0.000000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
WEST BENGAL 0.000000
SIKKIM 1.318152 2022.706 10113.529 2022.706 10109.451 46473.361 45132.230 0.000
SUB-TOTAL 99.207911 152234.538 761172.689 143528.740 631305.198 3497385.615 2909460.613

SR:
TELANGANA (NSM-II) 0.678453 1041.086 5205.431 465.850 1767.129 23901.654 13668.655 6647.751
SUB-TOTAL 0.678453 1041.086 5205.431 465.850 1767.129 23901.654 13668.655

POWERGRID (ALIPURDUAR) 0.113636 174.376 871.880 137.394 696.777 4413.980 2452.815 1299.068

VSCED(UP) 271.090 5278.940 38725.320


VSCED(DOWN) 17744.985 86769.565 260796.470
VAE (UP) 215.280 2772.940 9756.210
VAE (DOWN) 3523.878 47049.683 123623.640
GRAND TOTAL 100.000000 153450.000 767250.000 123349.492 508001.737 3525701.249 2589643.503

# Please refer to Annexure

SE (Comml)
Page No. 9/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

BRBCL (3X250)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)

BIHAR # 10.000 5877.000 29626.138 5835.018 27918.575 175187.914 163299.428 0.000

RAILWAY drawn in ER:


DVC 13.306 7819.936 39420.539 8112.672 40876.003 233105.036 251131.757 0.000
BIHAR 12.097 7109.407 35838.739 6826.278 35209.623 211924.817 213193.939 0.000
SUB-TOTAL 25.403 14929.343 75259.278 14938.950 76085.626 445029.853 464325.696

RAILWAY drawn in WR:


MADHYA PRADESH 18.629 10948.263 55190.532 10890.921 54624.205 326357.562 323323.306 0.000
MAHARASTRA 14.516 8531.053 43005.301 8512.935 42900.180 254302.774 253741.212 0.000
SUB-TOTAL 33.145 19479.316 98195.833 19403.856 97524.385 580660.336 577064.518

RAILWAY drawn in NR:


UTTAR PRADESH (ISTS Points) 6.653 3909.968 19710.269 3909.968 19705.817 116552.519 116537.962 0.000
UTTAR PRADESH (STU Points) 15.725 9241.583 46587.101 9336.121 47219.486 275482.994 289854.377 0.000
HARYANA 1.815 1066.676 5377.144 1054.418 5302.110 31796.607 13839.336 13187.780
PUNJAB 4.234 2488.322 12543.707 2441.467 12113.824 74174.563 69363.704 0.000
RAJASTHAN 1.210 711.117 3584.763 632.462 3350.090 21197.738 20264.408 0.000
DELHI 0.605 355.559 1792.381 352.716 1783.956 21197.738 20264.408 0.000
SUB-TOTAL 30.242 17773.225 89595.365 17727.152 89475.283 540402.159 530124.195

RAILWAY drawn in SR:


KARNATAKA 1.210 711.117 3584.763 622.726 3296.392 21197.738 14186.218 3831.859

SUB-TOTAL 1.210 711.117 3584.763 622.726 3296.392 21197.738 14186.218

VSCED(UP) 39.185 409.135 3548.760


VSCED(DOWN) 804.168 28879.863 121230.680
VAE (UP) 61.993 142.658 1040.050
VAE (DOWN) 0.000 10994.630 45678.140
GRAND TOTAL 100.000 58770.001 296261.377 57824.712 254977.561 1762478.000 1586680.045

# Please refer to Annexure

SE (Comml)
Page No. 10/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

MTPS STAGE-II (2X195)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 74.972 25323.165 122602.907 25052.456 115251.159 706271.830 636543.330 0.000
JHARKHAND 3.433 1159.559 5614.040 1115.710 5906.637 32340.490 34885.057 0.000
DVC 2.600 878.198 4251.821 878.198 3805.548 24493.235 19472.018 1347.232
ODISHA 8.527 2880.150 13944.339 33.082 1855.105 80328.388 6361.201 61917.929
WEST BENGAL 9.635 3254.398 15756.269 3286.813 10093.099 90766.275 69551.137 7600.197
SIKKIM 0.554 187.124 905.965 190.124 905.627 5218.944 6123.098 0.000
SUB-TOTAL 99.721 33682.594 163075.341 30556.383 137817.175 939419.162 772935.841

SR:
TELANGANA (NSM-II) 0.279 94.237 456.253 198.880 365.468 2628.312 2630.408 0.000
SUB-TOTAL 0.279 94.237 456.253 198.880 365.468 2628.312 2630.408

VSCED(UP) 1801.873 5708.118 35358.710


VSCED(DOWN) 96.175 4258.025 37722.320
VAE (UP) 980.968 2224.593 12197.120
VAE (DOWN) 0.000 916.720 15375.330
GRAND TOTAL 100.000 33776.831 163531.594 33441.928 140940.608 942047.474 770024.429

# Please refer to Annexure

SE (Comml)
Page No. 11/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

Nabinagar STPP (2X660)

ENTITLE MENT, INCENTIVE( IF ANY) & DRAWL SCHEDULE OF BENEFICIARIES

CUMULATIVE
WT. AVG SHARE CUMULATIVE CUM. QUANTUMOF
DRAWL
BENEFICIARIES ALLOCATION OF ENTITLE MENT OF THE BENEFICIARIES DRAWAL SCHEDULE ENTITLEMENT OF SCHEDULE BELOW 85%
SCHEDULE OF
CURRENT MONTH BENEFICIARIES OF CUM. ENTITLEMENT
BENEFICIARIES

PEAK OFF-PEAK PEAK OFF-PEAK


(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 84.766 71056.954 348053.169 70673.807 327756.224 1508640.846 1424753.003 0.000
JHARKHAND 3.276 2746.179 13451.410 2715.368 12598.086 58305.305 56247.769 0.000
SIKKIM 0.546 457.696 2241.902 457.696 2246.262 9717.551 9833.117 0.000
SUB-TOTAL 88.588 74260.829 363746.481 73846.871 342600.572 1576663.702 1490833.889

NR:
Uttar Pradesh 11.412 9566.359 46858.207 9272.858 31912.039 203107.488 155287.522 17353.843
SUB-TOTAL 11.412 9566.359 46858.207 9272.858 31912.039 203107.488 155287.522

VSCED(UP) 636.880 10870.840 40595.300


VSCED(DOWN) 293.898 28856.763 68608.760
VAE (UP) 0.000 597.670 4909.130
VAE (DOWN) 0.000 9255.000 16792.930
GRAND TOTAL 100.000 83827.188 410604.688 83462.712 347869.359 1779771.190 1606224.151

# Please refer to Annexure

SE (Comml)
Page No. 12/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

Darlipalli STPS-I (1X800)

ENTITLE MENT DRAWAL

BENEFICIARIES WT AVG SHARE CUMULATIVE CUMULATIVE QUANTUM OF


PEAK OFF-PEAK PEAK OFF-PEAK
(%) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH) (MWH)
ER:
BIHAR # 11.860 10839.447 53984.052 10839.447 52960.004 221778.149 216135.369 0.000
JHARKHAND 9.220 8426.619 41967.366 8367.894 40639.616 172411.007 168589.422 0.000
ODISHA 58.820 53758.539 267735.406 53758.539 267735.406 1099914.887 1096793.357 0.000
WEST BENGAL 18.350 16770.983 83525.071 16770.983 81529.509 343139.036 337358.035 0.000
SIKKIM 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SUB-TOTAL 98.250 89795.588 447211.895 89736.863 442864.535 1837243.079 1818876.183 0.000

WR:
GUJARAT 1.750 1599.413 7965.606 1589.569 7965.606 32724.431 32880.502 0.000

SUB-TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

VSCED(UP) 58.725 4330.185 17688.480


VSCED(DOWN) 0.000 0.000 30.000
VAE (UP) 9.840 17.280 465.670
VAE (DOWN) 0.000 0.000 19.990
GRAND TOTAL 100.000 91395.001 455177.501 91394.997 455177.606 1869967.510 1869860.845

# Please refer to Annexure

SE (Comml)
Page No. 13/14
EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

A. STATION : RANGIT HPS (3 X 20 MW)

1 Installed Capacity ( MW ) : 60

2 Auxliary Energy Consumption (AUX) in ( % ) : 1.2

3 Normative Plant Availability Factor - NAPAF ( % ) : 90

4 Annual Design Energy in MU : 338.61

5 Free Energy for Home State - FEHS ( % ) : 12

6 Annual Saleable Energy in MU 294.4010784


[ { DE x ( 100 - AUX ) x ( 100 - FEHS ) / 10000 } ]

7 Scheduled Energy ( ex-bus ) of the month (MWH) : 41808.000

8 Free Energy (ex-bus) of the month (MWH) : 5016.960

9 Saleable Energy ( ex-bus) of the month (MWH): 36791.040

10 Cumulative Schedule Energy up to preceding month (MWH) : 75703.500

11 Cumulative Schedule Energy including current month (MWH) : 117511.500

12 Plant Availability Factor (PAFM) achieved during the month ( % ) : 104.59

BILLING STATEMENT OF SALEABLE ENRGY:


SHARE DRAWAL SCHUDULE
ALLOCATION OF THE
BENEFICIARIES FOR THE BENEFICIARIES
CURRENT MONTH
(%) (MWH)

BIHAR # 35.000 14632.800


JHARKHAND 13.330 5573.006
DVC 10.000 4180.800
ODISHA 0.000 0.000
WEST BENGAL 28.340 11848.387
SIKKIM 1.330 556.046
SUB-TOTAL* 88.000 36791.039
Free Energy to Home
State (FEHS)
12.000 5016.960
TOTAL 100.000 41807.999
* Saleable Energy of the hydro generator.

# Please refer to Annexure

SE (Comml)
Page No. 14/14

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA


REGIONAL ENERGY ACCOUNTING FOR THE MONTH OF JULY - 2021 (Low Demand Season of ER)

B. STATION : TEESTA STAGE - V HPS (3 X 170 MW)

1 Installed Capacity ( MW ) : 510

2 Auxliary Energy Consumption (AUX) in ( % ) : 1.2

3 Normative Plant Availability Factor - NAPAF ( % ) : 87

4 Annual Design Energy in MU : 2572.67

5 Free Energy for Home State - FEHS ( % ) : 12

6 Annual Saleable Energy in MU : 2236.782205


[ { DE x ( 100 - AUX ) x ( 100 - FEHS ) / 10000 } ]

7 Scheduled Energy ( ex-bus ) of the month (MWH) : 357629.50

8 Free Energy ( ex-bus) of the month : 42915.540

9 Saleable Energy ( ex-bus ) of the month : 314713.96

10 Cumulative Schedule Energy up to preceding month (MWH) : 675017.500

11 Cumulative Schedule Energy including current month (MWH) : 1032647.000

12 Plant Availability Factor achieved during the month - PAFM ( % ) : 99.08

BILLING STATEMENT OF SALEABLE ENERGY :

SHARE DRAWAL SCHUDULE


ALLOCATION OF THE
BENEFICIARIES FOR THE BENEFICIARIES
CURRENT MONTH
(%) (MWH)
BIHAR # 21.260 76032.032
JHARKHAND 12.340 44131.480
DVC 8.640 30899.189
ODISHA 20.590 73635.914
WEST BENGAL 23.980 85759.554
SIKKIM 1.190 4255.791
SUB-TOTAL* 88.000 314713.960
Free Energy to Home State
(FEHS)
12.000 42915.540
TOTAL 100.000 357629.500
* Saleable Energy of the hydro generator.

# Please refer to Annexure

SE (Comml)
ANNEXURE

EASTERN REGIONAL POWER COMMITTEE :: KOLKATA

# BREAK-UP OF REGIONAL ENERGY ACCOUNTING OF BIHAR AMONG NBPDCL AND SBPDCL


FOR THE MONTH OF JULY,2021

SHARE SHARE
ALLOCATION ALLOCATION DRAWAL DRAWAL
NAME OF OF OF SCHUDULE SCHUDULE
POWER STATION CURRENT MONTH CURRENT MONTH

(%) (%) (MWH) (MWH)


NBPDCL ( 46 % ) SBPDCL ( 54 % ) NBPDCL ( 46 % ) SBPDCL ( 54 % )
NTPC :
FSTPS I & II 14.443018 16.954848 117892.165360 138395.150640
FSTPS III 9.898222 11.619652 29081.658160 34139.337840
KhSTPS I 19.261385 22.611191 70111.782740 82305.136260
KhSTPS II 2.290738 2.689127 22145.780000 25997.220000
TSTPS I 18.972874 22.272505 118982.690580 139675.332420
BARH STPS II 41.769494 49.033753 323350.412340 379585.266660
BRBCL 4.600000 5.400000 15526.652780 18226.940220
MTPS-II 34.487120 40.484880 64539.662900 75763.952100
NPGC 38.992360 45.773640 183277.814260 215152.216740
RANGIT 14.000000 21.000000 5853.120000 8779.680000
TEESTA-V 8.504000 12.756000 30412.812800 45619.219200