Certificate G59/3: Engineering Recommendation

This certificate provides test results for SMA Solar Technology AG photovoltaic inverters to demonstrate compliance with the Engineering Recommendation G59/3. The certificate includes details of the inverter models tested, test dates, test house, and results for harmonics, voltage fluctuations, flicker, DC injection, and power factor. Test results showed the inverters met all limits specified in G59/3 for connection to the UK grid.

Uploaded by

Nguyen Vansu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views4 pages

Certificate G59/3: Engineering Recommendation

This certificate provides test results for SMA Solar Technology AG photovoltaic inverters to demonstrate compliance with the Engineering Recommendation G59/3. The certificate includes details of the inverter models tested, test dates, test house, and results for harmonics, voltage fluctuations, flicker, DC injection, and power factor. Test results showed the inverters met all limits specified in G59/3 for connection to the UK grid.

Uploaded by

Nguyen Vansu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SMA Solar Technology AG | Sonnenallee 1 | 34266 Niestetal | Germany

Telefon: +49 561 9522-0 | Fax: +49 561 9522-100 | Internet: www.SMA.de | E-Mail: [email protected]
Amtsgericht Kassel (District Court) HRB (registration number) 3972
Vorsitzender des Aufsichtsrats (Chairman of the Supervisory Board): Günther Cramer
Managing Board: Roland Grebe, Dr.-Ing. Jürgen Reinert, Lydia Sommer, Pierre-Pascal Urbon

Certificate G59/3

Engineering Recommendation

Manufacturer SMA Solar Technology AG

Address Sonnenallee 1, 34266 Niestetal (Germany)

Type Tested reference number ZE_G59-3_STPxx000TL-20_en_11

Generating Unit technology Three phase inverter

Test house details SMA Solar Technology AG

Test period From 2014-04-26 until 2014-05-26

From FW
Type reference Max. apparent AC power (VA) Rated AC power (W)
Pack

STP 12000TL-20 12000 12000 2.52.00.R

STP 10000TL-20 10000 10000 2.52.00.R

STP 9000TL-20 9000 9000 2.52.00.R

STP 8000TL-20 8000 8000 2.52.00.R

STP 7000TL-20 7000 7000 2.52.00.R


ZE_G59-3_STP xx000TL-20_en_11

STP 6000TL-20 6000 6000 2.52.00.R

STP 5000TL-20 5000 5000 2.52.00.R

The results of the G59/3 are summarized in this certificate. SMA declares that all units shipped to the UK,
with at least the aforementioned FW version, are within the specifications and parameters set by the G59/3
Engineering Recommendation. These settings cannot be changed by an installer, user or by any person other
than SMA. Note that all tests were carried out in the biggest inverter of the family under test. The results for
the other inverters of the family are equivalent.

Page 1/4
SMA Solar Technology AG | Sonnenallee 1 | 34266 Niestetal | Germany
Telefon: +49 561 9522-0 | Fax: +49 561 9522-100 | Internet: www.SMA.de | E-Mail: [email protected]
Amtsgericht Kassel (District Court) HRB (registration number) 3972
Vorsitzender des Aufsichtsrats (Chairman of the Supervisory Board): Günther Cramer
Managing Board: Roland Grebe, Dr.-Ing. Jürgen Reinert, Lydia Sommer, Pierre-Pascal Urbon

Test Results
Power quality

Harmonics as per BS EN 61000-3-12


P/Pn [%]
Frequency Thresholds
Order 50 100
[Hz] I/In [%] Max. MV / Limit [%]
MV MV
2 100 8,00% 0,046 A 0,26% 0,091 A 0,52% 6,50%
3 150 - 0,041 A 0,24% 0,038 A 0,22% - -
4 200 4,00% 0,072 A 0,41% 0,039 A 0,23% 10,31%
5 250 10,70% 0,06 A 0,35% 0,067 A 0,38% 3,58%
6 300 2,67% 0,034 A 0,20% 0,013 A 0,08% 7,41%
7 350 7,20% 0,056 A 0,32% 0,047 A 0,27% 4,47%
8 400 2,00% 0,018 A 0,11% 0,011 A 0,06% 5,31%
9 450 - 0,015 A 0,09% 0,013 A 0,08% - -
10 500 1,60% 0,013 A 0,07% 0,009 A 0,05% 4,58%
11 550 3,10% 0,056 A 0,32% 0,048 A 0,28% 10,29%
12 600 1,33% 0,011 A 0,06% 0,006 A 0,04% 4,54%
13 650 2,00% 0,036 A 0,20% 0,064 A 0,37% 18,36%
14 700 - 0,008 A 0,05% 0,005 A 0,03% - -
15 750 - 0,011 A 0,07% 0,008 A 0,05% - -
16 800 - 0,007 A 0,04% 0,005 A 0,03% - -
17 850 - 0,036 A 0,21% 0,017 A 0,10% - -
18 900 - 0,006 A 0,03% 0,005 A 0,03% - -
19 950 - 0,023 A 0,13% 0,062 A 0,36% - -
20 1000 - 0,005 A 0,03% 0,004 A 0,02% - -
21 1050 - 0,007 A 0,04% 0,007 A 0,04% - -
22 1100 - 0,004 A 0,03% 0,003 A 0,02% - -
23 1150 - 0,021 A 0,12% 0,009 A 0,05% - -
24 1200 - 0,004 A 0,02% 0,004 A 0,02% - -
25 1250 - 0,018 A 0,11% 0,048 A 0,27% - -
26 1300 - 0,004 A 0,02% 0,003 A 0,02% - -
27 1350 - 0,01 A 0,06% 0,01 A 0,06% - -
28 1400 - 0,003 A 0,02% 0,003 A 0,02% - -
29 1450 - 0,013 A 0,08% 0,028 A 0,16% - -
30 1500 - 0,003 A 0,01% 0,004 A 0,02% - -
31 1550 - 0,007 A 0,04% 0,015 A 0,08% - -
ZE_G59-3_STP xx000TL-20_en_11

32 1600 - 0,002 A 0,01% 0,003 A 0,01% - -


33 1650 - 0,008 A 0,05% 0,01 A 0,06% - -
34 1700 - 0,002 A 0,01% 0,002 A 0,01% - -
35 1750 - 0,01 A 0,06% 0,011 A 0,07% - -
36 1800 - 0,002 A 0,01% 0,002 A 0,01% - -
37 1850 - 0,007 A 0,04% 0,017 A 0,09% - -
38 1900 - 0,002 A 0,01% 0,002 A 0,01% - -
39 1950 - 0,002 A 0,01% 0,002 A 0,01% - -
40 2000 - 0,002 A 0,01% 0,001 A 0,01% - -

MV=Measured Value

Test report according to G59/3 for STP x000TL-20 Page 2/4


SMA Solar Technology AG | Sonnenallee 1 | 34266 Niestetal | Germany
Telefon: +49 561 9522-0 | Fax: +49 561 9522-100 | Internet: www.SMA.de | E-Mail: [email protected]
Amtsgericht Kassel (District Court) HRB (registration number) 3972
Vorsitzender des Aufsichtsrats (Chairman of the Supervisory Board): Günther Cramer
Managing Board: Roland Grebe, Dr.-Ing. Jürgen Reinert, Lydia Sommer, Pierre-Pascal Urbon

Test Results
Power quality

Voltage fluctuations and flicker as per BS EN 61000-3-11


Starting Stopping Running
dmax dc d(t) in ms dmax dc d(t) in ms Pst Plt (2hours)
Limit 4,0% 3,3% 500 4,0% 3,3% 500 1 0,65
MV 2,1% 1,7% 0 2,6% 2,2% 0 0,11 0,11
Verification

DC injection Power factor


P/Pn [%] Voltage [V]
10 55 100 218,2 230 253
Limit 0,25% In 0,25% In 0,25% In Limit 0,95 0,95 0,95
MV 0,0064 A 0,00903 A 0,00814 A MV 1,00 1,00 1,00
%Inom 0,04% 0,05% 0,05% Verification
Verification
MV - Measured value
Protection - Grid monitoring and reconnection time

Trip Tests G59/3 Setting Measures Values


Verification
Function Magnitude Time Magnitude Time Magnitude Time
Undervoltage stage 1 200,1 V 2,5 s 200,1 V 2,5 s 199,7 V 2,54 s
Undervoltage stage 2 184 V 0,5 s 184 V 0,5 s 183,7 V 0,6 s
Overvoltage stage 1 262,2 V 1s 262,2 V 1s 263 V 1,06 s
Overvoltage stage 2 273,7 V 0,5 s 273,7 V 0,5 s 274,5 V 0,56 s
Underfrequency stage 1 47,5 Hz 20 s 47,5 Hz 20 s 47,5 Hz 20,1 s
Underfrequency stage 2 47 Hz 0,5 s 47 Hz 0,5 s 47 Hz 0,61 s
Overfrequency stage 1 51,5 Hz 90 s 51,5 Hz 90 s 51,55 Hz 90,07 s
Overfrequency stage 2 52 Hz 0,5 s 52 Hz 0,5 s 52,05 Hz 0,6 s

No trip test G59/3 No trip test G59/3


Verification Verification
Magnitude Time Magnitude Time
U/V 1 204,1 V 3,5 s U/F 1 47,7 Hz 25 s
U/V 2 188 V 2,48 s U/F 2 47,2 Hz 19,98 s
ZE_G59-3_STP xx000TL-20_en_11

U/V 3 180 V 0,48 s U/F 3 46,8 Hz 0,48 s


O/V 1 258,2 V 2s O/F 1 51,3 Hz 95 s
O/V 2 269,7 V 0,98 s O/F 2 51,8 Hz 89,98 s
O/V 3 277,7 V 0,48 s O/F 3 52,2 Hz 0,48 s

Reconnection time No reconnection


Limit Setting MV Verification At 266,2 V At 196,1 V At 47,4 Hz At 51,8 Hz
20 s 20 s 26,7 s

Test report according to G59/3 for STP x000TL-20 Page 3/4


SMA Solar Technology AG | Sonnenallee 1 | 34266 Niestetal | Germany
Telefon: +49 561 9522-0 | Fax: +49 561 9522-100 | Internet: www.SMA.de | E-Mail: [email protected]
Amtsgericht Kassel (District Court) HRB (registration number) 3972
Vorsitzender des Aufsichtsrats (Chairman of the Supervisory Board): Günther Cramer
Managing Board: Roland Grebe, Dr.-Ing. Jürgen Reinert, Lydia Sommer, Pierre-Pascal Urbon

Test Results
Protection

Loss of mains test according to the BS EN 62116


29 % 58 % 100 % 29 % 58 % 100 %
Test power and imbalance -5%Q -5%Q -5%P +5%Q +5%Q +5%P
(Test 22) (Test 12) (Test 5) (Test 31) (Test 21) (Test 10)
Trip time limit (s) 0,5 0,5 0,5 0,5 0,5 0,5
Measured Value L1 (s) 0,081 0,068 0,101 0,108 0,102 0,051
Measured Value L2 (s)* 0,063 0,1 0,105 0,103 0,066 0,057
Measured Value L3 (s)* 0,053 0,1 0,084 0,095 0,105 0,059
Measured Value L1L2L3 (s)* 0,059 0,063 0,066 0,112 0,095 0,053
Verification

Single phase test for three phase inverters*


Ph1 Confirm trip (t < 1 s) Ph2 Confirm trip (t < 1 s) Ph3 Confirm trip (t < 1 s)
removed removed removed

* Only applicable to three phase inverters

Frequency change - Stability test


Start frequency Change End frequency Verification
Positive vector shift 49,5 Hz +9 degrees N/A
Negative vector shift 50,5 Hz -9 degrees N/A
Positive frequency drift 49,5 Hz +0,19 Hz/s 51,5 Hz
Negative frequency drift 50,5 Hz -0,19 Hz/s 47,5 Hz

Fault level contribution Self monitoring - solid state switching


Time after fault Voltage (V) Current (A) Not applicable as electro-mechanical relays are
< 50 ms 229,9 15,91 used
100 ms 11,51 0,04
250 ms 11,56 0,04
500 ms 11,64 0,04
Time to Trip 0,53 in seconds
ZE_G59-3_STP xx000TL-20_en_11

Test report according to G59/3 for STP x000TL-20 Page 4/4