Control Plan
Control Plan
1/01/10
CONTROL PLAN
Control Plan No:- CP/MMPL/UFSLP1/ N127036
Control Plan Type : Key Contact Person / Phone Numbers : Key contact / phone no Original Date : 22.05.13 Rev No & Date : 02/08.09.21
Proto type Pre Launch Production TOOL NO: TL1015 G.Sathiyamoorthy / 9841578560
Core Team : Customer engineering approval / date (if req)
Part Description : SEAL Product Drawing Number : N127036
S.Govindarajan,G.Sathiyamoorthy,V.Ravi.
Customer Part Number: N127036 Issue No. :- Organization/ plant approval Customer Quality approval / date (if req)
Rev. No. :
Customer Name :Ucal Fuel System Ltd Other approval / date PAGE NO
Sheet Breadth - 18.5 - 21.5 mm Vernier Daily once Daily Once First off Inspection Stop And Inform Supervisor
Normal Eyes (Rod inspection) - Limit Sample/ 48 Hours with Visual 100% Visual Inspection 100% Visual Quarantined in hold area
Inspection 100% Visual Inspection _
Rod condition Inspection and raise Flash Report
60
As per Quality Plan Dimension As per Quality Plan As per Quality Plan Quarantined in hold area
PreDelivery Inspection - As per Quality Plan Inspector PDIR
and raise Flash Report
Weighing Balance
70 Packing and Approval Counting Mchine Counting - As per AOI-Part - C Despatch Head Counting Mchine Each Lot Verification Recount / Repacking
Record(Calibration)
OPR-Operator , DTG - Dial Thickness Gauge , DTI - Digital Temperature Indicatior , DT - Digital Timer -( On display) , PG - Pressure Gauge , AOI - Agreement Of Inspection , VIS - Vision Inspection System( Profile) , PDIR - Per Delivery inspection report
Amendment Record
SI NO AMENDMENT DETAIL DETAIL OF CHANGE REASON FOR CHANGE CURRENT REV NO / DATE REVISED REV NO / DATE RESPONSIBILITY APPROVED BY ISSUED BY
2 PFD Revised In line with ERP PFD Format Changed 0/22.05.13 1/15.04.15 M.Murugammal G.Sathiyamoorthi S.Govindarajan
3 CP Revised CSR Implemented layout inspection added 1/15.04.15 02/08.09.21 N Joseph G.Sathiyamoorthi S.Govindarajan