0% found this document useful (1 vote)
1K views

Control Plan

This document is a control plan for the manufacture of part number N127036. It outlines the key processes, characteristics that will be controlled, sampling plans, and methods for evaluation. The processes include receipt of compound, sheeting, blanking, and inspection. Characteristics such as identification, weight, dimensions, and material properties will be controlled. Methods for evaluation include visual inspection, measurement with vernier calipers, measurement gauges, and weighing balances. The plan also describes control methods, reaction plans for non-conformances, and responsibilities of staff.

Uploaded by

ilaya raja
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views

Control Plan

This document is a control plan for the manufacture of part number N127036. It outlines the key processes, characteristics that will be controlled, sampling plans, and methods for evaluation. The processes include receipt of compound, sheeting, blanking, and inspection. Characteristics such as identification, weight, dimensions, and material properties will be controlled. Methods for evaluation include visual inspection, measurement with vernier calipers, measurement gauges, and weighing balances. The plan also describes control methods, reaction plans for non-conformances, and responsibilities of staff.

Uploaded by

ilaya raja
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FM/7.

1/01/10

CONTROL PLAN
Control Plan No:- CP/MMPL/UFSLP1/ N127036
Control Plan Type : Key Contact Person / Phone Numbers : Key contact / phone no Original Date : 22.05.13 Rev No & Date : 02/08.09.21
Proto type Pre Launch Production TOOL NO: TL1015 G.Sathiyamoorthy / 9841578560
Core Team : Customer engineering approval / date (if req)
Part Description : SEAL Product Drawing Number : N127036
S.Govindarajan,G.Sathiyamoorthy,V.Ravi.

Customer Part Number: N127036 Issue No. :- Organization/ plant approval Customer Quality approval / date (if req)

Rev. No. :
Customer Name :Ucal Fuel System Ltd Other approval / date PAGE NO

Characteristics Methods Sample


Special
Process Control Method & Error Reaction Plan Corrective
Process Description Process Machine, Jig, Tool for Mfg. Char. Product / Process Evaluation / Measurement
Number. Product Process Responsibility Size Frequency Proofing Action
Class Specification / Tolerance Technique

Batch No And Compound Quarandined in hold area


Identification -
Reference(710/3) raise Flash Report
10 Blanking Visual 100% Remarks on DC
Receipt Of Compound Manual Every Batch
Supervisor
Weight Weight Mentioned in DC / ID
- Inform Supplier
Tag

- Nip Setting 2.3-4.5 Reading Scale

- Uniform Sizing 180 REF Vernier 100% Every Sheet Resheet

- Stroke Setting 18.5 - 19.8 mm Vernier


20 1.Sheeting Mill 2.Scissor / Blade cutting 3.Blank
Blanking
cutting Machine
Sheet Thickness - 3.5 - 6.5 mm DTG / Vernier

Sheet Breadth - 18.5 - 21.5 mm Vernier Daily once Daily Once First off Inspection Stop And Inform Supervisor

Blank Weight - 18.0 - 19.8 GM Weighing Balance


Operator /
Mat Thickness - 0.2 mm max Inspector DTG

_ Temperature 180 - 200°C DTI


ACMM Once in 4 Hrs Once in 4 Hrs
_ Time 105 Sec DT

_ Pressure 2000 - 4000 PSI PG Stop Production Inform to


Moulding
Supervisor
30 Product Profile - limit sample

Mould Visual Every Lift Every Lift Inprocess Inspection


Free from Visual Defects Flow,Shortfill,curing
_
rejection,Air bubbles,Tearing

OD 12.80 / 13.20 mm vis

Dia 3.60 / 3.80 mm vis / vernier


Ref Layout inspection report Inspector Stop Production and Rectify
First Off Inspection Inspector dimension 1 31.70 / 32.30 mm vis / vernier 5 Nos Random Once in a shift First off Inspection
FM/8.2/06-A in the Die

dimension 2 7.30 / 7.70 mm vis / vernier

dimension 3 8.80 / 9.20 mm vis / vernier

50 Manual Removal Of Flash Operator / Visual Stop Deflashing Inform To


Deflashing - Limit Sample 5 Nos Lot Inprocess Inspection
Inspector Supervisor

Normal Eyes (Rod inspection) - Limit Sample/ 48 Hours with Visual 100% Visual Inspection 100% Visual Quarantined in hold area
Inspection 100% Visual Inspection _
Rod condition Inspection and raise Flash Report
60

As per Quality Plan Dimension As per Quality Plan As per Quality Plan Quarantined in hold area
PreDelivery Inspection - As per Quality Plan Inspector PDIR
and raise Flash Report

Weighing Balance
70 Packing and Approval Counting Mchine Counting - As per AOI-Part - C Despatch Head Counting Mchine Each Lot Verification Recount / Repacking
Record(Calibration)

OPR-Operator , DTG - Dial Thickness Gauge , DTI - Digital Temperature Indicatior , DT - Digital Timer -( On display) , PG - Pressure Gauge , AOI - Agreement Of Inspection , VIS - Vision Inspection System( Profile) , PDIR - Per Delivery inspection report

Amendment Record

SI NO AMENDMENT DETAIL DETAIL OF CHANGE REASON FOR CHANGE CURRENT REV NO / DATE REVISED REV NO / DATE RESPONSIBILITY APPROVED BY ISSUED BY

1 New Release _ _ 0/22.05.13 _ M.Murugammal G.Sathiyamoorthi S.Govindarajan

2 PFD Revised In line with ERP PFD Format Changed 0/22.05.13 1/15.04.15 M.Murugammal G.Sathiyamoorthi S.Govindarajan

3 CP Revised CSR Implemented layout inspection added 1/15.04.15 02/08.09.21 N Joseph G.Sathiyamoorthi S.Govindarajan

Prepared by:M.Murugammal Approved by: G.Sathiyamoorthi