Aircraft Maintenance Manual
Aircraft Maintenance Manual
1. General
A. The maintenance procedure that follows is for the installation of the integrated drive generator
(IDG) (written as the “IDG” in this procedure. There is one IDG installed on the accessory
gearbox on each engine. This procedure is applicable to the IDG installed on the left engine.
Differences for the IDG installed on the right engine are identified.
NOTE: Contact GE Fleet Support for more information or the most recent versions of the tools,
equipment, and consumable materials.
REFERENCE DESIGNATION
B. Consumable Materials
REFERENCE DESIGNATION
C. Parts
D. Reference Information
3. Job Set−Up
A. Make sure that the aircraft is in the same configuration as in the removal task.
4. Procedure
NOTE: Make sure that the surfaces are clean with no corrosion, paint, grease, or preservation
fluids.
WARNING: WHEN YOU MOVE THE IDG, MAKE SURE YOU USE APPROVED SUPPORT
EQUIPMENT. THE IDG WEIGHS APPROXIMATELY 72.0 POUNDS (32.7 KG)
AND CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO
EQUIPMENT.
(1) Put the IDG (1) on the support cradle and mobile lift.
(3) Apply the lubricant to a new preformed packing (24) and install the packing on the union (6).
(4) Install the union (6) and a new packing (24) in the IDG oil−in port (25).
(5) Torque the union (6) from 30.0 to 33.3 lbf·ft (40.75 to 45.22 N·m).
(6) Apply the lubricant to a new preformed packing (22) and install the packing on the union (5).
(7) Install the union (5) and a new packing (22) in the IDG oil−out port (23).
(8) Torque the union (5) from 22.5 to 25.0 lbf·ft (30.56 to 33.95 N·m).
(9) Apply the lubricant to a new preformed packing (26) and install the packing on the IDG
spline shaft (21).
(10) Apply the lubricant to a new preformed packing (27) and install the packing on the IDG
mounting pad (28).
(11) Put the support cradle and mobile lift in position under the engine.
(12) Remove the cover from the gearbox mounting pad (20).
(13) Set the V−band clamp (19) on the gearbox mounting pad (20).
(14) Set the IDG in position behind the gearbox mounting pad (20).
CAUTION: MAKE SURE THAT YOU CORRECTLY ALIGN THE IDG MOUNTING FLANGE
WITH THE GEARBOX MOUNTING FLANGE. YOU CAN PREVENT
INSTALLATION OF THE V−BAND CLAMP, AND/OR CAUSE DAMAGE TO THE
EQUIPMENT.
(15) Align the mounting hole (30) on the IDG mounting pad (28) with the alignment pin (29) on
the gearbox mounting pad (20).
(16) Install the IDG (1) on the gearbox mounting pad (20).
CAUTION: WHEN YOU INSTALL THE V−BAND CLAMP. MAKE SURE THAT IT DOES
NOT CATCH ON OTHER PARTS AND THAT ALL OF ITS PARTS TOUCH THE
MOUNTING FLANGE ON THE GEARBOX AND THE IDG. YOU CAN CAUSE
DAMAGE TO THE EQUIPMENT.
(17) Install the V−band clamp (19) around the IDG mounting pad (28) and the gearbox mounting
pad (20).
(18) When the V−band clamp (19) is aligned correctly, install the coupling nut (18).
(19) Make sure that the V−band clamp (19) moves freely around the mounting pad (20).
(20) Tighten and torque the coupling nut (18) from 115 to 125 lbf·in (13.00 to 14.12 N·m).
(21) To prevent incorrect torque values, do the steps that follow until the torque on nut (18) stays
from 115 to 125 lbf·in (13.00 to 14.12 N·m):
(a) Hit the outer edge of the V−band clamp (19) lightly with a plastic hammer.
(b) Torque the coupling nut (18) from 115 to 125 lbf·in (13.00 to 14.12 N·m).
(22) Remove the IDG support cradle and the mobile lift.
(24) Use two wrenches to install the oil−in line (4) on the oil−in union (6).
(25) Torque the oil−in line (4) from 54.17 to 64.16 lbf·ft (73.44 to 87.00 N·m).
(26) Remove the cap from the right−angle union (36) on the oil−out line (3).
(27) Use two wrenches and install the right−angle union (36) to the oil−out union (5).
(28) Torque the right−angle union (36) from 37.50 to 45.83 lbf·ft (50.84 to 62.14 N·m).
(29) Remove the caps from the electrical connectors (15) and (16).
(30) Connect the electrical connector G1P50 (G2P50) (15) to IDG connector G1J1 (G2J1) (31).
(31) Connect the electrical connector G1P54 (G2P54) (16) to IDG connector G1J2 (G2J2) (32).
(32) Remove the screws (9) and the washers (10) from the terminal block cover (11).
(34) Remove the nuts (12) from the studs in the terminal block (13).
(35) Remove the tags and connect the electrical leads (14) to the studs in the terminal block (13)
as follows: (WDM 24−21−03) (WDM 24−21−04).
– Lead N to terminal N
– Lead T1 to terminal T1
– Lead T2 to terminal T2
– Lead T3 to terminal T3.
(37) Torque the nuts (12) from 48 to 53 lbf·in (5.42 to 5.98 N·m).
(38) Install the terminal block cover (11) with the screws (9) and the washers (10).
(39) Torque the screws (9) from 20 to 22 lbf·in (2.26 to 2.48 N·m).
(40) Install the harness support bracket (8) with the screws (7).
(41) Torque the screws (7) from 48 to 53 lbf·in (5.42 to 5.98 N·m).
(a) Use two wrenches and connect one coupling nut on the pipe (33) to the fitting on the
gearbox (35).
(b) Torque the coupling nut on the pipe (33) from 23 to 25 lbf·ft (31.19 to 33.89 N·m).
(c) Use two wrenches and connect the pipe (33) to the fitting at the kiss plate (34).
(d) Torque the coupling nut on the pipe (33) from 23 to 25 lbf·ft (31.19 to 33.89 N·m).
5. Close Out
A. Do a clearance check of the main fuel pump (MFP) to cooler fuel tube
(TASK 73−11−09−820−801).
B. Remove all tools, equipment, and unwanted materials from the work area.
D. Remove the tags and close the circuit breakers that follow:
E. Remove the tags and close the circuit breakers that follow:
G. Do an operational test of the IDG 1 (IDG 2) disconnect mechanism with the engine stopped
(TASK 24−11−01−710−802).
I. Examine the IDG 1 (IDG 2 ) and the oil lines to make sure there is no leak.
B
C
1
35 A
33 2
LEGEND
34
1. IDG G1 (G2).
2. Overflow drain plug.
8. Harness support bracket.
9. Screw.
10. Washer.
11. Terminal block cover
12. Nut.
13. Terminal block.
14. Electrical leads N, T1, T2
and T3.
33. Air/oil separator pipe No.2
34. Kiss plate fitting.
35. Gearbox fitting.
11 14
12
9
10
baz82a01_02.cgm
8
13 C
LEGEND
1. IDG G1 (G2). 26. Preformed packing.
3. Oil−out line 27. Preformed packing.
4. Oil−in line. 28. IDG mounting pad.
5. Oil−out union. 29. Locating pin.
6. Oil−in union. 30. Locating hole.
17. Tension bolt. 36. Right−angle union.
D
18. Coupling nut.
19. V−band clamp.
20. Gearbox
1 mounting pad.
21. Spline shaft.
E
26 27
18
20
29
6
5
19
17
21
baz82a02_02.cgm
28
30
E D 36 4 3
7
F
8
1
15 31
16
32
LEGEND
1. IDG G1 (G2).
5. Oil−out union. 23
6. Oil−in union.
22
7. Screw.
8. Harness support bracket. 5
15. Electrical connector G1P50 (G2P50).
16. Electrical connector G1P54 (G2P54).
22. Preformed packing. 25
23. Oil−out port. 24
24. Preformed packing.
25. Oil−in port.
baz82a03_01.cgm