Qusahwira Field Development Phase Ii Project Project No. 14395 Forklift Checklist
Qusahwira Field Development Phase Ii Project Project No. 14395 Forklift Checklist
Unions
NOTE: Sign only when all items have been checked
Rods
Connections
Plant Check By:
Position:
Date: / / Instructions:
Note : Register if to be used on Public Roads Verify Box to be ticked by Owner / Supplier / Operator prior to arrival onsite.
Check Box to be ticked after visual inspection by HES Department
This is to certify that the plant being supplied conforms to the relevant HSE Legislation, and the requirements as detailed above. HSE Department will assess this Pre-start Checklist to ensure the supplier has verified compliance to HSE Legislative requirements and, to
register the plant onto the site. The operator will be required to participate in ongoing training and perform work in accordance with the relevant Work Method Statement. Should the plant be found to not conform to the above, then it will be prevented from
commencing work on the site until the non-compliance is rectified. HSE Management will not reimburse the Owner / Supplier / Contractor for any down / lost time so caused from the non-conformance.
This form does not remove any liability for the plant supplier to conform with the relevant HSE Legislation.