Dokumen - Tips - Bomba Ve VRZ Ee14e 11162 VRZ Service Manual
Dokumen - Tips - Bomba Ve VRZ Ee14e 11162 VRZ Service Manual
VRZ
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 1/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
WARNINGS
The following definitions and warning signs are used in this service manual.
These are extremely important to safe operation.
Important points are described to prevent bodily injury and property damage.
They must be fully understood before beginning VRZ maintenance.
CAUTION
CAUTION!! Improper maintenance can result in injury and property damage.
MEANINGS OF MARKS
The following marks are used in this service manual to facilitate correct VRZ maintenance.
Advice Procedures that must be performed to enable the best possible VRZ
maintenance.
Note Information assisting in the best possible VRZ maintenance.
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 2/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
FOREWORD
This service manual describes the disassembly, The contents of the manual, including
inspection, reassembly and adjustment of the illustrations, drawings and specifications were
VRZ (radial plunger system position-control the latest available at the time of printing.
distributor type fuel injection pump). The right is reserved to make changes in
Refer to the separate service manuals listed specifications and procedures at any time
below to facilitate VRZ type injection pump without notice.
maintenance.
This manual is intended for use by vehicle BOSCH K.K.
maintenance technicians or persons with an Sales Automotive Aftermarket Division
adequate knowledge of injection pumps.
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 3/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 4/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SERVICE PRECAUTIONS
Injection pump
P-VRZR- 320
CAUTION
Never hold the pump by the GE actuator or
the harnesses.
Holding the pump by these components may
result in damage or injury.
Wire harness
Pump body
P-VRZR- 321
GE actuator
[2] Disassembly and reassembly
• Only the mechanical components of the
injection pump body can be disassembled
and reassembled.
Advice
Do not disassemble the GE actuator other
than directed in this manual.
• The GE actuator consists of electrical
components. Do not damage them.
Injection pump
P-VRZR- 322
Wire harness
Injection pump
P-VRZR- 323
-1-
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 5/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
20 21 18 31 30
19
32
34
10
22
33
7
9
27
24
6
26 29
13
8 15
11
14
12
37
28 25
36
23 16
3, 4
5
1
17
35
P-VRZR- 324
-2-
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 6/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 7/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
Key
RBAJ part no Bosch part no Part name Qty Remarks
no
30 157915-9700 9 681 610 686 Socket 1 For removing and installing pump support
bracket (T50)
31 157928-4800 9 442 612 302 Plate 1 For temporarily holding feed pump
32 157917-4920 9 681 610 711 Wrench 1 For turning auxiliary gear
33 157977-8000 9 681 610 829 Adapter 1 For inlet piping
34 026512-1640 9 421 617 041 Gasket 3 For inlet piping
35 157971-0500 9 443 613 408 Clip 1 For fixing plunger
36 157924-8520 9 681 611 028 Base 1 Stand for installing drive gear
37 157928-4400 9 442 612 371 Pliers 1 For removing and installing drive gear snapring
-4-
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 8/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 9/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
46
25 75
-6-
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 10/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
-7-
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 11/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 12/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 13/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 14/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
200
M12X1.5
11
M10X1.0
- 11 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 15/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
1-3: 157966-3820
(9 443 613 457)
1-4: 157966-3920
(9 443 613 458)
Note:
Key number 1 (RBAJ part no.105782-8360, Bosch part no. 9 680 610 209) enables adjustment of
both VRZ and COVEC-F pumps.
With the VRZ, however, only key numbers 1-1 (RBAJ part no. 157966-4020, Bosch part no. 9 443
613 446) and 1-3 (RBAJ part no. 157966-3820, Bosch part no. 9 443 613 457) are necessary.
1-1-2 157966-4420 9 443 613 448 Wire harness 1 Power supply (Japan, USA)
1-1-3 157966-4520 9 443 613 449 Wire harness 1 Power supply (EC)
1-1-9 157966-5100 9 443 613 455 CD-ROM 1 Software (Overseas Ver.) & (Calibration data)
& Manual
1-3 157966-3820 9 443 613 457 ECU assembly 1 For Mitsubishi 4M41 engines
- 12 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 16/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
SPECIAL TOOLS
1-1 157966-4020
(9 443 613 446)
CONTROLLER ASSY
2000
2000
1000
2000
2990
- 13 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 17/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 18/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
1. PREPARATION
Clean the outside of the injection pump • Lay out the disassembled parts neatly and
before disassembly, removing all grease and sequentially on the work bench, labelling
dirt. Drain the fuel oil from the pump. them if necessary, to facilitate later
• Keep the work bench and workshop clean reassembly.
and tidy. • Prepare a container of clean fuel oil for
• Before beginning disassembly, record plungers, delivery valves and other precision
performance data for later reference to parts.
facilitate the diagnosis of malfunctions and
defects, if any, in the pump.
2. EXPLODED VIEW
153
150
65
161 150/8
152 956
151
121 66
120 955
37
35
36
948 949 34
33 160
110 38 100 122
111 50 22 101
130
112 878S
50 102
949 32
31
55 911 910
30
56 46 35
45
905
50 11 912
50 17 914 3
51 2
50 205 1 922
53 5
54 60 41
62 6 40
61 16 7 80/7 42
8 43
10
9
25 83
18
20
15 80/8 82
931 930
80
920
26
27 810S 856S 925 923
P-VRZR- 326
- 15 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 19/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
P-VRZR- 300
Bolt (M6x1)
(2) Install wrench B so that it can turn the two
gears (ie, the main gear and the sub-gear)
clockwise.
(3) Turn the main gear and the sub-gear using
wrench A until they are aligned. Then, insert
a bolt through the two gears and tighten it
using a torque wrench. (Tighten
Wrench A temporarily.)
Drive gear
Tool name Part no Remarks
Wrench A 157917-4920
Wrench B P-VRZR- 301 Wrench B 157917-4620
Note:
The drive gear is divided into the main gear and
the sub-gear.
Wrench B is used to prevent drive gear rotation.
Wrench A is used to align the main gear and
the sub-gear.
- 16 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 20/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
Sub-gear
P-VRZR- 302
P-VRZR- 303
P-VRZR- 304
Drive shaft
(11) Assemble puller B to the drive shaft and
puller A.
Puller B
P-VRZR- 305
- 17 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 21/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
Drive gear (12) Tighten the puller bolt to remove the drive
gear.
Advice
Hold the puller so that it does not drop when
the gear is removed from the drive shaft.
Bolt
P-VRZR- 306
Key
Drive shaft
P-VRZR- 307
Nuts (3)
O-ring
P-VRZR- 319
- 18 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 22/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 23/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
P-VRZR- 020
Advice
Do not remove the GE cover.
P-VRZR- 021
P-VRZR- 022
P-VRZR- 023
- 20 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 24/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 25/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
P-VRZR- 026
Timer spring (3) Remove the TPS, the adjusting shim, the
Adjusting shim
timer spring, the core rod and the TPS
TPS
standard point shim.
Advice
Label the TPS standard point shim and the
timer stroke adjusting shim to avoid
mistaking them at reassembly.
Torx bolts (2) (4) Remove the timer cover and the O-rings
O-ring (large) (large and small).
Tool name Part no Remarks
Holder 157915-9820
Bit 157915-9600 T30
Timer cover
O-ring (small)
Bit Holder P-VRZR- 028
- 22 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 26/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
P-VRZR- 029
P-VRZR- 030
Plug
P-VRZR- 031
P-VRZR- 032
- 23 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 27/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 28/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
DISASSEMBLY
Advice
Do not disassemble the plunger from the
rotor shaft.
P-VRZR- 037
Seal ring
Washer
P-VRZR- 038
- 25 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 29/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 30/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 31/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 32/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 33/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 34/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 35/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
COMPONENT INSPECTION
Ball pin
Roller shoes
Washer
Rollers P-VRZR- 057
Timer slider
P-VRZR- 058
P-VRZR- 059
- 32 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 36/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 37/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
COMPONENT INSPECTION
Control sleeve
P-VRZR- 064
CPV holder
P-VRZR- 065
P-VRZR- 066
P-VRZR- 067
- 34 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 38/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
COMPONENT INSPECTION
[15] GE actuator
(1) Replace the GE actuator if the ball pin is
worn or if the plating is damaged or peeling.
P-VRZR- 069
Control sleeve
- 35 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 39/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 40/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
COMPONENT INSPECTION
[18] Np sensors
Np sensors
1 Measure the Np sensors’ resistances.
Terminal nos Resistance (Ω ) Remarks
(-)
2-3 2.15k Main
2 (-)
3 (+)
2-3 2.15k Backup
(+)
Advice
W h e n u s in g a d ig ita l c ir c u it te s te r ,
resistances cannot be measured unless you
hold the minus probe against the No. 2
terminal and the plus probe against the No.
P-VRZR- 314 3 terminal.
- 37 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 41/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 42/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 43/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
GEAR REASSEMBLY
Pin
P-VRZR- 333
P-VRZR- 334
CAUTION
Pliers
Snapring Socket head bolts cannot be reused.
Main gear
Part no
Part name Remarks
(Mitsubishi part no)
- 40 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 44/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 45/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Pins
Cover
(1) Position the feed pump assembly and the
cover on the feed pump holder. Assemble
the holder pins in the feed pump holes (2).
Tool name Part no Remarks
Notch Feed pump holder 157928-4320
Chamfer
Advice
Align the feed pump cover notch with the
Feed pump holder
feed pump holder chamfer.
Notch Feed pump
P-VRZR- 078
P-VRZR- 079
- 42 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 46/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 47/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Advice
Move the rotor backward and forward and
left and right with your finger and check that
it moves smoothly. If it does not move
smoothly, loosen the feed pump cover and
then retighten it to the specified torque.
P-VRZR- 084
Advice
Ensure the bearing is positioned correctly.
P-VRZR- 085
- 44 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 48/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Timer piston
Slider
P-VRZR- 086
Timer’s low pressure side (2) Assemble the timer piston and slider in the
Pump housing
Slider hole
pump housing.
Advice
• Align the slider hole with the timer piston
hole.
Timer piston
• The slider is assembled in the timer with
the hole positioned toward the GE
actuator side.
Note:
The timer piston’s low pressure side is
positioned toward where the Q adjustment ROM
Timer’s low pressure side P-VRZR- 087
is installed.
Cam ring [4] Cam ring reassembly
Assemble the cam ring in the pump housing.
At this time, insert the cam ring pin into the
timer piston’s slider hole.
Cam ring pin
Advice
Confirm that the timer piston slides
smoothly.
- 45 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 49/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Spacer Feed pump cover (3) Insert the spacer into the pump housing.
Spacer
Tool name Part no Remarks
Bearing
P-VRZR- 091
- 46 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 50/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Plastic hammer (8) Lightly tap the drive shaft using a plastic
Drive shaft hammer to assemble the drive shaft with the
end fully protruding from the drive side.
1 ~ 2 mm Advice
;
• When tapping the drive shaft with the
plastic hammer, ensure no burrs or dirt
remain on the shaft.
;
Inner cam • Insert the drive shaft so that the end of
the drive shaft is 1 ~ 2 mm higher than
the end of the inner cam (when viewed
from above).
P-VRZR- 093
• After assembling the drive shaft, confirm
that the shaft rotates smoothly.
Spacer
[6] Snapring reassembly
(1) Remove the spacer from the pump housing.
Pump housing Advice
Confirm that the drive shaft’s snapring
groove can be seen through the housing
window.
P-VRZR- 094
Clip Advice
Snapring Position the snapring on the clip with the
convex face toward the clip.
Convex face
P-VRZR- 095
P-VRZR- 096
- 47 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 51/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Distributor head
[7] Adjusting drive shaft axial play
(1) Position the distributor head on the pump
housing.
Advice
Pump housing Do not assemble the O-ring or the control
sleeve at this time.
P-VRZR- 097
P-VRZR- 098
- 48 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 52/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Shims
RBAJ part no Bosch part no Thickness (mm)
149602-0000 9 443 612 809 1.90
149602-0100 9 443 612 810 1.95
149602-0200 9 443 612 811 2.00
149602-0300 9 443 612 812 2.05
149602-0400 9 443 612 813 2.10
149602-0500 9 443 612 814 2.15
149602-0600 9 443 612 815 2.20
149602-0700 9 443 612 816 2.25
149602-0800 9 443 612 817 2.30
149602-0900 9 443 612 818 2.35
149602-1000 9 443 612 819 2.40
Extractor
P-VRZR- 101
Pump housing
P-VRZR- 102
Rotor shaft
[8] Selecting the rotor shaft shim
Distributor head Purpose
The rotor shaft’s axial play is measured and then
the play is adjusted to the specified value using
the shim.
- 49 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 53/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
P-VRZR- 104
(4) Pull the rotor shaft fully to the left and set
Head
the dial gauge to the ‘0’ position.
Measuring device
Rotor shaft
Dial gauge
Adapter
P-VRZR- 105
P-VRZR- 106
Rotor shaft
(2) Select a shim using the formula below.
Distributor head Shim thickness = full stroke – 0.2 (mm)
RBAJ part no Thickness
Bosch part no
(key no. 53) (mm)
149720-0000 9 443 612 851 2.1
149720-0100 9 443 612 852 2.2
149720-0200 9 443 612 853 2.3
149720-0300 9 443 612 854 2.4
(3) Install the selected shim and the snapring
Shim Snapring to the inserting
(4) After rotor shaft.
the shim, confirm that the
P-VRZR- 107
stroke is as specified. If not as specified,
repeat Procedure 1 and Procedure 2.
Specified stroke: 0.2±0.1 mm
- 50 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 54/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
TPS standard point shim [9] TPS and timer cover reassembly
Pump housing
Adjusting shim (1) Assemble the TPS to the pump housing.
Specified torque: 7.0 ~ 10.0 N·m
Core rod {0.7 ~ 1.0 kgf·m}
Advice
Do not mistake the positions of the TPS
standard point shim and the adjusting shim.
TPS
P-VRZR- 108
P-VRZR- 109
Pump housing
Bracket C
P-VRZR- 110
- 51 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 55/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
2. PRE-STROKE ADJUSTMENT
)
m
m
(
t
f
i
l
m
Timing link shaft ball pin a
C
Fundamentally, pre-stroke is the amount of lift from the cam’s bottom dead center position to the
beginning of pressure delivery position. With the VRZ pump, however, because it is not possible
to measure the cam lift with the pump assembled, the cam angle is instead measured from the
beginning of cam lift position to the beginning of pressure delivery position.
The beginning of pressure delivery position can be changed by changing the phase (ie, the angle)
between the cam link and the control sleeve, which are connected by the timing link shaft.
Consequently, by changing the position of the link plate groove, we can change the phase of the
cam link and the control sleeve to adjust the pre-stroke (ie, substituting the angle instead).
- 52 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 56/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
P-VRZR- 111
assembled.
Measuring device Existing bolts (2) Drive shaft (4) Install the pre-stroke measuring device.
Specified torque: 10.0 ~ 14.0 N·m
{1.0 ~ 1.4 kgf·m}
Tool name Part no Remarks
Measuring device 105782-4540
Advice
Assembly position • Align the drive shaft’s key groove and the
of measuring
device’s measuring
measuring device’s measuring terminal
terminal with the drive shaft.
P-VRZR- 112 • Ensure the end of the measuring device
is securely assembled to the drive shaft
groove.
- 53 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 57/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
P-VRZR- 114
Fixing stand
P-VRZR- 115
Flywheel
(7) Securely tighten the fixing stand installation
bolts and nuts and the drive coupling socket
head bolt to fix the injection pump to the
pump test bench.
(8) Turn the pump test bench flywheel using the
lever to confirm that the injection pump
rotates smoothly.
CAUTION
Remove the lever after operating the
Lever flywheel.
P-VRZR- 116 Operating the test bench without removing
the lever can cause serious injury and
damage the test bench.
- 54 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 58/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Monitor display example [2] Setting the ‘0’ point for pre-stroke
1 2 3 4 5
angle measurement
6 7 8 9 10 11 12
adjustment
(1) Turn the pump test bench’s main switch ON
and set the KMA (continuous measuring
device) as described below. [Refer to the
KMA (continuous measuring device
operation manual): Publication No EC18E-
11091.]
P-VRZR- 164
Dial gauge
P-VRZR- 117
- 55 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 59/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Measuring device
P-VRZR- 120
- 56 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 60/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Pump housing (10) Remove the TPS from the pump housing.
(11) Remove the timer cover from the pump
housing.
TPS
Timer cover
P-VRZR- 121
P-VRZR- 123
(2) Rotate the drive shaft so that the rotor shaft
pin is positioned toward the GE actuator as
shown at left.
Note:
The rotor shaft does not contact the forked pate.
(3) Remove the clip from the rotor shaft.
Tool name Part no Remarks
Clip 157971-0500
(4) Assemble the radial plungers, the roller
shoes and the rollers to the rotor shaft.
(5) With the spring assembled to the rotor shaft,
assemble the rotor shaft assembly to the
drive shaft groove.
Advice
Do not drop the roller shoes or the rollers.
- 57 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 61/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Distributor head
P-VRZR- 124
- 58 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 62/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
P-VRZR- 127
Shim
Plug
P-VRZR- 128
P-VRZR- 129
- 59 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 63/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 64/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Small O-ring Pump housing (2) Push the small O-ring securely into the pump
Large O-ring housing using your finger.
(3) Push the large O-ring securely into the timer
cover using your finger and install the timer
cover using the torx bolts.
Specified torque: 7.0 ~ 10.0 N·m
Timer
{0.7 ~ 1.0 kgf·m}
Torx bolts (2) cover
Tool name Part no Remarks
Bit
Holder 157915-9820
Holder
Bit 157915-9600 T30
P-VRZR- 136
TPS O-ring (4) Assemble the TPS standard point shim, the
core rod, the timer spring and the timer
Timer stroke
stroke adjusting shim in the pump housing.
adjusting shim Advice
Do not mistake the assembly positions of the
TPS standard point shim and the timer stroke
adjusting shim.
(5) Assemble the TPS to the pump housing.
Timer spring Advice
Core rod Ensure the O-rings are not damaged.
Standard point shim
Pump housing P-VRZR- 137
Socket wrench
- 61 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 65/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 66/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
P-VRZR- 143
P-VRZR- 145
Holder Torx bolts (6) (6) Secure the GE actuator to the pump housing
using the torx bolts.
Advice
Tighten diagonally opposed torx bolts
gradually and uniformly to the specified
torque.
Bit
Specified torque: 7.0 ~ 10.0 N·m
{0.7 ~ 1.0 kgf·m}
Tool name Part no Remarks
Holder 157915-9820
Pump housing P-VRZR- 146 Bit 157915-9600 T30
- 63 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 67/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Armature
Gauze filter
P-VRZR- 147
P-VRZR- 148
Injection pump
Adapter 157977-8000
Gasket 026512-1640
Hose
P-VRZR- 149
P-VRZR- 150
- 64 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 68/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
P-VRZR- 151
P-VRZR- 152
Injection pump
(5) Turn the pump test bench drive switch ON.
(6) Supply test oil to the injection pump at the
specified pressure (20.0 kPa {0.2 kgf/cm2}).
Advice
Leave the drive switch ON. Do not turn the
drive switch OFF until pre-stroke adjustment
has been completed.
P-VRZR- 153
Lever
P-VRZR- 154
- 65 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 69/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 70/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
REASSEMBLY
Cylinder B
P-VRZR- 158
Plugs
(12) Tighten the CPV holder using a socket
wrench.
Specified torque: 44.0 ~ 54.0 N·m
{4.5 ~ 5.5 kgf·m}
Tool name Part no Remarks
Socket wrench 157914-3600
- 67 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 71/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
1. ADJUSTMENT CONDITIONS
[1] Test equipment
(1) Pump test bench EPS815
(2) KMA802
(3) Oil cooler (1 687 010 130)
(4) Adjustment software operating environment
Windows 2000 PRO (at least Service Pack 2.0) English language version;
Windows OS
Control Panel - Regional Options, Your locale: English (United Kingdom or United States)
Clock speed Personal computer equipped with Pentium CPU (clock speed at least 333 MHz)
Display Resolution: at least 1027 x 768, number of display colors: high color minimum (16 bit)
Note:
Refer to the Installation Manual, MC-02 TESTER SOFTWARE, ADJUSTMENT AND INSPECTION
DATA, Publication No. ED14E-11011, for details of personal computer settings and software
installation procedures.
[2] Fuel piping
(1) Injection system piping diagram
Nozzle and nozzle holder assembly (1 688 901 035) Tubes
Cooling unit
Injection tubes
- 68 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 72/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Piping outline
Pressure gauge
1/5 1/4
1/1 1/2 1/3
1/6 1/2
Multi-way cock
1/5
1/7
Test oil hose
- 69 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 73/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Intermediate harness
Personal computer
(157966-2421) Intermediate harness
(157966-5720)
Dsub 9 pin
Dsub 7 pin
ROM harness
(157966-5020)
Dsub 9 pin
To AC100V - AC120V or
AC200V - 240V power source VRZ and COVEC-F Main harness Earth to injection pump
(157966-4420 or 157966-4520) controller unit (157966-4920) or pump test bench P-VRZR- 392
PC
COM2 COM1
RS232C RS232C
COM2 COM2
VRZ & COVEC-F (ROM) CONTROLLER 25 pin 9 pin
AC ROM
100 - 120V ROM writer ROM
cable
200 - 240V
ROM
lamp
ECU
AC lamp 4D56 Injection
socket (COVEC-F) Main pump
DC 5V cable
Constant ECU
power supply
FCV switch FCV line
GE
CSP
Main power DC 24V TPS
switch Constant ECU
power supply lamp 4M41 TCV
(VRZ) Main
cable TF
ECU
DC 12V FCV
Constant FCV switch FCV line
power supply FCV line Main
cable
1
0 2 FCV
Power switch
lamp Sub-switch ECU
3 lamp WL
(COVEC-F)
ECU
Selector 4
switch
P-VRZR- 395
- 70 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 74/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
When installing the ECU assembly for the controller unit, refer to the installation
1 ED14E-11021
instructions included with the controller unit.
When installing the adjustment software, refer to the installation manual included with the
2 ED14E-11011
CD-ROM.
Note:
Where updating of adjustment data and inspection data is indicated, copy the data from the ESPI
(ZW)’s CD-ROM.
- 71 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 75/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 76/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Key
Name Use and purpose
no
Turn to align with ECU in use.
0: All OFF
1: No. 1 ECU
11 ECU changeover switch 2: No. 2 ECU
3: No. 3 ECU
4: Spare ECU
Power sub-switch for controller unit for VRZ adjustment. Press once to turn ON.
12 Sub-switch
When turned ON for use, orange lamp lights. Press once again to turn OFF.
ROM wire harness connecting For connecting injection pump's ROM harness connector to ROM controller
14
terminal using wire harness.
CAUTION
If you smell any unusual smell or see smoke or sparks when using the controller unit, turn the
power switch OFF immediately and stop using the controller unit.
Fire may result if you continue to use the controller unit.
Advice
• Do not use the controller unit with oily hands. The oil may stick to the dials and cause
improper resistor contact inside the controller unit, preventing proper operation.
• Before turning the power switch ON, confirm that the wire harnesses are properly
connected.
- 73 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 77/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
CE
P-VRZR- 345
Key
Name Use and purpose
no
CAUTION
If you smell any unusual smell or see smoke or sparks when using the controller unit, turn the
power OFF immediately and stop using the controller unit.
Fire may result if you continue to use the controller unit.
Advice
• Do not use the controller unit with oily hands. The oil may stick to the dials and cause
improper resistor contact inside the controller unit, preventing proper operation.
• Before turning the power switch ON, confirm that the wire harnesses are properly
connected.
- 74 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 78/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
1. Password input
Disagreement
Agreement
2. ECU selection
[1] 4D56
[2] 4M41
[3] WL
[4] Manual operation
[5] Workshop name registration
[6] Exit
OK
P
-V
R
Final confirmation Final confirmation
Z
R
-
3
9
6
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 79/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
MC-02 TESTER
4 Manual operation
Exit
6
P-VRZR- 346
- 76 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 80/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Pump information
1 N 0 r/min
44-6666
44-3032
000000000b 19
2 T 0.0 deg C 00000-000-0000b
VRZ 4M41
3 Rotation Right
20
Ua-ist V 4 cylinders
ECU MELCO
4 3 Mode Adjustment
Q 0.0 mm /st Pump type VRZ(12V) 21
5 Pt 0.000 MPa
6 Qo 0.0 l/h
7 TF
2001-01-15 11:28:44
22
V MENU Part number input
17
8 VTPS V
9 16
TPS V
10
Only items necessary for each TA mm
step are displayed. 11 DQ 0.0 mm3/st
23
Circled numbers indicate fields 24
where input is necessary. 12 Zero set
13 Soll-cor
Step information
Back Next No. STEP N Soll Soll-cor TCVF DTCV
18 Step status
Comment
03 P_cham_ADJ
PT standard point
1000rpm 2.91v 0.00mv 60Hz 100%
14 Next
Sequence 03 / 32 After values are input, push 'Next' button. 25
15 Select 04 500rpm 2.50v 60Hz 0%
P-VRZR- 347
- 77 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 81/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
MC-02 TESTER
Manual operation
ECU reader data
TF deg C Np r/min
Select ECU
5 ROM COVEC-F MITSUBISHI 12V VRZ MITSUBISHI 12V ROM COVEC-F MAZDA 12V
4 Menu
P-VRZR- 348
- 78 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 82/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
7. WORKSHOP DISPLAY
Second timing adjustment (manual operation)
Pump adjustment tools for service Workshop name registration
MC-02 TESTER
Workshop name registration
6 Password ****
7 Menu Registration 8
P-VRZR- 350
WORKSHOP REGISTRATION
MC-02 TESTER
Manual operation
(1)
Workshop name registration
Exit
P-VRZR- 346
Password ****
Input a new password if desired. (The only limit
to the number of figures and letters in the
Input items and select Registration button.
password is the size of the input field.)
(3)
Menu Registration
P-VRZR- 350
- 79 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 83/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
8. ADJUSTMENT
Adjustment sequence
Recording the pump and GE serial numbers ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Preparation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Warming-up operation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Pre-stroke adjustment ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Non-injection confirmation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Finish
- 80 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 84/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 85/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Fixing stand (8) Reconfirm that the coupling and the fixing
stand bolts and nuts are securely tightened.
(9) Set the 20NP pump test bench’s test oil
outlet temperature at 45°C.
(10) Set the cooling unit oil delivery pressure
lever at ‘80 kPa {0.8 kgf/cm2}’ or less.
P-VRZR- 355
FCV (magnet valve) ON/OFF switch (11) Connect the wire harness to the controller
Sub-switch unit’s No 2 ECU connector.
(12) Turn the main switch on the rear of the
controller unit ON.
(13) Set the No 1 ~ No 4 changeover switch at
No 2.
(14) Turn the FCV (magnet valve) ON/OFF
switch ON to energize the magnet valve.
(15) Turn the sub switch on the front of the
ECU for VRZ type controller unit ON.
injection pump
No. 1 ~ No. 4 changeover switch
P-VRZR- 397
P-VRZR- 210
(3)
P-VRZR- 357
- 82 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 86/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
[4] P a r t n u m b e r i np u t and
MC-02 TESTER
Manual operation
Exit
P-VRZR- 346
443062
(10 digits)
GE serial no.
0880052496
5062008852056 (5)
and press ‘Enter’.
(3) (last 6 digits) (13 digits)
Systemspecifications
Engine model VRZ_4M41
1. Specified part no.
Pump Pump
OEM
Specified part no.
(4) Input the pump serial number (10 digits) and
part no. type
press ‘Enter’.
Adjustment Inspection
Rotation Right 104700-304* 003040 008040
104700-305* COVEC-F 003051 008051
Pump cylinders 4 cylinders 104700-306* MITSUBISHI 003060 008060
ECU MELCO 109144-305*
109144-306*
VRZ
000550 008550
(5) Input the GE’s serial number (13 digits) and
2. Pump part no.
Mode Adjustment
Example:
Full pump no.
109144-3052
104700-0551
Input pump part no.
443052
000551
press ‘Enter’.
(6)
(6) Press the ‘Next’ key.
Menu Clear Next
P-VRZR- 358
2. Overflow piping
3
4
Joint
Injection tube
Same as VP44
Clicking the different buttons (1. Injection system
3. Adjustment controller wiring
3
piping, 2. Overflow piping, 3. Adjustment
4. Operation sequence
If necessary to proceed
after confirmation, push Next button.
1
Menu
Back Next
P-VRZR- 359
- 83 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 87/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
N 0 r/min
Specifiedpartno.
44-3062
(1) Set the pump test bench delivery pressure
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056 at the specified 40 kPa {0.4 kgf/cm2}.
(4)
(2) Confirm that the sequence is 01/31.
Engine model VRZ_4M41
Ua-ist V Rotation Right
Pump cylinders 4 cylinders
Mode
MELCO
Adjustment
(3) Run the injection pump at the specified
Pump type VRZ (12V)
speed N (see figure at left).
05/04/03 13:20:52 (4) Measure N, T and Q on the pump test bench
Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
(5) Step status Present step 01 Warm-up 300r/min 2.80v 0.00mv 60Hz 100%
Next
Comment Check for fuel leaks.
Note:
(6)
U α ist is displayed automatically.
Sequence 01 / 31
After values are input, push Next button.
Select 02 Warm-up 1000r/min 2.91v 0.00mv 60Hz 100%
(2)
(5) Confirm that the Step status field is green.
P-VRZR- 360
(6) Proceed to the next step.
Advice
If U α ist values are not as specified, press
the ‘Next’ button several times. Then, return
to Step the
01/31 using theand
back arrow.that U α
Repeat Step 01/31 confirm
ist values are as specified.
Note:
If not as specified after confirming U α ist several
times, the GE may be faulty.
N 0 r/min
Specifiedpartno.
44-3062
(8) Run the injection pump at the specified
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056
speed N (see figure at left).
(9)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right (9) Measure N, T and Q on the pump test bench
Pump cylinders 4 cylinders
Mode
MELCO
Adjustment
and input the values.
Pump type VRZ (12V)
Note:
05/04/03 13:21:45
U α ist is displayed automatically.
Step information
No. S tep name N Soll
Menu
Soll-cor
Part number input
Frequency Duty
(10) Confirm injection.
(13) (11) Confirm that no fuel leaks from the
Step status Present step 02 Warm-up 1000r/min 2.91v 0.00mv 60Hz 100%
Comment Warm-up
Next
(14) Sequence
Select
02 / 31
03
After values are input, push Next button.
P-cham_ADJ 1000r/min 2.91v 0.00mv 60Hz 100%
injection pump fuel piping connections.
(7) P-VRZR- 361 CAUTION
If there are any fuel leaks, if there is no
injection or if any unusual noises occur
during operation, stop test bench operation
immediately and inspect the pump.
(12) Confirm that the injection pump is
operating normally.
(13) Confirm that the Step status field is green.
(14) Proceed to the next step.
Advice
Because the test oil temperature takes
longer to increase in cold weather, turn the
pump test bench on earlier.
- 84 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 88/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 89/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
44-3062
0880052496
adjustment
T 0.0 deg C GE serial no.
Engine model
50620-088-52056
VRZ_4M41
(1) Confirm that the sequence is 04/31.
(3) Ua-ist V Rotation
Pump cylinders
Right
4 cylinders (2) Run the injection pump at the specified
Q 0.0 mm3/st MELCO
Mode Adjustment
to the specified
Specified torque: torque.
7 ~ 10 N.m
{0.7 ~ 1.0 kgf.m}
(8) Measure N, T, Q and DQ again on the pump
test bench and input the values.
(9) Confirm that the Step status field is green.
(10) Proceed to the next step.
(1) confirmation
N 0 r/min Pump part no. 44-3062
Mode
MELCO
Adjustment
speed N (see figure at left).
Qo 0.0 I/h Pump type VRZ (12V)
(3) Measure N, T, Pt and Qo on the pump test
TF V
05/04/03 13:23:42 bench and input the values.
Part number input
Note:
Menu
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Present step
(5) Step status 05 P-cham_ADJ 1000r/min 2.91v 0.00mv 60Hz 100%
Next
Comment Reconfirmation of PT standard point
U α ist and TF are displayed automatically.
(6)
(4) Confirm the pump chamber pressure.
Sequence 05 / 31
After values are input, push Next button
Select 06 Zero_set 500r/min 2.50v 0.00mv 60Hz 100%
- 86 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 90/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 91/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
N 0 r/min
Specifiedpartno.
44-3062
confirmation
0880052496
(3)
T 0.0 deg C GE serial no.
Engine model
50620-088-52056
VRZ_4M41
(1) Confirm that the sequence is 07/31.
Ua-ist V Rotation
Pump cylinders
Right
4 cylinders
(2) Run the injection pump at the specified
Pt 0.000 MPa ECU
Mode
MELCO
TA mm
Menu
05/04/03 13:20:52
Part number input
and input the values.
Step information
Step status Present step
No. S tep name
Timer_TA
N Soll Soll-cor Frequency Duty Note:
(5) 07 100r/min 2.41v 0.00mv 60Hz 100%
Next
Comment 100r/min
U α is t, V T P S a n d T A a re d is p la y e d
(6) Sequence 07 / 31 After values are input, push Next button.
Select 08 Timer_TA 50r/min 2.41v 0.00mv 60Hz 100% automatically.
(1) P-VRZR- 366 (4) Confirm that the timer stroke is within the
specifications.
TPS
(5) Confirm that the Step status field is green.
(6) Proceed to the next step.
Note:
Because the TPS standard point shim was
Timer stroke adjusting shim adjusted in Step 06/31, it cannot be changed.
Spring
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056
procedure used for 100 revolutions (Step 7/31)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
above.
Pt 0.000 MPa
Pump cylinders
ECU
4 cylinders
MELCO Advice
Repeat Step 06/31 if the timer stroke is not
Mode Adjustment
TA mm as specified.
05/04/03 13:25:27
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Step status Present step 08 Timer_TA 50r/min 2.41v 0.00mv 60Hz 100%
Comment 50r/min
Next
Sequence 08 / 31 After values are input, push Next button.
Select 09 Timer_TA 325r/min 1.53v 0.00mv 60Hz 100%
P-VRZR- 367
N 0 r/min
Specifiedpartno.
44-3062
(1) Confirm that the sequence is 17/31.
(2) Run the injection pump at the specified
Pump serial no. 0880052496
Mode
MELCO
Adjustment
(3) Measure N, T, Q and DQ on the pump test
DQ 0.0 mm3/st Pump type VRZ (12V)
bench and input the values.
05/04/03 13:35:08
Note:
Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Present step
(4) Step status 17 Q_characteristics 2300r/min 0.87v 0.00mv 60Hz 100%
Next
Comment Confirm no nozzle injection.
(4) Confirm that the Step status field is green.
(5) Sequence 17 / 31
After values are input, push Next button.
Select
18 Cor-Q_ADJ 1900r/min 3.73v 0.00mv 60Hz 100%
- 88 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 92/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
N 0 r/min
Specifiedpartno.
44-3062
point adjustment
Pump serial no. 0880052496
T 0.0 deg C GE serial no.
Engine model
50620-088-52056
VRZ_4M41
(1) Confirm that the sequence is 18/31.
(3) Ua-ist V Rotation
Pump cylinders
Right
4 cylinders
(2) Run the injection pump at the specified
Q 0.0 mm3/st ECU
Mode
MELCO
Next
Comment Correction point 10
U α ist is displayed automatically.
(7) Sequence 18 / 31
After values are input, push Next button.
Select 19 Cor-Q_ADJ 1900r/min 1.53v 0.00mv 60Hz 100% (4) If the injection quantity is not as specified,
(1) P-VRZR- 369
press the ‘Soll-cor’ setting, input the soll
compensation voltage and adjust the
injection quantity to the specification.
(5) Measure the injection quantity and confirm
that it is as specified.
Advice
With the Soll-cor setting, the compensation
voltage range differs with the service data
or the calculation file. If the compensation
voltage range is exceeded, a ‘Reset’
message is displayed.
When the injection quantity is greater than
the specification
Input a minus to the compensation voltage and
input the value
Service tools for pump adjustment Adjustment display
Status Item Measured / input value Unit Specification Tolerance Pump information
N 0 r/min
Specifiedpartno. 44-6613
When the injection quantity is less than the
Pump part no.
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
Input the value only to the compensation voltage
Pump cylinders 4 cylinders
Mode
MELCO
Adjustment
(6) Confirm that the Step status field is green.
DQ 0.0 mm3/st Pump type VRZ (12V)
(7) Proceed to the next step.
05/04/03 13:36:43
Soll- cor
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Step status Present step 19 Cor-Q_ADJ 1900r/min 1.53v 0.00mv 60Hz 100%
Next
Comment Correction point 9 compensation point 1 (Step 27/31) using the
same procedure used for compensation point
Sequence 19 / 31
After values are input, push Next button.
Select 20 Cor-Q_ADJ 1000r/min 2.91v 0.00mv 60Hz 100%
After
pressadjusting thebutton
the ‘Next’ compensation point 1,
to automatically
Service tools for pump adjustment Adjustment display
Status I tem Measured / input value Unit Specification Tolerance Pump information
Specifiedpartno. 44-6613
proceed to Step 28/31.
Pump part no. 44-3062
Pump serial no. 0880052496
GE serial no. 50620-088-52056
Engine model
Rotation
VRZ_4M41
Right
[13] Compensation ROM interpolation
Injection quantity input data is outside
specification after correction point 1.
Pump cylinders
ECU
Mode
4 cylinders
MELCO
Adjustment
calculation
Pump type VRZ (12V)
Note:
05/04/03 13:43:00
• In Step 28/31 the adjustment software
Step information
No. S tep name N Soll
Menu
Soll-cor
Part number input
Frequency Duty
automatically performs the calculations.
• If the compensation voltage Soll values are
Step status Present step 28 Q-ROM_CAL 0r/min 0.00v 0.00mv 60Hz 0%
Comment Q-ROM intermediate point calculation
Next
Sequence
Select
28 / 31
After values are input, push Next button.
ROM_overwrite 0%
not correct, compensation calculations are
29 0r/min 0.00v 0.00mv 60Hz
- 89 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 93/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
44-3062
(1) Press Step 28/31 to automatically display
Pump serial no.
GE serial no.
0880052496
50620-088-52056
the step.
Engine model
Rotation
VRZ_4M41
Right (2) The adjustment software automatically
Injection quantity input data is outside Pump cylinders 4 cylinders
Soll-cor
Part number input
Frequency Duty
Never touch the computer, the injection
pump or the connecting wire harnesses
Step status Present step 29 ROM_overwrite 0r/min 0.00v 0.00mv 60Hz 0%
Comment Overwrite Q-ROM.
Next
Sequence
Select
29 / 31
30 Stop_Q
After values are input, push Next button.
1000r/min 2.91v 0.00mv 60Hz 0%
while writing to the ROM.
(1) P-VRZR- 372
44-3062
0880052496
confirmation
T 0.0 deg C GE serial no.
Engine model
50620-088-52056
VRZ_4M41
(1) Confirm that the sequence is 30/31.
(3) Ua-ist V Rotation
Pump cylinders
Right
4 cylinders (2) Run the injection pump at the specified
Q 0.0 mm3/st ECU MELCO
Mode
Pump type
Adjustment speed N (see figure at left).
VRZ (12V)
(1)
P-VRZR- 373
FCV (magnet valve) ON/OFF switch (4) Turn the FCV (magnet valve) ON/OFF
switch OFF and confirm that non-injection
results.
Advice
To confirm non-injection from the nozzle,
look at the monitor screen and confirm that
non-injection occurs within a short time (6 ~
7 seconds).
P-VRZR- 356
N
Measured / input value
0 r/min
Unit Specification Tolerance Pump information
Specifiedpartno.
44-3062
test bench and input the values.
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056
(6) Confirm that the Step status field is green.
(5)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
(7) Proceed to the next step.
Pump cylinders 4 cylinders
Mode Adjustment
05/04/03 13:44:15
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Comment
30 Stop_Q 1000r/min 2.91v 0.00mv 60Hz 100%
Confirm no nozzle injection when the FCV is OFF.
Next
(7) Sequence 30 / 31 After values are input, push Next button.
P-VRZR- 373
- 90 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 94/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
P-VRZR- 356
Fuel piping Injection pump Coupling (2) Disconnect the intermediate harness
connectors.
(3) Disconnect the fuel piping.
(4) Remove the coupling.
(5) Remove the pump from the fixing stand.
(6) Remove the fixing stand.
Fixing stand
Harness connectors P-VRZR- 375
Key
P-VRZR- 253
- 91 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 95/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 96/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
P-VRZR- 258
P-VRZR- 259
Pipe assembly (4) Remove the CPV from cylinder B and attach
the pipe assembly and the gasket.
Tool name Part no Remarks
Pipe assembly 157845-9520
P-VRZR- 260
- 93 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 97/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Adjusting device Chamfered tooth (8) Align the adjusting device’s pin hole with the
injection pump bracket’s pin. In this position,
attach the adjusting device to the injection
pump’s bracket and fix using the bolts.
Tool name Part no Remarks
Pin Rack
Adjusting
Rack teeth 105793-0020
Pin hole device
Advice
When aligning the adjusting device’s pin hole
with the bracket’s pin, position the adjusting
P-VRZR- 263 device’s rack teeth on either side of the drive
gear’s chamfered tooth.
(4)
(1) Second
Turn the timing adjustment
controller unit’s sub-switch ON.
(2) Supply test oil to the injection pump at the
Sub-switch specified pressure of 20 kPa {0.2 kgf/cm 2}.
P-VRZR- 356
Mode Adjustment
05/04/03 13:44:46
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Step status Present step 31 Q_characteristics 0r/min 2.91v 0.00mv 60Hz 100%
Comment Second timing
Next
Sequence 31 / 31
After values are input, push Next button.
Select _
Adjustment finished
- 94 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 98/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
P-VRZR- 264
P-VRZR- 265
Pipe assembly Adjusting device (6) Insert the lever into the adjusting device and
turn the lever once in the reverse rotation
direction, then turn the lever in the direction
of rotation.
(7) Adjust so that test oil flows from cylinder B’s
pipe assembly at a rate of 1 drop / 3
seconds.
P-VRZR- 266
P-VRZR- 267
- 95 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 99/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
P-VRZR- 268
P-VRZR- 269
P-VRZR- 270
Pump cylinders
Right
4 cylinders
U α ist is displayed automatically.
Q 0.0 mm3/st
(14) Confirm that the Step status field is green.
ECU MELCO
Mode Adjustment
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Comment
31 Q_characteristics
Second timing
0r/min 2.91v 0.00mv 60Hz 100%
Next
(15) Sequence 31 / 31
_
After values are input, push Next button.
Select
Adjustment finished
P-VRZR- 376
- 96 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 100/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
is displayed.
5 P-cham_ADJ 1000 2.91 0.00 60 100 0 0.0 0.00 0.000 0.0 0.00
6 Zero_set 500 2.50 0.00 60 0 0 0.0 0.00 0.00 0.00
7 Timer_TA 100 2.41 0.00 60 100 0 0.0 0.00 0.000 0.00 0.00
8 Timer_TA 50 2.41 0.00 60 100 0 0.0 0.00 0.000 0.00 0.00
9 Timer_TA 325 1.53 0.00 60 0 0 0.0 0.00 0.000 0.00 0.00
10 375 1.53 0.00 60 0 0 0.0 0.00 0.000 0.00 0.00
Adjusting device
(6) Injection pump removal
(1) Remove the adjusting device from the
injection pump’s drive gear.
P-VRZR- 271
- 97 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 101/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Torx bolts (4) (5) Install the Q adjustment ROM to the pump
housing.
Note:
Removing the inlet adapter facilitates
installation.
(6) Tighten the Q adjustment ROM’s torx bolts.
Specified torque: 2 ~ 3 N·m
Q adjustment
{0.2 ~ 0.3 kgf·m}
ROM Pump housing Tool name Part no Remarks
Bit
Holder 157915-9820
Holder Bit 157915-9301 T20
P-VRZR- 393
Overflow
valve
P-VRZR- 274
P-VRZR- 275
- 98 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 102/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
Stand
P-VRZR- 276
9. MANUAL OPERATION
(SECOND TIMING ADJUSTMENT)
Note:
Preparation (Injection pump disassembly, Drive
gear installation and Injection pump installation)
is the same as that described on pages 93 to
96 for automatic adjustment of second timing.
P-VRZR- 397
Exit
P-VRZR- 346
- 99 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 103/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
ADJUSTMENT
TCV Duty
mV
%
(8)
(5)
TCV Frequency
Initialize ECU
Hz
into the field. Press the keyboard’s ‘Enter’
Menu key.
P-VRZR- 348
(8) Press the ‘TCV Frequency’ button and input
‘60’ into the field. Press the keyboard’s
Nuts (3)
‘Enter’ key.
Advice
Values must be input for GE soll, TCV Duty
and TCV Frequency.
(9) L o o s e n th e in je c tion p u mp b ra c k e t
installation nuts.
P-VRZR- 264
P-VRZR- 265
Pipe assembly Adjusting device (11) Insert the lever into the adjusting device
and turn the lever once in the reverse
rotation direction, then turn the lever in the
direction of rotation.
(12) Adjust so that test oil flows from cylinder
B’s pipe assembly at a rate of 1 drop /3
seconds.
P-VRZR- 266
- 100 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 104/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 105/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
INSPECTION
Inspection sequence
Recording the pump and GE serial numbers ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Preparation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Warming-up operation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
TPS confirmation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Non-injection confirmation ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Inspection result ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Finish
- 102 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 106/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 107/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
Fixing stand (8) Reconfirm that the coupling and the fixing
stand bolts and nuts are securely tightened.
(9) Set the 20NP pump tester’s test oil outlet
temperature at 45°C.
(10) Set the cooling unit oil delivery pressure
lever at ‘80 kPa {0.8 kgf/cm2}’ or less.
P-VRZR- 355
FCV (magnet valve) ON/OFF switch (11) Connect the wire harness to the controller
Sub-switch unit’s No 2 ECU connector.
(12) Turn the main switch on the rear of the
controller unit ON.
(13) Set the No 1 ~ No 4 changeover switch at
No 2.
(14) Turn the FCV (magnet valve) ON/OFF
switch ON to energize the magnet valve.
(15) Turn the sub switch on the front of the
ECU for VRZ type controller unit ON.
injection pump
No. 1 ~ No. 4 change-over switch
P-VRZR- 397
P-VRZR- 210
(3)
P-VRZR- 357
- 104 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 108/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
[4] P a r t n u m b e r i np u t and
MC-02 TESTER
Manual operation
Exit
P-VRZR- 346
(3)
Pump part no.
(last 6 digits)
443062 GE serial no.
(13 digits)
6666666666666 (5)
System specifications 1. Specified part no. (4) Input the pump serial number (10 digits) and
Engine model VRZ_4M41 Pump Pump
OEM
Specified part no.
press ‘Enter’.
part no. type Adjustment Inspection
Rotation Right 104700-304* 003040 008040
104700-305* COVEC-F 003051 008051
Pump cylinders 4 cylinders 104700-306* MITSUBISHI 003060 008060
ECU MELCO 109144-305*
109144-306*
VRZ
000550 008550
(5) Input the GE’s serial number (13 digits) and
press ‘Enter’.
2. Pump part no.
Example:
Full pump no. Input pump part no.
Mode Inspection 109144-3052 443052
104700-0551 000551
(6)
(6) Press the ‘Next’ key.
Menu Clear Next
P-VRZR- 378
Installationconfirmation
Setup confirmation injection system piping display.
Click on appropriate item Key no. Part name Part no. Note
and explanatory illustration is displayed. 1 Injection pipe 157808-4720
2 Nozzle & nozzle holder assembly 1 688 901 035
1. Injection system piping 3 Same as VP44
Joint
4 Injection tube
2. Overflow piping
4. Operation sequence 3
2 4
If necessary to proceed
after confirmation, push Next button.
1
Menu
Back Next
P-VRZR- 359
- 105 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 109/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
N 0 r/min
Specifiedpartno.
44-3052
(1) Set the pump test bench delivery pressure
at the specified 40 kPa {0.4 kgf/cm2}.
Pump serial no. 5555555555
T 0.0 deg C GE serial no. 66666-666-66666
(4) VRZ_4M41
Mode
MELCO
Adjustment
(3) Run the injection pump at the specified
Pump type VRZ (12V)
speed N (see figure at left).
02/04/03 14:07:56 (4) Measure N, T and Q on the pump test bench
Menu Part number input
Step information
Present step
No. S tep name N Soll Soll-cor Frequency Duty
and input the values.
(5) Step status 01 Warm-up 300r/min 2.80v 0.00mv 60Hz 100%
Next
Comment Check for fuel leaks.
Note:
(6) Sequence
(2)
(5) Confirm that the Step status field is green.
P-VRZR- 379
(6) Proceed to the next step.
Advice
If U α ist values are not as specified, press
the ‘Next’ button several times. Then, return
to Step the
01/26 using theand
back arrow.that U α
Repeat Step 01/26 confirm
ist values are as specified.
Note:
If not as specified after confirming U α ist several
times, the GE may be faulty.
N 0 r/min
Specifiedpartno.
44-3052
(8) Run the injection pump at the specified
T 0.0 deg C
Pump serial no.
GE serial no.
5555555555
66666-666-66666
speed N (see figure at left).
(9)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
(9) Measure N, T and Q on the pump test bench
4 cylinders
Mode Adjustment
Pump type VRZ (12V)
Note:
02/04/03 14:09:35
U α ist is displayed automatically.
Step information
No. S tep name N Soll
Menu
Soll-cor
Part number input
Frequency Duty
(10) Confirm injection.
(11) Confirm that no fuel leaks from the
Step status Present step 02 Warm-up 1000r/min 2.91v 0.00mv 60Hz 100%
(13) Comment Warm-up
Next
(14) Sequence
Select
02 / 26
03
After values are input, push Next button.
P-cham_ADJ 1000r/min 2.91v 0.00mv 60Hz 100%
injection pump fuel piping connections.
(7) P-VRZR- 380 CAUTION
If there are any fuel leaks, if there is no
injection or if any unusual noises occur
during operation, stop test bench operation
immediately and inspect the pump.
(12) Confirm that the injection pump is
operating normally.
(13) Confirm that the Step status field is green.
(14) Proceed to the next step.
Advice
Because the test oil temperature takes
longer to increase in cold weather, turn the
pump test bench on earlier.
- 106 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 110/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
N 0 r/min
Specifiedpartno.
44-3052
confirmation
5555555555
T 0.0 deg C GE serial no. 66666-666-66666
(1) Confirm that the sequence is Step 03/26.
(3) Engine model VRZ_4M41
Ua-ist V Rotation
Pump cylinders
Right
4 cylinders
(2) Run the injection pump at the specified
Pt 0.000 MPa ECU
Mode
MELCO
TF V
Menu
02/04/03 14:10:05
Part number input
bench and input the values.
Step information
Present step
No. S tep name N Soll Soll-cor Frequency Duty Note:
(5) Step status 03 P-cham_ADJ 1000r/min 2.91v 0.00mv 60Hz 100%
(6) Next
Comment
Sequence
Reconfirm PT standard point.
03 / 26
U α ist and Tf are displayed automatically.
After values are input, push Next button.
Select 04 Zero_set 500r/min 2.50v 0.00mv 60Hz 100% (4) Confirm the pump chamber pressure.
(1) P-VRZR- 386
(5) Confirm that the Step status field is green.
(6) Proceed to the next step.
Service tools for pump adjustment Adjustment display
[7] TPS confirmation
Status I tem Measured / input value Unit Specification Tolerance Pump information
N 0 r/min
Specifiedpartno.
44-3062
(1) Confirm that the sequence is Step 04/26.
(3)
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056 (2) Run the injection pump at the specified
speed N (see figure at left).
Engine model VRZ_4M41
Ua-ist V Rotation Right
Pump cylinders 4 cylinders
VTPS V ECU
Mode
MELCO
Adjustment
(3) Measure N and T on the pump test bench
TPS V Pump type VRZ (12V)
and input the values.
(4) 05/04/03 14:10:51
Note:
Zero set
U α ist, VTPS and TPS are displayed
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Present step
(5) Step status
Comment
04 Zero_set
automatically.
Next
(6)
(4) Press the ‘Zero set’ key and confirm that the
Sequence 04 / 26
After values are input, push Next button.
Select 05 Timer_TA 100r/min 2.41v 0.00mv 60Hz 0%
(1)
VTPS value is within the specifications.
P-VRZR- 387
(5) Confirm that the Step status field is green.
(6) Proceed to the next step.
N
Measured / input value
0 r/min
Unit Specification Tolerance Pump information
Specifiedpartno.
44-3062
(1) Confirm that the sequence is Step 05/26.
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056
(2) Run the injection pump at the specified
(3)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
speed N (see figure at left).
4 cylinders
Mode Adjustment
Soll-cor
Part number input
Frequency Duty
U α is t, V T P S a n d T A a re d is p la y e d
automatically.
Step status Present step 05 Timer_TA 100r/min 2.41v 0.00mv 60Hz 100%
(5) Comment 100r/min
Next
(6) Sequence 05 / 26 After values are input, push Next button.
Select
(1)
the specifications.
P-VRZR- 388
(5) Confirm that the Step status field is green.
(6) Proceed to the next step.
- 107 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 111/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
N
Measured / input value
0 r/min
Unit Specification Tolerance Pump information
Specifiedpartno. 44-6613 revolutions (Step 14/26) using the same
Pump part no. 44-3062
T 0.0 deg C
Pump serial no.
GE serial no.
0880052496
50620-088-52056
procedure used for 100 revolutions (Step 5/26)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
above.
Pump cylinders 4 cylinders
Mode Adjustment
VTPS V Pump type VRZ (12V)
TA mm
05/04/03 14:11:50
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Step status Present step 05 Timer_TA 100r/min 2.41v 0.00mv 60Hz 100%
Comment 100r/min
Next
Sequence 05 / 26 After values are input, push Next button.
Select 06 Timer_TA 50r/min 2.41v 0.00mv 60Hz 100%
P-VRZR- 381
N
Measured / input value
0 r/min
Unit Specification Tolerance Pump information
Specifiedpartno.
44-3052
(1) Confirm that the sequence is Step 15/26.
T 0.0 deg C
Pump serial no.
GE serial no.
5555555555
66666-666-66666
(2) Run the injection pump at the specified
(3) Ua-ist V
Engine model
Rotation
VRZ_4M41
Right speed N (see figure at left).
4 cylinders
Mode Adjustment
Soll-cor
Part number input
Frequency Duty
U α ist is displayed automatically.
(4) (4) Confirm that the Step status field is green.
Step status Present step 15 Q_characteristics 2300r/min 0.87v 0.00mv 60Hz 100%
Comment Confirm no nozzle injection.
(5) Next
Sequence
Select 16
15 / 26 After values are input, push Next button.
Cor-Q_INSP 1000r/min 2.91v -34.18mv 60Hz 100%
(5) Proceed to the next step.
(1) P-VRZR- 382
44-3052
(1) Confirm that the sequence is Step 16/26.
(2) Run the injection pump at the specified
Pump serial no. 5555555555
Mode
MELCO
Adjustment
(3) Measure N, T, Q and DQ on the pump test
DQ 0.0 mm3/st Pump type VRZ (12V)
bench and input the values.
02/04/03 14:13:47 Note:
Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Step status Present step Cor-Q_INSP
(4) Comment
16
Correction point 8
1000r/min 2.91v -34.18mv 60Hz 100%
Advice
Next
(5) Sequence
(1) adjustment.
P-VRZR- 383
Ua-ist
Engine model VRZ_4M41 compensation point 1 (Step 25/26) using the
V Rotation Right
Q 0.0 mm3/st
Pump cylinders
ECU
4 cylinders
MELCO
same procedure used for compensation point
DQ 0.0 mm3/st
Mode
Pump type
Adjustment
VRZ (12V)
10 (Step 16/26) above.
02/04/03 14:13:47
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Step status Present step 16 Cor-Q_INSP 1000r/min 2.91v -34.18mv 60Hz 100%
Comment Correction point 8
Next
Sequence 16 / 26 After values are input, push Next button.
Select 17 Cor-Q_INSP 1900r/min 3.73v 34.18mv 60Hz 100%
P-VRZR- 383
- 108 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 112/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
(3)
T 0.0 deg C GE serial no.
Engine model
66666-666-66666
VRZ_4M41
(1) Confirm that the sequence is Step 26/26.
Ua-ist V Rotation
Pump cylinders
Right
4 cylinders (2) Run the injection pump at the specified
Q 0.0 mm3/st ECU MELCO
Mode
Pump type
Adjustment
VRZ (12V)
speed N (see figure at left).
(3) Measure N, T and Q on the pump test bench
Menu
02/04/03 14:14:59
Part number input
and input the values.
Step information
Step status Present step
No.
26 Stop_Q
S tep name N
1000r/min
Soll
2.91v
Soll-cor
0.00mv
Frequency
60Hz
Duty
100%
Note:
Comment
FCV (magnet valve) ON/OFF switch (4) Turn the FCV (magnet valve) ON/OFF
switch OFF and confirm that non-injection
results.
Advice
To confirm non-injection from the nozzle,
look at the monitor screen and confirm that
non-injection occurs within a short time (6 ~
7 seconds).
P-VRZR- 356
N 0 r/min
Specifiedpartno.
44-3052
and input the values.
T 0.0 deg C
Pump serial no.
GE serial no.
5555555555
66666-666-66666
(6) Confirm that the Step status field is green.
(5)
Ua-ist V
Engine model
Rotation
VRZ_4M41
Right
(7) Proceed to the next step.
Pump cylinders 4 cylinders
Mode Adjustment
Pump type VRZ (12V)
02/04/03 14:14:59
Menu Part number input
Step information
No. S tep name N Soll Soll-cor Frequency Duty
Comment
26 Stop_Q
Next
(7) Sequence 26 / 26
After values are input, push Next button.
Select _
Inspection finished
P-VRZR- 384
- 109 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 113/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
INSPECTION
MC-02 TESTER
[12] Inspection result
Specifiedpartno. 44-8813
Inspection result
Pump serial no. 5555555555 Test complete Adjustmentnecessary
(1) Click the ‘Next’ key.
44-3052 66666-666-66666
(2) The message ‘Do you want to print and save
Pump part no. GE serial no.
- 110 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 114/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
TIGHTENING TORQUES
- 111 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 115/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
(6): Suffix
- 112 -
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 116/117
7/22/2019 Bomba VE VRZ EE14E-11162 VRZ Service Manual
http://slidepdf.com/reader/full/bomba-ve-vrz-ee14e-11162-vrz-service-manual 117/117