Performance Measurement Analysis of Injection Molding Machine JSW J450AD Using Methods Overall Effectiveness (OEE) and Failure Mode Effect Analysis (FMEA) in The Plastics Industry
Performance Measurement Analysis of Injection Molding Machine JSW J450AD Using Methods Overall Effectiveness (OEE) and Failure Mode Effect Analysis (FMEA) in The Plastics Industry
ISSN No:-2456-2165
Abstract:- PT. Bumimulia Indah Lestari is a Keywords:- Injection Molding, Downtime, OEE, Reduced
manufacturing company that produces plastic packaging Speed Losses, Equipment Failure Losses, FMEA,
using injection molding machines. The problem faced by Improvement.
the company is the high downtime of the JSW J450AD
machine. during the early semester of 2020, the total I. INTRODUCTION
downtime of the machine was 18,060 hours. From these
problems, the author tries to measure machine Nowadays, there is a very rapid growth in the use of
performance using the Overall Equipment Effectiveness plastic products because they are very versatile and have
method. OEE measurement results show an average of high economic value. The Aromatile, Olefin, and Plastic
72.35%. Based on the Pareto diagram analysis, the Industry Association (Inaplas) predict that the national
biggest causes of the low OEE number are reduced speed plastic industry will still grow 7% this year.
losses by 14%. After an analysis using FMEA, it was
found that mold overheating was the biggest cause of PT. Bumimulia Indah Lestari is a manufacturing
failure with RPN 448. The recommendation for company engaged in the manufacture of plastic packaging
improvement given was to carry out routine inspections such as bottles, caps, jerrycans, pallets. The problem faced
of the cooling system such as checking the condition of by the company is the high downtime of the JSW J450AD
the hose, compressor chiller air pressure, and the injection molding machine at plant 2. The following is the
condition of the nozzle. machine downtime data for the period from January 2020 to
June 2020.
Based on table above, the total downtime data for the Various efforts such as repairs (maintenance) have been
JSW J450 AD injection molding machine was very high carried out by the company but the actual number of
during the period from January 2020 to June 2020, reaching downtime is still very high. From these problems the author
18,060 minutes and the highest downtime occurred in tries to provide a solution so that downtime can be reduced,
January 2020, which was 4,020 minutes. Downtime is one of namely by measuring machine performance with the Overall
the factors that affect the optimization of production machines Equipment Effectiveness method. Measuring machine
(Prabowo & R, 2019). The effect of high downtime is a performance is very important so that we can find out how
decrease in the speed and performance of the effectively the machine is used.
machine/equipment so that the output produced is not
optimal and in the end will reduce the level of productivity.
Figure.2 Pareto Losses Diagram for January 2020 to June 2020 Source : data processing
From the Pareto diagram above, it can be seen that the The next step is to find the cause of the reduced speed
most dominant loss factor that causes low OEE is reduced on the JSW J450AD machine with a fishbone diagram and
speed with an average of 14%. root cause failure analysis (RCFA).
Lack of
regular
3 Swing arm Gear worn Lack of checking
stuck lubrication of
lubricating
oil
Lack of
Machine checking
4 Screw Barrel is not Bearing worn Lack of lubrication lubricating oil
center regularly
Need long time for Parts Spare part stock Spare part usage is not Spare part stock
5 replacement machine is often empty recorded control tool Not yet made
part
Source : Authors
Man : Lack of knowledge causes the ability to overcome Material : Poor material quality because the material is
production problems to be not optimal. In addition, high lumpy. clumping material is caused because it is
production targets require operators to operate more than contaminated with water, dust and dirt, it is caused by
one machine, causing operators to be tired at work. the dirty dirty material storage room because 5R is rarely
Machine : machine conditions that often experience done.
breakdowns due to engine damage or part failures such as the set up process takes a long time due to incomplete
mold overheating, swing arm stuck, screw barrels are not work equipment, this happens because there is no good
in the center resulting in machine downtime so that data collection on the work equipment used.
production time is reduced. engine breakdown caused by
lack of periodic checks. In addition, the unavailability of After analyzing the causes of reduced speed using
spare parts stock results in the process of replacing spare RCFA, the next step is to find the risk priority number using
parts when there is damage or during preventive FMEA tools. After knowing the RPN of each failure mode,
maintenance to be long. the highest RPN will be selected to be the priority for
improvement.
Based on the calculation of the RPN in table 8 above, it is known that the cause of the highest failure is in the machine factor,
namely mold overheating with RPN 448. Therefore, the mold overheating problem will be a priority for improvement. The tools
used by the author to recommend improvements are 5W+1H .