0% found this document useful (0 votes)
68 views

Contractor: Balaji Krupa Projects Private LTD: Chikmaglauru Medical College

The document appears to be a bill of quantities (BOQ) for construction work done by contractor Nazim Ansari for a girls' hostel and teaching staff type B buildings from May 2021 to August 2021. It includes line items for activities like PCC, footing concrete, RCC, trimming work and provides details of the date, description, unit and quantity of work completed each day. A second table provides information about transportation of construction materials like rebar for the same projects during this period.

Uploaded by

yashas s
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views

Contractor: Balaji Krupa Projects Private LTD: Chikmaglauru Medical College

The document appears to be a bill of quantities (BOQ) for construction work done by contractor Nazim Ansari for a girls' hostel and teaching staff type B buildings from May 2021 to August 2021. It includes line items for activities like PCC, footing concrete, RCC, trimming work and provides details of the date, description, unit and quantity of work completed each day. A second table provides information about transportation of construction materials like rebar for the same projects during this period.

Uploaded by

yashas s
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 115

Contractor: Ba

chikma
Name of the
SL. No Date BOQ Description Unit
Contractor
Girl's Hostel
1 6/4/2021 Nazim Ansari PCC Cum

2 6/5/2021 Nazim Ansari PCC Cum

3 6/5/2021 Nazim Ansari Footing Concrete Cum

4 6/9/2021 Nazim Ansari PCC Cum

5 6/10/2021 Nazim Ansari Footing Concrete Cum

6 6/11/2021 Nazim Ansari Trimming Work of PCC lift Sqm

7 6/12/2021 Nazim Ansari Trimming Work of PCC Sqm

8 6/21/2021 Nazim Ansari Footing Concrete Cum

9 6/23/2021 Nazim Ansari Footing Concrete Cum

10 6/25/2021 Nazim Ansari Trimming Work Sqm


11 6/25/2021 Nazim Ansari Footing Concrete Cum
12 6/26/2021 Nazim Ansari Trimming Work Sqm
13 6/27/2021 Nazim Ansari PCC Cum
14 6/27/2021 Nazim Ansari Trimming Work for PCC Sqm
15 6/28/2021 Nazim Ansari Trimming Work for PCC Sqm
16 6/29/2021 Nazim Ansari Trimming Work for PCC Sqm
17 6/30/2021 Nazim Ansari Trimming Work Sqm
18 6/30/2021 Nazim Ansari PCC Cum
19 7/1/2021 Nazim Ansari Trimming Work Sqm
20 7/1/2021 Nazim Ansari PCC Cum
21 7/2/2021 Nazim Ansari PCC Cum
22 7/2/2021 Nazim Ansari Trimming Work Sqm
23 7/3/2021 Nazim Ansari PCC Cum
24 7/3/2021 Nazim Ansari Trimming Work Sqm
25 7/4/2021 Nazim Ansari Trimming Work Sqm
26 7/5/2021 Nazim Ansari PCC Cum
27 7/5/2021 Nazim Ansari Trimming Work Sqm
28 7/6/2021 Nazim Ansari PCC Cum
29 7/6/2021 Nazim Ansari RCC Cum
30 7/6/2021 Nazim Ansari Trimming Work Sqm
31 7/7/2021 Nazim Ansari Trimming of lift Area Sqm
32 7/8/2021 Nazim Ansari Trimming Work Sqm
33 7/8/2021 Nazim Ansari PCC Cum
34 7/10/2021 Nazim Ansari RCC Cum
35 7/11/2021 Nazim Ansari RCC Cum
36 7/12/2021 Nazim Ansari Dressing for PCC Cum
37 7/12/2021 Nazim Ansari PCC Cum
38 7/14/2021 Nazim Ansari RCC Cum
39 7/15/2021 Nazim Ansari RCC Cum
40 7/16/2021 Nazim Ansari RCC of Retaining wall & Pedastals Cum
41 7/17/2021 Nazim Ansari PCC Cum
42 7/19/2021 Nazim Ansari RCC Cum
43 7/20/2021 Nazim Ansari RCC Cum
44 7/24/2021 Nazim Ansari RCC for Footings Cum
45 7/25/2021 Nazim Ansari RCC for Footings Cum
46 7/26/2021 Nazim Ansari RCC for Retaining Wall Cum
47 7/27/2021 Nazim Ansari RCC for lift wall Cum
48 7/28/2021 Nazim Ansari RCC for Footings Cum
49 7/29/2021 Nazim Ansari RCC for Footings Cum
50 7/30/2021 Nazim Ansari RCC for Retaining Wall Cum
51 8/1/2021 Nazim Ansari RCC for Footings Cum
52 8/3/2021 Nazim Ansari RCC for Footings Cum
53 8/4/2021 Nazim Ansari RCC for Footings Cum
54 8/5/2021 Nazim Ansari Trimming work Sqm
55 8/7/2021 Nazim Ansari Footing Concrete - CF1 Cum
56 8/19/2021 Nazim Ansari Footing Concrete - F5, F1-2F2 Cum
Contractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
Work Place From To Offset Trips Nos
Type wise

Girls Hostel 5/28/2021 6/10/2021

Girls Hostel 5/28/2021 6/10/2021

Girls Hostel 5/28/2021 6/10/2021

Girls Hostel 5/28/2021 6/10/2021

Girls Hostel 5/28/2021 6/10/2021

Girls Hostel 6/11/2021 6/24/2021

Girls Hostel 6/11/2021 6/24/2021

Girls Hostel 6/11/2021 6/24/2021

Girls Hostel 6/11/2021 6/24/2021

Girls Hostel 6/25/2021 7/8/2021


Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 6/25/2021 7/8/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/9/2021 7/22/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 7/23/2021 8/5/2021
Girls Hostel 8/6/2021 8/19/2021
Girls Hostel 8/6/2021 8/19/2021
Length Width Depth Qty Remarks

14.000

15.000

171.00 102+69

11.000

17.000 102+69

34.720

42.320

48.000

85.000

44.230
85.5
38.55
16.5
66.96
123.51
106.91
72.8
10.5
40.43
36
4.5
14.44
8.5
57.76
243.24
28
101.53
14
52
100
19
19
15
26.5
40
37.144
4.5
18
102
19.5
6
86.5
4.5
69.5
30
3
3
26
52
9
105
35
16
13
104.5
37
Contractor: Balaji kru
chikmaglauru
Name of the
SL. No Date BOQ Description Unit Work Place From
Contractor
Teaching staff Type-
B
Teaching Staff
1 7/6/2021 Nazim Ansari Trimming Work Sqm 6/25/2021
Type-B
Teaching Staff
Nazim Ansari Trimming Work Sqm 6/25/2021
2 7/7/2021 Type-B
Teaching Staff
Nazim Ansari Trimming Work Sqm 7/23/2021
3 7/29/2021 Type-B
Teaching Staff
Nazim Ansari PCC Cum 7/23/2021
4 7/29/2021 Type-B
Teaching Staff
Nazim Ansari Trimming Work Sqm 7/23/2021
5 7/30/2021 Type-B
Teaching Staff
Nazim Ansari PCC Cum 7/23/2021
6 7/30/2021 Type-B
Teaching Staff
Nazim Ansari Trimming Work Sqm 7/23/2021
7 7/31/2021 Type-B
Teaching Staff
Nazim Ansari PCC Cum 7/23/2021
8 7/31/2021 Type-B
Teaching Staff
Nazim Ansari Trimming Work Sqm 8/6/2021
9 8/7/2021 Type-B
Trimming Work Teaching Staff
Nazim Ansari Sqm 8/6/2021
10 8/9/2021 - CF5 Type-B
Teaching Staff
Nazim Ansari PCC - CF5 Cum 8/6/2021
11 8/10/2021 Type-B
Teaching Staff
Nazim Ansari RCC Footing Cum 8/6/2021
12 8/11/2021 Type-B
RCC Footing - Teaching Staff
Nazim Ansari Cum 8/6/2021
13 8/11/2021 CF3 Type-B
Teaching Staff
Nazim Ansari RCC Footing Cum 8/6/2021
14 8/15/2021 Type-B
actor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
To Offset Trips Nos Length Width Depth Qty
Type wise

7/8/2021 120.000

7/8/2021
50

8/5/2021
113

8/5/2021
23.5

8/5/2021
73

8/5/2021
13

8/5/2021
100

8/5/2021
12
8/19/2021
60.23
8/19/2021
60
8/19/2021
15
8/19/2021
124
8/19/2021
44
8/19/2021
32
Remarks

No. of Helpers-7

1-Mason & 6-
Helpers
1-Mason & 6-
Helpers
1-Mason & 6-
Helpers
1-Mason & 6-
Helpers
1-Mason & 6-
Helpers
1-Mason & 6-
Helpers
1-Mason & 6-
Helpers
Contractor: Balaji krupa Proje
chikmaglauru medical
Name of the Work
SL. No Date BOQ Description Unit From To
Contractor Place

Nurse Quarters Block

Nurse
Quarters
1 8/6/2021 Nasim Ansari Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Quarters
2 8/6/2021 Nasim Ansari PCC Cum Block 8/6/2021 8/19/2021

Nurse
Quarters
3 8/7/2021 Nasim Ansari Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Quarters
4 8/8/2021 Nasim Ansari Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Quarters
5 8/8/2021 Nasim Ansari PCC Cum Block 8/6/2021 8/19/2021

Nurse
Quarters
6 8/18/2021 Nasim Ansari PCC Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
7 8/6/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
8 8/6/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
9 8/7/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
10 8/8/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
11 8/8/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
12 8/9/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021
Nurse
Venkatesh Quarters
13 8/10/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
14 8/10/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
15 8/11/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
16 8/11/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
17 8/12/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
18 8/12/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
19 8/13/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
20 8/14/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
21 8/16/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
22 8/17/2021 Nayak RCC Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
23 8/18/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
24 8/18/2021 Nayak PCC Work Cum Block 8/6/2021 8/19/2021

Nurse
Venkatesh Quarters
25 8/19/2021 Nayak Trimming Work Sqm Block 8/6/2021 8/19/2021
Balaji krupa Projects Private Ltd
maglauru medical college
Side or Steel Dia
Offset Trips Nos Length Width Depth Qty Remarks
Type wise

36

4.5

42

26

10

36

4.5

42

26

10

62
62

14

74

9.5

53

96

13

37

73.5

74

10.5

69
Contractor: Balaji kru
chikmaglauru
Name of the
SL. No Date BOQ Description Unit Work Place
Contractor

Boy's Hostel
1 4/15/2021 Nasim Ansari Trimming Work Sqm Boy's Hostel
2 4/15/2021 Nasim Ansari PCC Cum Boy's Hostel
3 4/15/2021 Nasim Ansari Block Work Cum Boy's Hostel
4 4/18/2021 Nasim Ansari PCC-Lift pit Concrete Cum Boy's Hostel
5 4/20/2021 Nasim Ansari PCC Cum Boy's Hostel
6 4/23/2021 Nasim Ansari PCC Cum Boy's Hostel
7 4/24/2021 Nasim Ansari PCC Cum Boy's Hostel
8 4/26/2021 Nasim Ansari PCC Cum Boy's Hostel
9 4/28/2021 Nasim Ansari Footing Concrete Cum Boy's Hostel
10 4/30/2021 Nasim Ansari Soil Leveling For PCC CF1 Sqm Boy's Hostel
11 5/2/2021 Nasim Ansari PCC Concrete Cum Boy's Hostel
12 5/3/2021 Nasim Ansari Pedestal Concrete Cum Boy's Hostel
13 5/4/2021 Nasim Ansari Pedestal Concrete Cum Boy's Hostel
14 5/5/2021 Nasim Ansari Pedestal Concrete Cum Boy's Hostel
15 5/6/2021 Nasim Ansari Soil Leveling For PCC F3 Sqm Boy's Hostel
16 5/9/2021 Nasim Ansari Soil Leveling For PCC F3 Sqm Boy's Hostel
Footing, Retaining wall
17 5/12/2021 cum
Nasim Ansari Concrete Work Boy's Hostel
18 5/14/2021 Nasim Ansari CF1 Footing Concrete cum Boy's Hostel
19 6/5/2021 Nasim Ansari Retaining wall Concrete cum Boy's Hostel
CF1,Pedestal Concrete, PCC-
20 6/6/2021 cum
Nasim Ansari Work Boy's Hostel
CF1,Pedestal Concrete, RCC-
21 6/6/2021 cum
Nasim Ansari Work Boy's Hostel
22 6/8/2021 CF1 Soil Leveling Sqm
Nasim Ansari Boy's Hostel
23 6/8/2021 F3- Soil Leveling Sqm
Nasim Ansari Boy's Hostel
24 6/9/2021 CF1,F3,F3 Footing RCC Concrete cum
Nasim Ansari Boy's Hostel
25 6/10/2021 CF1,F3,F3 Footing RCC cum
Nasim Ansari Boy's Hostel
26 6/21/2021 Nasim Ansari Soil leveling CF1 Sqm Boy's Hostel
27 6/21/2021 Nasim Ansari CF1 RCC cum Boy's Hostel
28 6/23/2021 Nasim Ansari Soil leveling Sqm Boy's Hostel
29 6/23/2021 Nasim Ansari PCC cum Boy's Hostel
30 6/24/2021 Nasim Ansari RCC cum Boy's Hostel
31 6/25/2021 Nasim Ansari Soil leveling F3-A8 Sqm Boy's Hostel
32 6/25/2021 Nasim Ansari Soil leveling F5-A9 Sqm Boy's Hostel
33 6/25/2021 Nasim Ansari PCC : F3-A8 Cum Boy's Hostel
34 6/25/2021 Nasim Ansari PCC : F5-A9 Cum Boy's Hostel
35 6/26/2021 Nasim Ansari Pedestal concrete Cum Boy's Hostel
36 6/28/2021 Nasim Ansari Column concrete Cum Boy's Hostel
37 6/30/2021 Nasim Ansari Pedestal concrete Cum Boy's Hostel
38 7/1/2021 Nasim Ansari CF1 Footing Concrete Cum Boy's Hostel
39 7/4/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
40 7/4/2021 Nasim Ansari PCC Cum Boy's Hostel
41 7/5/2021 Nasim Ansari Column Concrete-RCC Cum Boy's Hostel
42 7/6/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
43 7/7/2021 Nasim Ansari Footing RCC Cum Boy's Hostel
44 7/8/2021 Nasim Ansari Column Concrete-RCC Cum Boy's Hostel
45 7/9/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
46 7/10/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
47 7/11/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
48 7/12/2021 Nasim Ansari Footing Concrete - F2,F5 Cum Boy's Hostel
49 7/16/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
50 7/20/2021 Nasim Ansari Lift wall Concrete Cum Boy's Hostel
51 7/25/2021 Nasim Ansari Retaining Wall Concrete Cum Boy's Hostel
52 7/26/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
53 7/27/2021 Nasim Ansari Pedestral Concrete Cum Boy's Hostel
54 7/28/2021 Nasim Ansari soil Leveling at CF1 Sqm Boy's Hostel
55 7/28/2021 Nasim Ansari soil Leveling at CF1 Sqm Boy's Hostel
56 7/29/2021 Nasim Ansari Retaining Wall Concrete F1;N1 - Cum Boy's Hostel
57 7/30/2021 Nasim Ansari PCC Cum Boy's Hostel
58 7/31/2021 Nasim Ansari PCC Cum Boy's Hostel
59 8/2/2021 Nasim Ansari Column Concrete Cum Boy's Hostel
60 8/3/2021 Nasim Ansari Lift Stater Concrete work Cum Boy's Hostel
61 8/7/2021 Nasim Ansari Staging Work Cum Boy's Hostel
62 8/8/2021 Nasim Ansari Retaining wall concrete Cum Boy's Hostel
63 8/10/2021 Nasim Ansari Staging Removing Work Cum Boy's Hostel
64 8/13/2021 Nasim Ansari Pedestal Concrete work CF1 Cum Boy's Hostel
65 8/9/2021 Venkatesh Nayak Footing Concrete work CF1 Cum Boy's Hostel
tractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
From To Offset Trips Nos Length Width Depth
Type wise

4/2/2021 4/15/2021
4/2/2021 4/15/2021
4/2/2021 4/15/2021 1.500 0.400 0.400

4/16/2021 4/29/2021
4/16/2021 4/29/2021
4/16/2021 4/29/2021
4/16/2021 4/29/2021
4/16/2021 4/29/2021
4/16/2021 4/29/2021
4/30/2021 5/13/2021 16.240 7.050

4/30/2021 5/13/2021
4/30/2021 5/13/2021
4/30/2021 5/13/2021
4/30/2021 5/13/2021
4/30/2021 5/13/2021 3.800 3.800

4/30/2021 5/13/2021 2 3.800 3.800

4/30/2021 5/13/2021
5/14/2021 5/27/2021
5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021
5/28/2021 6/10/2021
6/11/2021 6/24/2021
6/11/2021 6/24/2021
6/11/2021 6/24/2021
6/11/2021 6/24/2021
6/11/2021 6/24/2021
6/25/2021 7/8/2021 3.800 3.800
6/25/2021 7/8/2021 3.700 3.700
6/25/2021 7/8/2021 3.800 3.800 0.150
6/25/2021 7/8/2021 3.700 3.700 0.150
6/25/2021 7/8/2021
6/25/2021 7/8/2021
6/25/2021 7/8/2021
6/25/2021 7/8/2021
7/2/2021 7/8/2021
7/2/2021 7/8/2021
7/2/2021 7/8/2021
7/2/2021 7/8/2021
7/2/2021 7/8/2021
7/2/2021 7/8/2021
7/9/2021 7/22/2021
7/9/2021 7/22/2021
7/9/2021 7/22/2021
7/9/2021 7/22/2021
7/9/2021 7/22/2021
7/9/2021 7/22/2021
7/23/2021 8/5/2021
7/23/2021 8/5/2021
7/23/2021 8/5/2021
7/23/2021 8/5/2021 13.05 7.05
7/23/2021 8/5/2021 3.24 3.3
7/23/2021 8/5/2021
7/23/2021 8/5/2021
7/23/2021 8/5/2021
7/23/2021 8/5/2021
7/23/2021 8/5/2021
8/6/2021 8/19/2021 3 21.46 2
8/6/2021 8/19/2021
8/6/2021 8/19/2021 3 21.46 2
8/6/2021 8/19/2021
8/6/2021 8/19/2021
Qty Remarks

100.000
20.000
0.240
5.163
3.460
1.800
13.000
10.000
116.000 12No.s

114.492 1231Sqft
3.200
3.000
4.000
3.500
14.440 155.37Sq
ft
28.880 310.74Sq
ft
168.000

69.000
13.000

24.000

3.000

69.000

25.920

86.000
18.000

93.760
102.000
59.400
10.000
5.000
14.440
13.690
2.166
2.054
2.500
3.000
2.000
106.000
1.5
5
3.5
1
65
2
2.5
3
3
14
2.5
3.5
7
1.5
3
92.0025
10.692
3.5
14
17.5
1
0.5
128.76 (1385.45 Sft)
16
128.76 (1385.45 Sft)
88
102
Contractor: Balaj
chikmagla
Name of the
SL. No Date BOQ Description Unit
Contractor

footing,column and beam


1 1/21/2021 Durgesh MT
barbending work
footing,column and beam
2 1/21/2021 Durgesh MT
barbending work
footing,column and beam
3 1/21/2021 Durgesh MT
barbending work

4 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING WORK Sqm


RMC PLANT

5 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING WORK Sqm


RMC PLANT

6 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING WORK Sqm


RMC PLANT

7 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING WORK Sqm


RMC PLANT

8 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING WORK Sqm


RMC PLANT

9 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING WORK Sqm


RMC PLANT
10 1/21/2021 Parameshwarappa Sqm
RCC RAFT SHUTTERING
11 1/21/2021 Parameshwarappa Sqm
RCC RAFT SHUTTERING
12 1/21/2021 Parameshwarappa Sqm
RCC RAFT SHUTTERING
13 1/21/2021 Parameshwarappa Sqm
RCC RAFT SHUTTERING
14 1/21/2021 Parameshwarappa Sqm
RCC RAFT SHUTTERING
15 1/21/2021 Parameshwarappa Sqm
RCC RAFT SHUTTERING
16 1/21/2021 Parameshwarappa Sqm
RMC PILLARS SHUTTERING
17 1/21/2021 Parameshwarappa Sqm
RMC PILLARS SHUTTERING
18 1/21/2021 Parameshwarappa Sqm
RMC PILLARS SHUTTERING
19 1/21/2021 Parameshwarappa Sqm
RMC PILLARS SHUTTERING
20 1/21/2021 Parameshwarappa Sqm
SILOS RAFT
21 1/21/2021 Parameshwarappa Sqm
MIXING PLANT
22 1/21/2021 Parameshwarappa Sqm
BIW RAFT
23 1/21/2021 Parameshwarappa Sqm
DG PEDASTRAL
24 1/21/2021 Parameshwarappa Sqm
SILOS RAFT
25 1/21/2021 Parameshwarappa Sqm
M PAN RAFT
26 1/21/2021 Parameshwarappa Sqm
BIW RAFT
27 1/21/2021 Parameshwarappa Block work Pillars Sqm

28 1/21/2021 Parameshwarappa plastering for block work Sqm

29 1/21/2021 Parameshwarappa plastering for block work Sqm


pedastral and plinth beam
30 1/21/2021 Parameshwarappa Rmt
concreting
pedastral and plinth beam
31 1/21/2021 Parameshwarappa Rmt
concreting
pedastral and plinth beam
32 1/21/2021 Parameshwarappa Rmt
concreting
pedastral and plinth beam
33 1/21/2021 Parameshwarappa Rmt
concreting

34 2/5/2021 Durgesh Steel -8mm Kg

35 2/5/2021 Durgesh Steel -10mm Kg

36 2/5/2021 Durgesh Steel -12mm Kg

37 2/5/2021 Durgesh Steel -16mm Kg


Block Work ; Plant Control room
38 2/5/2021 Parameshwarappa sqm
-Plinth
Block Work ; Plant Control room
39 2/5/2021 Parameshwarappa sqm
-Plinth
Block Work ; Plant Control room
40 2/5/2021 Parameshwarappa sqm
-Walls
Block Work ; Plant Control room
41 2/5/2021 Parameshwarappa sqm
-Walls
Block Work ; Plant Control room
42 2/5/2021 Parameshwarappa sqm
-Deductions - doors
Block Work ; Plant Control room
43 2/5/2021 Parameshwarappa sqm
-Deductions - Window
Block Work ; Plant Control room
44 2/5/2021 Parameshwarappa sqm
-Deductions - Window
45 2/5/2021 Parameshwarappa Block Work -QC Lab; Foundation sqm

46 2/5/2021 Parameshwarappa Block Work -QC Lab; Foundation sqm

47 2/5/2021 Parameshwarappa Block Work -QC Lab; Walls sqm

48 2/5/2021 Parameshwarappa Block Work -QC Lab; Walls sqm


Block Work -QC Lab; Deduction
49 2/5/2021 Parameshwarappa sqm
of doors
Block Work -QC Lab; Deduction
50 2/5/2021 Parameshwarappa sqm
of Windows
Block Work - water tank Block
51 2/5/2021 Parameshwarappa sqm
work (200mm)
Block Work - water tank Block
52 2/5/2021 Parameshwarappa sqm
work (200mm)
Plastering Work (RMC Sump
53 2/5/2021 Parameshwarappa sqm
Tank)
54 2/5/2021 Parameshwarappa Floor finishing sqm

55 2/5/2021 Parameshwarappa Toilet Foundation sqm


56 2/5/2021 Parameshwarappa Toilet Foundation sqm
57 2/5/2021 Parameshwarappa Toilet Foundation sqm
58 2/5/2021 Parameshwarappa Toilet Foundation sqm
59 2/5/2021 Parameshwarappa Ramp shuttering - Main Wall sqm

60 2/5/2021 Parameshwarappa Ramp shuttering - Main Wall sqm

61 2/5/2021 Parameshwarappa Ramp shuttering -Side Wall sqm

62 2/5/2021 Parameshwarappa Ramp shuttering -Side Wall sqm

63 2/5/2021 Parameshwarappa Ramp shuttering -Raft sides sqm

64 2/5/2021 Parameshwarappa Main Wall Concreting Cum

65 2/5/2021 Parameshwarappa Side Wall Concreting Cum

66 2/5/2021 Parameshwarappa Side Wall Concreting Cum


Contractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Work Side or Steel Dia
From To Offset Trips Nos Length
Place Type wise

RMC
1/8/2021 1/21/2021 8 1311.800
plant
RMC
1/8/2021 1/21/2021 12 2664.500
plant
RMC
1/8/2021 1/21/2021 16 509.000
plant
RMC
1/8/2021 1/21/2021 2.000 12.200
plant
RMC
1/8/2021 1/21/2021 2.000 5.300
plant
RMC
1/8/2021 1/21/2021 2.000 4.300
plant
RMC
1/8/2021 1/21/2021 2.000 1.800
plant
RMC
1/8/2021 1/21/2021 2.000 5.300
plant
RMC
1/8/2021 1/21/2021 2.000 4.300
plant
RMC
1/8/2021 1/21/2021 2.000 12.000
plant
RMC
1/8/2021 1/21/2021 2.000 5.100
plant
RMC
1/8/2021 1/21/2021 2.000 4.100
plant
RMC
1/8/2021 1/21/2021 2.000 1.600
plant
RMC
1/8/2021 1/21/2021 2.000 5.100
plant
RMC
1/8/2021 1/21/2021 2.000 4.100
plant
RMC
1/8/2021 1/21/2021 12.000 2.400
plant
RMC
1/8/2021 1/21/2021 4.000 2.400
plant
RMC
1/8/2021 1/21/2021 2.000 2.400
plant
RMC
1/8/2021 1/21/2021 12.000 1.200
plant
RMC
1/8/2021 1/21/2021 1.000 12.200
plant
RMC
1/8/2021 1/21/2021 1.000 4.300
plant
RMC
1/8/2021 1/21/2021 1.000 5.300
plant
RMC
1/8/2021 1/21/2021 1.000 2.000
plant
RMC
1/8/2021 1/21/2021 1.000 12.000
plant
RMC
1/8/2021 1/21/2021 1.000 4.100
plant
RMC
1/8/2021 1/21/2021 1.000 5.100
plant
RMC
1/8/2021 1/21/2021 6.000 1.800
plant
RMC
1/8/2021 1/21/2021 6.000 2.400
plant
RMC
1/8/2021 1/21/2021 6.000 0.600
plant
RMC
1/8/2021 1/21/2021 12.000 2.200
plant
RMC
1/8/2021 1/21/2021 4.000 2.400
plant
RMC
1/8/2021 1/21/2021 2.000 2.000
plant
RMC
1/8/2021 1/21/2021 12.000 1.700
plant

RMC
2/5/2021 2/18/2021 1590.8
Ramp 8
RMC
2/5/2021 2/18/2021 1646.4
Ramp 10
RMC
2/5/2021 2/18/2021 1573.5
Ramp 12
RMC
2/5/2021 2/18/2021 768.5
Ramp 16
RMC
2/5/2021 2/18/2021 2 3.450
Ramp
RMC
2/5/2021 2/18/2021 2 2.600
Ramp
RMC
2/5/2021 2/18/2021 2 3.400
Ramp
RMC
2/5/2021 2/18/2021 2 3.100
Ramp
RMC
2/5/2021 2/18/2021 -1 0.900
Ramp
RMC
2/5/2021 2/18/2021 -1 0.900
Ramp
RMC
2/5/2021 2/18/2021 -1 1.200
Ramp
RMC
2/5/2021 2/18/2021 2 5.600
Ramp
RMC
2/5/2021 2/18/2021 2 4.800
Ramp
RMC
2/5/2021 2/18/2021 2 5.400
Ramp
RMC
2/5/2021 2/18/2021 2 5.200
Ramp
RMC
2/5/2021 2/18/2021 -1 1.200
Ramp
RMC
2/5/2021 2/18/2021 -2 1.200
Ramp
water
2/5/2021 2/18/2021 2 21.660
tank
water
2/5/2021 2/18/2021 3 9.660
tank
water
2/5/2021 2/18/2021 8 9.660
tank
water
2/5/2021 2/18/2021 2 9.660
tank
toilet 2/5/2021 2/18/2021 2 10.213
toilet 2/5/2021 2/18/2021 1 10.213
toilet 2/5/2021 2/18/2021 10 0.457
toilet 2/5/2021 2/18/2021 10 0.811
RMC
2/5/2021 2/18/2021 1 6.850
Ramp
RMC
2/5/2021 2/18/2021 1 6.250
Ramp
RMC
2/5/2021 2/18/2021 2 6.050
Ramp
RMC
2/5/2021 2/18/2021 2 5.750
Ramp
RMC
2/5/2021 2/18/2021 4 1.200
Ramp
RMC
2/5/2021 2/18/2021 1 6.850
Ramp
RMC
2/5/2021 2/18/2021 2 5.750
Ramp
RMC
2/5/2021 2/18/2021 2 1.550
Ramp
Width Depth Qty Remarks

0.518

2.345

0.799

0.120 2.928

0.120 1.272

0.120 1.032

0.120 0.432

0.120 1.272

0.120 1.032

0.450 10.800

0.450 4.590

0.450 3.690

0.450 1.440

0.450 4.590

0.450 3.690

2.200 63.360

2.400 23.040

2.000 9.600

1.700 24.480

5.300 64.660

1.800 7.740

4.300 22.790

1.400 2.800

5.150 61.800
1.600 6.560

4.100 20.910

0.900 9.720

0.900 12.960

0.600 2.160

26.400 86.59

9.600 31.49

4.000 13.12

20.400 66.91

628.366

1015.829

1384.680

1214.230
0.400
2.760
0.400
2.080
2.600
17.680
2.600
16.120
2.100
-1.890
1.200
-1.080
1.200
-1.440
0.400
4.480
0.400
3.840
2.600
28.080
2.600
27.040
2.100
-2.520
1.200 992.07
-2.880
5.100
220.932
5.100
147.798
6.330
489.182
9.660
186.631
0.811 16.566
0.457 4.671
1.220 5.577
1.220 9.890
3.400
23.290
3.400
21.250
2.650
32.065
2.650
30.475
0.500
2.400
2.300 0.300
4.727
1.550 0.300
5.348
1.800 0.300
1.674
Contractor: Balaji
chikmaglau
Name of the
SL. No Date BOQ Description Unit
Contractor

Academic Block
Kishore
1 2/19/2021 Chandra Footing Concrete-F2 cum
Pradhan
Kishore
2 2/19/2021 Chandra Footing Concrete-F7 cum
Pradhan
3 4/16/2021 Nasim Ansari Trimming work Sqm

4 4/16/2021 Nasim Ansari PCC Cum

5 4/16/2021 Nasim Ansari PCC Cum

6 4/16/2021 Paramesh Trimming work- F3 Footing Sqm

7 4/16/2021 Paramesh Trimming work- F10 Footing Sqm

8 4/16/2021 Paramesh PCC - CF8 Cum

9 4/16/2021 Paramesh PCC - F1 Cum

10 4/16/2021 Paramesh PCC - F8 Cum

11 4/16/2021 Paramesh PCC - F6 Cum

Office Rest room-Block


Work Foundation -
(2*3.10*0.4)+(2*2.15*0.4)=
4.2sqm Block
Work-
(2*2.97*2.58)+(2*2.35*2.58
12 4/16/2021 Paramesh )=27.451 Cum
Door Deduction-
0.786*2.11=1.65
Portation -
(2.1*1.4)+(2.1*0.45)=3.465
Total=4.2+27.451+3.465-
1.65

Flooring,Platering with
13 4/16/2021 Paramesh No.s
Finishing
14 4/30/2021 Suresh RCC for Footings W-38 ;F3 Cum
RCC for Footings AV
15 4/30/2021 Suresh (13,18,27,31) ;F11 Cum

16 4/30/2021 Suresh PCC for Footings CF12-A grid Cum

17 4/30/2021 Suresh PCC for Footings CF1-A grid Cum

18 4/30/2021 Suresh PCC for Footings F3 Cum


PCC for Footings (C-39,B-
19 4/30/2021 Suresh Cum
35)F3
PCC for RC wall (B-28) to B-
20 4/30/2021 Suresh Cum
35
Earth work excavation @ A
21 4/30/2021 Suresh Sqm
Grid - CF12
Earth work excavation @ A
22 4/30/2021 Suresh Sqm
Grid - CF1
Earth work excavation @ A
23 4/30/2021 Suresh Sqm
Grid - F3 (C-39)
24 4/30/2021 Suresh Earth work excavation @ A Sqm
Grid - F3
25 5/7/2021 Suresh RCC for Footings KL-29 ;F1 Cum
Slush Removal @ Footing
26 5/7/2021 Suresh Sqm
CF12; A-24,A-28,A-21,A-18
Dewatering @ Footings
27 5/7/2021 Suresh Sqm
CF12 ; A-24, A-28,A-21,A-18
RCC for Footings (X,Y -29)-
28 5/9/2021 Sanjit Cum
CF2
29 5/9/2021 Sanjit RCC for Footings S -29- F8 Cum

30 5/9/2021 Sanjit RCC for Footings A -29- F8 Cum


RCC for Footings AR -31-
31 5/9/2021 Sanjit Cum
CF10
32 5/9/2021 Sanjit PCC for Footings F10 Cum
PCC for Footings CF5 (K,L-
33 5/9/2021 Sanjit 36,38) Cum
PCC for Footings CF5 (K,L-
34 5/9/2021 Sanjit Cum
36,38)
35 5/9/2021 Sanjit PCC for Footings F9A (J-38) Cum

36 5/9/2021 Sanjit plump concrete Cum

37 5/9/2021 Sanjit RCC for Footings F6 Cum


Slush Removal @ F2
38 5/9/2021 Sanjit sqm
footings
RCC for Footings CF8 -
39 5/9/2021 Nasim Ansari Cum
AP,AQ-13
RCC for Footings CF8 -
40 5/9/2021 Nasim Ansari Cum
AP,AQ-13
RCC for Footings CF8 -
41 5/9/2021 Nasim Ansari Cum
AP,AQ-13
RCC for Footings CF8 -
42 5/9/2021 Nasim Ansari Cum
AP,AQ-13
Curing Bund Work CF8 -
43 5/9/2021 Nasim Ansari m
AP,AQ-13
Slush Removal & dewatering
44 5/9/2021 Nasim Ansari sqm
works @ F2- AQ-36
Slush Removal & dewatering
45 5/9/2021 Nasim Ansari sqm
works @ Retaining wall
RCC for Footings A-
46 5/14/2021 Nasim Ansari Cum
17,27,21,24
RCC for Retaining Wall Raft
47 5/14/2021 Nasim Ansari Cum
Q42-Z42
RCC for Retaining Wall Raft
48 5/14/2021 Nasim Ansari Cum
Q42-Z42
RCC for Retaining Wall Raft
49 5/14/2021 Nasim Ansari Cum
Q42-Z42
50 5/14/2021 Sanjit RCC for Footings AG-36- F2 Cum

51 5/14/2021 Sanjit RCC for Footings Lift CF1 Cum

52 5/14/2021 Suresh RCC for Footing F3-Z36 Cum

53 5/14/2021 Suresh RCC for Footing F4-L42 Cum

PCC for Footing F4-K,L-


54 5/14/2021 Suresh Cum
19,21,23,25

55 5/14/2021 Suresh Dressing work For Footings Sqm

56 5/21/2021 Sanjit RCC for Footings J-37,39- Cum


F9A
RCC for Footings AM-37,39-
57 5/21/2021 Sanjit Cum
F9
RCC for Footings KL-
58 5/21/2021 Sanjit Cum
19,22,23,26
PCC for Footings AL-36,38
59 5/21/2021 Sanjit -CF5 Cum

60 5/21/2021 Sanjit Plump Concrete Cum


Dressing Work AL;36,38
61 5/21/2021 Sanjit Sqm
-CF5
62 5/21/2021 Sanjit Dressing Work GH-29; -CF5 Sqm

Starter Concrete @ RC,


63 5/21/2021 Sanjit Cum
Shear Wall S-32, CF1

Starter Concrete @ RC,


64 5/21/2021 Sanjit Cum
Shear Wall 2-32, CF1

Starter Concrete @ RC,


65 5/21/2021 Sanjit Cum
Shear Wall (SW-1), AP-38

Starter Concrete @ RC,


66 5/21/2021 Sanjit Cum
Shear Wall (SW-1), AN-38

RCC for Footing K-35,38 -


67 5/21/2021 Suresh Cum
CF5
RCC for Footing B-28,B-31,B-
68 5/21/2021 Suresh Cum
35

69 5/21/2021 Suresh RCC for Raft B-35,B-28 Cum

70 5/21/2021 Suresh RCC for Raft AG42-AK42 Cum

71 5/21/2021 Suresh RCC for Raft AG42-AK42 Cum

RCC for Retaining wall &


72 5/21/2021 Suresh Cum
shear wall Q42 - AG42

RCC for Retaining wall &


73 5/21/2021 Suresh Cum
shear wall Q42 - AG42

RCC for Retaining wall &


74 5/21/2021 Suresh Cum
shear wall Q42 - AG42

75 5/21/2021 Suresh RCC for Retaining wall & Cum


shear wall Q42 - AG42

RCC for Retaining wall &


76 5/21/2021 Suresh Cum
shear wall SW1-AP38

77 5/21/2021 Suresh RCC for Pedestal - Q42 Cum

78 5/21/2021 Suresh RCC for Pedestal - W42 Cum

79 5/21/2021 Suresh RCC for Pedestal - W41 Cum

80 5/21/2021 Suresh RCC for Pedestal - W40 Cum

81 5/21/2021 Suresh RCC for Pedestal - Z41 Cum

82 5/21/2021 Suresh RCC for Pedestal - Z42 Cum


83 5/21/2021 Suresh RCC for Pedestal - CF11 Cum

84 5/21/2021 Suresh RCC for Pedestal - CF11 Cum

85 5/21/2021 Suresh RCC for Pedestal - CF11 Cum

RCC for Footings G-35 -


86 5/28/2021 Nasim Ansari Cum
CF10
87 5/28/2021 Nasim Ansari Curing Bund Work Z-38; F3 sqm

88 5/28/2021 Nasim Ansari Curing Bund Work Z-40; F3 sqm

89 5/28/2021 Nasim Ansari Curing Bund Work Z-38; F3 sqm


RCC for Footings CF5- GH ,
90 5/28/2021 Sanjit Cum
28-31
91 5/28/2021 Sanjit RCC for Footings F3- Z-38 Cum

92 5/28/2021 Suresh RCC for Footings F3- Z-40 Cum

93 5/28/2021 Suresh RCC for Footings F3- C-39 Cum

94 5/28/2021 Suresh PCC for Footings F3- E-28 Cum


PCC for Footings CF4- H-
95 5/28/2021 Suresh Cum
22,23
RCC for Retaining wall Raft
96 5/28/2021 Suresh Cum
C-39 to E-28

Earthwork Excavation-
97 5/28/2021 Suresh Sqm
Dressing work E-28, F3

Earthwork Excavation-
98 5/28/2021 Suresh Sqm
Dressing work H-22,23 - CF4

Earthwork Excavation-
99 5/28/2021 Suresh Dressing work Au6 - CF7 Sqm

Earthwork Excavation-
100 5/28/2021 Suresh Sqm
Dressing work Au6 - CF7

Earthwork Excavation-
101 5/28/2021 Suresh Dressing work F4 - AR,AS,AU Sqm

Earthwork Excavation-
102 5/28/2021 Suresh Sqm
Dressing work Retaining wall
Earthwork Excavation-
103 5/28/2021 Suresh Sqm
Dressing work CF3- B8

Earth Work Excavation B-12,


104 6/4/2021 Suresh Sqm
F4
Earth Work Excavation C'-
105 6/4/2021 Suresh Sqm
12, F3
Earth Work Excavation H-14,
106 6/4/2021 Suresh Sqm
F1
Earth Work Excavation X-14,
107 6/4/2021 Sanjit Sqm
CF2
Earth Work Excavation F-4,
108 6/4/2021 Sanjit Sqm
AS-6
Earth Work Excavation
109 6/4/2021 Sanjit Sqm
Retaining Wall PCC
110 6/4/2021 Sanjit RCC for Footings CF4- H22 Cum
PCC for Footings F4;
111 6/4/2021 Nasim Ansari Cum
AR,AS,AV-4,AS-6

112 6/4/2021 Nasim Ansari Retaining Wall PCC Cum

113 6/4/2021 Nasim Ansari PCC for Footings CF7; Av-6 Cum

114 6/4/2021 Nasim Ansari PCC for Footings CF2; X-14 Cum
RCC for Footings F7;
X19,Y19,AA19,AC19,AE19,X2
115 6/4/2021 Nasim Ansari 0,AE20,AE22,AF22,AJ22,V23 Cum
,X23,AE23,AF23,AJ23,X23,AE
23,X25,Y25,AA25,AC25,AE25
116 6/4/2021 Nasim Ansari RCC for Footings F4; AL25 Cum

117 6/4/2021 Nasim Ansari RCC for Footings F3; E-28 Cum

118 6/4/2021 Nasim Ansari RCC for Footings CF5 Cum

119 6/4/2021 Nasim Ansari RCC for Footings CF5 Cum

Rcc for Footings AL, AV-6 ;


120 6/11/2021 Sanjit Cum
CF7
121 6/11/2021 Sanjit Staging Work Sw5 Sqm
Rcc for Footings- AR,AS,AL-4
122 6/11/2021 Nasim Ansari Cum
- F4

123 6/11/2021 Nasim Ansari Retaining wall RCC Cum

124 6/11/2021 Nasim Ansari Retaining wall RCC wall Cum

PCC for Footings CF12 @


125 6/11/2021 Nasim Ansari Cum
North
126 6/11/2021 Nasim Ansari PCC for Footings AS-6 -F4 Cum

127 6/11/2021 Nasim Ansari RCC wall- PCC Cum

RCC for Pedestal CF8 , CF10


128 6/11/2021 Nasim Ansari Cum
& F1 ; P1
RCC for Pedestal CF8 , CF10
129 6/11/2021 Nasim Ansari Cum
& F1 ; P2
RCC for Pedestal CF8 , CF10
130 6/11/2021 Nasim Ansari Cum
& F1 ; P3
RCC for Pedestal CF8 , CF10
131 6/11/2021 Nasim Ansari Cum
& F1 ; P3
RCC for Pedestal CF8 , CF10
132 6/11/2021 Nasim Ansari Cum
& F1 ; P6
RCC Wall Raft F11 B/w F11
133 6/11/2021 Nasim Ansari & F4 Cum

134 6/11/2021 Nasim Ansari Lift RC Wall Concrete Cum

135 6/11/2021 Nasim Ansari Lift RC Wall Concrete Cum

Lift RC Wall Concrete


136 6/11/2021 Nasim Ansari Cum
Pedestal P1-W36
Earthwork Excavation CF12
137 6/11/2021 Nasim Ansari Sqm
@ Northside
Earthwork Excavation F4 &
138 6/11/2021 Nasim Ansari Sqm
F3
Earthwork Excavation B12 &
139 6/11/2021 Nasim Ansari Sqm
B18

140 6/11/2021 Nasim Ansari Earthwork Excavation E18 Sqm

141 6/11/2021 Nasim Ansari Earthwork Excavation CF1 Sqm

PCC for Footing CF4 Grid -


142 6/18/2021 Nasim Ansari Cum
E(22,23)
RCC for Footing CF2 Grid -
143 6/18/2021 Nasim Ansari (X,Y) (14,15) Cum

144 6/18/2021 Nasim Ansari Lift RC Wall Concrete (AB-9) Cum

145 6/18/2021 Nasim Ansari Lift RC Wall Concrete (AB-9) Cum

Pedastal P1 on above F3
146 6/18/2021 Nasim Ansari Footing (w,2) (36,38,40) -P1 Cum
Retaining Wall Concrete b/w
147 6/18/2021 Nasim Ansari F2 Footings For C-188 & C- Cum
189
148 6/18/2021 Nasim Ansari RCC wall Cum

149 6/18/2021 Nasim Ansari RCC wall Cum


PCC for footings CF3 (B-F:4-
150 6/25/2021 Hamid Ansari Cum
8) Area-1
PCC for footings CF3 (B-F:4-
151 6/25/2021 Hamid Ansari Cum
8) Area-2
PCC for footings CF3 (B-F:4-
152 6/25/2021 Hamid Ansari 8) Area-3 Cum

153 6/25/2021 Hamid Ansari PCC for footings CF1 (V:9) Cum

154 6/25/2021 Hamid Ansari PCC for footings CF1 (AB:9) Cum

155 6/25/2021 Hamid Ansari PCC for footings F3 (B:17) Cum

156 6/25/2021 Hamid Ansari PCC for footings F4 (B:12) Cum

157 6/25/2021 Hamid Ansari RCC for footing Pedestal's Cum


F2 (Q;36)

158 6/25/2021 Hamid Ansari RCC for footing Pedestal's Cum


F6 (K-L;29 - M;29) P1

159 6/25/2021 Hamid Ansari RCC for footing Pedestal's Cum


F6 (K-L;29 - M;29) P6

160 6/25/2021 Hamid Ansari RCC for footing Pedestal's Cum


F4 (K;19,22,23,26 ) P2

161 6/25/2021 Hamid Ansari RCC for footing Pedestal's Cum


F4 (K;19,22,23,26 ) P7

162 6/25/2021 Hamid Ansari RCC for footing Pedestal's Cum


CF5 (G;31,H;29) P1

163 6/25/2021 Hamid Ansari Shear Wall @ North (AM;39) Cum

164 6/25/2021 Hamid Ansari Dewatering works F3(B:17) Sqm

165 6/25/2021 Hamid Ansari Dewatering works F1(H:14) Sqm

166 6/25/2021 Hamid Ansari Dewatering works F3(K-L:14) Sqm

167 6/25/2021 Hamid Ansari Trimming Works F3 (B;17) Sqm

168 6/25/2021 Hamid Ansari Trimming Works F1 (H;14) Sqm

169 6/25/2021 Hamid Ansari Trimming Works F3 (K-L;14) Sqm

170 6/25/2021 Hamid Ansari Trimming Works F3 (B-F;4-8) Sqm


171
7/2/2021 Hamid Ansari PCC for Footings - F3 (E; 17) Cum
172 PCC for Footings - F5 (K, L;
7/2/2021 Hamid Ansari 17) Cum

173
7/2/2021 Hamid Ansari PCC for Footings - F1 ( H; 17) Cum
174 RCC for Footings - CF12
7/2/2021 Hamid Ansari ( AW; 17,18) Cum
175 RCC for Footings - CF12
7/2/2021 Hamid Ansari ( AW; 21,22) Cum
176 RCC for Footings - CF12
7/2/2021 Hamid Ansari ( AW; 24,25) Cum
177 RCC for Footings - CF12
7/2/2021 Hamid Ansari ( AW; 27,28) Cum
178
7/2/2021 Hamid Ansari RCC for Footings - F4 ( AS; 6) Cum
179 RCC for Footings - CF3 ( B; 8)
7/2/2021 Hamid Ansari (F:4) Cum
180
7/2/2021 Hamid Ansari RCC for Footings - F1 (P;14) Cum
181
7/2/2021 Hamid Ansari RCC for Footings - CF1 (V;9) Cum
182
7/2/2021 Hamid Ansari RCC for Footings - CF1 (AE;9) Cum
183 RCC Wall Concreting F3 &
7/2/2021 Hamid Ansari CF5 Cum

184 RCC Wall Concreting F3 &


7/2/2021 Hamid Ansari F3 Cum
185 RCC Wall Concreting CF11
7/2/2021 Hamid Ansari (C150 & C156) Cum
186 RCC Wall Concreting CF11
7/2/2021 Hamid Ansari (C154 & C156) Cum
187 RCC Wall Concreting CF11
7/2/2021 Hamid Ansari (C134& C145B) Cum
188 Pedastal for Footing CF11
7/2/2021 Hamid Ansari (AV;33)- P1 Cum
189 Pedastal for Footing CF11
7/2/2021 Hamid Ansari (AV;35)- P3 Cum
190 Pedastal for Footing CF11
7/2/2021 Hamid Ansari (AT;35)- P3 Cum
191 Pedastal for Footing F11
7/2/2021 Hamid Ansari (AV;27)- P1 Cum
192 Pedastal for Footing F11
7/2/2021 Hamid Ansari (AV;30)- P1 Cum
193 Pedastal for Footing CF5
7/2/2021 Hamid Ansari (L;36)- P6 Cum
194 Pedastal for Footing CF5
7/2/2021 Hamid Ansari (L;38)- P6 Cum
195 Pedastal for Footing F3
7/2/2021 Hamid Ansari (L;40)- P1 Cum
196 Pedastal for Footing F3
7/2/2021 Hamid Ansari (L;41)- P1 Cum
197 Pedastal for Footing F3
7/2/2021 Hamid Ansari (E;28)- P3 Cum
198 7/2/2021 Hamid Ansari Pedastal CF4 (E;23)- P3 Cum
199 7/2/2021 Hamid Ansari Pedastal CF4 (E;22)- P3 Cum
200 7/2/2021 Hamid Ansari Pedastal CF4 (H;23)- P3 Cum
201 7/2/2021 Hamid Ansari Pedastal CF4 (H;22)- P3 Cum
202
7/2/2021 Hamid Ansari Dressing for PCC F3 (E;17) Sqm
203
7/2/2021 Hamid Ansari Dressing for PCC F5 (K,L;17) Sqm
204
7/2/2021 Hamid Ansari Dressing for PCC F1 (H;14) Sqm
205
7/9/2021 Hamid Ansari RCC for Footings F3 (E;17) Cum
206
7/9/2021 Hamid Ansari RCC for Footings F5 (KL;14) Cum
207
7/9/2021 Hamid Ansari RCC for Footings F1 (H;14) Cum
208
7/9/2021 Hamid Ansari RCC for Footings F1 (B;17) Cum
209 7/9/2021 Hamid Ansari PCC for Footings F3 (L;2) Cum
210 7/9/2021 Hamid Ansari PCC for Footings F3 (L;3) Cum
211
7/9/2021 Hamid Ansari PCC for Footings F3 (D;12) Cum
212
7/9/2021 Hamid Ansari PCC for Footings F3 (AK;2) Cum
213
7/9/2021 Hamid Ansari PCC for Footings F3 (AK;3) Cum
214
7/9/2021 Hamid Ansari PCC for Footings F3 (AG;1) Cum
215
7/9/2021 Hamid Ansari RCC for Pedestals F3 (AK;40) Cum
216
7/9/2021 Hamid Ansari RCC for Pedestals F3 (AK;41) Cum
217
7/9/2021 Hamid Ansari RCC for Pedestals F3 (AG;42) Cum
218
7/9/2021 Hamid Ansari Dressing for PCC F3(L;2-3) Sqm
219 7/9/2021 Hamid Ansari Dressing for PCC F3(D;12) Sqm
220
7/9/2021 Hamid Ansari Dressing for PCC F3(AK;2-3) Sqm
221
7/9/2021 Hamid Ansari Dressing for PCC F3(AG;1) Sqm
222 7/9/2021 Hamid Ansari PCC for Footings F3 (L;2) Cum
223 7/9/2021 Hamid Ansari PCC for Footings F3 (L;3) Cum
224
7/9/2021 Hamid Ansari PCC for Footings F3 (D;12) Cum
225
7/9/2021 Hamid Ansari PCC for Footings F3 (AK;2) Cum
226
7/9/2021 Hamid Ansari PCC for Footings F3 (AK;3) Cum
227
7/9/2021 Hamid Ansari PCC for Footings F1 (AG;1) Cum
228
7/9/2021 Hamid Ansari RCC for Footings F3 (E;17) Cum
229
7/9/2021 Hamid Ansari RCC for Footings F5 (KL;14) Cum
230
7/9/2021 Hamid Ansari RCC for Footings F1 (H;14) Cum
231
7/9/2021 Hamid Ansari RCC for Footings F3 (B;17) Cum
232 RCC for Pedestal & RC Wall
7/9/2021 Hamid Ansari F3 (AK;40) Cum
233 RCC for Pedestal & RC Wall
7/9/2021 Hamid Ansari F3 (AK;41) Cum
234 RCC for Pedestal & RC Wall
7/9/2021 Hamid Ansari F2 (AK;42) Cum
235 RCC for Pedestal & RC Wall
7/9/2021 Hamid Ansari F4 (AK;42) Cum
236 RCC for Pedestal & RC Wall
7/9/2021 Hamid Ansari B/w F2-F4 & F3 Cum
237
7/9/2021 Hamid Ansari Dressing for PCC F3 (L;2-3) Sqm
238
7/9/2021 Hamid Ansari Dressing for PCC F3 (D;12) Sqm
239
7/9/2021 Hamid Ansari Dressing for PCC F3 (AK;2-3) Sqm
240
7/9/2021 Hamid Ansari Dressing for PCC F1 (AG;1) Sqm
241
7/23/2021 Hamid Ansari PCC for Footings F9 (H;3-7) Cum
242
7/23/2021 Hamid Ansari PCC for Footings F9 (J;3-7) Cum
243
7/23/2021 Hamid Ansari PCC for Footings F1 (H;9-10) Cum
244 PCC for Raft B/w F9 (H; 3-7)
7/23/2021 Hamid Ansari & F9 (J;3-7) Cum
245 PCC for Raft B/w F4 (B; 12)
7/23/2021 Hamid Ansari & F3 (B;17) Cum
246 PCC for Raft B/w CF3 (C; 4)
7/23/2021 Hamid Ansari & F9 (H;3) Cum
247 PCC for Raft B/w F1 (AG; 1)
7/23/2021 Hamid Ansari & F4 (AK;1) Cum
248 PCC for Raft Around F4
7/23/2021 Hamid Ansari (AK;1) Cum
249 7/23/2021 Hamid Ansari RCC for Footings F3 (L;3) Cum
250
7/23/2021 Hamid Ansari RCC for Footings F3 (C';12) Cum
251
7/23/2021 Hamid Ansari RCC for Footings F3 (AK;3) Cum
252 7/23/2021 Hamid Ansari RCC for Footings F4 (L;1) Cum
253 7/23/2021 Hamid Ansari RCC for Footings F3 (L;2) Cum
254
7/23/2021 Hamid Ansari RCC for Footings F9 (H;3-7) Cum
255
7/23/2021 Hamid Ansari RCC for Footings F9 (J;3-7) Cum
256
7/23/2021 Hamid Ansari RCC for Footings F1 (AG;1) Cum
257 RCC for Raft B/w F3 (L;2)
7/23/2021 Hamid Ansari &F3 (L;3) Cum
258 RCC for Raft B/w F3 (L;2)
7/23/2021 Hamid Ansari &F4 (L;1) Cum
259
7/23/2021 Hamid Ansari RCC for Raft Around F4 (L;1) Cum
260 RCC for Raft B/w F9 (H;3-7)
7/23/2021 Hamid Ansari &F9 (J;3-7) Cum
261 RCC for Raft Right of F1
7/23/2021 Hamid Ansari (AG;1) Cum
262 RCC for Pedestals F5(AK-
7/23/2021 Hamid Ansari AL;29) - P6 Cum
263 RCC for Pedestals F1(AH;29)
7/23/2021 Hamid Ansari - P1 Cum
264 RCC for Pedestals F8(AD;29)
7/23/2021 Hamid Ansari - P1 Cum
265 RCC for Pedestals CF2(Y;29)
7/23/2021 Hamid Ansari - P1 Cum
266 RCC for Pedestals CF2(X;29)
7/23/2021 Hamid Ansari - P1 Cum
267 RCC for Pedestals F8(S;29) -
7/23/2021 Hamid Ansari P1 Cum
268 RCC for Pedestals CF3(C-4) -
7/23/2021 Hamid Ansari P2 Cum
269 RCC for Pedestals CF3(C;6) -
7/23/2021 Hamid Ansari P2 Cum
270 RCC for Pedestals CF3(D;4) -
7/23/2021 Hamid Ansari P2 Cum
271 RCC for Pedestals CF3(D;6) -
7/23/2021 Hamid Ansari P2 Cum
272 RCC for Pedestals CF3(F;4) -
7/23/2021 Hamid Ansari P2 Cum
273 RCC for Pedestals CF3(F;6) -
7/23/2021 Hamid Ansari P2 Cum
274 RCC for Pedestals CF3(B;8) -
7/23/2021 Hamid Ansari P1 Cum
275 RCC for Pedestals F4(AR;39)
7/23/2021 Hamid Ansari - P2 Cum
276 RCC for Pedestals F4(AS;39)
7/23/2021 Hamid Ansari - P2 Cum
277 RCC for Pedestals CF5(AK-
7/23/2021 Hamid Ansari AL;36) - P6 Cum

278 RCC for short Column Upto


Plinth Beam bottom F4(W-
7/23/2021 Hamid Ansari Z;36,38,40,41) Cum
279 RCC for RT Wall b/w SW
7/23/2021 Hamid Ansari (AM-AP) Cum
280 RCC for RT Wall b/w (AM-
7/23/2021 Hamid Ansari AP) Cum
281 RCC for RT Wall b/w
7/23/2021 Hamid Ansari SW(AP;38) & F4(AR;39) Cum

282 RCC for RT Wall


7/23/2021 Hamid Ansari b/wF4(AR;39) & F4(AS;39) Cum

RCC for RT Wall b/w


283 F2(AG;42),F4(AK;42) &
7/23/2021 Hamid Ansari F3(AK;41) Cum
284 RCC for RT Wall b/W
7/23/2021 Hamid Ansari F4(AK;42) Column Cum
285 RCC for RT Wall b/W
7/23/2021 Hamid Ansari F4(AR;39) & F4(AS;39) Cum
286
7/23/2021 Hamid Ansari Dressing for PCC F9(H-3,7) Sqm
287
7/23/2021 Hamid Ansari Dressing for PCC F9(J-3,7) Sqm
288
7/23/2021 Hamid Ansari Dressing for PCC F1(H-9,10) Sqm
289 Dressing for PCC Raft F9(H-
7/23/2021 Hamid Ansari 3,7,9,10) Sqm
290 Dressing for PCC Raft b/W
7/23/2021 Hamid Ansari F4(B;12) & F3(B;17) Sqm
291 Dressing for PCC Raft b/W
7/23/2021 Hamid Ansari CF3(C;4) & F9(H;3) Sqm
292 Dressing for PCC Raft b/W
7/23/2021 Hamid Ansari F1(AG;1) & F4(AK;1) Sqm
293 Dressing for PCC Raft
7/23/2021 Hamid Ansari Around F4(AK;1) Sqm
294 8/7/2021 Hamid Ansari PCC for Footing Q-1 ; F1 Cum
295
8/9/2021 Hamid Ansari PCC for Footing KL-7 ; CF5 Cum
296
8/9/2021 Hamid Ansari PCC for Footing KL-7 ; CF5 Cum
297 8/9/2021 Hamid Ansari PCC for Footing Z-3 ; F3 Cum
298 8/11/2021 Hamid Ansari PCC for Footing Z-2 ; F3 Cum
299 8/12/2021 Hamid Ansari PCC for Footing W-2 ; F3 Cum
300 8/12/2021 Hamid Ansari PCC for Footing W-3 ; F3 Cum
301 8/13/2021 Hamid Ansari PCC for Footing Q-8 ; F2 Cum
302 8/14/2021 Hamid Ansari PCC for Footing W-8 ; F3 Cum
303 8/14/2021 Hamid Ansari PCC for Footing W-6 ; F3 Cum
304 8/16/2021 Hamid Ansari PCC for Footing Z-6 ; F3 Cum
305 8/16/2021 Hamid Ansari PCC for Footing Z-8 ; F3 Cum
306 8/17/2021 Hamid Ansari PCC for Footing AG-8 ; F2 Cum
307 8/6/2021 Hamid Ansari RCC for Footing AK-2 ; F3 Cum
308 8/6/2021 Hamid Ansari RCC for Footing AK-1 ; F4 Cum
309 8/9/2021 Hamid Ansari RCC for Footing B-12 ; F4 Cum
310 8/10/2021 Hamid Ansari RCC for Footing H-9 ; F1 Cum
311 8/14/2021 Hamid Ansari RCC for Footing Q-1 ; F1 Cum
312
8/16/2021 Hamid Ansari RCC for Footing K,L-5,7 ; CF5 Cum
313
8/16/2021 Hamid Ansari RCC for Footing K,L-5,7 ; CF5 Cum
314 8/19/2021 Hamid Ansari RCC for Footing W-2 ; F3 Cum
315 8/19/2021 Hamid Ansari RCC for Footing Z-3; F3 Cum
316
8/3/2021 Hamid Ansari RCC for Pedestal's AR-39; F4 Cum
317
8/3/2021 Hamid Ansari RCC for Pedestal's AS-39; F4 Cum
318 RCC for Pedestal's AK,AL-36;
8/3/2021 Hamid Ansari CF5 Cum
319 RCC for Pedestal's A-17;
8/11/2021 Hamid Ansari CF12 Cum
320 RCC for Pedestal's A-18;
8/11/2021 Hamid Ansari CF12 Cum
321 RCC for Pedestal's A-21;
8/11/2021 Hamid Ansari CF12 Cum
322 RCC for Pedestal's A-22;
8/11/2021 Hamid Ansari CF12 Cum
323 RCC for Pedestal's A-24;
8/11/2021 Hamid Ansari CF12 Cum
324 RCC for Pedestal's A-25;
8/11/2021 Hamid Ansari CF12 Cum
325 RCC for Pedestal's A-27;
8/11/2021 Hamid Ansari CF12 Cum
326 RCC for Pedestal's A-28;
8/11/2021 Hamid Ansari CF12 Cum
327
8/11/2021 Hamid Ansari RCC for Pedestal's AL-26; F4 Cum
328
8/13/2021 Hamid Ansari RCC for Pedestal's AL-22; F4 Cum
329
8/13/2021 Hamid Ansari RCC for Pedestal's AL-23; F4 Cum
330
8/13/2021 Hamid Ansari RCC for Pedestal's AL-19; F4 Cum
331
8/14/2021 Hamid Ansari RCC for Pedestal's N-23; F7 Cum
332
8/14/2021 Hamid Ansari RCC for Pedestal's Q-23; F7 Cum
333
8/14/2021 Hamid Ansari RCC for Pedestal's R-23; F7 Cum
334
8/14/2021 Hamid Ansari RCC for Pedestal's S-23; F7 Cum
335
8/14/2021 Hamid Ansari RCC for Pedestal's T-23; F7 Cum
336
8/14/2021 Hamid Ansari RCC for Pedestal's Q-22; F7 Cum
337
8/14/2021 Hamid Ansari RCC for Pedestal's R-22; F7 Cum
338
8/14/2021 Hamid Ansari RCC for Pedestal's S-22; F7 Cum
339
8/14/2021 Hamid Ansari RCC for Pedestal's T-22; F7 Cum
340
8/14/2021 Hamid Ansari RCC for Pedestal's P-14; F1 Cum
341
8/14/2021 Hamid Ansari RCC for Pedestal's KL-14; F5 Cum
342
8/19/2021 Hamid Ansari RCC for Pedestal's AG-36; F2 Cum
343 RCC for Pedestal's AK,AL-38;
8/19/2021 Hamid Ansari CF5 Cum
344 RCC for Shear wall J; 37-40 -
8/7/2021 Hamid Ansari F9A Cum
345 PCC for Retaining wall AK-
8/12/2021 Hamid Ansari 38/40 - F3/CF5 Cum
346 PCC for Retaining wall AK-
8/12/2021 Hamid Ansari 38/AM-38 - CF5/F9 Cum
347 RCC for Retaining wall Raft
8/6/2021 Hamid Ansari AK-1,2 - F4/F3 Cum
348 RCC for Retaining wall Raft
8/6/2021 Hamid Ansari AK,AG-1 - F4/F1 Cum
349 RCC for Retaining wall Raft
8/14/2021 Hamid Ansari L,Q-1 - F4/F1 Cum
350 RCC for Retaining wall Raft
8/14/2021 Hamid Ansari L,Q-1 - F4/F1 Cum
351 RCC for Retaining wall Raft
8/16/2021 Hamid Ansari (K,L-5,7) (L-3) - CF5/F3 Cum
352 RCC for Retaining wall Raft
8/17/2021 Hamid Ansari AU-37,39 - CF11/F4 Cum
353 RCC for Retaining wall Raft
8/19/2021 Hamid Ansari AK-38,40 - CF5/F3 Cum
354 RCC for Retaining wall
8/10/2021 Hamid Ansari AG,AK-42 - F2/F4 Cum
355 RCC for Retaining wall AK-
8/10/2021 Hamid Ansari 42 - F4/C191 Cum
356 RCC for Retaining wall AK-
8/10/2021 Hamid Ansari 42,41 - F4/F3 Cum
357 RCC for Retaining wall AK-
8/10/2021 Hamid Ansari 41 - F3/C185 Cum
358 RCC for Retaining wall AK-
8/11/2021 Hamid Ansari 40,41 - F3/F3 Cum
359 RCC for Retaining wall AK-
8/11/2021 Hamid Ansari 40 - F3/C181 Cum
360 RCC for Retaining wall
8/17/2021 Hamid Ansari AP,AR-38,39 - CF11/F4 Cum
361 RCC for Retaining wall AR-
8/17/2021 Hamid Ansari 39 - F4/C175 Cum
362 RCC for Retaining wall
8/17/2021 Hamid Ansari AR,AS-39 - F4/F4 Cum
363 RCC for Retaining wall AS-
8/17/2021 Hamid Ansari 39 - F4/C176 Cum
364 RCC for Retaining wall AS-
8/17/2021 Hamid Ansari 39 - F4 Cum
365 RCC for Retaining wall AS,
8/17/2021 Hamid Ansari AT-39 - F4/F4 Cum
366 8/6/2021 Hamid Ansari Dressing For PCC Q-1 -F1 Sqm
367
8/7/2021 Hamid Ansari Dressing For PCC KL-7 -CF5 Sqm
368
8/7/2021 Hamid Ansari Dressing For PCC KL-7 -CF5 Sqm
369 8/8/2021 Hamid Ansari Dressing For PCC Z-3 -F3 Sqm
370 8/10/2021 Hamid Ansari Dressing For PCC Z-2 -F3 Sqm
371 8/11/2021 Hamid Ansari Dressing For PCC W-2 -F3 Sqm
372 8/11/2021 Hamid Ansari Dressing For PCC W-3 -F3 Sqm
373 8/12/2021 Hamid Ansari Dressing For PCC Q-8 -F2 Sqm
374 8/13/2021 Hamid Ansari Dressing For PCC W-8 -F3 Sqm
375 8/13/2021 Hamid Ansari Dressing For PCC W-6 -F3 Sqm
376 8/14/2021 Hamid Ansari Dressing For PCC Z-6 -F3 Sqm
377 8/16/2021 Hamid Ansari Dressing For PCC Z-8 -F3 Sqm
378
8/16/2021 Hamid Ansari Dressing For PCC AG-8 -F2 Sqm
379 Stagging & Platform Work
8/10/2021 Hamid Ansari AG,AK-40,42 - F2/F3 Sqm

Stagging & Platform Work


380 AP,AR,AS,AT-38,39 -
8/16/2021 Hamid Ansari CF11/F4 Sqm
Contractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
Work Place From To Offset Trips Nos Length
Type wise

Academic Block 2/19/2021 3/4/2021 2 10.200

Academic Block 2/19/2021 3/4/2021 8 1.950

Academic Block 3/19/2021 4/1/2021

Academic Block 3/19/2021 4/1/2021

Academic Block 3/19/2021 4/1/2021

Academic Block 4/16/2021 4/29/2021 4 6.200

Academic Block 4/16/2021 4/29/2021 1 6.200

Academic Block 4/16/2021 4/29/2021

Academic Block 4/16/2021 4/29/2021 1 8.200

Academic Block 4/16/2021 4/29/2021 1 5.200

Academic Block 4/16/2021 4/29/2021 1 16.150

Academic Block 4/16/2021 4/29/2021

Academic Block 4/16/2021 4/29/2021

Academic Block 4/30/2021 5/13/2021 1 6.000

Academic Block 4/30/2021 5/13/2021 4 5.000

Academic Block 4/30/2021 5/13/2021 4 3.200

Academic Block 4/30/2021 5/13/2021 2 5.930

Academic Block 4/30/2021 5/13/2021 1 6.000

Academic Block 4/30/2021 5/13/2021 2 6.000


Academic Block 4/30/2021 5/13/2021

Academic Block 4/30/2021 5/13/2021 4 3.200

Academic Block 4/30/2021 5/13/2021 2 5.930

Academic Block 4/30/2021 5/13/2021 1 6.200

Academic Block 4/30/2021 5/13/2021 1 6.200

Academic Block 4/30/2021 5/13/2021 1 8.000

Academic Block 4/30/2021 5/13/2021 4 3.200

Academic Block 4/30/2021 5/13/2021 4 3.200

Academic Block 4/30/2021 5/13/2021 1 9.510

Academic Block 4/30/2021 5/13/2021 1 5.000

Academic Block 4/30/2021 5/13/2021 1 5.000

Academic Block 4/30/2021 5/13/2021

Academic Block 4/30/2021 5/13/2021 136.860

Academic Block 4/30/2021 5/13/2021 8.150

Academic Block 4/30/2021 5/13/2021 6.350

Academic Block 4/30/2021 5/13/2021 11.300

Academic Block 4/30/2021 5/13/2021 0.5 11.300

Academic Block 4/30/2021 5/13/2021 1 15.955

Academic Block 4/30/2021 5/13/2021 1 9.600

Academic Block 4/30/2021 5/13/2021 1 9.420

Academic Block 4/30/2021 5/13/2021 1 19.175

Academic Block 4/30/2021 5/13/2021 1 5.250

Academic Block 4/30/2021 5/13/2021 1 7.950

Academic Block 4/30/2021 5/13/2021

Academic Block 4/30/2021 5/13/2021 9.600

Academic Block 4/30/2021 5/13/2021 5.000

Academic Block 5/14/2021 5/27/2021 4 3.000

Academic Block 5/14/2021 5/27/2021 5.220


Academic Block 5/14/2021 5/27/2021 0.300

Academic Block 5/14/2021 5/27/2021 2.900

Academic Block 5/14/2021 5/27/2021 9.600

Academic Block 5/14/2021 5/27/2021 2 5.730

Academic Block 5/14/2021 5/27/2021 1 6.000

Academic Block 5/14/2021 5/27/2021 1 4.000

Academic Block 5/14/2021 5/27/2021 4 4.200

Academic Block 5/14/2021 5/27/2021 4 4.200

Academic Block 5/14/2021 5/27/2021 11.100

Academic Block 5/14/2021 5/27/2021 12.200

Academic Block 5/14/2021 5/27/2021 4 4.000

Academic Block 5/14/2021 5/27/2021 92.150

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021

Academic Block 5/14/2021 5/27/2021 88.060


Academic Block 5/14/2021 5/27/2021 3 6.000

Academic Block 5/14/2021 5/27/2021 5.500

Academic Block 5/14/2021 5/27/2021 2 5.215

Academic Block 5/14/2021 5/27/2021 1 1.000

Academic Block 5/14/2021 5/27/2021 1 9.600

Academic Block 5/14/2021 5/27/2021 1 5.200

Academic Block 5/14/2021 5/27/2021 2 2.900

Academic Block 5/14/2021 5/27/2021 1 2.900

Academic Block 5/14/2021 5/27/2021 1 9.300

Academic Block 5/14/2021 5/27/2021 1 1.400

Academic Block 5/14/2021 5/27/2021 1 1.100

Academic Block 5/14/2021 5/27/2021 1 1.100

Academic Block 5/14/2021 5/27/2021 1 1.100

Academic Block 5/14/2021 5/27/2021 1 1.100

Academic Block 5/14/2021 5/27/2021 1 1.100


Academic Block 5/14/2021 5/27/2021 3 0.950

Academic Block 5/14/2021 5/27/2021 1 1.100

Academic Block 5/14/2021 5/27/2021 2 0.800

Academic Block 5/28/2021 6/10/2021 73.142

Academic Block 5/28/2021 6/10/2021 4.000

Academic Block 5/28/2021 6/10/2021 6.000

Academic Block 5/28/2021 6/10/2021 4.000

Academic Block 5/28/2021 6/10/2021 95.800

Academic Block 5/28/2021 6/10/2021 6.000

Academic Block 5/28/2021 6/10/2021 6.000

Academic Block 5/28/2021 6/10/2021 6.000

Academic Block 5/28/2021 6/10/2021 6.200

Academic Block 5/28/2021 6/10/2021 10.850

Academic Block 5/28/2021 6/10/2021 6.800

Academic Block 5/28/2021 6/10/2021 6.200

Academic Block 5/28/2021 6/10/2021 10.850

Academic Block 5/28/2021 6/10/2021 5.200

Academic Block 5/28/2021 6/10/2021 6.805

Academic Block 5/28/2021 6/10/2021 3 4.200

Academic Block 5/28/2021 6/10/2021 2.000


Academic Block 5/28/2021 6/10/2021 15.495

Academic Block 5/28/2021 6/10/2021 4.200

Academic Block 5/28/2021 6/10/2021 6.200

Academic Block 5/28/2021 6/10/2021 8.200

Academic Block 5/28/2021 6/10/2021 9.785

Academic Block 5/28/2021 6/10/2021 4.200

Academic Block 5/28/2021 6/10/2021 3.350

Academic Block 5/28/2021 6/10/2021 10.650

Academic Block 5/28/2021 6/10/2021 4 4.200

Academic Block 5/28/2021 6/10/2021 2.000

Academic Block 5/28/2021 6/10/2021 75.000

Academic Block 5/28/2021 6/10/2021 9.785

Academic Block 5/28/2021 6/10/2021 24 1.750

Academic Block 5/28/2021 6/10/2021 4.000

Academic Block 5/28/2021 6/10/2021 6.000

Academic Block 5/28/2021 6/10/2021 7.055

Academic Block 5/28/2021 6/10/2021 5.200

Academic Block 6/11/2021 6/24/2021

Academic Block 6/11/2021 6/24/2021 11.350

Academic Block 6/11/2021 6/24/2021 3 4.000

Academic Block 6/11/2021 6/24/2021 3.550

Academic Block 6/11/2021 6/24/2021 3.000

Academic Block 6/11/2021 6/24/2021 4 3.200


Academic Block 6/11/2021 6/24/2021 1 4.200

Academic Block 6/11/2021 6/24/2021

Academic Block 6/11/2021 6/24/2021 5 1.100

Academic Block 6/11/2021 6/24/2021 2 0.800

Academic Block 6/11/2021 6/24/2021 5 0.950

Academic Block 6/11/2021 6/24/2021 3 0.950

Academic Block 6/11/2021 6/24/2021 2.050

Academic Block 6/11/2021 6/24/2021 6.050

Academic Block 6/11/2021 6/24/2021 2 3.630

Academic Block 6/11/2021 6/24/2021 2 2.400

Academic Block 6/11/2021 6/24/2021 1.100

Academic Block 6/11/2021 6/24/2021 4 3.200

Academic Block 6/11/2021 6/24/2021 1.000 4.200

Academic Block 6/11/2021 6/24/2021 1.000 6.200

Academic Block 6/11/2021 6/24/2021 1.000 6.200

Academic Block 6/11/2021 6/24/2021 1.000 5.930

Academic Block 6/11/2021 6/24/2021 10.650

Academic Block 6/11/2021 6/24/2021 9.585

Academic Block 6/11/2021 6/24/2021 2.000 3.630

Academic Block 6/11/2021 6/24/2021 2.000 2.800

Academic Block 6/11/2021 6/24/2021 5.000 1.100

Academic Block 6/11/2021 6/24/2021 2.000 0.900

Academic Block 6/11/2021 6/24/2021 2.000 6.670

Academic Block 6/11/2021 6/24/2021 5.800


Academic Block 6/25/2021 7/8/2021 15.695

Academic Block 6/25/2021 7/8/2021 13.745

Academic Block 6/25/2021 7/8/2021 2.050

Academic Block 6/25/2021 7/8/2021 5.730

Academic Block 6/25/2021 7/8/2021 5.730

Academic Block 6/25/2021 7/8/2021 6.000

Academic Block 6/25/2021 7/8/2021 4.000

Academic Block 6/25/2021 7/8/2021 1.400

Academic Block 6/25/2021 7/8/2021 1.100

Academic Block 6/25/2021 7/8/2021 2.050

Academic Block 6/25/2021 7/8/2021 2 0.800

Academic Block 6/25/2021 7/8/2021 2 1.285

Academic Block 6/25/2021 7/8/2021 2 1.100

Academic Block 6/25/2021 7/8/2021 9.300

Academic Block 6/25/2021 7/8/2021 6.000

Academic Block 6/25/2021 7/8/2021 8.000

Academic Block 6/25/2021 7/8/2021 7.950

Academic Block 6/25/2021 7/8/2021 6.000

Academic Block 6/25/2021 7/8/2021 8.000

Academic Block 6/25/2021 7/8/2021 7.950

Academic Block 6/25/2021 7/8/2021


Academic Block 7/2/2021 7/8/2021 6.2

Academic Block 7/2/2021 7/8/2021 8.95

Academic Block 7/2/2021 7/8/2021 8.2

Academic Block 7/2/2021 7/8/2021 3

Academic Block 7/2/2021 7/8/2021 3

Academic Block 7/2/2021 7/8/2021 3

Academic Block 7/2/2021 7/8/2021 3

Academic Block 7/2/2021 7/8/2021 4

Academic Block 7/2/2021 7/8/2021 212.07

Academic Block 7/2/2021 7/8/2021 8

Academic Block 7/2/2021 7/8/2021 5.73

Academic Block 7/2/2021 7/8/2021 5.73

Academic Block 7/2/2021 7/8/2021 5.2

Academic Block 7/2/2021 7/8/2021 5.2

Academic Block 7/2/2021 7/8/2021 6.01

Academic Block 7/2/2021 7/8/2021 6.42

Academic Block 7/2/2021 7/8/2021 5.52

Academic Block 7/2/2021 7/8/2021 1.1

Academic Block 7/2/2021 7/8/2021 0.95

Academic Block 7/2/2021 7/8/2021 0.95

Academic Block 7/2/2021 7/8/2021 1.1

Academic Block 7/2/2021 7/8/2021 1.1

Academic Block 7/2/2021 7/8/2021 2.05

Academic Block 7/2/2021 7/8/2021 2.05


Academic Block 7/2/2021 7/8/2021 1.1

Academic Block 7/2/2021 7/8/2021 1.1

Academic Block 7/2/2021 7/8/2021 0.95


Academic Block 7/2/2021 7/8/2021 0.95
Academic Block 7/2/2021 7/8/2021 0.95
Academic Block 7/2/2021 7/8/2021 0.95
Academic Block 7/2/2021 7/8/2021 0.95

Academic Block 7/2/2021 7/8/2021 6.2

Academic Block 7/2/2021 7/8/2021 8.95

Academic Block 7/2/2021 7/8/2021 8.2

Academic Block 7/9/2021 7/22/2021 6

Academic Block 7/9/2021 7/22/2021 7.95

Academic Block 7/9/2021 7/22/2021 8

Academic Block 7/9/2021 7/22/2021 6


Academic Block 7/9/2021 7/22/2021 6.2
Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 8.2

Academic Block 7/9/2021 7/22/2021 1.1

Academic Block 7/9/2021 7/22/2021 1.1

Academic Block 7/9/2021 7/22/2021 1.4

Academic Block 7/9/2021 7/22/2021 12.5


Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 12.5

Academic Block 7/9/2021 7/22/2021 8.2


Academic Block 7/9/2021 7/22/2021 6.2
Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 8.2

Academic Block 7/9/2021 7/22/2021 6

Academic Block 7/9/2021 7/22/2021 7.95

Academic Block 7/9/2021 7/22/2021 8

Academic Block 7/9/2021 7/22/2021 6

Academic Block 7/9/2021 7/22/2021 1.1

Academic Block 7/9/2021 7/22/2021 1.1

Academic Block 7/9/2021 7/22/2021 1.4

Academic Block 7/9/2021 7/22/2021 1.1

Academic Block 7/9/2021 7/22/2021 9.2

Academic Block 7/9/2021 7/22/2021 12.8

Academic Block 7/9/2021 7/22/2021 6.2

Academic Block 7/9/2021 7/22/2021 12.8

Academic Block 7/9/2021 7/22/2021 8.2

Academic Block 7/23/2021 8/5/2021 12.4

Academic Block 7/23/2021 8/5/2021 12.4

Academic Block 7/23/2021 8/5/2021 8.2

Academic Block 7/23/2021 8/5/2021 2.5

Academic Block 7/23/2021 8/5/2021 5

Academic Block 7/23/2021 8/5/2021 3.45


Academic Block 7/23/2021 8/5/2021 5

Academic Block 7/23/2021 8/5/2021 18


Academic Block 7/23/2021 8/5/2021 6

Academic Block 7/23/2021 8/5/2021 6

Academic Block 7/23/2021 8/5/2021 6


Academic Block 7/23/2021 8/5/2021 4
Academic Block 7/23/2021 8/5/2021 6

Academic Block 7/23/2021 8/5/2021 12.2

Academic Block 7/23/2021 8/5/2021 12.2

Academic Block 7/23/2021 8/5/2021 8

Academic Block 7/23/2021 8/5/2021 1.5

Academic Block 7/23/2021 8/5/2021 5.5

Academic Block 7/23/2021 8/5/2021 10

Academic Block 7/23/2021 8/5/2021 2.5

Academic Block 7/23/2021 8/5/2021 1

Academic Block 7/23/2021 8/5/2021 2.05

Academic Block 7/23/2021 8/5/2021 1.1

Academic Block 7/23/2021 8/5/2021 1.1

Academic Block 7/23/2021 8/5/2021 1.1

Academic Block 7/23/2021 8/5/2021 1.1

Academic Block 7/23/2021 8/5/2021 1.1

Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 0.8


Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 1.1

Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 0.8

Academic Block 7/23/2021 8/5/2021 2.05

Academic Block 7/23/2021 8/5/2021 8 0.9

Academic Block 7/23/2021 8/5/2021 2.5

Academic Block 7/23/2021 8/5/2021 3.7

Academic Block 7/23/2021 8/5/2021 3.28

Academic Block 7/23/2021 8/5/2021 6.4

Academic Block 7/23/2021 8/5/2021 20.06

Academic Block 7/23/2021 8/5/2021 0.9

Academic Block 7/23/2021 8/5/2021 1.05

Academic Block 7/23/2021 8/5/2021 12.4

Academic Block 7/23/2021 8/5/2021 12.4

Academic Block 7/23/2021 8/5/2021 8.2

Academic Block 7/23/2021 8/5/2021 2.5

Academic Block 7/23/2021 8/5/2021 5

Academic Block 7/23/2021 8/5/2021 3.45

Academic Block 7/23/2021 8/5/2021 5

Academic Block 7/23/2021 8/5/2021 18


Academic Block 8/6/2021 8/19/2021 8.2

Academic Block 8/6/2021 8/19/2021 8.15

Academic Block 8/6/2021 8/19/2021 5.1


Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 9.8
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 9.8
Academic Block 8/6/2021 8/19/2021 6
Academic Block 8/6/2021 8/19/2021 4
Academic Block 8/6/2021 8/19/2021 4
Academic Block 8/6/2021 8/19/2021 8
Academic Block 8/6/2021 8/19/2021 8

Academic Block 8/6/2021 8/19/2021 7.95

Academic Block 8/6/2021 8/19/2021 6.15


Academic Block 8/6/2021 8/19/2021 6
Academic Block 8/6/2021 8/19/2021 6

Academic Block 8/6/2021 8/19/2021 0.8

Academic Block 8/6/2021 8/19/2021 0.8

Academic Block 8/6/2021 8/19/2021 2.05

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65


Academic Block 8/6/2021 8/19/2021 0.8

Academic Block 8/6/2021 8/19/2021 1.285

Academic Block 8/6/2021 8/19/2021 1.285

Academic Block 8/6/2021 8/19/2021 0.8

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 0.65

Academic Block 8/6/2021 8/19/2021 1.1

Academic Block 8/6/2021 8/19/2021 2.05

Academic Block 8/6/2021 8/19/2021 1.4

Academic Block 8/6/2021 8/19/2021 2.05

Academic Block 8/6/2021 8/19/2021 9.3

Academic Block 8/6/2021 8/19/2021 0.8

Academic Block 8/6/2021 8/19/2021 1.62

Academic Block 8/6/2021 8/19/2021 3.975

Academic Block 8/6/2021 8/19/2021 6.015

Academic Block 8/6/2021 8/19/2021 6.015

Academic Block 8/6/2021 8/19/2021 3.35


Academic Block 8/6/2021 8/19/2021 0.7

Academic Block 8/6/2021 8/19/2021 0.92

Academic Block 8/6/2021 8/19/2021 0.7

Academic Block 8/6/2021 8/19/2021 10.965

Academic Block 8/6/2021 8/19/2021 0.9

Academic Block 8/6/2021 8/19/2021 5.255

Academic Block 8/6/2021 8/19/2021 0.9

Academic Block 8/6/2021 8/19/2021 5.4

Academic Block 8/6/2021 8/19/2021 0.9

Academic Block 8/6/2021 8/19/2021 6.43

Academic Block 8/6/2021 8/19/2021 0.6

Academic Block 8/6/2021 8/19/2021 4.45

Academic Block 8/6/2021 8/19/2021 0.6

Academic Block 8/6/2021 8/19/2021 1.7

Academic Block 8/6/2021 8/19/2021 1.2


Academic Block 8/6/2021 8/19/2021 8.2

Academic Block 8/6/2021 8/19/2021 8.15

Academic Block 8/6/2021 8/19/2021 5.1


Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 9.8
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2
Academic Block 8/6/2021 8/19/2021 6.2

Academic Block 8/6/2021 8/19/2021 9.8


Academic Block 8/6/2021 8/19/2021 1.9

Academic Block 8/6/2021 8/19/2021 1.9


Width Depth Qty Remarks

10.200 0.170 35.374

1.950 0.100 3.042

500.000

60.000

1.000
153.76*1
6.200 153.760
0.76=165
4Sqf
62*10.76
10.000 62.000
=667.12S
Concrete
qf
236.000 conceptio
n=36cum
8.200 0.120 8.069

5.200 0.120 3.245

8.200 0.120 15.892

33.466

11700.000 18*650

6.000 1.750 63.000

5.000 1.300 130.000

2.200 0.150 4.224

5.100 0.150 9.073

6.000 0.150 5.400

6.000 0.150 10.800


(1.03+3.8
0.942
05)*1.3*0
.15
2.200 28.160

5.100 60.486

6.200 38.440

6.200 38.440

8.000 2.000 128.000

2.200 28.160

2.200 0.300 8.448

5.000 1.200 57.060

5.000 1.200 30.000

5.000 1.200 30.000

100.000

0.150 20.529

7.255 0.150 8.869

5.200 0.150 4.953

3.300 0.150 5.594

0.900 0.650 3.305

8.000 2.000 255.280

9.600 92.160

23.205 1.750 382.534

0.230 1.750 7.718

5.000 1.750 45.938

7.000 1.750 97.388

98.400 Rmt

9.600 92.160 Rmt

1.300 6.500 Rmt

2.000 0.600 14.400

1.100 0.300 1.723


1.100 0.300 0.099

1.100 0.300 0.957

9.600 2.500 230.400

4.900 0.900 50.539

6.000 1.750 63.000

4.000 0.900 14.400

4.200 0.150 10.584

4.200 70.560

3.100 1.000 34.410

3.100 1.000 37.820

4.000 0.900 57.600

0.150 13.823

9.000

92.150

92.150

11.660 (2*3.43)+(
2*2.4)

11.660 (2*3.43)+(
2*2.4)

9.300

9.300

1.500 132.090
6.000 1.750 189.000

1.100 0.300 1.815

1.100 0.300 3.442

1.100 0.300 0.330

0.200 0.450 0.864

0.200 1.100 1.144

0.200 0.450 0.522

0.200 1.100 0.638

0.200 2.100 3.906

1.400 0.450 0.882

1.100 0.450 0.545

1.100 0.450 0.545

1.100 0.450 0.545

1.100 0.450 0.545

1.100 0.450 0.545


0.950 0.750 2.031

1.100 0.750 0.908

0.800 0.750 0.960

1.750 127.999

6.000 24.000

4.000 24.000

6.000 24.000

1.500 143.700

6.155 1.750 64.628

6.000 1.750 63.000

6.000 1.750 63.000

6.200 0.150 5.766

6.200 0.150 10.091

1.100 0.300 2.244

6.200 38.440

6.200 67.270

5.605 29.146

7.585 51.616

4.200 52.920

2.700 5.400
9.605 148.829

4.200 17.640

6.200 38.440

8.200 67.240

5.200 50.882

4.200 17.640

2.000 6.700

6.000 1.500 95.850

4.200 0.150 10.584

3.550 0.150 1.065

0.150 11.250

5.200 0.150 7.632

1.750 0.450 33.075

4.000 0.900 14.400

6.000 1.750 63.000

7.950 1.500 84.131

6.150 1.500 47.970

91.702 70.54sqm
*1.30
2.400 27.240

4.000 0.900 43.200

2.150 0.600 4.580

0.200 0.900 0.540

2.200 0.150 4.224


4.200 0.150 2.646

1.000

1.100 0.450 2.723

0.800 0.450 0.576

0.950 0.450 2.031

0.950 0.750 2.031

1.100 0.450 1.015

1.100 0.300 1.997

0.200 1.600 2.323

0.200 1.600 1.536

1.100 0.450 0.545

2.200 28.160

4.200 17.640

6.200 38.440

6.200 38.440

5.100 30.243

6.000 9.585
0.15
5.000 57.510
1.2
0.200 2.323
1.6
0.200 1.792
1.6
1.100 2.723
0.45
0.900 1.944
1.2
1.200 3.202
0.2
1.200 1.392
0.2
10.505 0.150 24.731 But in
Site
condition
3.300 0.150 6.804 for
undulatio
n it is 41.5
0.900 0.150 0.277 cum

4.900 0.150 4.212

4.900 0.150 4.212

6.000 0.150 5.400

4.000 0.150 2.400

1.400 0.450 0.882

1.100 0.450 0.545

1.100 0.450 1.015

0.800 0.450 0.576

0.800 0.450 0.925

1.100 0.750 1.815

5.000 0.300 13.950

6.000 36.000

8.000 64.000

7.000 55.650

6.000 36.000

8.000 64.000

7.000 55.650

212.070
6.2 0.15 5.77

7.2 0.15 9.67

8.2 0.15 10.09

2 0.6 3.60

2 0.6 3.60

2 0.6 3.60

2 0.6 3.60

4 0.9 14.40

212.07 1 212.07

8 2 128.00

4.9 0.9 25.27

4.9 0.9 25.27

0.45 0.3 0.70

0.45 0.3 0.70

0.45 0.3 0.81

0.45 0.3 0.87

0.45 0.3 0.75

1.1 0.45 0.54

0.95 0.45 0.41

0.95 0.45 0.41

1.1 0.45 0.54

1.1 0.45 0.54

1.1 0.45 1.01

1.1 0.45 1.01


1.1 0.45 0.54

1.1 0.45 0.54

0.95 0.45 0.41


0.95 0.45 0.41
0.95 0.45 0.41
0.95 0.45 0.41
0.95 0.45 0.41

6.2 38.44

7.2 64.44

8.2 67.24

6 1.75 63

7 1.75 97.39

8 2 128.00

6 1.75 63.00
6.2 0.15 5.77
6.2 0.15 5.77

6.2 0.15 5.77

6.2 0.15 5.77

6.2 0.15 5.77

8.15 0.15 10.02

1.1 0.45 0.54

1.1 0.45 0.54

1.4 0.45 0.88

6.2 77.50
6.2 38.44

6.2 77.50

8.15 66.83
6.2 0.15 5.766
6.2 0.15 5.766

6.2 0.15 5.766

6.2 0.15 5.766

6.2 0.15 5.766

8.15 0.15 10.025

6 1.75 63.000

7 1.75 97.388

8 2 128.000

6 1.75 63.000

1.1 0.45 0.545

1.1 0.45 0.545

1.4 0.45 0.882

1.1 0.45 0.545

1.2 0.2 2.208

6.2 79.360

6.2 38.440

6.2 79.360

8.15 66.830

3.3 0.15 6.138

3.3 0.15 6.138

8.2 0.15 10.086

1.3 0.15 0.488

4 0.15 3.000

1.3 0.15 0.673


3.8 0.15 2.850

1 0.15 2.700
6 1.75 63.000

6 1.75 63.000

6 1.75 63.000
4 0.9 14.400
6 1.75 63.000

3.1 1 37.820

3.1 1 37.820

8 2 128.000

0.3 0.6 0.270

1.155 0.6 3.812

1.3 0.6 7.800

1.3 0.6 1.950

3.8 0.6 2.280

1.1 0.45 1.015

1.1 0.45 0.545

1.1 0.45 0.545

1.1 0.45 0.545

1.1 0.45 0.545

1.1 0.45 0.545

0.8 0.45 0.288

0.8 0.45 0.288

0.8 0.45 0.288

0.8 0.45 0.288


0.8 0.45 0.288

0.8 0.45 0.288

1.1 0.45 0.545

0.8 0.45 0.288

0.8 0.45 0.288

1.1 0.45 1.015

0.9 0.45 2.916

1.2 0.2 0.600 1ST Lift

1.8 0.2 1.332 2ND LIFT

1.05 0.2 0.689

0.45 0.2 0.576

1.2 0.2 4.814

0.9 1.2 0.972

1.05 0.2 0.221

3.3 40.920

3.3 40.920

8.2 67.240

1.3 3.250

4 20.000

1.3 4.485

3.8 19.000

1 18.000
8.2 0.15 10.086

7.35 0.15 8.985

6.35 0.15 4.858


6.2 0.15 5.766
6.2 0.15 5.766
6.2 0.15 5.766
6.2 0.15 5.766
9.8 0.15 14.406
6.2 0.15 5.766
6.355 0.15 5.910
6.2 0.15 5.766
6.355 0.15 5.910
9.8 0.15 14.406
6 1.75 63.000
4 0.9 14.400
4 0.9 14.400
8 2 128.000
8 2 128.000

7.055 1.5 84.131

5.2 1.5 47.970


6 1.75 63.000
6 1.75 63.000

0.8 0.45 0.288

0.8 0.45 0.288

1.1 0.45 1.015

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190


0.8 0.45 0.288

0.8 0.45 0.463

0.8 0.45 0.463

0.8 0.45 0.288

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

0.65 0.45 0.190

1.1 0.45 0.545

1.1 0.45 1.015

1.4 0.45 0.882

1.1 0.45 1.015

0.2 1 1.860

1.3 1.6 1.664

1.3 0.75 1.580

3.35 0.6 7.990

3.35 0.6 12.090

3.35 0.6 12.090

0.42 0.6 0.844


3.35 0.6 1.407

1.1 0.3 0.304

1.1 0.3 0.231

0.2 0.8 1.754

0.9 0.8 0.648

0.2 1.6 1.682

0.9 1.6 1.296

0.2 1.7 1.836

0.9 1.7 1.377

0.2 1.95 2.508

0.6 1.95 0.702

0.2 1.95 1.736

0.6 1.95 0.702

0.2 1.95 0.663

0.2 1.05 0.252


8.2 67.240

7.35 59.903

6.35 32.385
6.2 38.440
6.2 38.440
6.2 38.440
6.2 38.440
9.8 96.040
6.2 38.440
6.355 39.401
6.2 38.440
6.355 39.401

9.8 96.040
23.7 45.030

15 28.500
Contractor: B
chikm

SL. No Date BOQ Name of the Contractor Description Unit

Type-A Quarters
1 3/19/2021 Parameshwarappa Footing Concrete F1/E12 Cum
2 3/19/2021 Parameshwarappa Footing Concrete F1/F12 Cum
3 3/19/2021 Parameshwarappa Footing Concrete CF1/A1 Cum
4 3/19/2021 Parameshwarappa Footing Concrete CF1/K1 Cum
5 3/19/2021 Parameshwarappa Footing Concrete F1/E1 Cum
6 3/19/2021 Parameshwarappa Footing Concrete F1/F1 Cum
7 3/19/2021 Parameshwarappa Footing Concrete CF2/J1 Cum
8 3/19/2021 Parameshwarappa Footing Concrete CF2/B1 Cum
Footing Concrete CF2/E2 (pit
9 3/19/2021 Parameshwarappa of lift) Cum
Footing Concrete CF5/E2
10 3/19/2021 Parameshwarappa (Slope) Cum
Footing Concrete CF5/E2 &F2
11 3/19/2021 Parameshwarappa (Wings) Cum
Footing Concrete CF4/C7 (Lift
12 3/19/2021 Parameshwarappa pit) Cum

13 3/19/2021 Parameshwarappa Footing Concrete CF3/G1 Cum

Weigh Bridge Room 1.


Foundation-
((2*2.70*0.2)+(2*3.5*0.2))=2.4
8 2.
BrickWork ; Long Wall-
(3.36*2*2.65*2)+Short Wall-
(3.06*2*2.65)=34.026 3.
Deductions ; (Doors-0.9*2.1)+
14 3/19/2021 Parameshwarappa (windows-0.9*2.1)=4.05 Cum
15
16 3/22/2021 Parameshwarappa Dressing of CF1/A1 &CF1/K1 Sqm
17 3/23/2021 Parameshwarappa Dressing of CF2/B1 Sqm
18 3/23/2021 Parameshwarappa Dressing of CF2/J1 Sqm
19 3/26/2021 Parameshwarappa Dressing of CF5 Lift Sqm
20 3/27/2021 Parameshwarappa Dressing of CF5 Wings Sqm

21 3/28/2021 Parameshwarappa Dressing of CF3/B1 Sqm


22 3/30/2021 Parameshwarappa Dressing of CF3 Slopes Sqm

23 4/1/2021 Parameshwarappa Dressing of CF1/K9 Sqm


Contractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
Work Place From To Offset Trips Nos Length
Type wise

Type-A Quarters 3/19/2021 4/1/2021 1 3.7


Type-A Quarters 3/19/2021 4/1/2021 1 3.7
Type-A Quarters 3/19/2021 4/1/2021 1 3.9
Type-A Quarters 3/19/2021 4/1/2021 1 3.9
Type-A Quarters 3/19/2021 4/1/2021 1 3.7
Type-A Quarters 3/19/2021 4/1/2021 1 3.7
Type-A Quarters 3/19/2021 4/1/2021 1 4.4
Type-A Quarters 3/19/2021 4/1/2021 1 4.4

Type-A Quarters 3/19/2021 4/1/2021

Type-A Quarters 3/19/2021 4/1/2021

Type-A Quarters 3/19/2021 4/1/2021

Type-A Quarters 3/19/2021 4/1/2021

Type-A Quarters 3/19/2021 4/1/2021

Type-A Quarters 3/19/2021 4/1/2021

3/19/2021 4/1/2021
3/19/2021 4/1/2021
3/19/2021 4/1/2021
3/19/2021 4/1/2021
3/19/2021 4/1/2021

3/19/2021 4/1/2021
3/19/2021 4/1/2021

3/19/2021 4/1/2021
Width Depth Qty Remarks

3.7 0.15 2.05


3.7 0.15 2.05
11.84 0.15 6.93
11.84 0.15 6.93
3.7 0.15 2.05
3.7 0.15 2.05
12.2 0.15 8.052
12.2 0.15 8.052

9.654 ((10*6.8)-(2.6*1.4))*0.15

1.332 (3.7*1.2*0.15)*2

3.663 (3.7*3.3*0.15)*2
((5.3*4.9)+(0.6*1.3)+(3.3
5.39 5*2.75))*0.15
((3.7*5.13)+(4.8*1.53)+(
3.9*7.175)+(13.84*3.2)+(
15.62 3.4*1.62))*0.15

32.46 2.48+34.026-4.05

92.352 (3.9*11.84)*2
52.8
52.8
64.36 (10*6.8)-(2.6*1.4)
24.42 (3.7*3.3)*2

((3.7*5.13)+(4.8*1.53)+(
3.9*7.175)+(13.84*3.2)+(
104.1 3.4*1.62))
1.92 (1.2*0.8)*2

23.361 (3.9*5.99)
Contractor: Balaji krup
chikmaglauru m
Name of the
SL. No Date BOQ Description Unit Work Place
Contractor
Teaching Staff Type-
A
Footing Concrete
1 4/15/2021
Parameshwarapp -CF1 Cum Teaching staff Type-A
Footing Concrete -
2 4/15/2021
Parameshwarapp CF2 Cum Teaching staff Type-A
3 4/15/2021 Trimming work
Nasim Ansari Sqm Teaching staff Type-A
4 4/15/2021 PCC
Nasim Ansari Cum Teaching staff Type-A
5 4/15/2021 RCC
Nasim Ansari Cum Teaching staff Type-A
Footing Concrete
6 5/28/2021
Nasim Ansari CF1 Cum Teaching staff Type-A
7 5/28/2021 Footing Concrete
Nasim Ansari CF2 Cum Teaching staff Type-A
Pedestal's - 9 No.S
8 5/31/2021 &Column Starter
Nasim Ansari concrete-8 No.s Cum Teaching staff Type-A
Pedestal &
Retaining wall
9 6/1/2021 ConcreteUpto
Nasim Ansari Plinth Beam Cum Teaching staff Type-A
Pedestal
Bottom&
Retaining wall
10 6/1/2021 Concrete, Lift wall
Nasim Ansari Starter, Column Cum Teaching staff Type-A
concrete-4No.s
Pedestal &
Retaining wall
11 6/1/2021
Concrete, Column
Nasim Ansari concrete-1No.s Cum Teaching staff Type-A
12 Plinth Beam
6/21/2021 Nasim Ansari conctrete Cum Teaching staff Type-A
13 Plinth Beam
6/23/2021 Nasim Ansari conctrete Cum Teaching staff Type-A
14 Plinth Beam
6/24/2021 Nasim Ansari conctrete Cum Teaching staff Type-A
15 Plinth Beam
6/30/2021 Nasim Ansari conctrete Cum Teaching staff Type-A
16 Plinth Beam
7/1/2021 Nasim Ansari conctrete Cum Teaching staff Type-A
17 Plinth Beam
7/9/2021 Nasim Ansari conctrete Cum Teaching staff Type-A
18 Soil removing &
8/7/2021 Paramesh Trimming for PCC Sqm Teaching staff Type-A

19 Soil removing &


8/8/2021 Paramesh Trimming for PCC Sqm Teaching staff Type-A

20 Soil removing &


8/9/2021 Paramesh Trimming for PCC Sqm Teaching staff Type-A

21 Soil removing &


8/10/2021 Venkatesh Nayak Trimming for PCC Sqm Teaching staff Type-A

22 Soil removing &


8/11/2021 Venkatesh Nayak Trimming for PCC Sqm Teaching staff Type-A

23 Soil removing &


8/12/2021 Venkatesh Nayak Trimming for PCC Sqm Teaching staff Type-A

24 Soil removing &


8/13/2021 Venkatesh Nayak Trimming for PCC Sqm Teaching staff Type-A

25 Soil removing &


8/14/2021 Venkatesh Nayak Trimming for PCC Sqm Teaching staff Type-A

26 Soil removing &


8/17/2021 Venkatesh Nayak Trimming for PCC Sqm Teaching staff Type-A

27 Plinth Beam Earth


8/18/2021 Venkatesh Nayak Excavation Sqm Teaching staff Type-A

28 Plinth Beam Earth


8/19/2021 Venkatesh Nayak Excavation Sqm Teaching staff Type-A
ntractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
From To Offset Trips Nos Length Width Depth
Type wise

1 11.640 3.700 0.750


4/2/2021 4/15/2021
1 11.990 4.200 0.850
4/2/2021 4/15/2021

4/2/2021 4/15/2021

4/2/2021 4/15/2021

4/2/2021 4/15/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

5/28/2021 6/10/2021

6/11/2021 6/24/2021

6/11/2021 6/24/2021

6/11/2021 6/24/2021

6/25/2021 7/8/2021

6/25/2021 7/8/2021

7/9/2021 7/22/2021
8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021

8/6/2021 8/19/2021 3 0.4 0.5

8/6/2021 8/19/2021 5 0.4 0.5


Qty Remarks

32.301

42.804

244.780

63.460

233.000

110.000

98.000

1.730 Manual
Concrete

Manual
3.700
Concrete

Manual
2.500
Concrete

Manual
2.500
Concrete

8.5

10

3.1

10

13

6
120 (Avg Height-1m)

135 (Avg Height-0.9m)

80 (Avg Height-0.4m)

50 (Avg Height-0.4m)

55 (Avg Height-0.4m)

85 (Avg Height-0.4m)

50 (Avg Height-0.45m)

100 (Avg Height-0.5m)

55 (Avg Height-0.4m)

0.6 (Avg Height-0.4m)

1 (Avg Height-0.4m)
Contractor: Balaji k
chikmaglau
Name of the
SL. No Date BOQ Description Unit Work Place
Contractor

Non Teaching Staff Type-B

Non Teaching staff


1 8/17/2021 Nasim Ansari Soil leveling F1 Sqm Type-B
Non Teaching staff
2 8/17/2021 Nasim Ansari Soil leveling CF1 Sqm Type-B
Non Teaching staff
3 8/17/2021 Nasim Ansari Soil leveling CF1 Sqm Type-B
Non Teaching staff
4 8/18/2021 Nasim Ansari PCC Cum Type-B
Non Teaching staff
5 8/19/2021 Nasim Ansari Soil leveling CF1 Sqm Type-B
Non Teaching staff
6 8/19/2021 Nasim Ansari PCC Cum Type-B
Venkatesh Soil leveling F1 Non Teaching staff
7 8/16/2021 Nayak Footing Sqm Type-B
Venkatesh Soil leveling CF1 Non Teaching staff
8 8/17/2021 Nayak Footing Sqm Type-B
ontractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
From To Offset Trips Nos Length Width
Type wise

8/6/2021 8/19/2021 10.425 3.4

8/6/2021 8/19/2021 8.507 4.6

8/6/2021 8/19/2021 6.7 3.5

8/6/2021 8/19/2021

8/6/2021 8/19/2021 5.15 6

8/6/2021 8/19/2021

8/6/2021 8/19/2021 3.4 3.4

8/6/2021 8/19/2021 8.507 4.6


Depth Qty Remarks

35.445

39.1322

23.45

14

30.9

11.56

39.1322
Contractor: Balaj
chikmagl
SL. No Date BOQ Name of the Contractor Description Unit

footing,column and beam


1 1/21/2021 Durgesh MT
barbending work

footing,column and beam


2 1/21/2021 Durgesh MT
barbending work
footing,column and beam
3 1/21/2021 Durgesh MT
barbending work

4 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING Sqm


WORK RMC PLANT

5 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING Sqm


WORK RMC PLANT

6 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING Sqm


WORK RMC PLANT

7 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING Sqm


WORK RMC PLANT

8 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING Sqm


WORK RMC PLANT

9 1/21/2021 Parameshwarappa FOUNDATION SHUTTERING Sqm


WORK RMC PLANT
10 1/21/2021 Parameshwarappa RCC RAFT SHUTTERING Sqm

11 1/21/2021 Parameshwarappa RCC RAFT SHUTTERING Sqm

12 1/21/2021 Parameshwarappa RCC RAFT SHUTTERING Sqm

13 1/21/2021 Parameshwarappa RCC RAFT SHUTTERING Sqm

14 1/21/2021 Parameshwarappa RCC RAFT SHUTTERING Sqm

15 1/21/2021 Parameshwarappa RCC RAFT SHUTTERING Sqm

16 1/21/2021 Parameshwarappa RMC PILLARS SHUTTERING Sqm

17 1/21/2021 Parameshwarappa RMC PILLARS SHUTTERING Sqm

18 1/21/2021 Parameshwarappa RMC PILLARS SHUTTERING Sqm

19 1/21/2021 Parameshwarappa RMC PILLARS SHUTTERING Sqm

20 1/21/2021 Parameshwarappa SILOS RAFT Sqm

21 1/21/2021 Parameshwarappa MIXING PLANT Sqm

22 1/21/2021 Parameshwarappa BIW RAFT Sqm


23 1/21/2021 Parameshwarappa DG PEDASTRAL Sqm

24 1/21/2021 Parameshwarappa SILOS RAFT Sqm

25 1/21/2021 Parameshwarappa M PAN RAFT Sqm

26 1/21/2021 Parameshwarappa BIW RAFT Sqm

27 1/21/2021 Parameshwarappa Block work Pillars Sqm

28 1/21/2021 Parameshwarappa plastering for block work Sqm

29 1/21/2021 Parameshwarappa plastering for block work Sqm


pedastral and plinth beam
30 1/21/2021 Parameshwarappa Rmt
concreting
pedastral and plinth beam
31 1/21/2021 Parameshwarappa Rmt
concreting
pedastral and plinth beam
32 1/21/2021 Parameshwarappa Rmt
concreting
pedastral and plinth beam
33 1/21/2021 Parameshwarappa Rmt
concreting
Block Work ; Plant Control
1 2/5/2021 Parameshwarappa sqm
room -Plinth
Block Work ; Plant Control
2 2/5/2021 Parameshwarappa sqm
room -Plinth
Block Work ; Plant Control
3 2/5/2021 Parameshwarappa sqm
room -Walls
Block Work ; Plant Control
4 2/5/2021 Parameshwarappa sqm
room -Walls
Block Work ; Plant Control
5 2/5/2021 Parameshwarappa sqm
room -Deductions - doors
Block Work ; Plant Control
6 2/5/2021 Parameshwarappa sqm
room -Deductions - Window
7 Block Work ; Plant Control
2/5/2021 Parameshwarappa sqm
room -Deductions - Window
Block Work -QC Lab;
8 2/5/2021 Parameshwarappa sqm
Foundation
Block Work -QC Lab;
9 2/5/2021 Parameshwarappa sqm
Foundation
10 2/5/2021 Parameshwarappa Block Work -QC Lab; Walls sqm

11 2/5/2021 Parameshwarappa Block Work -QC Lab; Walls sqm


Block Work -QC Lab;
12 2/5/2021 Parameshwarappa sqm
Deduction of doors
Block Work -QC Lab;
13 2/5/2021 Parameshwarappa sqm
Deduction of Windows
Block Work - water tank Block
14 2/5/2021 Parameshwarappa sqm
work (200mm)
Block Work - water tank Block
15 2/5/2021 Parameshwarappa sqm
work (200mm)
16 Plastering Work (RMC Sump
2/5/2021 Parameshwarappa sqm
Tank)
17 2/5/2021 Parameshwarappa Floor finishing sqm
18 2/5/2021 Parameshwarappa Toilet Foundation sqm

19 2/5/2021 Parameshwarappa Toilet Foundation sqm

20 2/5/2021 Parameshwarappa Toilet Foundation sqm

21 2/5/2021 Parameshwarappa Toilet Foundation sqm

22 2/5/2021 Parameshwarappa Ramp shuttering - Main Wall sqm

23 2/5/2021 Parameshwarappa Ramp shuttering - Main Wall sqm

24 2/5/2021 Parameshwarappa Ramp shuttering -Side Wall sqm

25 2/5/2021 Parameshwarappa Ramp shuttering -Side Wall sqm

26 2/5/2021 Parameshwarappa Ramp shuttering -Raft sides sqm

27 2/5/2021 Parameshwarappa Main Wall Concreting Cum

28 2/5/2021 Parameshwarappa Side Wall Concreting Cum

29 2/5/2021 Parameshwarappa Side Wall Concreting Cum

30 2/5/2021 Durgesh Steel -8mm Kg

31 2/5/2021 Durgesh Steel -10mm Kg

32 2/5/2021 Durgesh Steel -12mm Kg

33 2/5/2021 Durgesh Steel -16mm Kg

34 2/19/2021 Parameshwarappa RR Masonry (Bottom layer) Cum

35 Block work up to Plinth Level -


2/19/2021 Parameshwarappa Sqm
6" wall
Block work up to Plinth Level -
36 2/19/2021 Parameshwarappa Sqm
6" wall
Block work up to Plinth Level -
37 2/19/2021 Parameshwarappa Sqm
6" wall
Block work up to Plinth Level -
38 2/19/2021 Parameshwarappa Sqm
6" wall
39 Block work above Plinth Level
2/19/2021 Parameshwarappa Sqm
- 6" wall
Block work above Plinth Level
40 2/19/2021 Parameshwarappa Sqm
- 6" wall
Block work above Plinth Level
41 2/19/2021 Parameshwarappa Sqm
- 6" wall
Block work above Plinth Level
42 2/19/2021 Parameshwarappa Sqm
- 4" wall
43 2/19/2021 Parameshwarappa Deductions; Doors Sqm

44 2/19/2021 Suresh Block Work; QC Cubes tank Sqm

45 2/19/2021 Suresh Block Work; QC Cubes tank Sqm


46 2/19/2021 Suresh Block Work; Labours bath tank Sqm

47 2/19/2021 Suresh Block Work; Labours bath tank Sqm

48 2/19/2021 Suresh Block Work; Ramp side Walls Sqm

49 2/19/2021 Suresh Block Work; QC lab Flat Form Sqm

50 2/19/2021 Suresh Block Work; Kitchen Sqm

51 Plastering Work - QC lab Cube


2/19/2021 Suresh Sqm
Tank
Plastering Work - QC lab Cube
52 2/19/2021 Suresh Sqm
Tank
Plastering Work - Labours
53 2/19/2021 Suresh Sqm
Tank (Bathing)
Plastering Work - Labours
54 2/19/2021 Suresh Sqm
Tank (Bathing)
Shuttering Work- weigh Bridge
55 2/19/2021 Suresh Sqm
Footing Sides
Shuttering Work- weigh Bridge
56 2/19/2021 Suresh Sqm
Footing Sides
Shuttering Work- QC lab
57 2/19/2021 Suresh Sqm
Flatform
Shuttering Work- Kitchen
58 2/19/2021 Suresh Sqm
Flatform

59 2/19/2021 Kishore chandra Pradhan RCC for weigh Bridge raft cum

60 2/19/2021 Kishore chandra Pradhan RCC for weigh Bridge raft cum

61 2/19/2021 Kishore chandra Pradhan Store Room PCC cum

62 2/19/2021 Kishore chandra Pradhan Canteen PCC cum

63 2/19/2021 Kishore chandra Pradhan Labour Tank PCC cum

Flooring Concrete with Smooth


64 2/19/2021 Kishore chandra Pradhan cum
Finish - QC Lab

Flooring Concrete with Smooth


65 2/19/2021 Kishore chandra Pradhan cum
Finish - RMC Plant Room

Flooring Concrete with Smooth


66 2/19/2021 Kishore chandra Pradhan cum
Finish - Labour Shed

67 Flooring Concrete with Smooth


2/19/2021 Kishore chandra Pradhan cum
Finish - Cube Tank Flooring
Flooring Concrete with Smooth
68 2/19/2021 Kishore chandra Pradhan Finish - Steel Yard Machine cum
Flatform
69 2/19/2021 Kishore chandra Pradhan Blockwork- Store outside sqm

70 2/19/2021 Kishore chandra Pradhan Blockwork- Canteen outside sqm

71 2/19/2021 Kishore chandra Pradhan Blockwork- Soling sqm

Loose Soil Removal &


72 2/19/2021 Kishore chandra Pradhan sqm
Trimming - F4

73 Loose Soil Removal &


2/19/2021 Kishore chandra Pradhan sqm
Trimming - F5

Loose Soil Removal &


74 2/19/2021 Kishore chandra Pradhan sqm
Trimming - F9

Loose Soil Removal &


75 2/19/2021 Kishore chandra Pradhan sqm
Trimming - F6

Loose Soil Removal &


76 2/19/2021 Kishore chandra Pradhan sqm
Trimming - F1

77 Loose Soil Removal &


2/19/2021 Kishore chandra Pradhan sqm
Trimming - F8

78 Loose Soil Removal &


2/19/2021 Kishore chandra Pradhan sqm
Trimming - CF2

Shuttering Work ;Mainwall-


((6.85*3.40)+(6.25*3.40)) &
79 3/4/2021 Parameshwarappa
Side Walls -
((2*6.05*2.65)+(2*5.75*2.65))
Sqm
80 3/4/2021 Parameshwarappa RCC- Ramp main wall Cum
81 3/4/2021 Parameshwarappa RCC- Side Walls Cum

82 Weigh Bridge Shuttering Work


3/4/2021 Parameshwarappa
- Wall Pedestal's ; All sides
sqm
Weigh Bridge Shuttering Work
83 3/4/2021 Parameshwarappa
- Pedestal's
sqm
Weigh Bridge Shuttering Work
84 3/4/2021 Parameshwarappa
- Pedestal's
sqm
Weigh Bridge Shuttering Work
85 3/4/2021 Parameshwarappa
- Wall End Pedestal's
sqm

Trimming Work -
86 F4/AU39/AK42/Z42/W42/AR3
3/18/2021 Suresh 9/AS39 Sqm
87 Trimming Work - F3 -
3/18/2021 Suresh Z41/AK40/W41/AK41 Sqm

88
3/18/2021 Suresh Trimming Work - F5 - AK29 Sqm

89
3/18/2021 Suresh Trimming Work - F1 - AH29 Sqm

90
3/18/2021 Suresh Trimming Work - CF11 Sqm

91
3/18/2021 Suresh Trimming Work - CF11 Sqm

92
3/18/2021 Suresh Trimming Work - CF11 Sqm

93
3/18/2021 Suresh Trimming Work - CF11 Sqm

94
3/18/2021 Suresh Trimming Work - CF11 Sqm

95 Trimming Work - F2-


3/18/2021 Suresh AG42/Q42 Sqm

96
3/18/2021 Suresh PCC -F4 Cum

97
3/18/2021 Suresh PCC -F3 Cum

98
3/18/2021 Suresh PCC -F5 Cum

99
3/18/2021 Suresh PCC -F1 Cum

100
3/18/2021 Suresh PCC -F2 Cum

101
3/18/2021 Suresh PCC -CF11 Cum
102
3/18/2021 Suresh Shuttering -F4 Sqm

103
3/18/2021 Suresh Shuttering -F3 Sqm

104
3/18/2021 Suresh Shuttering -F5 Sqm

105
3/18/2021 Suresh Shuttering -F2 Sqm

106
3/18/2021 Suresh Shuttering -CF11 Sqm
107 4/18/2021 Suresh Trimming Work Sqm
108 4/18/2021 Suresh PCC Cum
109 4/18/2021 Suresh RCC Cum
Contractor: Balaji krupa Projects Private Ltd
chikmaglauru medical college
Side or Steel Dia
Work Place From To Offset Trips Nos Length
Type wise

RMC plant 1/8/2021 1/21/2021 8 1311.800

RMC plant 1/8/2021 1/21/2021 12 2664.500

RMC plant 1/8/2021 1/21/2021 16 509.000

RMC plant 1/8/2021 1/21/2021 2.000 12.200

RMC plant 1/8/2021 1/21/2021 2.000 5.300

RMC plant 1/8/2021 1/21/2021 2.000 4.300

RMC plant 1/8/2021 1/21/2021 2.000 1.800

RMC plant 1/8/2021 1/21/2021 2.000 5.300

RMC plant 1/8/2021 1/21/2021 2.000 4.300

RMC plant 1/8/2021 1/21/2021 2.000 12.000

RMC plant 1/8/2021 1/21/2021 2.000 5.100

RMC plant 1/8/2021 1/21/2021 2.000 4.100

RMC plant 1/8/2021 1/21/2021 2.000 1.600

RMC plant 1/8/2021 1/21/2021 2.000 5.100

RMC plant 1/8/2021 1/21/2021 2.000 4.100

RMC plant 1/8/2021 1/21/2021 12.000 2.400

RMC plant 1/8/2021 1/21/2021 4.000 2.400

RMC plant 1/8/2021 1/21/2021 2.000 2.400

RMC plant 1/8/2021 1/21/2021 12.000 1.200

RMC plant 1/8/2021 1/21/2021 1.000 12.200

RMC plant 1/8/2021 1/21/2021 1.000 4.300

RMC plant 1/8/2021 1/21/2021 1.000 5.300


RMC plant 1/8/2021 1/21/2021 1.000 2.000

RMC plant 1/8/2021 1/21/2021 1.000 12.000

RMC plant 1/8/2021 1/21/2021 1.000 4.100

RMC plant 1/8/2021 1/21/2021 1.000 5.100

RMC plant 1/8/2021 1/21/2021 6.000 1.800

RMC plant 1/8/2021 1/21/2021 6.000 2.400

RMC plant 1/8/2021 1/21/2021 6.000 0.600

RMC plant 1/8/2021 1/21/2021 12.000 2.200

RMC plant 1/8/2021 1/21/2021 4.000 2.400

RMC plant 1/8/2021 1/21/2021 2.000 2.000

RMC plant 1/8/2021 1/21/2021 12.000 1.700

2/5/2021 2/18/2021 2 3.450

2/5/2021 2/18/2021 2 2.600

2/5/2021 2/18/2021 2 3.400

2/5/2021 2/18/2021 2 3.100

2/5/2021 2/18/2021 -1 0.900

2/5/2021 2/18/2021 -1 0.900

2/5/2021 2/18/2021 -1 1.200

2/5/2021 2/18/2021 2 5.600

2/5/2021 2/18/2021 2 4.800

2/5/2021 2/18/2021 2 5.400

2/5/2021 2/18/2021 2 5.200

2/5/2021 2/18/2021 -1 1.200

2/5/2021 2/18/2021 -2 1.200

2/5/2021 2/18/2021 2 21.660

2/5/2021 2/18/2021 3 9.660

2/5/2021 2/18/2021 8 9.660

2/5/2021 2/18/2021 2 9.660


2/5/2021 2/18/2021 2 10.213

2/5/2021 2/18/2021 1 10.213

2/5/2021 2/18/2021 10 0.457

2/5/2021 2/18/2021 10 0.811

2/5/2021 2/18/2021 1 6.850

2/5/2021 2/18/2021 1 6.250

2/5/2021 2/18/2021 2 6.050

2/5/2021 2/18/2021 2 5.750

2/5/2021 2/18/2021 4 1.200

2/5/2021 2/18/2021 1 6.850

2/5/2021 2/18/2021 2 5.750

2/5/2021 2/18/2021 2 1.550

RMC Ramp 2/5/2021 2/18/2021 8 1590.8

RMC Ramp 2/5/2021 2/18/2021 10 1646.4

RMC Ramp 2/5/2021 2/18/2021 12 1573.5

RMC Ramp 2/5/2021 2/18/2021 16 768.5

Labour Toilets 2/19/2021 3/4/2021 1 10.061

Labour Toilets 2/19/2021 3/4/2021 2 9.934

Labour Toilets 2/19/2021 3/4/2021 9 1.220

Labour Toilets 2/19/2021 3/4/2021 1 9.933

Labour Toilets 2/19/2021 3/4/2021 9 1.220

Labour Toilets 2/19/2021 3/4/2021 1 9.934

Labour Toilets 2/19/2021 3/4/2021 2 9.933

Labour Toilets 2/19/2021 3/4/2021 4 1.220

Labour Toilets 2/19/2021 3/4/2021 16 1.220

Labour Toilets 2/19/2021 3/4/2021 -18 0.811

2/19/2021 3/4/2021 3 6.500

2/19/2021 3/4/2021 3 2.600


2/19/2021 3/4/2021 2 6.400

2/19/2021 3/4/2021 3 2.500

2/19/2021 3/4/2021 8 4.000

2/19/2021 3/4/2021 4 0.600

2/19/2021 3/4/2021 5 0.600

2/19/2021 3/4/2021 4 6.500

2/19/2021 3/4/2021 4 2.600

2/19/2021 3/4/2021 2 6.400

2/19/2021 3/4/2021 4 2.500

2/19/2021 3/4/2021 2 11.000

2/19/2021 3/4/2021 2 10.000

2/19/2021 3/4/2021 1 4.800

2/19/2021 3/4/2021 1 5.800

2/19/2021 3/4/2021 2 3.500

2/19/2021 3/4/2021 2 3.500

2/19/2021 3/4/2021 1 9.000

2/19/2021 3/4/2021 1 9.000

2/19/2021 3/4/2021 1 6.600

2/19/2021 3/4/2021 1 5.200

2/19/2021 3/4/2021 1 3.000

2/19/2021 3/4/2021 4 3.000

2/19/2021 3/4/2021 1 6.600

2/19/2021 3/4/2021 5 1.800


2/19/2021 3/4/2021 1 16.000

2/19/2021 3/4/2021 1 18.000

2/19/2021 3/4/2021 4 4.000

2/19/2021 3/4/2021 8 4.200

2/19/2021 3/4/2021 6 6.200

2/19/2021 3/4/2021 2 12.400

2/19/2021 3/4/2021 8 1.950

2/19/2021 3/4/2021 4 8.200

2/19/2021 3/4/2021 4 5.200

2/19/2021 3/4/2021 2 9.780

2/19/2021 3/4/2021

2/19/2021 3/4/2021 1 6.850

2/19/2021 3/4/2021 2 5.750

2/19/2021 3/4/2021 1 9.600

2/19/2021 3/4/2021 2 0.600

2/19/2021 3/4/2021 2 1.100

2/19/2021 3/4/2021 1 9.600

3/5/2021 3/18/2021 6 4.2


3/5/2021 3/18/2021 4 6.2

3/5/2021 3/18/2021 1 7.95

3/5/2021 3/18/2021 1 7.95

3/5/2021 3/18/2021 1 3.3

3/5/2021 3/18/2021 1 23.725

3/5/2021 3/18/2021 1 11.38

3/5/2021 3/18/2021 1 4.41

3/5/2021 3/18/2021 1 2.975

3/5/2021 3/18/2021 2 9.8

3/5/2021 3/18/2021 6 4.2

3/5/2021 3/18/2021 4 6.2

3/5/2021 3/18/2021 1 7.95

3/5/2021 3/18/2021 1 7.95

3/5/2021 3/18/2021 2 9.8

3/5/2021 3/18/2021
3/5/2021 3/18/2021 6 16.8

3/5/2021 3/18/2021 4 24.8

3/5/2021 3/18/2021 1 29.9

3/5/2021 3/18/2021 2 39.2

3/5/2021 3/18/2021 1 100.42


4/2/2021 4/15/2021
4/2/2021 4/15/2021
4/2/2021 4/15/2021
Width Depth Qty Remarks

0.518

2.345

0.799

0.120 2.928

0.120 1.272

0.120 1.032

0.120 0.432

0.120 1.272

0.120 1.032

0.450 10.800

0.450 4.590

0.450 3.690

0.450 1.440

0.450 4.590

0.450 3.690

2.200 63.360

2.400 23.040

2.000 9.600

1.700 24.480

5.300 64.660

1.800 7.740

4.300 22.790
1.400 2.800

5.150 61.800

1.600 6.560

4.100 20.910

0.900 9.720

0.900 12.960

0.600 2.160

26.400 86.59

9.600 31.49

4.000 13.12

20.400 66.91

0.400 2.760
0.400 2.080
2.600 17.680
2.600 16.120
2.100 -1.890
1.200 -1.080
1.200 -1.440
0.400 4.480
0.400 3.840
2.600 28.080
2.600 27.040
2.100 -2.520
1.200 -2.880 992.07

5.100 220.932
5.100 147.798
6.330 489.182
9.660 186.631
0.811 16.566
0.457 4.671
1.220 5.577
1.220 9.890
3.400 23.290
3.400 21.250
2.650 32.065
2.650 30.475
0.500 2.400
2.300 0.300 4.727
1.550 0.300 5.348
1.800 0.300 1.674

628.366

1015.829

1384.680

1214.230
1.524 0.203 3.119
0.915 18.172
0.915 10.039
0.432 4.288
0.432 4.738
2.134 21.200
1.905 37.854
1.982 9.667
2.020 39.411
1.905 -27.815
0.650 12.675
0.650 5.070
0.900 11.520
0.900 6.750
0.700 22.400
0.800 1.920
0.800 2.400
0.800 20.800
0.800 8.320
1.050 13.440
1.050 10.500
0.300 6.600
0.300 6.000
0.700 3.360
0.800 4.640

2.000 0.300
4.200

1.500 0.300
3.150

7.000 0.100
6.300

9.000 0.100
8.100

3.000 0.100
1.980

5.100
26.520

3.000
9.000

3.000
36.000

2.500
16.500

1.500
13.500
0.200
3.200

0.200
3.600

1.000
16.000

4.200
141.120

6.200
230.640

3.300
81.840

1.950
30.420

8.200
268.960

5.200
108.160

5.200
101.712

107.080

3.400 0.275 6.405

2.650 0.275 8.381

0.420 4.032

1.800 2.160

1.800 3.960

1.200 11.520

4.2 105.84
6.2 153.76

7 55.65

8 63.6

7.975 26.3175

7.2 170.82

5.18 58.9484

4.2 18.522

1.72 5.117

9.8 192.08

4.2 0.15 15.876

6.2 0.15 23.064

7 0.15 8.3475 Actual


Quantity=
120cum

8 0.15 9.54

9.8 0.15 28.812

41.9574
0.15 15.12

0.15 14.88

0.15 4.485

0.15 11.76

0.15 15.063
1060.000
85.000
480.000