0 Transmitting 132Kv Substation 1 Project Master Schedule: Construction Drawings

The document outlines the work breakdown structure and schedule for a transmitting substation project. It includes key milestones and identifies tasks for preliminary design and engineering, procurement, manufacturing, site construction, testing and commissioning. Major milestones include completion of demolition at the old substation by September 2021, equipment procurement by June 2021, and mechanical completion by April 2023 with full project completion by September 2023.

Uploaded by

shahidbolar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
799 views

0 Transmitting 132Kv Substation 1 Project Master Schedule: Construction Drawings

The document outlines the work breakdown structure and schedule for a transmitting substation project. It includes key milestones and identifies tasks for preliminary design and engineering, procurement, manufacturing, site construction, testing and commissioning. Major milestones include completion of demolition at the old substation by September 2021, equipment procurement by June 2021, and mechanical completion by April 2023 with full project completion by September 2023.

Uploaded by

shahidbolar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 39

levels Activity ID

0 TRANSMITTING 132KV SUBSTATION


1 Project Master Schedule
2 Project Milestone
3 Contract Milestones

PKMS1000

PKMS1060
PKMS1070
3 Project Key Milestones

PKMS1010

PKMS1020

PKMS1030

PKMS1040

PKMS1050

PKMS1055
PKMS1080
3 Project Management Team
PEGN1300
2 TRANSMITTING 132KV SUBSTATION
3 Preliminaries and Generally
PEGN2040
3 Design and Engineering
4 Civil Design and Engineering
0 Construction Drawings
CDSN1100

CDSN1110
CDSN1120
CDSN1130
CDSN1140
CDSN1150
CDSN1160
CDSN1170
CDSN1180
4 Electrical Design and Engineering
5 Primary Switchyard Drawings and Calculation Submission/Approval
EDSN1000
EDSN1011
EDSN1012
EDSN1021
EDSN1060
EDSN1081
EDSN1090
EDSN1100
EDSN1111
EDSN1120
EDSN1130
EDSN1140
EDSN1150
5 Primary Equipment Drawings Submission/Approval
EDSN2000
EDSN2001

EDSN2010

EDSN2011

EDSN2020

EDSN2021
5 Secondary Engineering Design Submission/Approval
EDSN3000
EDSN3010
EDSN3021
3 Procurement, Manufacturing and Delivery
4 Procurement
5 Procurement - Electrical
PROC1000

PROC1010
PROC1020
PROC1030

PROC1040
PROC1050
PROC1060
PROC1070
PROC1080
PROC1090
PROC1110
PROC1120
PROC1130
PROC1140
PROC1150
PROC1160
PROC1170
PROC1180
PROC1190
PROC1200
PROC1210
PROC1220
PROC1230
PROC1240
PROC1250
PROC1260
5 Procurement - Civil
PROC1500
PROC1510
PROC1520
PROC1530
PROC1540
PROC1550
PROC1560
4 Manufacturing
MANU1000

MANU1010
MANU1020
MANU1030

MANU1040

MANU1050

MANU1060

MANU1070
MANU1080

MANU1090
MANU1110
MANU1120
MANU1130
MANU1140
MANU1150
MANU1160
MANU1170
MANU1180
MANU1190
MANU1200
MANU1210
MANU1220
MANU1230
MANU1240
MANU1250
MANU1260
4 Delivery
DLRY5000
DLRY5010
DLRY5020
DLRY5030
DLRY5040
DLRY5050
DLRY5060
DLRY5070
DLRY5080
DLRY5090
DLRY5100
DLRY5110
DLRY5120
DLRY5130
DLRY5140
DLRY5150
DLRY5160
DLRY5170
DLRY5180
DLRY5190
DLRY5200
DLRY5210
DLRY5220
DLRY5230
DLRY5240
DLRY5250
3 Site Construction
4 Civil and Structural Works
5 Earthworks
CCWS1000
CCWS1100
CCWS1110
CCWS1120
5 132kV Building Construction
CCWS1130
CCWS1140
CCWS1150
CCWS1160
5 Outdoor Foundation and Cable Trenches
CCWS1170
5 Infrastructure Works
CCWS1180
CCWS1190
CCWS1200
CCWS1210
CCWS1220
4 Building M&E Services
5 Building Mechanical Works
BMES1060
BMES1070
BMES1080
BMES1090
4 Substation Electrical Erection and Installation
5 Equipment Erection and Installation Works
6 Primary Equipment
EEIW2000
EEIW2010
EEIW2020
EEIW2030
EEIW2040

EEIW2050
6 Secondary Equipment
EEIW2120
EEIW2130
EEIW2140
EEIW2150
EEIW2160
EEIW2170
5 Stringing and Busbar Installation Works
6 Earthwire Stringing
EEIW2300
EEIW2310
5 Cable Trays and Cable Installation Works
6 Cable Trays & Control Cable Laying & Terminations

EEIW2700

4 Inspection, Testing and Commissioning


5 Pre-Commissioning Test
PRCO1000
PRCO1010
PRCO1020
PRCO1040
6 Equipment Testing

PRCO1100
PRCO1110
PRCO1120
PRCO1130
PRCO1140
5 End to End Test

PRCO2000
5 Commissioning
PRCO2020
5 Final Joint Inspection
PRCO2030
4 Demobilization and Hand Over
DMHO1010
DMHO1020
Activity Name Original DuStart Finish
V SUBSTATION 30m 1-Apr-21 29-Sep-23
30m 1-Apr-21 29-Sep-23
30m 1-Apr-21 29-Sep-23
30m 1-Apr-21 29-Sep-23

Project Commencement 0m 01-Apr-21*

Project Completion 0m 29-Sep-23*


Mechanical Completion 0m 11-Apr-23*
19m 9-Jun-21 20-Dec-22
Completion of Demolition works for Existing Structures at Old
Transmitting Substation 0m 30-Sep-21*

Completion of Procurement of Major Equipment 0m 09-Jun-21*

Completion of Approval of Overall Switchyard Lay ut and Section


drawings (Status 2) 0m 08-Dec-21*

Completion of Control Building, 132kV 0m 20-Dec-22*

Completion of Design & Engineering C&S, Architecture and M&E) 2-Feb-22*

Construction of Civil Works (Outdoor Foundation & Cable Trench) 2-Mar-23*


Completion of Design & Engineering(Electrical) 0m 2-Mar-22*
30m 1-Apr-21 29-Sep-23
Project Management Team 30m 1-Apr-21 29-Sep-23
30m 1-Apr-21 29-Sep-23
3m 1-Apr-21 30-Jun-21
Site Office & Facilities 3m 1-Apr-21 30-Jun-21
11m 8-Apr-21 17-Mar-22
8m 26-May-21 20-Jan-22
8m 26-May-21 20-Jan-22
132kV GIS Control Building Piling Layout 2m 26-May-21 20-Jul-21

132kV GIS Control Building Structural Drawings 2m 21-Jul-21 14-Sep-21


132kV GIS Control Building Architectural Drawings 2m 15-Sep-21 9-Nov-21
Confirmation of Floor Openings 2m 15-Sep-21 9-Nov-21
Switchyard Piling Layout 2m 1-Oct-21 25-Nov-21
Switchyard Foundation Drawings 2m 26-Nov-21 20-Jan-22
132kV GIS Control Building Building M&E Drawings 2m 26-Nov-21 20-Jan-22
Cable Trench Piling Layout 2m 1-Oct-21 25-Nov-21
Cable Trench Drawings 2m 26-Nov-21 20-Jan-22
11m 8-Apr-21 17-Mar-22
awings and Calculation Submission/Approval 11m 8-Apr-21 17-Mar-22
Master List of Drawings 4m 8-Apr-21 5-May-21
Switchyard Layout & Section (Status 2) 2m 6-Aug-21 30-Sep-21
Overall Single Line Diagram 3m 7-May-21 29-Jul-21
132kV GIS Control Building Layout (Status 2) 2m 20-Jul-21 30-Sep-21
Soil Resistivity Test 2m 12-Apr-21 4-Jun-21
Single Line Diagram for 415/240V AC System 3m 22-Jul-21 7-Oct-21
LVAC Distribution Board Drawings 2m 5-Oct-21 29-Nov-21
Earthing System Calculation & Layout 3m 29-Oct-21 3-Feb-22
Connector Details 3m 10-Dec-21 17-Mar-22
DC System Design 3m 22-Jul-21 7-Oct-21
110V DC System Drawings 2m 23-Sep-21 17-Nov-21
48V DC System Drawings 2m 23-Sep-21 17-Nov-21
Lighting Illumination Calculation & Drawings 3m 19-Aug-21 4-Nov-21
awings Submission/Approval 4m 20-May-21 27-Sep-21
132kV Indoor GIS Switchgear Drawings & GTD (Status 2) 1m 10-Jun-21 19-Jul-21
132kV Indoor GIS Switchgear Drawings & GTD (Status 1) 1m 27-Jul-21 6-Sep-21
120MVA 132/33kV Power Transformer c/w RTCC Panel Drawings &
GTD (Status 2) 2m 20-May-21 14-Jul-21
120MVA 132/33kV Power Transformer c/w RTCC Panel Drawings &
GTD (Status 1) 1m 27-Jul-21 6-Sep-21
200kVA 33/0.415kV Earthing Transformer Drawings & GTD (Status
2) 1m 24-Jun-21 4-Aug-21
200kVA 33/0.415kV Earthing Transformer Drawings & GTD (Status
1) 1m 17-Aug-21 27-Sep-21
g Design Submission/Approval 6m 24-Jun-21 8-Dec-21
Single Line Diagram 4m 24-Jun-21 13-Oct-21
Protection & Control Logic Diagram 4m 24-Jun-21 13-Oct-21
132kV Relay List (Status 1) 2m 14-Oct-21 8-Dec-21
uring and Delivery 16m 13-May-21 25-Aug-22
11m 13-May-21 14-Apr-22
10m 13-May-21 24-Feb-22
Procurement of 132kV Indoor GIS Switchgear 1m 13-May-21 2-Jun-21
Procurement of 120MVA 132/33kV Power Transformer c/w RTCC
Panels 1m 20-May-21 9-Jun-21
Procurement of 200kVA 33/0.415kV Earthing Transformer 1m 20-May-21 9-Jun-21
Procurement of Steel Structure 1m 20-May-21 9-Jun-21

Procurement of Relay and Control Panels 1m 20-May-21 9-Jun-21


Procurement of SCADA Interface Cubicle 1m 20-May-21 9-Jun-21
Procurement of Disturbance Recorder Panel 1m 20-May-21 9-Jun-21
Procurement of TWS & TLMS Control Panel 1m 20-May-21 9-Jun-21
Procurement of 33kV Neutral Earthing Equipment 1m 24-Jun-21 14-Jul-21
Procurement of 33kV Neutral Current Transformer (HV NCT) 1m 20-May-21 9-Jun-21
Procurement of Clamps & Connectors 1m 5-Nov-21 25-Nov-21
Procurement of Flexible Conductor 1m 1-Oct-21 21-Oct-21
Procurement of Busbar 1m 22-Jul-21 11-Aug-21
Procurement of Post Insulators 1m 10-Jun-21 30-Jun-21
Procurement of Surge Arrester 1m 20-May-21 9-Jun-21
Procurement of Batteries, Chargers and DC Switchboards 1m 19-Aug-21 8-Sep-21
Procurement of LVAC Distribution Board 1m 31-Aug-21 20-Sep-21
Procurement of Cable Trays and Accessories 1m 14-Oct-21 3-Nov-21
Procurement of 33kV Cables 1m 16-Sep-21 6-Oct-21
Procurement of 415V Cables 1m 16-Sep-21 6-Oct-21
Procurement of Multicore Cables and Ancillaries 1m 16-Sep-21 6-Oct-21
Procurement of Earthing Systems 1m 4-Feb-22 24-Feb-22
Procurement of Outdoor Lighting 1m 3-Dec-21 23-Dec-21
Procurement of 33kV Cable Sealing End 1m 16-Sep-21 6-Oct-21
Procurement of 33kV Heat Shrink Termination Kit 1m 6-Jan-22 26-Jan-22
Procurement of Anchor Bolts 1m 20-May-21 9-Jun-21
7m 15-Sep-21 14-Apr-22
Procurement of Overhead Crane 1m 21-Jan-22 17-Feb-22
Procurement of 132kV Control Building Roof Truss & Purlins 1m 15-Sep-21 12-Oct-21
Procurement of 132kV Control Building Roof Sheet 1m 10-Nov-21 30-Nov-21
Procurement of AHU 1m 21-Jan-22 10-Feb-22
Procurement of Drainage Grating 1m 11-Feb-22 3-Mar-22
Procurement of Fence Post & Gate 1m 4-Mar-22 14-Apr-22
Procurement of Fire Alarm Panel 1m 21-Jan-22 10-Feb-22
11m 10-Jun-21 21-Apr-22
Manufacturing of 132kV Indoor GIS Switchgear 6m 27-Jul-21 10-Jan-22
Manufacturing of 120MVA 132/33kV Power Transformer c/w RTCC
Panels 5m 7-Sep-21 24-Jan-22
Manufacturing of 200kVA 33/0.415kV Earthing Transformer 4m 28-Sep-21 17-Jan-22
Manufacturing of Steel Structure 4m 10-Jun-21 29-Sep-21

Manufacturing of Relay and Control Panels 5m 14-Oct-21 2-Mar-22

Manufacturing of SCADA Interface Cubicle 5m 17-Jun-21 3-Nov-21

Manufacturing of Disturbance Recorder Panel 5m 17-Jun-21 3-Nov-21

Manufacturing of TWS & TLMS Control Panel 5m 17-Jun-21 3-Nov-21


Manufacturing of 33kV Neutral Earthing Equipment 4m 22-Jul-21 10-Nov-21
Manufacturing of 33kV Neutral Current Transformer (Mounted on
Power Tx) 4m 17-Jun-21 6-Oct-21
Manufacturing of Clamps & Connectors 3m 10-Dec-21 3-Mar-22
Manufacturing of Flexible Conductor 3m 22-Oct-21 13-Jan-22
Manufacturing of Busbar 4m 12-Aug-21 1-Dec-21
Manufacturing of Post Insulators 3m 15-Jul-21 6-Oct-21
Manufacturing of Surge Arrester 4m 29-Jun-21 18-Oct-21
Manufacturing of Batteries, Chargers and DC Switchboards 2m 18-Nov-21 26-Jan-22
Manufacturing of LVAC Distribution Board 2m 30-Nov-21 24-Jan-22
Manufacturing of Cable Trays and Accessories 2m 4-Nov-21 29-Dec-21
Manufacturing of 33kV Cables 2m 7-Oct-21 1-Dec-21
Manufacturing of 415V Cables 2m 7-Oct-21 1-Dec-21
Manufacturing of Multicore Cables and Ancillaries 2m 7-Oct-21 1-Dec-21
Manufacturing of Earthing Systems 2m 25-Feb-22 21-Apr-22
Manufacturing of Outdoor Lighting 1m 24-Dec-21 20-Jan-22
Manufacturing of 33kV Cable Sealing End 1m 7-Oct-21 3-Nov-21
Manufacturing of 33kV Heat Shrink Termination Kit 1m 27-Jan-22 23-Feb-22
Manufacturing of Anchor Bolts 2m 10-Jun-21 4-Aug-21
13m 5-Aug-21 25-Aug-22
132kV Indoor GIS Switchgear 4m 11-Jan-22 16-May-22
120MVA 132/33kV Power Transformer c/w RTCC Panels 4m 25-Jan-22 30-May-22
200kVA 33/0.415kV Earthing Transformer 4m 18-Jan-22 23-May-22
Steel Structure 1m 30-Sep-21 10-Nov-21
Relay and Control Panels 4m 3-Mar-22 6-Jul-22
SCADA Interface Cubicle 4m 4-Nov-21 9-Mar-22
Disturbance Recorder Panel 4m 4-Nov-21 9-Mar-22
TWS & TLMS Control Panel 4m 4-Nov-21 9-Mar-22
33kV Neutral Earthing Equipment 1m 11-Nov-21 22-Dec-21
33kV Neutral Current Transformer (Mounted on Power Tx) 1m 7-Oct-21 17-Nov-21
Clamps & Connectors 1m 4-Mar-22 14-Apr-22
Flexible Conductor 1m 14-Jan-22 24-Feb-22
Busbar 1m 2-Dec-21 12-Jan-22
Post Insulators 1m 7-Oct-21 17-Nov-21
Surge Arrester 1m 19-Oct-21 29-Nov-21
Batteries, Chargers and DC Switchboards 4m 27-Jan-22 1-Jun-22
LVAC Distribution Board 4m 25-Jan-22 30-May-22
Cable Trays and Accessories 1m 30-Dec-21 9-Feb-22
33kV Cables 4m 2-Dec-21 6-Apr-22
415V Cables 4m 2-Dec-21 6-Apr-22
Multicore Cables and Ancillaries 4m 2-Dec-21 6-Apr-22
Earthing Systems 4m 22-Apr-22 25-Aug-22
Outdoor Lighting 1m 21-Jan-22 3-Mar-22
33kV Cable Sealing End 4m 4-Nov-21 9-Mar-22
33kV Heat Shrink Termination Kit 4m 24-Feb-22 29-Jun-22
Anchor Bolts 1m 5-Aug-21 15-Sep-21
29m 24-May-21 29-Sep-23
28m 24-May-21 26-Sep-23
11m 24-May-21 21-Apr-22
Soil Resistivity Test 0m 24-May-21 25-May-21
New 132kV GIS Building Area 0m 11-Feb-22 24-Feb-22
New Switchyard Area 0m 18-Feb-22 3-Mar-22
Others 0m 15-Apr-22 21-Apr-22
15m 15-Sep-21 20-Dec-22
Substructure 1m 15-Sep-21 26-Oct-21
Superstructure 7m 27-Oct-21 24-May-22
Finishing 6m 25-May-22 8-Nov-22
Roof 1m 9-Nov-22 20-Dec-22
nd Cable Trenches 9m 25-May-22 28-Feb-23
Outdoor Foundation, Trenches and Oil Interceptor 9m 25-May-22 28-Feb-23
16m 25-May-22 26-Sep-23
Road 3m 25-May-22 30-Aug-22
Switchyard Gravel Topping 3m 31-Aug-22 6-Dec-22
Surface Water Drainages 3m 7-Dec-22 14-Mar-23
Fencing and Gate 3m 15-Mar-23 20-Jun-23
Sewerage 3m 21-Jun-23 26-Sep-23
8m 28-Sep-22 6-Jun-23
8m 28-Sep-22 6-Jun-23
Air Conditioning & Ventilation System 3m 28-Sep-22 13-Dec-22
Fire Protection System 2m 14-Dec-22 21-Feb-23
Internal cold water & Sanitary system 3m 22-Feb-23 16-May-23
Overhead Travelling Crane 1m 17-May-23 6-Jun-23
ection and Installation 9m 5-Jul-22 11-Apr-23
nd Installation Works 9m 5-Jul-22 11-Apr-23
9m 5-Jul-22 11-Apr-23
Installation of 132kV Indoor GIS Switchgear 1m 9-Nov-22 6-Dec-22
Erection of 120MVA 132/33kV Power Transformers 2m 12-Jul-22 5-Sep-22
Erection of 200kVA 33/0.415kV Earthing Transformers 0m 5-Jul-22 11-Jul-22
Oil Filtration 1m 1-Mar-23 11-Apr-23
Erection of Outdoor Structures

Erection of Outdoor Equipments


5m 7-Jul-22 13-Dec-22
Installation of 132kV Relay & Control Panels 0m 7-Jul-22 13-Jul-22
Installation of SCADA Interface Cubicle 0m 14-Jul-22 20-Jul-22
Installation of Disturbance Recorder 0m 23-Nov-22 29-Nov-22
Installation of TWS & TLMS Control Panels 0m 30-Nov-22 6-Dec-22
Installation of 120MVA 132/33kV Transformer RTCC Panels 0m 12-Jul-22 18-Jul-22
Installation of Local Control Panel 0m 7-Dec-22 13-Dec-22
nstallation Works 0m 9-Nov-22 22-Nov-22
0m 9-Nov-22 22-Nov-22
Paying Out and Cutting of Earth Wire to Required Length 0m 9-Nov-22 15-Nov-22
Hoisting and Hooking of Earthwire to Towers 0m 16-Nov-22 22-Nov-22
Installation Works 1m 14-Dec-22 10-Jan-23
l Cable Laying & Terminations 1m 14-Dec-22 10-Jan-23

Control Cable Laying and Termination

1m 14-Dec-22 10-Jan-23

Commissioning 15m 12-Jul-22 28-Sep-23


10m 12-Jul-22 25-Apr-23
Auxiliary Power & Control Cables Testing 0m 11-Jan-23 24-Jan-23
Ferrule and Continuity Check of Multicore Cable 0m 11-Jan-23 24-Jan-23
Multicore Termination Check & AC/DC Pre-Commissioning 0m 25-Jan-23 7-Feb-23
Testing on DC System (LVAC and Battery Bank) 0m 11-Jan-23 24-Jan-23
10m 12-Jul-22 25-Apr-23

132kV Indoor GIS Switchgear Testing 1m 8-Feb-23 21-Mar-23


120MVA 132/33kV Power Transformers Testing 0m 12-Apr-23 25-Apr-23
200kVA 33/0.415kV Earthing Transformers Testing 0m 12-Jul-22 18-Jul-22
Secondary Equipment Testing 1m 7-Dec-22 27-Dec-22
Outdoor Equipment Testing 1m 7-Dec-22 27-Dec-22
2m 7-Jun-23 1-Aug-23

End to End Test Transmitting 132KV Substation 2m 7-Jun-23 1-Aug-23


2m 2-Aug-23 26-Sep-23
Commissioning Transmitting 132KV Substation 2m 2-Aug-23 26-Sep-23
0m 27-Sep-23 28-Sep-23
Attending Punch Point 0m 27-Sep-23 28-Sep-23
0m 29-Sep-23 29-Sep-23
Handing Over to SEB 0m 29-Sep-23 29-Sep-23
Demobilization 0m 29-Sep-23 29-Sep-23
Predecessors Successors

PROC1000, PROC1010, PROC1020, PROC1030, PROC1040,


EDSN1000, PROC1080, PROC1140, PROC1150, PROC1160,
PROC1170, EDSN1150, PROC1130, EDSN1081, PROC1190,
EDSN1060, EDSN3000, PROC1090, PROC1240, PROC1250,
PEGN1300, EDSN1012, PEGN2040, PKMS1030, MANU1000
DMHO1020, PKMS1020, PKMS1010,
PKMS1030, PEGN1300
EEIW2030

PEGN2040 PKMS1060,CCWS1100
PROC1000, PROC1010, PROC1020,
PROC1090 PKMS1060
EDSN2010, EDSN2020, PROC1090,
PROC1150, PKMS1000, EDSN1021,
EDSN3021, EDSN1011 PKMS1060
CCWS1100, CCWS1110, CCWS1120,
CCWS1130, CCWS1140, CCWS1150,
CCWS1160 PKMS1060
CDSN1100, CDSN1110, CDSN1120,
CDSN1160 PKMS1060

CCWS1170, CCWS1180, CCWS1190 PKMS1060


CDSN1180 PKMS1060

PKMS1000 PKMS1060

PKMS1000 PKMS1010

CCWS1000 CDSN1110
CDSN1120, PROC1500, PROC1510, PROC1520, CDSN1130,
CDSN1100, CCWS1000 CCWS1130
CDSN1110 CDSN1160, PROC1500, PROC1520, PROC1530, PROC1560
CDSN1110 EEIW2120
EDSN1011, EDSN1021 CDSN1150, CDSN1160
CDSN1140 CCWS1100
CDSN1120, CDSN1140 PROC1500, PROC1530, PROC1560
EDSN1011, EDSN1021 CDSN1180
CDSN1170 EEIW2700, PKMS1080

PKMS1000 EDSN1011
PROC1120, PROC1110, EDSN1111, PKMS1030, CDSN1140,
EDSN1000,PKMS1000 CDSN1170
PKMS1000 PRCO2000
EDSN2000 EDSN1100, PKMS1030, CDSN1140, CDSN1170
PKMS1000 CCWS1000
PKMS1000 PROC1170, EDSN1120
PROC1170 MANU1170
EDSN1060 PROC1220
EDSN1011, PROC1110 MANU1110
EDSN1081 MANU1160
PROC1160 MANU1160
PROC1160 MANU1160
PKMS1000, EDSN1021, EDSN1011 PROC1230

PROC1000 EDSN2001, EDSN1021


EDSN2000 MANU1000

PROC1010 EDSN2011, PKMS1030

EDSN2010 MANU1010

PROC1020 EDSN2021, PKMS1030

EDSN2020 MANU1020

PKMS1000 EDSN3010, MANU1040, PROC1180


EDSN3000 MANU1040, EEIW2700, EDSN3021
EDSN3010 PKMS1030

PKMS1000 PKMS1020, EDSN2000

PKMS1000 MANU1010, PKMS1020, EDSN2010


PKMS1000 PKMS1020, EDSN2020
PKMS1000 MANU1030, PROC1260
PROC1050, PROC1060, PROC1070, MANU1040, MANU1060,
PKMS1000 MANU1050, MANU1070, EEIW2700
PROC1040 MANU1050, MANU1040, MANU1060, MANU1070, EEIW2700
PROC1040 MANU1060, MANU1040, MANU1050, MANU1070, EEIW2700
PROC1040 MANU1070, MANU1040, MANU1060, MANU1050, EEIW2700
PKMS1000 MANU1080
PKMS1000 PKMS1020, PKMS1030, MANU1080, MANU1090
EDSN1011 EDSN1111, MANU1110
EDSN1011 MANU1120
PKMS1000 MANU1130
PKMS1000 MANU1140
PKMS1000 PKMS1030, MANU1150
PKMS1000 EDSN1130, EDSN1140
PKMS1000, EDSN1081 EDSN1090,
EDSN3000 MANU1180
PKMS1000 PROC1200, MANU1190
PROC1190 PROC1210, MANU1200
PROC1200 MANU1180, MANU1210
EDSN1100 MANU1220
EDSN1150 MANU1230
PKMS1000 MANU1240
PKMS1000 MANU1250
PROC1030 MANU1260

CDSN1110, CDSN1120, CDSN1160 BMES1090


CDSN1110 CCWS1100
CDSN1120, CDSN1110 CCWS1100
CDSN1160, CDSN1120 CCWS1100, PROC1540
PROC1530 PROC1550
PROC1540 CCWS1120
CDSN1160, CDSN1120 BMES1070

EDSN2001, PKMS1000 DLRY5000

PROC1010, EDSN2011 DLRY5010


EDSN2021 DLRY5020
PROC1030 DLRY5030
EDSN3000, EDSN3010, PROC1040,
PROC1050, PROC1060, PROC1070 DLRY5040
PROC1050, PROC1040, PROC1060,
PROC1070 DLRY5050
PROC1060, PROC1040, PROC1050,
PROC1070 DLRY5060
PROC1070, PROC1040, PROC1050,
PROC1060 DLRY5070
PROC1080, PROC1090 DLRY5080

PROC1090 DLRY5090
PROC1110, EDSN1111 DLRY5100
PROC1120 DLRY5110
PROC1130 DLRY5120
PROC1140 DLRY5130
PROC1150 DLRY5140
EDSN1130, EDSN1140, EDSN1120 DLRY5150
EDSN1090 DLRY5160
PROC1180, PROC1210 DLRY5170
PROC1190 DLRY5180
PROC1200 DLRY5190
PROC1210 DLRY5200
PROC1220 DLRY5210
PROC1230 DLRY5220
PROC1240 DLRY5230
PROC1250 DLRY5240
PROC1260 DLRY5250
MANU1000 EEIW2000, EEIW2170
MANU1010 EEIW2010, EEIW2160
MANU1020 EEIW2020
MANU1030 EEIW2030
MANU1040 EEIW2120
MANU1050 EEIW2130
MANU1060 EEIW2140
MANU1070 EEIW2150
MANU1080 EEIW2030
MANU1090 EEIW2030
MANU1110 EEIW2300
MANU1120 EEIW2030
MANU1130 EEIW2030
MANU1140 EEIW2030
MANU1150 EEIW2030
MANU1160 EEIW2030
MANU1170 EEIW2030
MANU1180 EEIW2030
MANU1190 EEIW2030
MANU1200 EEIW2700
MANU1210 EEIW2700
MANU1220 EEIW2030
MANU1230 EEIW2030
MANU1240 EEIW2030
MANU1250 EEIW2030
MANU1260 EEIW2030

EDSN1060 CDSN1100, CDSN1110


CCWS1000 CCWS1110, BMES1060, BMES1080, BMES1090
CCWS1100 CCWS1120
CCWS1110 CCWS1220, CCWS1210, CCWS1200, CCWS1190, CCWS1180

CDSN1110 CCWS1140
CCWS1130 CCWS1150, CCWS1170, CCWS1180
CCWS1140 CCWS1160, BMES1060, EEIW2300, EEIW2000
CCWS1150 PKMS1040

CCWS1140 EEIW2030

CCWS1140 CCWS1190
CCWS1180 CCWS1200
CCWS1190 CCWS1210
CCWS1200 CCWS1220
CCWS1210 PRCO2030

CCWS1100, CCWS1150 BMES1070


PROC1560, BMES1060 BMES1080
CCWS1100, BMES1070 BMES1090
CCWS1100, PROC1500, BMES1080 PRCO2000

DLRY5000, CCWS1150,BMES1090 PRCO1100, EEIW2170, EEIW2700


DLRY5010,CCWS1170 EEIW2030, PRCO1110
DLRY5020,CCWS1170 PRCO1120
EEIW2010, PRCO1110
CCWS1170,DLRY5030 EEIW2050
DLRY5130, EEIW2040,DLRY5140,
DLRY5080 PRCO1130

DLRY5040, CDSN1130 EEIW2130


EEIW2120, DLRY5050 EEIW2140
EEIW2130, DLRY5060, EEIW2310 EEIW2150
EEIW2140, DLRY5070 PRCO1130
DLRY5010 PRCO1110
EEIW2000, DLRY5000 EEIW2700, PRCO1100

DLRY5100, CCWS1150 EEIW2310


EEIW2300 EEIW2140

EEIW2170, EEIW2000, EDSN3010,


PROC1040, PROC1050, PROC1060,
PROC1070, DLRY5190, DLRY5200,
CDSN1180 PRCO1020, PRCO1100, PRCO1010, PRCO1000, PRCO1040

EEIW2700 PRCO2000
EEIW2700 PRCO1020
EEIW2700, PRCO1010 PRCO1100
EEIW2700 PRCO2000

EEIW2000, EEIW2700, EEIW2170,


PRCO1020 PRCO2000
EEIW2010, EEIW2030, EEIW2160 PRCO2000
EEIW2020 PRCO2000
EEIW2150,PRCO1040 PRCO2000
EEIW2050 PRCO2000

EDSN1012, PRCO1000, PRCO1040,


PRCO1100, PRCO1110, PRCO1120,
PRCO1130, BMES1090 PRCO2020

PRCO2000 PRCO2030
PRCO2020, CCWS1120, CCWS1220 DMHO1010, DMHO1020

PRCO2030 DMHO1020
DMHO1010, PRCO2030 PKMS1060
Not Driving, DO you want to start building?

Increasing redendency, No Impact Not driving

Driving to 20 Jan, Not 2nd Feb

Driving 28 Feb,

Adjusted end date


Start early Keep the End date same as 30 Sept. Increase
the Duration Added SS Relationship

Done
Start Date changed, since linkxs changed
dates Changed
Dates Changed

Duration?

Duration?

Try to reduce Total duration 12 month. Start Late, Keep


End date same

Increase Duration to 1month

Done
art building?

act Not driving


Level Activity ID
0 TRANSMITTING 132KV SUBSTATION
1 Project Master Schedule
2 Project Milestone
3 Contract Milestones
PKM
PKM
PKM
3 Project Key Milestones
PKM
PKM
PKM
PKM
PKM
PKM
PKM
3 Project Management Team
PEG
2 TRANSMITTING 132KV SUBSTATION
3 Preliminaries and Generally
PEG
3 Design and Engineering
4 Civil Design and Engineering
5 Shop Drawings

4 Electrical Design and Engineering


5 Primary Switchyard Drawings and Calculation Submission/Approval
E
E
E
E
E
E
E
E
E
E
E
E
E
5 Primary Equipment Drawings Submission/Approval
E
E
E
E
E
E
5 Secondary Engineering Design Submission/Approval
E
E
E
3 Procurement, Manufacturing and Delivery
4 Procurement
5 Procurement - Electrical

5 Procurement - Civil
4 Manufacturing
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
4 Delivery
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
3 Site Construction
4 Civil and Structural Works
5 Earthworks

5 132kV Building Construction

5 Outdoor Foundation and Cable Trenches

5 Infrastructure Works

4 Building M&E Services


5 Building Mechanical Works

4 Substation Electrical Erection and Installation


5 Equipment Erection and Installation Works
6 Primary Equipment
6 Secondary Equipment

5 Stringing and Busbar Installation Works


6 Earthwire Stringing

5 Cable Trays and Cable Installation Works


6 Cable Trays & Control Cable Laying & Terminations

4 Inspection, Testing and Commissioning


5 Pre-Commissioning Test

6 Equipment Testing

5 End to End Test

5 Commissioning

5 Final Joint Inspection

4 Demobilization and Hand Over


D
D
Activity Name
TRANSMITTING 132KV SUBSTATION
Project Master Schedule
Project Milestone
Contract Milestones
Project Commencement
Project Completion
Mechanical Completion
Project Key Milestones
`
Completion of Procurement of Major Equipment
Completion of Approval of Major Engineering Drawings & Guaranteed Technical Data Submission (Status 2)
Completion of Control Building, 132kV
Completion of Design & Engineering C&S, Architecture and M&E)
Construction of Civil Works (Outdoor Foundation & Cable Trench)
Completion of Design & Engineering
Project Management Team
Project Management Team
TRANSMITTING 132KV SUBSTATION
Preliminaries and Generally
Site Office & Facilities
Design and Engineering
Civil Design and Engineering
Shop Drawings
132kV GIS Control Building Piling Layout
132kV GIS Control Building Structural Drawings
132kV GIS Control Building Architectural Drawings
Confirmation of Floor Openings
Switchyard Piling Layout
Switchyard Foundation Drawings
132kV GIS Control Building Building M&E Drawings
Cable Trench Piling Layout
Cable Trench Drawings
Electrical Design and Engineering
Primary Switchyard Drawings and Calculation Submission/Approval
Master List of Drawings
Switchyard Layout & Section (Status 1)
Overall Single Line Diagram
132kV GIS Control Building Layout (Status 1)
Soil Resistivity Test
Single Line Diagram for 415/240V AC System
LVAC Distribution Board Drawings
Earthing System Calculation & Layout
Connector Details
DC System Design
110V DC System Drawings
48V DC System Drawings
Lighting Illumination Calculation & Drawings
Primary Equipment Drawings Submission/Approval
132kV Indoor GIS Switchgear Drawings & GTD (Status 2)
132kV Indoor GIS Switchgear Drawings & GTD (Status 1)
120MVA 132/33kV Power Transformer c/w RTCC Panel Drawings & GTD (Status 2)
120MVA 132/33kV Power Transformer c/w RTCC Panel Drawings & GTD (Status 1)
200kVA 33/0.415kV Earthing Transformer Drawings & GTD (Status 2)
200kVA 33/0.415kV Earthing Transformer Drawings & GTD (Status 1)
Secondary Engineering Design Submission/Approval
Single Line Diagram
Protection & Control Logic Diagram
132kV Relay List (Status 1)
Procurement, Manufacturing and Delivery
Procurement
Procurement - Electrical
Procurement of 132kV Indoor GIS Switchgear
Procurement of 120MVA 132/33kV Power Transformer c/w RTCC Panels
Procurement of 200kVA 33/0.415kV Earthing Transformer
Procurement of Steel Structure
Procurement of Relay and Control Panels
Procurement of SCADA Interface Cubicle
Procurement of Disturbance Recorder Panel
Procurement of TWS & TLMS Control Panel
Procurement of 33kV Neutral Earthing Equipment
Procurement of 33kV Neutral Current Transformer (HV NCT)
Procurement of Clamps & Connectors
Procurement of Flexible Conductor
Procurement of Busbar
Procurement of Post Insulators
Procurement of Surge Arrester
Procurement of Batteries, Chargers and DC Switchboards
Procurement of LVAC Distribution Board
Procurement of Cable Trays and Accessories
Procurement of 33kV Cables
Procurement of 415V Cables
Procurement of Multicore Cables and Ancillaries
Procurement of Earthing Systems
Procurement of Outdoor Lighting
Procurement of 33kV Cable Sealing End
Procurement of 33kV Heat Shrink Termination Kit
Procurement of Anchor Bolts
Procurement - Civil
Procurement of Overhead Crane
Procurement of 132kV Control Building Roof Truss & Purlins
Procurement of 132kV Control Building Roof Sheet
Procurement of AHU
Procurement of Drainage Grating
Procurement of Fence Post & Gate
Procurement of Fire Alarm Panel
Manufacturing
Manufacturing of 132kV Indoor GIS Switchgear
Manufacturing of 120MVA 132/33kV Power Transformer c/w RTCC Panels
Manufacturing of 200kVA 33/0.415kV Earthing Transformer
Manufacturing of Steel Structure
Manufacturing of Relay and Control Panels
Manufacturing of SCADA Interface Cubicle
Manufacturing of Disturbance Recorder Panel
Manufacturing of TWS & TLMS Control Panel
Manufacturing of 33kV Neutral Earthing Equipment
Manufacturing of 33kV Neutral Current Transformer (Mounted on Power Tx)
Manufacturing of Clamps & Connectors
Manufacturing of Flexible Conductor
Manufacturing of Busbar
Manufacturing of Post Insulators
Manufacturing of Surge Arrester
Manufacturing of Batteries, Chargers and DC Switchboards
Manufacturing of LVAC Distribution Board
Manufacturing of Cable Trays and Accessories
Manufacturing of 33kV Cables
Manufacturing of 415V Cables
Manufacturing of Multicore Cables and Ancillaries
Manufacturing of Earthing Systems
Manufacturing of Outdoor Lighting
Manufacturing of 33kV Cable Sealing End
Manufacturing of 33kV Heat Shrink Termination Kit
Manufacturing of Anchor Bolts
Delivery
132kV Indoor GIS Switchgear
120MVA 132/33kV Power Transformer c/w RTCC Panels
200kVA 33/0.415kV Earthing Transformer
Steel Structure
Relay and Control Panels
SCADA Interface Cubicle
Disturbance Recorder Panel
TWS & TLMS Control Panel
33kV Neutral Earthing Equipment
33kV Neutral Current Transformer (Mounted on Power Tx)
Clamps & Connectors
Flexible Conductor
Busbar
Post Insulators
Surge Arrester
Batteries, Chargers and DC Switchboards
LVAC Distribution Board
Cable Trays and Accessories
33kV Cables
415V Cables
Multicore Cables and Ancillaries
Earthing Systems
Outdoor Lighting
33kV Cable Sealing End
33kV Heat Shrink Termination Kit
Anchor Bolts
Site Construction
Civil and Structural Works
Earthworks
Soil Resistivity Test
New 132kV GIS Building Area
New Switchyard Area
132kV Building Construction
Substructure
Superstructure
Finishing
Roof
Outdoor Foundation and Cable Trenches
Outdoor Foundation, Trenches and Oil Interceptor
Infrastructure Works
Road
Switchyard Gravel Topping
Surface Water Drainages
Fencing and Gate
Sewerage
Building M&E Services
Building Mechanical Works
Air Conditioning & Ventilation System
Fire Protection System
Internal cold water & Sanitary system
Overhead Travelling Crane
Substation Electrical Erection and Installation
Equipment Erection and Installation Works
Primary Equipment
Installation of 132kV Indoor GIS Switchgear
Erection of 120MVA 132/33kV Power Transformers
Erection of 200kVA 33/0.415kV Earthing Transformers
Oil Filtration
Erection of Outdoor Structures
Erection of Outdoor Equipments
Secondary Equipment
Installation of 132kV Relay & Control Panels
Installation of SCADA Interface Cubicle
Installation of Disturbance Recorder
Installation of TWS & TLMS Control Panels
Installation of 120MVA 132/33kV Transformer RTCC Panels
Installation of Local Control Panel
Stringing and Busbar Installation Works
Earthwire Stringing
Paying Out and Cutting of Earth Wire to Required Length
Hoisting and Hooking of Earthwire to Towers
Cable Trays and Cable Installation Works
Cable Trays & Control Cable Laying & Terminations
Control Cable Laying and Termination
Inspection, Testing and Commissioning
Pre-Commissioning Test
Auxiliary Power & Control Cables Testing
Ferrule and Continuity Check of Multicore Cable
Multicore Termination Check & AC/DC Pre-Commissioning
Testing on DC System (LVAC and Battery Bank)
Equipment Testing
132kV Indoor GIS Switchgear Testing
120MVA 132/33kV Power Transformers Testing
200kVA 33/0.415kV Earthing Transformers Testing
Secondary Equipment Testing
Outdoor Equipment Testing
End to End Test
End to End Test Transmitting 132KV Substation
Commissioning
Commissioning Transmitting 132KV Substation
Final Joint Inspection
Attending Punch Point
Demobilization and Hand Over
Handing Over to SEB
Demobilization
Original DuEarly Start Early Finis Late Start Late FinishPredecessoSuccessor DTotal FloatFree Float Primary Constraint
642d ### ### 44287 45184 0d 0d
642d ### ### 44287 45184 0d 0d
642d 1-Apr-21 15-Sep-23 1-Apr-21 15-Sep-23 0d 0d
642d 1-Apr-21 15-Sep-23 1-Apr-21 15-Sep-23 0d 0d
0d 1-Apr-21 1-Apr-21 PROC1000:0d 0d Start On or After
0d 15-Sep-23 15-Sep-23 DMHO1020: FS, PKMS1
0d 0d Finish On or Before
0d 25-Apr-23 25-Apr-23 EEIW2030: FS 0d 103d Finish On or Before
365d ### 17-Jan-23 ### 17-Jan-23 0d 0d
0d ### ### CCWS1110:PKMS1060:0d 538d Finish On or Before
0d ### ### PROC1000:PKMS1060:0d 537d Finish On or Before
0d 22-Sep-21 22-Sep-21 EDSN2000:PKMS1060:0d 517d Finish On or Before
0d 6-Dec-22 6-Dec-22 CCWS1160: FS 0d 203d Finish On or Before
0d 13-Jan-22 13-Jan-22 CDSN1100: FS, CDSN11
0d 436d Finish On or Before
0d 17-Jan-23 17-Jan-23 CCWS1170: FS, CCWS10d 173d Finish On or Before
0d 13-Jan-22 13-Jan-22 CDSN1180: FS 0d 436d Finish On or Before
642d 1-Apr-21 15-Sep-23 1-Apr-21 15-Sep-23 0d 0d
642d 1-Apr-21 15-Sep-23 1-Apr-21 15-Sep-23 PKMS1000:PKMS1060:0d 0d
642d 1-Apr-21 15-Sep-23 12-Apr-21 15-Sep-23 0d 0d
65d 1-Apr-21 30-Jun-21 ### ### 37d 0d
65d 1-Apr-21 30-Jun-21 ### ### PKMS1000:CCWS1000:37d 37d
301d 8-Apr-21 2-Jun-22 12-Apr-21 15-Sep-23 336d 0d
167d ### 13-Jan-22 ### 4-Apr-23 318d 0d
167d ### 13-Jan-22 ### 4-Apr-23 318d 0d
40d ### 20-Jul-21 ### 20-Jul-21 CCWS1000:CDSN1110:0d 0d
40d 21-Jul-21 14-Sep-21 21-Jul-21 14-Sep-21 CDSN1100:CDSN1120:0d 0d
40d 15-Sep-21 9-Nov-21 22-Oct-21 ### CDSN1110:CDSN1160:27d 0d
40d 15-Sep-21 9-Nov-21 8-Feb-23 4-Apr-23 CDSN1110:EEIW2120:365d 171d
20d ### ### ### ### EDSN1011:CDSN1150:0d 0d
20d ### 13-Jan-22 13-Apr-22 ### CDSN1140:CCWS1170:83d 83d
20d ### 13-Jan-22 ### 13-Jan-22 CDSN1120:PROC1500:0d 0d
20d ### ### ### ### EDSN1011:CDSN1180:0d 0d
20d ### 13-Jan-22 ### 13-Jan-22 CDSN1170:EEIW2700:0d 0d
301d 8-Apr-21 2-Jun-22 12-Apr-21 15-Sep-23 336d 0d
301d 8-Apr-21 2-Jun-22 12-Apr-21 ### 253d 0d
20d 8-Apr-21 5-May-21 ### 23-Jun-21 PKMS1000:EDSN1011:35d 0d
126d 8-Apr-21 30-Sep-21 ### ### EDSN1000:PROC1120:35d 0d
60d 7-May-21 29-Jul-21 1-Mar-23 ### PKMS1000:PRCO2000:473d 473d
53d 7-Sep-21 ### 7-Sep-21 ### EDSN2000:CDSN1140:0d 0d
40d 12-Apr-21 4-Jun-21 12-Apr-21 4-Jun-21 PKMS1000:CCWS1000:0d 0d
56d 22-Jul-21 7-Oct-21 ### 4-Mar-22 PKMS1000:PROC1170:106d 0d
40d ### 14-Feb-22 ### 12-Jul-22 PROC1170:MANU1170:
106d 0d
70d 7-Jun-21 10-Sep-21 ### 28-Jun-22 EDSN1060:PROC1220:207d 0d
70d 25-Feb-22 2-Jun-22 19-Oct-22 24-Jan-23 EDSN1011:MANU1110:168d 0d
56d 22-Jul-21 7-Oct-21 12-Apr-22 28-Jun-22 EDSN1081:MANU1160:
188d 84d
40d 9-Dec-21 2-Feb-22 4-May-22 28-Jun-22 PROC1160:MANU1160:104d 0d
40d 9-Dec-21 2-Feb-22 4-May-22 28-Jun-22 PROC1160:MANU1160:104d 0d
56d ### 4-Nov-21 19-Apr-22 5-Jul-22 PKMS1000:PROC1230:173d 0d
128d ### ### 29-Jul-21 2-Aug-22 186d 0d
28d 29-Jul-21 6-Sep-21 29-Jul-21 6-Sep-21 PROC1000:EDSN2001:0d 0d
30d 14-Sep-21 25-Oct-21 ### 3-May-22 EDSN2000:MANU1000: 136d 0d
40d ### 14-Jul-21 29-Jul-21 22-Sep-21 PROC1010:EDSN2011:50d 0d
30d 27-Jul-21 6-Sep-21 2-Feb-22 ### EDSN2010:MANU1010:136d 0d
30d ### 22-Sep-21 ### 22-Sep-21 PROC1020:EDSN2021:0d 0d
30d 5-Oct-21 ### 22-Jun-22 2-Aug-22 EDSN2020:MANU1020: 186d 0d
120d 24-Jun-21 8-Dec-21 ### 15-Sep-23 462d 0d
80d 24-Jun-21 13-Oct-21 ### 12-Jul-22 PKMS1000:EDSN3010:194d 0d
80d 24-Jun-21 13-Oct-21 ### 12-Jul-22 EDSN3000:MANU1040:194d 0d
40d 14-Oct-21 8-Dec-21 24-Jul-23 15-Sep-23 EDSN3010: FS 462d 462d
350d ### 14-Sep-22 ### 12-Sep-23 259d 0d
240d ### 13-Apr-22 ### 12-Sep-23 369d 0d
240d ### 13-Apr-22 ### 8-Nov-22 149d 0d
50d ### 21-Jul-21 ### 21-Jul-21 PKMS1000:PKMS1020:0d 0d
70d ### ### ### ### PKMS1000:MANU1010:0d 0d
50d ### 28-Jul-21 ### 28-Jul-21 PKMS1000:PKMS1020:0d 0d
70d ### ### 1-Jun-22 6-Sep-22 PKMS1000:MANU1030: 269d 0d
70d ### ### ### 5-Jul-22 PKMS1000:PROC1050:224d 0d
70d ### ### ### 5-Jul-22 PROC1040:MANU1050: 224d 0d
70d ### ### ### 5-Jul-22 PROC1040:MANU1060: 224d 0d
70d ### ### ### 5-Jul-22 PROC1040:MANU1070: 224d 0d
70d 24-Jun-21 29-Sep-21 6-Jul-22 11-Oct-22 PKMS1000:MANU1080: 269d 0d
70d ### ### ### ### PKMS1000:PKMS1020:0d 0d
70d 5-Nov-21 10-Feb-22 29-Jun-22 4-Oct-22 EDSN1011:EDSN1111:168d 0d
70d 1-Oct-21 6-Jan-22 6-Jul-22 11-Oct-22 EDSN1011:MANU1120: 198d 0d
70d 22-Jul-21 27-Oct-21 8-Jun-22 13-Sep-22 PKMS1000:MANU1130: 229d 0d
70d 10-Jun-21 15-Sep-21 27-Jul-22 1-Nov-22 PKMS1000:MANU1140: 294d 0d
70d ### ### 24-Jun-22 29-Sep-22 PKMS1000:MANU1150:286d 0d
70d ### ### 12-Jan-22 19-Apr-22 PKMS1000:EDSN1130:104d 0d
70d ### 6-Dec-21 26-Jan-22 3-May-22 PKMS1000:EDSN1090:106d 0d
70d 14-Oct-21 19-Jan-22 3-Aug-22 8-Nov-22 EDSN3000:MANU1180: 209d 0d
70d 16-Sep-21 ### 13-Apr-22 19-Jul-22 PKMS1000:PROC1200:149d 0d
70d 16-Sep-21 ### ### ### PROC1190:PROC1210:169d 0d
70d 16-Sep-21 ### ### ### PROC1200:MANU1180:169d 0d
70d 13-Sep-21 ### 29-Jun-22 4-Oct-22 EDSN1100:MANU1220: 207d 0d
70d 3-Dec-21 ### 3-Aug-22 8-Nov-22 EDSN1150:MANU1230: 173d 0d
70d 16-Sep-21 ### ### ### PKMS1000:MANU1240:169d 0d
70d 6-Jan-22 13-Apr-22 ### ### PKMS1000:MANU1250:89d 0d
70d ### ### 6-Jul-22 11-Oct-22 PROC1030:MANU1260: 294d 0d
147d 15-Sep-21 7-Apr-22 13-Apr-22 12-Sep-23 373d 0d
20d 14-Jan-22 10-Feb-22 5-Apr-23 2-May-23 CDSN1110:BMES1090:318d 318d
20d 15-Sep-21 12-Oct-21 13-Apr-22 ### CDSN1110:CCWS1150:150d 150d
15d ### ### 20-Apr-22 ### CDSN1120:CCWS1150:115d 115d
15d 14-Jan-22 3-Feb-22 21-Jun-23 11-Jul-23 CDSN1160:PROC1540:373d 0d
15d 4-Feb-22 24-Feb-22 12-Jul-23 1-Aug-23 PROC1530:PROC1550:373d 0d
30d 25-Feb-22 7-Apr-22 2-Aug-23 12-Sep-23 PROC1540:PRCO2030:373d 373d
15d 14-Jan-22 3-Feb-22 ### 20-Sep-22 CDSN1160:BMES1070:163d 163d
191d ### ### ### 7-Feb-23 188d 0d
120d 14-Sep-21 28-Feb-22 ### 6-Sep-22 EDSN2001:DLRY5000:136d 0d
100d 7-Sep-21 24-Jan-22 ### 2-Aug-22 PROC1010:DLRY5010:136d 0d
80d ### 7-Mar-22 3-Aug-22 ### EDSN2021:DLRY5020:186d 0d
80d ### ### 7-Sep-22 ### PROC1030:DLRY5030:269d 0d
100d 14-Oct-21 2-Mar-22 13-Jul-22 ### EDSN3000:DLRY5040:194d 0d
100d 2-Sep-21 19-Jan-22 20-Jul-22 6-Dec-22 PROC1050:DLRY5050:229d 0d
100d 2-Sep-21 19-Jan-22 27-Jul-22 ### PROC1060:DLRY5060:234d 0d
100d 2-Sep-21 19-Jan-22 3-Aug-22 ### PROC1070:DLRY5070:239d 0d
80d 7-Oct-21 26-Jan-22 19-Oct-22 7-Feb-23 PROC1080:DLRY5080:269d 0d
80d 2-Sep-21 ### ### 6-Dec-22 PROC1090:DLRY5090:249d 0d
60d 25-Feb-22 ### 19-Oct-22 10-Jan-23 PROC1110:DLRY5100:168d 0d
60d 7-Jan-22 ### 12-Oct-22 3-Jan-23 PROC1120:DLRY5110:198d 0d
80d 28-Oct-21 16-Feb-22 14-Sep-22 3-Jan-23 PROC1130:DLRY5120:229d 0d
60d 30-Sep-21 ### ### 7-Feb-23 PROC1140:DLRY5130:294d 0d
80d 14-Sep-21 3-Jan-22 19-Oct-22 7-Feb-23 PROC1150:DLRY5140:286d 0d
50d 3-Feb-22 13-Apr-22 29-Jun-22 6-Sep-22 EDSN1130:DLRY5150:104d 0d
40d 15-Feb-22 11-Apr-22 13-Jul-22 6-Sep-22 EDSN1090:DLRY5160:106d 0d
40d 20-Jan-22 ### 9-Nov-22 3-Jan-23 PROC1180:DLRY5170:209d 0d
40d ### 16-Feb-22 20-Jul-22 13-Sep-22 PROC1190:DLRY5180:149d 0d
40d ### 16-Feb-22 ### 11-Oct-22 PROC1200:DLRY5190:169d 0d
40d ### 16-Feb-22 ### 11-Oct-22 PROC1210:DLRY5200:169d 0d
40d ### 11-Feb-22 5-Oct-22 ### PROC1220:DLRY5210:207d 0d
20d ### 7-Apr-22 9-Nov-22 6-Dec-22 PROC1230:DLRY5220:173d 0d
20d ### 19-Jan-22 ### 13-Sep-22 PROC1240:DLRY5230:169d 0d
20d 14-Apr-22 ### ### 13-Sep-22 PROC1250:DLRY5240:89d 0d
40d ### 20-Oct-21 12-Oct-22 6-Dec-22 PROC1260:DLRY5250:294d 0d
235d 21-Oct-21 14-Sep-22 3-Aug-22 25-Apr-23 159d 0d
90d 1-Mar-22 4-Jul-22 7-Sep-22 10-Jan-23 MANU1000:
EEIW2000:136d 81d
90d 25-Jan-22 ### 3-Aug-22 6-Dec-22 MANU1010:EEIW2010:136d 0d
90d 8-Mar-22 11-Jul-22 ### ### MANU1020:
EEIW2020:186d 106d
30d ### 26-Jan-22 ### 7-Feb-23 MANU1030:
EEIW2040:269d 254d
90d 3-Mar-22 6-Jul-22 ### 4-Apr-23 MANU1040:
EEIW2120:194d 0d
90d 20-Jan-22 ### 7-Dec-22 11-Apr-23 MANU1050:
EEIW2130:229d 35d
90d 20-Jan-22 ### ### 18-Apr-23 MANU1060:
EEIW2140:234d 119d
90d 20-Jan-22 ### ### 25-Apr-23 MANU1070:
EEIW2150:239d 124d
30d 27-Jan-22 9-Mar-22 8-Feb-23 ### MANU1080:
EEIW2050:269d 254d
30d ### 2-Feb-22 7-Dec-22 17-Jan-23 MANU1090:
EEIW2010:249d 249d
30d ### 30-Jun-22 11-Jan-23 21-Feb-23 MANU1110:
EEIW2300:168d 53d
30d 1-Apr-22 ### 4-Jan-23 14-Feb-23 MANU1120:
EEIW2700:198d 143d
30d 17-Feb-22 ### 4-Jan-23 14-Feb-23 MANU1130:
EEIW2700:229d 174d
30d ### 2-Feb-22 8-Feb-23 ### MANU1140:
EEIW2050:294d 279d
30d 4-Jan-22 14-Feb-22 8-Feb-23 ### MANU1150:
EEIW2050:286d 271d
90d 14-Apr-22 ### 7-Sep-22 10-Jan-23 MANU1160:
EEIW2000:104d 49d
90d 12-Apr-22 ### 7-Sep-22 10-Jan-23 MANU1170:
EEIW2000:106d 51d
30d ### 27-Apr-22 4-Jan-23 14-Feb-23 MANU1180:
EEIW2700:209d 154d
90d 17-Feb-22 22-Jun-22 14-Sep-22 17-Jan-23 MANU1190:
EEIW2010:149d 149d
90d 17-Feb-22 22-Jun-22 12-Oct-22 14-Feb-23 MANU1200:
EEIW2700:169d 114d
90d 17-Feb-22 22-Jun-22 12-Oct-22 14-Feb-23 MANU1210:
EEIW2700:169d 114d
90d 14-Feb-22 17-Jun-22 ### 4-Apr-23 MANU1220:
EEIW2300:207d 92d
30d 8-Apr-22 ### 7-Dec-22 17-Jan-23 MANU1230:
EEIW2010:173d 173d
90d 20-Jan-22 ### 14-Sep-22 17-Jan-23 MANU1240:
EEIW2010:169d 169d
90d ### 14-Sep-22 14-Sep-22 17-Jan-23 MANU1250:
EEIW2010:89d 89d
30d 21-Oct-21 1-Dec-21 7-Dec-22 17-Jan-23 MANU1260:EEIW2010:294d 294d
605d ### 15-Sep-23 ### 15-Sep-23 0d 0d
602d ### 12-Sep-23 ### 12-Sep-23 0d 0d
67d ### ### ### ### 0d 0d
2d ### ### ### ### EDSN1060:CDSN1100:0d 0d
30d ### 6-Jul-21 ### 6-Jul-21 CCWS1000:CCWS1110:0d 0d
30d 14-Jul-21 ### 14-Jul-21 ### CCWS1100:PKMS1010:0d 0d
320d 15-Sep-21 6-Dec-22 15-Sep-21 6-Dec-22 0d 0d
30d 15-Sep-21 26-Oct-21 15-Sep-21 26-Oct-21 CDSN1110:CCWS1140:0d 0d
140d 27-Oct-21 ### 27-Oct-21 ### CCWS1130:CCWS1150:0d 0d
120d ### 25-Oct-22 ### 25-Oct-22 CCWS1140:CCWS1160:0d 0d
30d 26-Oct-22 6-Dec-22 26-Oct-22 6-Dec-22 CCWS1150:PKMS1040:0d 0d
180d ### 17-Jan-23 ### 17-Jan-23 0d 0d
180d ### 17-Jan-23 ### 17-Jan-23 CCWS1140:PKMS1055:0d 0d
350d ### 12-Sep-23 ### 12-Sep-23 0d 0d
70d ### ### ### ### CCWS1140:CCWS1190:0d 0d
70d ### ### ### ### CCWS1180:CCWS1200:0d 0d
70d ### 28-Feb-23 ### 28-Feb-23 CCWS1190:CCWS1210:0d 0d
70d 1-Mar-23 6-Jun-23 1-Mar-23 6-Jun-23 CCWS1200:CCWS1220:0d 0d
70d 7-Jun-23 12-Sep-23 7-Jun-23 12-Sep-23 CCWS1210:PRCO2030:0d 0d
180d 14-Sep-22 ### 14-Sep-22 ### 0d 0d
180d 14-Sep-22 ### 14-Sep-22 ### 0d 0d
55d 14-Sep-22 ### 14-Sep-22 ### CCWS1100:BMES1070:0d 0d
50d ### 7-Feb-23 ### 7-Feb-23 PROC1560:BMES1080:0d 0d
60d 8-Feb-23 2-May-23 8-Feb-23 2-May-23 CCWS1100:BMES1090:0d 0d
15d 3-May-23 ### 3-May-23 ### CCWS1100:PRCO2000:0d 0d
209d 7-Jul-22 25-Apr-23 11-Jan-23 ### 15d 0d
209d 7-Jul-22 25-Apr-23 11-Jan-23 ### 15d 0d
130d 26-Oct-22 25-Apr-23 11-Jan-23 ### 15d 0d
20d 26-Oct-22 ### 11-Jan-23 7-Feb-23 DLRY5000:PRCO1100:55d 0d
40d 18-Jan-23 ### 18-Jan-23 ### DLRY5010:PRCO1110:0d 0d
5d 18-Jan-23 24-Jan-23 ### ### DLRY5020:PRCO1120:80d 0d
30d ### 25-Apr-23 ### 25-Apr-23 EEIW2010:PRCO1110:0d 0d
30d 18-Jan-23 28-Feb-23 8-Feb-23 ### CCWS1170:EEIW2050:15d 0d
30d 1-Mar-23 11-Apr-23 ### 2-May-23 EEIW2040:PRCO1130:15d 0d
104d 7-Jul-22 ### 8-Feb-23 9-May-23 115d 0d
5d 7-Jul-22 13-Jul-22 5-Apr-23 11-Apr-23 DLRY5040:EEIW2130:194d 0d
5d 14-Jul-22 20-Jul-22 12-Apr-23 18-Apr-23 EEIW2120:EEIW2140:194d 79d
5d 9-Nov-22 ### 19-Apr-23 25-Apr-23 EEIW2130:EEIW2150:115d 0d
5d ### ### 26-Apr-23 2-May-23 EEIW2140:PRCO1130:115d 100d
5d 12-Jul-22 18-Jul-22 3-May-23 9-May-23 DLRY5010:PRCO1110:211d 201d
5d ### ### 8-Feb-23 14-Feb-23 EEIW2000:EEIW2700:55d 0d
10d 26-Oct-22 8-Nov-22 5-Apr-23 18-Apr-23 115d 0d
10d 26-Oct-22 8-Nov-22 5-Apr-23 18-Apr-23 115d 0d
5d 26-Oct-22 1-Nov-22 5-Apr-23 11-Apr-23 DLRY5100:EEIW2310:115d 0d
5d 2-Nov-22 8-Nov-22 12-Apr-23 18-Apr-23 EEIW2300:EEIW2140:115d 0d
20d ### ### 15-Feb-23 ### 55d 0d
20d ### ### 15-Feb-23 ### 55d 0d
20d ### ### 15-Feb-23 ### EEIW2170:PRCO1020:55d 0d
187d ### 14-Sep-23 ### 14-Sep-23 0d 0d
95d ### 9-May-23 ### ### 10d 0d
30d ### 7-Feb-23 12-Apr-23 ### EEIW2700:PRCO2000:75d 75d
10d ### 10-Jan-23 ### ### EEIW2700:PRCO1020:55d 0d
10d 11-Jan-23 24-Jan-23 ### 11-Apr-23 EEIW2700:PRCO1100:55d 0d
10d ### 10-Jan-23 ### ### EEIW2700:PRCO2000:95d 95d
75d 25-Jan-23 9-May-23 12-Apr-23 ### 10d 0d
30d 25-Jan-23 7-Mar-23 12-Apr-23 ### EEIW2000:PRCO2000:55d 55d
10d 26-Apr-23 9-May-23 ### ### EEIW2010:PRCO2000:10d 10d
5d 25-Jan-23 31-Jan-23 ### ### EEIW2020:PRCO2000:80d 80d
15d 12-Apr-23 2-May-23 3-May-23 ### EEIW2150:PRCO2000:15d 15d
5d 12-Apr-23 18-Apr-23 ### ### EEIW2050:PRCO2000:25d 25d
50d ### 1-Aug-23 ### 1-Aug-23 0d 0d
50d ### 1-Aug-23 ### 1-Aug-23 EDSN1012:PRCO2020:0d 0d
30d 2-Aug-23 12-Sep-23 2-Aug-23 12-Sep-23 0d 0d
30d 2-Aug-23 12-Sep-23 2-Aug-23 12-Sep-23 PRCO2000:PRCO2030:0d 0d
2d 13-Sep-23 14-Sep-23 13-Sep-23 14-Sep-23 0d 0d
2d 13-Sep-23 14-Sep-23 13-Sep-23 14-Sep-23 PRCO2020:DMHO1010:
0d 0d
1d 15-Sep-23 15-Sep-23 15-Sep-23 15-Sep-23 0d 0d
1d 15-Sep-23 15-Sep-23 15-Sep-23 15-Sep-23 PRCO2030:DMHO1020:
0d 0d
1d 15-Sep-23 15-Sep-23 15-Sep-23 15-Sep-23 DMHO1010:PKMS1060:0d 0d
Primary Constraint

Start On or After
Finish On or Before
Finish On or Before

Finish On or Before
Finish On or Before
Finish On or Before
Finish On or Before
Finish On or Before
Finish On or Before
Finish On or Before

You might also like