ERP (Group Week 2)

- The document describes three case studies involving assigning plants to products, machines to locations, and minimizing costs. - For the first case, the optimal assignment of plants to products to minimize total cost is $3,260. - For the second case, the optimal assignment of plants to products with additional constraints is $3,290 per day. - For the third case involving machines and locations, the optimal assignment to minimize total cost is $31.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

ERP (Group Week 2)

- The document describes three case studies involving assigning plants to products, machines to locations, and minimizing costs. - For the first case, the optimal assignment of plants to products to minimize total cost is $3,260. - For the second case, the optimal assignment of plants to products with additional constraints is $3,290 per day. - For the third case involving machines and locations, the optimal assignment to minimize total cost is $31.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

MINISTRY OF EDUCATION AND TRAINING

UNIVERSITY OF ECONOMICS HO CHI MINH CITY


SCHOOL OF INTERNATIONAL BUSINESS – MARKETING


PRACTICE FOR GROUP WORK WEEK 2


COURSE NAME: ERP (SCM)

A CASE STUDY:

CASE 2: ASSIGNING PLANTS TO PRODUCTS


(BETTER PRODUCTS COMPANY)

GVHD: ThS. HOÀNG NGỌC NHƯ Ý


THÀNH VIÊN: Nhóm 3
Nguyễn Khôi Nguyên – 31191025279
Trần Viễn Xứ – 31191025895
Nguyễn Ngọc Hằng – 31191023272
Tống Khánh Linh – 31191025687
Hoàng Nguyễn Ngọc Linh – 31191026616
LỚP HỌC PHẦN: 21D1BUS50313105

Ho Chi Minh City, January 23rd, 2021


TABLE OF CONTENTS
CASE 2.1 – ASSIGNING PLANTS TO PRODUCTS (BETTER PRODUCTS
COMPANY)............................................................................................................................................3
1.1. Summary................................................................................................................................................3
1.2. Case Solver............................................................................................................................................3
1.2.1. Constraints......................................................................................................................3
1.2.2. Excel Solver....................................................................................................................3
1.2.3. QM for Windows V5......................................................................................................5
CASE 2.2 – ASSIGNING PLANTS TO PRODUCTS (BETTER PRODUCTS
COMPANY)............................................................................................................................................5
2.1. Summary................................................................................................................................................5
2.2. Case Solver............................................................................................................................................5
2.2.1. Constraints......................................................................................................................5
2.2.2. Excel Solver....................................................................................................................6
2.2.3. QM for Windows V5......................................................................................................7
THE JOB SHOP CASE STUDY...........................................................................................................7
3.1. Summary................................................................................................................................................7
3.2. Case Solver............................................................................................................................................8
3.2.1. Constraints......................................................................................................................8
3.2.2. Excel Solver....................................................................................................................8
3.2.3. QM for Windows V5....................................................................................................10

2
PRACTICE FOR GROUP WORK WEEK 2
Case 2.1 – ASSIGNING PLANTS TO PRODUCTS (BETTER PRODUCTS
COMPANY)
1.1. Summary
Units of a commodity Number of units produced per day
Sources
Plant 1; Plant 2; Plant 3
(Plants)
Destinations
Product 1; Product 2; Product 3; Product 4
(Products)
Supply from a source
(Capacity Available)
Demand at a destination
Table case 2.1
(Required Production)
Costs per unit produced in a
plant
Table case 2.1 – The Data for the Better Products Co. Problem Formulated as a Variant
of a Transportation Problem

1.2. Case Solver


1.2.1. Constraints
- Total capacity available (Supply) > Total required production (Demand): 195 > 120,
so:
X11 + X12 + X13 + X14 <= 75
X21 + X22 + X23 + X24 <= 75
X31 + X32 + X33 + X34 <= 45
X11 + X21 + X31 = 20
X12 + X22 + X32 = 30
X13 + X23 + X33 = 30
Solver Parameters X14 + X24 + X34 = 40
Set Objective Cell: Total Cost
- Plant 2 cannot produce
To: Min
Product 3:
By Changing Variable Cells:
X23 = 0
Product Quantity
1.2.2. Excel Solver
Subject to the Constraints:
Total Units produced in Plant <= Capacity
Available
Total Units of Product = Required Production
E15 = 0 3
Solver Options:
Make Variables Nonnegative
Solving Method: Simplex LP
Range Name Cells
Required Production C19:F19
Product Quantity C14:F16
Capacity Available I14:I16
Total Cost I20
Total Units produced in Plant G14:G16
Total Units of Product C17:F17
Unit Cost C6:F8

Result: Total Cost = $3,260

4
1.2.3. QM for Windows V5

Result: Total Cost = Solution value = $3,260 million.


 Conclusion:
Minimizing the total cost for producing units of product per day is $3,260, including:
- Plant 1: 30 units of product 2, 30 units of product 3
- Plant 2: 15 units of product 4
- Plant 3: 20 units of product 1, 25 units of product 4
Case 2.2 – ASSIGNING PLANTS TO PRODUCTS (BETTER PRODUCTS
COMPANY)
2.1. Summary
Units of a commodity Number of units produced per day
Sources
Plant 1; Plant 2; Plant 3
(Plants)
Destinations
Product 1; Product 2; Product 3; Product 4
(Products)
Supply from a source
(Total Assignments)
Demand at a destination
Table case 2.2
(Total Assigned)
Costs per unit produced in a
plant
Table case 2.2 – Data for the Better Products Co. Problem

5
2.2. Case Solver
2.2.1. Constraints
- Sum of Total Assignments (Supply) = Sum of Total Assigned (Demand) = 4 units, so:
X11 + X12 + X13 + X14 = 2
X21 + X22 + X23 + X24 = 1
X31 + X32 + X33 + X34 = 1
X11 + X21 + X31 = 1
X12 + X22 + X32 = 1
X13 + X23 + X33 = 1
X14 + X24 + X34 = 1
- Plant 2 cannot produce Product 3:
X23 = 0
2.2.2. Excel Solver
Solver Parameters
Set Objective Cell: Total Cost
To: Min
By Changing Variable Cells:
Product Quantity
Subject to the Constraints:
Total Units produced in Plant = Total Assignments
Total Units of Product = Total Assigned
E15 = 0
Solver Options:
Make Variables Nonnegative
Solving Method: Simplex LP

Range Name Cells


Total Assigned C19:F19
Product Quantity C14:F16
Total Assignments I14:I16
Total Cost I20
Total Units produced in Plant G14:G16
Total Units of Product C17:F17
Unit Cost C6:F8

6
Result: Total Cost = $3,290/day
2.2.3. QM for Windows V5

Result: Total Cost = Solution value = $3,290/day


 Conclusion:
Minimizing the total cost for producing units of product is $3,290/day, including:
- Plant 1: 1 unit of product 2; 1 unit of product 3
- Plant 2: 1 units of product 1
- Plant 3: 1 unit of product 4
THE JOB SHOP CASE STUDY
3.1. Summary
Units of a commodity Locations
Sources
Machine 1; Machine 2; Machine 3
(Machines)

7
Destinations
Location 1; Location 2; Location 3; Location 4
(Locations)
Supply from a source
(Available)
Demand at a destination
Table case 2.3
(Needed)
Costs per hour of materials
handling
Table case 2.3 – Materials-Handling Cost Data for the Job Shop Co. Problem

3.2. Case Solver


3.2.1. Constraints
- Total Available (Supply) < Total Needed (Demand), so:
X11 + X12 + X13 + X14 + X15 = 1
X21 + X22 + X23 + X24 + X25 = 1
X31 + X32 + X33 + X34 + X35 = 1
X11 + X21 + X31 <= 1
X12 + X22 + X32 <= 1
X13 + X23 + X33 <= 1
X14 + X24 + X34 <= 1
X15 + X25 + X35 <= 1
- Location 2 is not considered suitable for machine 2, so no cost is given for this case:
X22 = 0
3.2.2. Excel Solver
Solver Parameters
Set Objective Cell: Total Cost
Range
To: MinName Cells
Needed
By Changing Variable Cells: C19:G19
Location Quantity
Location Quantity C14:G16
Available
Subject to the Constraints: H14:H16
TotalTotal
Cost Machines = AvailableJ20
TotalTotal
Machines
Locations = Needed I14:I16
TotalD15
Locations
=0 C17:G17
Cost PerOptions:
Solver Hour C6:G8
Make Variables Nonnegative
Solving Method: Simplex LP
8
Result: Total Cost = $31
3.2.3. QM for Windows V5

Result: Total Cost = Solution value = $31


 Conclusion:
Minimizing the total cost of assigning the new machines to the available locations is $31,
including:
- Machine 1: Location 4
- Machine 2: Location 3
- Machine 3: Location 1

9