ERP (Group Week 2)
ERP (Group Week 2)
A CASE STUDY:
2
PRACTICE FOR GROUP WORK WEEK 2
Case 2.1 – ASSIGNING PLANTS TO PRODUCTS (BETTER PRODUCTS
COMPANY)
1.1. Summary
Units of a commodity Number of units produced per day
Sources
Plant 1; Plant 2; Plant 3
(Plants)
Destinations
Product 1; Product 2; Product 3; Product 4
(Products)
Supply from a source
(Capacity Available)
Demand at a destination
Table case 2.1
(Required Production)
Costs per unit produced in a
plant
Table case 2.1 – The Data for the Better Products Co. Problem Formulated as a Variant
of a Transportation Problem
4
1.2.3. QM for Windows V5
5
2.2. Case Solver
2.2.1. Constraints
- Sum of Total Assignments (Supply) = Sum of Total Assigned (Demand) = 4 units, so:
X11 + X12 + X13 + X14 = 2
X21 + X22 + X23 + X24 = 1
X31 + X32 + X33 + X34 = 1
X11 + X21 + X31 = 1
X12 + X22 + X32 = 1
X13 + X23 + X33 = 1
X14 + X24 + X34 = 1
- Plant 2 cannot produce Product 3:
X23 = 0
2.2.2. Excel Solver
Solver Parameters
Set Objective Cell: Total Cost
To: Min
By Changing Variable Cells:
Product Quantity
Subject to the Constraints:
Total Units produced in Plant = Total Assignments
Total Units of Product = Total Assigned
E15 = 0
Solver Options:
Make Variables Nonnegative
Solving Method: Simplex LP
6
Result: Total Cost = $3,290/day
2.2.3. QM for Windows V5
7
Destinations
Location 1; Location 2; Location 3; Location 4
(Locations)
Supply from a source
(Available)
Demand at a destination
Table case 2.3
(Needed)
Costs per hour of materials
handling
Table case 2.3 – Materials-Handling Cost Data for the Job Shop Co. Problem
9