BNCV MTX Design Pack Reva

This 3-sentence summary provides the high-level details about the document: The document is a design pack for a BNCV MTX site that details a plan to implement a design at the Barton National Circuit site, including recovering existing connections, installing new fiber splicing, and listing required materials. It describes work to recover connections on two SIU units and a link, plans to reparent connections and recover another link for a new CRAN link, and includes a revision history and materials list. The site has 3 sectors and details solutions for the SIU units involving different radio technologies to be connected.

Uploaded by

Anjali Tiwari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views

BNCV MTX Design Pack Reva

This 3-sentence summary provides the high-level details about the document: The document is a design pack for a BNCV MTX site that details a plan to implement a design at the Barton National Circuit site, including recovering existing connections, installing new fiber splicing, and listing required materials. It describes work to recover connections on two SIU units and a link, plans to reparent connections and recover another link for a new CRAN link, and includes a revision history and materials list. The site has 3 sectors and details solutions for the SIU units involving different radio technologies to be connected.

Uploaded by

Anjali Tiwari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

BNCV MTX Design Pack

Steven Boadle 19/10/2020


Designer Date Created
19/10/2020
[email protected] Date Modified
+61409354053 5
Contact Details Pages

1. Contents
Page Title Author Comment
Site Details
Site Name
1 Cover Page Anil Ashok Sadul -
2 Materials List ‘’ BARTON NATIONAL CIRCUIT
3 Mobile Site ‘’
Address
4 Exchange Site ‘’
5 Link Recovery ‘’ 10 NATIONAL CRCT
BARTON 2600

Region

2. Work Overview ACT

Transmission Scenario
b Special
c
d
e
f
g Instructions b Work
c
d
e
f
g at Exchange
Option 1a1000 - 990Mbps/
c SPO1410
d
e
f
g Install c
d
e
f
g Fibre Splicing 10Mbps OAM - Metro -
WSC2SIU Direct Fibre
c TX
d
e
f
g CMART Required c PSI
d
e
f
g Connectivity to EAS 7450

c Type
d
e
f
g A c
d
e
f
g Type B c
d
e
f
g Type C
SIU-02 BNCVDX1
Main Link to S8CI-SS-004 Port 22
Dual Homing Link to N7CD-E-902_1/2/12
Existing:
WCDMA2100 (IUB ID 320003660) on to SIU port 2b to be recovered RAN Summary
WCDMA2100 (IUB ID 320004069) on to SIU port 3 to be recovered
LTE700-1800 (IUB ID 520005) connected to SIU port 7
Sectors=3SIU#1 solution -
Planned: WSC2 3G/4G 1G-1 x
WCDMA2100 (IUB ID 320003660) on to SIU port 2b to be recovered
LTECA_700_1800_2600_2100;
WCDMA2100 (IUB ID 320004069) on to SIU port 3 to be recovered
LTE700-1800 (IUB ID 520005) connected to SIU port 7 has to be recovered after CRAN/ 2 x WCDMA2100;
BBH cutover Sectors=3SIU#2 solution -
Recover SIU-02 BNCV0X2 WSC2 3G/4G 1G-2 x
Cancel Main Link to N7CD-E-901 2/1/2 WCDMA850
Existing:
WCDMA850 (IUB ID 320000060) on to SIU port 2b DBoRS Authority
WCDMA850 (IUB ID 320003452) on to SIU port 3
ESC connected to SIU port 5 NA17607.01
Reparent :
Reparent WCDMA850 (IUB ID 320000060) on to BNCVDX1 port 2b
Reparent WCDMA850 (IUB ID 320003452) on to BNCVDX1 port 3
Reparent ESC connected to BNCV0T1 port 4

Recover BNCV0X2 and J BNCV N7CD K101. Re-use 2nd fibre from recovered link
for new CRAN link to DKIN BBH.

MTX Design to be implemented first prior to CRAN/BBH cutover


Note: If there are any issues or discrepancies, please contact the designer.
3. Revision Handling
Version Date Author Comment
A 19/10/2020 Anil Ashok Sadul First Draft for site audit 1/5
BNCV MTX Design Pack
Anil Ashok Sadul 19/10/2020
Designer Date Created
19/10/2020
Date Modified
5
Pages

4. Materials List g Material


c
d
e
f List Complete

# Part No (S/I) Part No (E///) Qty. Description


SFP's
1 905/00667 1400422-0019 1000Base-LX
2 905/00668 1400422-0027 1000Base-ZX
3 40000640 RDH10248/1 1000BASE-BX10 BIDI13TX/15RX
4 40000641 RDH10248/2 1000BASE-BX10 BIDI15TX/13RX
5 905/02072 1700743-0014 10/100/1000BASE-TX RJ45
6 40007535 RDH10256/5 1000BASE-ZX-U (SFW)
7 40007536 RDH10256/6 1000BASE-ZX-D (SFW)
8 905/01667 RDH10262/1 10GBASE-LR SFP
9 RDH20262/2 10GBASE-LR LITE SFP
10 40007899 RDH901029/1 10GBASE-ER SFP
11 RDH10262/3 10GBASE-ZR SFP
12 RDH10270/1 10GBASE-BX20-U
13 RDH10270/2 10GBASE-BX20-D
SIU02
14 (bundle) SIU02 Bundle
Cables
15 (various) DESA factory-made shielded Cat 6
16 (various) LC-LC Optical Patch Fibre
17 (various) ASC-ASC Optical Patch Fibre
18 (various) LC-ASC Optical Patch Fibre
Other
19 35300905 5dB Attenuator (Angled SC)
20 35301356 5dB Attenuator (LC)
21 40003025 MEDIA CONVERTER, AFC2175MP/48V PUB WIFI
22 40007837 Optical cable 1F SM, LC (J-conn) -LC, 3M
23 40001208 Cisco 10GBASE-ER SFP
24 40001210 Cisco 10GBASE-ZR SFP

2/5
4 3 2 1
TITLE RBS ID: 520005
F BRTN 5028
BNCV MTX DESIGN PACK FNN: No FNN GE 7
SLOT/PORT: Slot 1 Port 11 GE 6
LTE to be recovered L700_
post CRAN/BBH cutover 1800_ GE 5
RBS ID: 320004069
2100
FNN: No FNN GE 4 J BNCV S8CI K102
Main Link
W2100 to be SLOT/PORT: Slot 1 Port 11 5.562 Km
D cancelled W2100 P/S POS P/S D
GE 3a 0b LX J BNCV N7CD K102
SIU02
RBS ID: 320003660 Dual Homing Link P 3 S
LX 2b BNCVDX1 1b LX 7.387 Km
FNN: No FNN P 2 S
SLOT/PORT: Slot 1 Port 7 P 11
X S
W2100

ESC to be cutover to P 12
X S
GE 7
BNCV0T1 Port 4
P ABCD4OFDP S
RBS ID: 320003452 GE 6 X/x/x/x
P 5 S
FNN: No FNN ESC GE 5 BNCV (B29) OFDP
SLOT/PORT: Slot 1 Port 7 GE 4 RT/104/1/1
W850
RBS ID: 320000060
0b LX J BNCV N7CD K101
GE 3a SIU02 Main Link
FNN: No FNN 7.387 Km
C LX 2b BNCV0X2 1b - C
SLOT/PORT: Slot 1 Port 11
W850
Current Site
MTX Design
Recover BNCV0X2 and J BNCV N7CD K101. Re-use 2nd fibre from recovered link for
new CRAN link to DKIN BBH. F BRTN 5028

GE 7 P/S POS P/S

RBS ID: 320000060 GE 6 P 3 S

FNN: No FNN P 2 S
GE 5
SLOT/PORT: Slot 1 Port 7 J BNCV S8CI K102 P 11 S
B W850 GE 4 Main Link B
5.562 Km P 12 S
RBS ID: 320003452
BNCV (B29) OFDP
GE 3a 0b LX
FNN: No FNN SIU02 RT/104/1/1
LX 2b BNCVDX1 1b LX
SLOT/PORT: Slot 1 Port 11
W850 J BNCV N7CD K102
Dual Homing Link
7.387 Km

MTX Parts List Special Instructions


BNCV MTX Design Pack
ITEM QTY. PART NO. DESCRIPTION # DESCRIPTION DATE APPROVED Title
1 905/00667 1000Base-LX SFP 1 Verify the SFP type in the WCDMA850 RBS before connecting it behind the SIU. If it’s ZX, then swap it with an LX SFP. Anil Ashok Sadul 19/10/2020
2 905/00668 1000Base-ZX SFP 2 Before connecting a link that was not an active or working link prior into the SIU port 0b, please check the RX power with a Designer Date Modified
A A
3 - SIU02 power meter and ensure the reading is within the SIU SFP receive power range (refer to the “SIU-02 Receive Power
Mobile Site
4 40000640 SFP BiDi13TX/15RX Measurement MOP” from Build Practices. Page Title
5 Cat 6 Cable 3/5
14/10/2020
6 LC LC Fibre Created Page No.

4 3 2 1
4 3 2 1
TITLE

BNCV MTX DESIGN PACK

D BNCV NHRU EA001


BNC VD X1

D 3G End to End Circuit D

P/S POS P/S

S 50 S

C S 49 S EAP: S8CI-SS-004 C
SLOT/PORT: Port 22 RNC Router
LOCATION: 1/27/4/32/9
J BNCV S8CI K102
S8CI OEF
Main Link
F CVIC 5476 NHRU
1/28/4/31 5.562 Km RNC:

Fibre 50 & 49 IP/MPLS 3G RNC

IP Core Network
F DKIN 5153 LTE RNC: NHQ6
J BNCV N7CD K102 RNC
Fibre 3 & 4
P/S POS P/S Dual Homing Link
7.387 Km DH EAP: N7CD-E-902 ETHERNET AGG RNC Router
S 3 S
NETWORK
B S 4 S
SLOT/PORT: 1/2/12 B
LOCATION: GD/710/6/8

N7CD OEF

GD/710/6/6

Dual Homing Exchange: DKIN


Special Instructions BNCV MTX Design Pack
# DESCRIPTION DATE APPROVED
Title

Anil Ashok Sadul 19/10/2020


Designer Date Modified
A A
Exchange Site
Page Title

19/10/2020 4/5
Created Page No.

4 3 2 1
4 3 2 1
TITLE

BNCV MTX DESIGN PACK

D D

DKIN Exchange
N7CD (EAP Router)
EAP: N7CD-E-901

SLOT/PORT: 2/1/2 RNC Router


Verify that there is no light on the fibre
prior to disconnecting the patch. If there is LOCATION: GD/704/14/8
light, please contact the designer before
proceeding.
RNC: NHRU

F DKIN 1012
F DKIN 5091
Fibre 19,20
IP/MPLS 3G RNC
Existing
C IP Core Network C
Fibre 23, 24 Patch
P/S POS P/S P/S POS P/S P/S POS P/S

S 23 P P 19 S S 91 S LTE RNC: NHQ6


RNC
S 24 P P 20 S S 92 S

ETHERNET AGG RNC Router


NETWORK
DKNU OMF DKNU OMF BPDK OEF

GD/714/11/13 GD/714/13/2 GD/704/14/7

DO NOT TOUCH !!

B J BNCV N7CD K101 B

DBoRS (Multiman & TPD) not aligned with above connectivity. In case of discrepancy at site.
Kindly confirm connectivity to designer so that DBoRS can be updated

Special Instructions BNCV MTX Design Pack


# DESCRIPTION DATE APPROVED
Title

1 Link J BNCV N7CD K101 is to be recovered at DKIN Exchange. Confirm if the termination point (in red) at GD/714/13/2 is Anil Ashok Sadul 19/10/2020
a patch, and can be easily disconnected. If so, please make the disconnection. If it is a hard splice, please make no Designer Date Modified
A A
change and call the designer to confirm. Link Recovery
Page Title

14/10/2020 5/5
Created Page No.

4 3 2 1