The document outlines a user acceptance test plan for archiving and unarchiving Trello cards. It defines the test scope, assumptions, constraints, risks, roles and responsibilities of the test team members. Test entry criteria and test cases are provided to test archiving and unarchiving a Trello card. The test results section documents the pass/fail status of each test case.

Uploaded by

Rohan Ajith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
482 views4 pages

User Acceptance Test Plan

The document outlines a user acceptance test plan for archiving and unarchiving Trello cards. It defines the test scope, assumptions, constraints, risks, roles and responsibilities of the test team members. Test entry criteria and test cases are provided to test archiving and unarchiving a Trello card. The test results section documents the pass/fail status of each test case.

Uploaded by

Rohan Ajith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

User Acceptance Test Template

Project Name: Archive Trello Card Feature


Project Sponsor:
Service Owner: John Lukas
Project Manager: Kathy Francis
Document Date: 01/02/18

1. UAT Scope (In Scope – Out of Scope)


UAT - In Scope UAT - Out of Scope
In Scope List features that are tested Out of Scope List features that are not tested.

- Archiving of Trello Cards on Desktop - Deletion of Trello Card


- Unarchiving of Trello Cards on Desktop - Mobile testing

2. UAT Assumptions and Constraints


UAT Assumptions
Assumption List the UAT assumptions.

- Test environment: The test cases are conducted by 3 experienced QA


manager, meeting rooms are blocked, and hard- and software is provided by IT
- Test documentation: All UAT test cases are documented within Google Drive
Project folder
- Error reporting: Errors, failures and other flaws are reported using the Usersnap
Chrome extension and are directly sent to the particular project

UAT Constraints
Constraint List the UAT constraints.

- Time frames: Test results must be provided by March 1st 2018

- Resources:
o Human resources: 3 testers available for 2 weeks
o Provided hardware: Macbook Air, iMac, Mac Mini, Chromebook, Surface
Pro, HP Spectre,
o Tested operating systems:
 Mac OS X: 10.10, 10.11, 10.12, 10.13
 Windows: 8, 8.1, 10
 Linux: Arch Linux, Debian, Ubuntu
o Browser tests:
 Firefox (latest 2 versions)
 Chrome (latest 2 versions)
 IE (latest 2 versions)
 Edge (latest 2 versions)
 Safari (latest 2 versions)
 Opera (latest 2 versions)
User Acceptance Test Template
Project Name: Archive Trello Card Feature
Project Sponsor:
Service Owner: John Lukas
Project Manager: Kathy Francis
Document Date: 01/02/18

3. UAT Risks
Description Probability Impact Mitigation
High|Med|Low High|Med|Low
not properly trained Low Med Ongoing training
Testers sessions for testers

Incomplete test Med Med Realistic time and


environment due to resource planning
time constraints
Error handling: Low High
Testers are not Easy-to-use bug
aware on how to reporting solution
report bugs for UAT test
available
UAT test failure Low High Feature-complete
development done
before UAT test
start

4. UAT Team Roles & Responsibilities


Name Roles Responsibilities
Markus Meyer Tester Testing on OS X
Liz Johnson Tester Testing on Windows
Hannah Lee Tester Testing on Linux
Andre LeBar QA Manager Managing UAT Test
Kathy Francis Product Owner Project ownership

5. UAT Entry Criteria


ID Criteria
5.1 The development of the archive feature is fully completed
5.2 Integration tests are completed
5.3 No high or medium defects are reported
5.4 All reported bugs should be fixed
5.5 UAT test environment (hardware, software, location) is ready
5.6 Testers got briefed and ready to start testing
5.7 UAT test plan is available
User Acceptance Test Template
Project Name: Archive Trello Card Feature
Project Sponsor:
Service Owner: John Lukas
Project Manager: Kathy Francis
Document Date: 01/02/18

6. UAT Requirements-Based Test Cases


ID Test Cases
6.1 Archiving:
 Please visit: Trello.com
 Log in with the following credentials:
o Mike
o 123
 Open the available Trello board
 Archive the first Trello card on the board

 Expected result:
o This Trello card will be removed from the board
o This Trello card will be moved to the Archive
6.2 Unarchiving:
 Please visit: Trello.com
 Log in with the following credentials:
o Mike
o 123
 Open the available Trello board
 Search for the board’s archive
 Un-archive the archived Trello card

 Expected result:
o This Trello card will be moved to the Trello board
o This Trello card will be removed from the Archive

7. UAT Test Results


ID Test Cases Pass/Fail Tested By Date
Tested
7.1 Archiving of Trello Card Pass Liz 02/01/2018
Johnson
7.2 Archiving of Trello Card Fail Markus 02/02/2018
Meyer
7.3 Unarchiving Trello Card Pass Markus 02/02/2018
Meyer
7.4 Unarchiving Trello Card Pass Hannah 02/01/2018
Lee
7.5 Unarchiving Trello Card Pass Liz 02/01/2018
Johnson
User Acceptance Test Template
Project Name: Archive Trello Card Feature
Project Sponsor:
Service Owner: John Lukas
Project Manager: Kathy Francis
Document Date: 01/02/18

8. Document Signatures
Role Name Signature Date
Service Owner John Lukas 02/03/2018

Project Manager Kathy Francis 02/03/2018

9. Addendums & Appendices