Introduction of Company: Manufacturing Facilities
Introduction of Company: Manufacturing Facilities
INTRODUCTION OF COMPANY
Manufacturing Facilities
Setup at Changodar with facilities for manufacturing Transformers
upto and including 220 kV Class 200MVA Odhav with facilities for
manufacturing Transformers upto 5000KVA,21 years experience in
designing .and manufacturing transformers
BREAKTHROUGHS
1981 - First 11 kV Transformer 0.5 MVA.
1
T & R PVT. LTD.
Bombay Stock Exchange
( 11th November, 2010 )
Rs. 366.10 +0.00 (0.00%)
Updated during trading hrs.
2
T & R PVT. LTD.
3
T & R PVT. LTD.
4
T & R PVT. LTD.
MANUFACTURING FACILITY
LOCATION:MORAIYA
T&R’s ultramodern manufacturing
facility in Moraiya, an industrial area near Ahmedabad, is built up on
an area of 14,000 sq. mt. and has the capacity to produce 16,000
MVA per annum. T&R has now leapfrogged to an elite league
capable of manufacturing and testing 765 KV Transformers.
Features
4. Epoxy coated floor in complete shop floor suitable for air cushion
transportermovement.
TestingFacility
1. 30 M high test lab.
5
T & R PVT. LTD.
Process/Equipments
6
T & R PVT. LTD.
3. FINANCIAL STANDLONE
Particulars (rs. In Q2 FY Q2 FY H1 FY H1 FY FY
lacs) 2011 2010 2011 2010 2010
Net sales/income from 11405 8850 19947 17444 52265
operations
Total Income 11405 8850 19947 17444 52265
Expenditure
(increase)/decrease 1952 2597 3538 4068 34
stock in trade
Consumption of raw 10210 8301 17633 15406 38298
material
Purchase of traded - - 71 - -
goods
Employee cost 450 315 729 630 1286
Other expenditure 977 1243 1859 2435 4391
EBITDA 1720 1588 3193 3041 8256
Depreciation 141 90 283 175 441
Interest 49 105 123 211 470
Other non operational - 31 - 82 117
income
Profit before tax 1530 1424 2787 2737 7462
Tax 509 468 916 898 2511
Profit after tax 1021 956 1871 1839 4951
EBITDA Margin 15% 18% 16% 17% 16%
PAT Margin 9% 11% 9% 11% 10%
7
T & R PVT. LTD.
4. HUMAN RESOURCES
(4.1)HRMISSION
Our mission is to propel business and human
performance improvement for the organization by partnering to
create innovative strategic solutions.
(4.2)HROBJECTIVES
Customer oriented department staffed by
human resource professionals dedicated to:
9
T & R PVT. LTD.
(4.6)MANAGER | PRODUCTION
10
T & R PVT. LTD.
11
T & R PVT. LTD.
YES
NO
12
T & R PVT. LTD.
NO
(6.2)Distribution transformer
- 500 KVA & above
13
T & R PVT. LTD.
(6.5)Specialty transfoemer
30 MVA,11/2 KV - 90 kV, in steps of 2 kV
14
T & R PVT. LTD.
(6.6)Testing Transformer
Defination:
15
T & R PVT. LTD.
1) Price
2) Quality
3) Quantity
4) Time
5) Size
6) Purpose
1) Core
2) Copper
3) Tank
4) Radiators
5) OLTC
6) Bushing
7) Fastening items like glue, tap cotton tape etc.
(7.2)Purchase process:
Vendor selection
Send Indent
Get quotation
16
T & R PVT. LTD.
1) Raw material
2) Stock based items.
Stock based items are: MOG, GOR, VALVES etc. These are
inventory based items.
8.INVENTORY
Inventory is a dynamic situation. It has to be
flexible. By inventory you can based upon the data.
Importance of Lead Time: Lead time for buying PICC is say 15 days.
1) Hindalco
2) Hindustan copper
17
T & R PVT. LTD.
3) Sterlite.
Transformer is a customized product. When we are
going to purchase any material or accessories we have to
consider all things. Suppose we want to buy OLTC, so there are
two vendors available. Then first we compare those two vendors
offer, as below:
Volume discount :
18
T & R PVT. LTD.
Store department
• INVENTRY
Hindalco
Hindustan copper
Sterlite.
19
T & R PVT. LTD.
* ABC CLASSIFICATION
[A]. In this class we include the equipments which has 70% cost and
10% quantity of the x’mer.
[B]. The material which consuption 20% cost and 15% quantity of the
x’mer are rated in B class.
(9.1)Post-order Activities.
20
T & R PVT. LTD.
21
T & R PVT. LTD.
Yes
Ask design to
Give approved Drg. To Design for proceed for mfg
preparing mfg. drg. Drg. If Drg. Not
received in
specific time from
Follow up with planning dept customer
for status of Transformer
Inform
Whether stage or final customer for
Yes
inspection is inspection the same and
contractual requirement ? get clearance
No from him
after
Follow up with planning dept inspection
for readyness of Transformer
22
T & R PVT. LTD.
Collect MOM or
commissioning If unloading, erection &
report from site commissioning is part of a contract
POST-ORDER ACTIVITIES
COMPLETED
23
T & R PVT. LTD.
(9.2)Pre-order Activities.
Account
Department
Receipt of Tender
24
T & R PVT. LTD.
YES
Pre-order contract
Review with Design &
Planning
Give Customer’s
specification to Design for
getting GTP, GA DRG &
Prices.
To Get
Design wants more Clarification MKTG Clarification
from the Customer from the
YES
Customer
NO
25
T & R PVT. LTD.
YES
Send Revised
Ask Design for Re-Design NO GTP,GA DRG to
and see whether revised
the Customer
Design affect Prices
Doc.no.702D021
YES
PRE-ORDER ACTIVITIES
COMPLETED
10.CUSTOMER BASE
Rajasthan
Gujarat
Maharastra
Karnataka
Kerala
Tamilnadu
Madhyapradesh
Westbengal
Uttarpradesh
Megalaya
Newdelhi
Punjab
26
T & R PVT. LTD.
(10.1)OVERSEAS CUSTOMER
Canada
United kingdom
Pakistan
Nepal
Bangladesh
Philipines
Indonesia
Srilanka
UAE
Tanzania
Kenya
Zimbabwe
Kazakhistan
11.INFRASTRUCTURE
(11.1)Windingshop
Study the design of winding given by design department.
Former is made and fitted on the winding machine.
Cylinder having lesser dia.than inner dia of coil is mounted on
former and both ends of this cylinder is fixed by glue.
Two types of wedges are mounted on it as per assembly
drawing. These wedges are stick tightly with glue and kept time
for drying.
(a) T-wedges
(b) Dummy wedges
After drying (natural drying) process of cylinder, powder of
candle brazed is applied on cylinder. By this coating, coil disc
can be easily mounted on it and easily pressed.
Now as per the conductor size and number of conductor given
27
T & R PVT. LTD.
For very first coil, wind as per design i.e. no. of turns are
wound in one ring of coil and arrangement of turns and block
drops are made and one disc is completed.
Now with the of bender, transposition is done in conductor.
After transposition, one disc rolled here. Bending is done in
such a way that transposition bending should not come
under spacers or wedges. It should come between two
blocks. So, at the time of pressing, at the place of bending,
insulation will be safe. Under high voltage winding, guard
washers are placed to avoid terminal damage.
As per drawing, spacers are provided and by similar
procedure, one by one all discs are completed.
Between some discs, oil guard washer provided for easy
circulation of oil.
TYPES OF WINDINGS
1) Cross – over winding
2) Spiral winding: a) single layer
b) double layer
c) multi layer
d) edge winding
3) Eight shaped winding
4) Helical winding: a) single helical
b) double helical
28
T & R PVT. LTD.
c) multistart helical
5) Disc winding: a) continuous disc winding
b) interleaved disc winding
6) Intershield winding
7) CTC winding
8) Foil winding
(11.2)Assembly Bay
100 Ton assembly bay
Span 18 metres
Lifting height 11 metres
In the Auto transformer,
we are use four type winding.
1. Tertiary winding
2. Regulating winding
3. Common winding
4. Series winding
We are use tertiary winding for reduce the 3 rd harmonic, to
compensate the circulating current.
(11.3)Testing
Transformer being an inherent part of any kind
of electrical industry, forms one of the most important equipment.
Before a transformer can be connected to the external circuits, the
internal connections within the transformer must be known so that
the compatibility of the transformer with respect to the external circuit
is checked and ensured. From a series of tests at factory site, which
might at most be spread over a few days, it is necessary to ascertain
that the transformer will be suitable for 30 years or more in service
All Transformers are to be tested in accor-dance with IS 2026 (Part I
to Part V).
The final testing of completely assembled trans-formers is classified
into three categories as below:-
ROUTINE TESTS
TYPE TESTS
SPECIAL TESTS
29
T & R PVT. LTD.
ROUTINE TESTS
The routine tests are conducted to ensure the particular transformer
is free from manufacturing defects.
Measurement of insulation resistance
Measurement of winding resistance
Measurement of voltage ratio
Verification of polarity and vector group
No-load loss and excitation current measurement
Load loss and impedance voltage measurement
Separate source voltage withstand test
Induced over voltage tests
Testing of transformer oil BDV
Magnetic balance & measurement of magnetizing I.
SPECIAL TESTS:
The special tests are conducted depending upon the need for
particular test-as per site conditions. The transformer shall pass the
appropriate di-electric tests specified in IS 2026 Part III of 1977. The
dielectric test may be type test, routine test or special tests.
NOTE: -The special tests have to be agreed between the purchaser
and supplier. Hence purchaser should clearly specify conducting
special tests in the P.O.:
Measurement of noise level
Measurement of Zero sequence impedance
Measurement ofDynamic short circuit test
harmonics
Partial discharge measurement
Measurement of tan delta
31
T & R PVT. LTD.
33
T & R PVT. LTD.
15.
We perceive ourselves as a world class
manufacturer of Transformers by establishing stringent quality norms
in a vibrant environment that
- Values Continuous Improvement -
34
T & R PVT. LTD.
Quality Systems
35
T & R PVT. LTD.
VISION
MISSION
Human Resources
Training
17.SALES DISTRIBUTION
37
T & R PVT. LTD.
(By MVA)
39%
62%
38
T & R PVT. LTD.
18.SALES DISTRIBUTION
(in Million US $ )
6%
33%
61%
39
T & R PVT. LTD.
19.FINANCIAL DETAILS
GROWTH IN TURNOVER
(IN MILLION US$)
5 .6
6
4 .6 4 4 .7
5 4 .26
3 .9 2
4 3 .22
US $ 3
0 40
96-97 97-98 98-99 99-00 00-01 2001-2002
YEAR
T & R PVT. LTD.
20.GROWTH IN MVA
TOTAL PRODUCTION
(IN MVA)
1400
1200
1000
800
MVA
600
400
200
0
41
96-97 97-98 98-99 99-00 00-01 2001-02
YEAR
T & R PVT. LTD.
21.Future
Focus on
Global Markets
Power Transformers
Customised Transformers
Mobile Substations.
42
T & R PVT. LTD.
22.Achievement
2007-09
1 Nos. 100 MVA; 245 kV class Transformer for MPEB under
execution
4 Nos. 50 MVA, 132 kV class Transformer for TNEB executed
3 Nos. 90 MVA; 132 kV class split winding for NTPC under
execution
11 Nos. 100 MVA; 245 kV class Auto Transformer for TNEB
executed
1 Nos. 100 MVA, 245 kV class and 12 nos. 20 MVA, 110 kV
class Transformers for KPTCL supplied
1 Nos. 100 MVA, 245 kV class Auto Transformer for AP
Transco supplied
2 Nos. 100 MVA, 220 kV; 3 Phase Auto and 4 Nos. 33 MVA,
220 kV, 1 Phase Auto Transformer for PGCIL under execution
2 Nos. 100 MVA, 245 kV class; 9 Nos. 50 MVA, 132 kV class
Transformers for TNEB executed
43
T & R PVT. LTD.
2006-07
5 Nos. 100 MVA, 245 kV class Transformers for GETCO
supplied
5 Nos. 50 MVA, 132 kV class Transformers for TNEB supplied
1 Nos. 100 MVA, 245 kV class and 12 nos. 20 MVA, 110 kV
class Transformers for KPTCL supplied
2 Nos. 100 MVA, 245 kV class Auto Transformer for AP
Transco supplied
2 Nos. 100 MVA, 220kV Transformer for Siemens a/c KPTCL
supplied
80 MVA, 132 kV Transformer successfully tested at CPRI
Bangalore for Dynamic Short Circuit Test
2 Nos. 80 MVA, 132 kV Transformer supplied to NTPC
3 Nos. 18.5 MVA Rectifier Transformer supplied to Hindalco
a/c ABB
1 Nos. 2 MVA, Rectifier Transformer executed for HZL
2005-06
4 nos. 50 MVA, 230 kV Transformer for wind power evacuation
a/c NEG-MICON-TNEB-commissioned
2 Nos. 100 MVA, 245 kV class Transformers for Siemens
supplied
2 Nos. 100 MVA, 245 kV class; 9 Nos. 50 MVA, 132 kV class
Transformers for TNEB
3 Nos. 50 MVA, 132 kV class supplied to Enercon a/c MSEB
3 Nos. Rectifier Transformer for Sterlite a/c ABB executed
2001-05
44
T & R PVT. LTD.
1995-2000
Expanded with State of Art New manufacturing plant with Built
up area of 7000 sq. mtrs. (approx. 75,000 sq. ft.) and total area
of 25,000 sq. mtrs. (269,000 sq. ft.) for manufacturing
transformers up to 160 MVA, 245 kV class
Executed first 66 kV Power Transformer having capacity of 15
MVA
Executed first 110 kV Power Transformer, 30 MVA
Obtained ISO:9000:1994 Certification
Executed first 132 kV, 50 MVA, Power Transformer
Executed first 220 kV, 50 MVA, Power Transformer
1981-94
45
T & R PVT. LTD.
23.CORPORATE RESPONSIBILITY
A responsible corporate citizen, aware of its social
obligations, the T&R Group has displayed an innate desire and a
missionary zeal to contribute to the social upliftment and welfare of
the community.
46
T & R PVT. LTD.
CONCLUSION
The SWOT Analysis of the group for three years from the financial
point of view are :-
47
T & R PVT. LTD.
But the profits and returns are very low and the turnover ratios are
also not very good. So, the company may find the problems in the
future.
25.BIBLIOGRAPHY
BOOKS :-
Accounting principles
(Sixth Edition)
48
T & R PVT. LTD.
Page : 265-270
26.SOURCES OF INFORMATAION
www.google.com
www.yahoo.com
www.msn.com
www.transformerindia.com
49