VERIFICATION
PROCESS DESCRIPTION
Opp Sign / Date
NO: OR Date Performed
ACTIVITY Garage Inspection REMARKS
Vendor
Representative Representative
04-Aug-21
3 PMI of the Raw Material Used as per drawing GS-1211 (IFC) W √ H √ W √
06-Aug-21
Fix the CAP on the lathe machine and make the center through dial
4 indicator, also note the all readings. H √ W √ W √
(Reading Chart attached with approved Sign)
06-Aug-21
6 Fperformed the DPT if required and observed the result and final H W W
to decide further.
7 Remove the CAP from Lathe Machine after all final witnessed. H O O
9 Fix the CAP on the lathe machine and make the center through dial H W W
indicator, also note the all readings.
12 Remove the CAP from Lathe Machine after all final witnessed. H O O
12
13
14
15
16
VERIFICATION
PROCESS DESCRIPTION
Opp Sign / Date
NO: OR Date Performed
ACTIVITY Garage Inspection REMARKS
Vendor
Representative Representative
Ref # 2 (Face)
Face # 1
Dia # 1
Dia # 2
0° 0 0
90° -0.01 0.01
180° -0.03 0.02
270° 0 0