1. This document provides a job safety analysis for pouring concrete to make foundations for metering and pig receiver equipment. 2. It lists the required personal protective equipment, including safety helmets, safety glasses, safety shoes/boots, and gloves. 3. The key steps are preparation, including permits and safety meetings; preparation of materials, equipment and tools while watching for pinch points, impacts or fire; and pouring the concrete while monitoring for hazards. Proper communication and safety procedures are emphasized.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
480 views

JSA Formwork Rebar Dan Puring at SB#1

1. This document provides a job safety analysis for pouring concrete to make foundations for metering and pig receiver equipment. 2. It lists the required personal protective equipment, including safety helmets, safety glasses, safety shoes/boots, and gloves. 3. The key steps are preparation, including permits and safety meetings; preparation of materials, equipment and tools while watching for pinch points, impacts or fire; and pouring the concrete while monitoring for hazards. Proper communication and safety procedures are emphasized.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

1

PCID/J/F2/HSE/EHSMS/4.4.6/06
Date :
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :

Job : Pouring Concrete (To make Foundation Metering & Pig receiver) Title of person who does the job : Analyzed by lead of crew :
Pekerjaan : Penuangan Beton (Untuk Pekerjaan pondasi Metering &Pig receiver) Jabatan personil yang melakukan pekerjaan : Supervisor Di analisa oleh pemimpin regu kerja :

Work Crew Supervisor : Executor Department : Section : Reviewed by HSE : Approved by Area Supv :
Pengawas Regu Kerja : Departemen Pelaksana : Bagian :Project Di Periksa Oleh HSE : Disetujui Oleh pengawas daerah kerja :
Sutikno PT Meindo Elang Indah

Write down correct specifications of personal


Personal protective equipment (PPE) : 
Put On PPE required for a safe job. protective equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield 11. SCBA 16. Safety shoes / boots √ Tuliskan spesifikasi alat pelindung diri yang
dibutuhkan (Konsultasikan dengan HSE Dept) :
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary √ 17. Rubber boots
3. Goggles – ordinary 8. Dust mask 13. Gloves - Chemicals 18. Prot. Clothing/ Apron
4. Goggles – tinted lenses 9. Air-purifying respirator 14. Gloves – Thermal 19.Body harness-line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
Urutan Pekerjaan Potensi Bahaya Peralatan Pelindung Prosedur Aman
1) Preparation (Permit To Work / Document)  Miscommunication  Prepare Permit To Work
 Pre-job safety meeting.
 Discuss JSA to workers before
job
 Discuss emergency response
preparedness to workers if
emergency situation happen
 Good communication with
personnel
 Everyone has permission to
stop the job
1) Persiapan (Lembaran Ijin kerja dan dokumen)  Miskomunikasi  Persiapan Izin Kerja
 Melakukan pembicaraan
keselamatan sebelum bekerja
 Membicarakan JSA kepada
pekerja sebelum bekerja
2

 Membicarakan tanggap
darurat ke pekerja jika terjadi
situasi darurat
 Komunikasi yang baik antar
personil
 Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan
pekerja
2) Preparation Material, Equipment and tools  Pinch point  Use hand gloves / PPE  Make sure since Gas release
 Crashed when heavy equipment enter to
 Burnt / Fire plan.
 Ensure all the equipment has
been inspected and check by
PCI and ready for use
 Be careful when pick up tools
 Watch body position
 Everyone must pay attention at
all times
 Stay focused
 Ensure tools ready to use
 Ensure all document for
already accepted and reviewed
by PCI
 Proper Safety Sign and
barricade will be install prior
execution
2) Mempersiapkan Material, Peralatan  Terjepit  Menggunakan sarung  Pastikan sejak Gas keluar
 Tertabrak tangan/APD disaat alat berat masuk ke
 Terbakar/Kebakaran dalam plan.
 Pastikan semua peralatan
yang dipergunakan untuk
pekerjaan sudah lulus inspeksi
dan siap untuk digunakan.
 Berhati-hati ketika mengambil
peralatan
 Memperhatikan posisi tubuh
3

 Setiap orang harus


memperhatikan pekerjaannya
dan lingkungannya setiap
waktu
 Tetap focus
 Memastikan semua peralatan
siap untuk digunakan
 Memastikan semua dokumen
telah disetujui dan ditinjau
kembali oleh pihak PCI
 Tanda Tanda Keselamatan
dan barricade terpasang
sebelum aktivitas dimulai.
3) Equipment and Material Handling  Sharp Object  Use hand gloves  Protect the sharp point before
lift with manual handling.
 Drop Object  Proper PPE
 Wearing proper PPE (Personal
Protective Equipment)
 Max weight for manual
handling by one person is shall
proportional
 Use appliance assist to handling
the heavy equipment
3) Penanganan Material dan Peralatan  Benda Tajam  Gunakan sarung tangan  Tutup atau bungkus benda yang
tajam sebelum melakukan
 Benda Jatuh  Gunakan APD yang benar pengangkatan manual
 Gunakan APD standard
 Maksimal berat yang diangkat
harus proposional dengan
badan
 Gunakan alat bantu untuk
mengangkat beban yang berat
4) Fabricate Formwork  Personnel Injury  Use Standart PPE  Only competent person can do
the job
 Ensure all sharp object already
covered and marking
 Ensure worker hand not in pinch
point position
4

 Use masker for exposed from


cement
4) Pembuatan formwork  Terjepit  Gunakan PPE Standert  Dikerjakan oleh orang yang
pengalaman
 Tertusuk
 Pastikan semua benda tajam
 Terpapar semen sudah ditutupi dan diberi tanda
 Pastikan tangan tidak dalam
berada posisi jepit
 Gunakan masker untuk
menghindari paparan debu
semen
5) Install Form Work  Personnel Injury  Use Standart PPE  Ensure all sharp object already
covered and marking
 Only competent person can do
the job
5) Pemasangan Form work  Tertusuk  Proper PPE  Pastikan semua benda yang
tajam sudah diberi tanda
 Gunakan alat yang sudah
tersertifikasi
 Hanya orang yang berkompeten
yang melakukan pekerjaan
6) Pouring Concrete activity  Burnt  Barricade  Gas detector to be provide for
ensure area of work is safe from
 Personnel fallen down to the  Safety sign gas leaking
excavated hole  Proper PPE  Fire extinguisher must be
 Concrete mixing operation provide in work area
 Excavator swing  Only required personnel at the
 Concrete in bucket droped work area
 Wearing proper PPE (Personal
 Concrete spurting Protective Equipment)
 Loss control of Vibrator  Ensure the worker experienced
 Electric Vibrator (electric shock) to use / running the equipment
 Rotating part to be protect
 Machine inspection to be done
 Keep hand away from pinch
point
 Ensure that working area is safe
5

for excavator movement


 Provide signal man to guide
excavator activity
 No personnel below bucket at
all times
 Ensure the soil around area is
strong enough for loaded
 Be aware and more careful
when walking through
excavated area
 Provide portable eyewash at
working area
 Good coordination when
transferring concrete
 Ensure all tool & equipment
have good condition
 Water prove socket and
grouping
 Safety Barrier to be install at the
around location.
6. Aktifitas Penuangan beton  Terbakar / kebakaran  Barricade  Gas detector harus disiapkan
untuk memastikan bahwa lokasi
 Pekerja jatuh ke dalam galian  Tanda Keselamatan kerja telah aman dari
 Pekerjaan pencampuran  Gunakan APD yang benar kebocoran gas
 Gerakan berayun Excavator  APAR / alat pemadam api harus
disediakan di lokasi kerja
 Beton jatuh dari bucket
 Hanya personnel yang
 Cipratan/semburan beton diperlukan yang ada di area
 Vibrator lepas kendali kerja
 Sengatan listrik  Gunakan APD standard
 Hanya pekerja yang sudah
pengalaman yang boleh
mengoeration peralatan
 Bagian yang berputar harus di
proteksi
 Mesin harus di cek sebelum
mulai pekerjaan
6

 Jaga jarak aman tangan dari


area penjepit
 Pastikan lokasi aman untuk
perpindahan excavator
 Tunjuk signal man untuk
memandu aktifitas excavator
 Tidak ada seorang pun yang
boleh lewat di bawah bucket
 Pastikan tanah di lokasi cukup
kuat untuk berpijak
 Perduli dan waspada ketika
melewati area sekitar galian
 Sediakan tempat cuci
mata/muka di lokasi kerja
 Koordinasi yang baik selama
pekerjaan berlangsung
 Pastikan semua peralatan
dalam kondisi baik
 Soket harus kedap air dan di
susun secara baik
 Safety Barikade harus di
pasang di area kerja
5. Housekeeping  Bad housekeeping  Proper PPE  Ensure housekeeping
implemented before and after
working hours.
 All the hazardous waste stored
on location
 Provide trash bin for organic
waste and anorganic waste at
location
5. Housekeeping  Housekeeping yang buruk  Gunakan APD yang benar  Pastikan housekeeping
dilakukan sebelum dan sesudah
jam kerja
 Semua limbah B3 dari sisa
aktifitas dikumpulkan dalam
tempat penyimpanan limbah B3
Sediakan tempat sampah untuk
7

sampah organic dan unorganik.


Note : Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
Catatan : Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.