Final RFTACT Monitoring Tool On The Opening of Classes Corrected 1
Final RFTACT Monitoring Tool On The Opening of Classes Corrected 1
Department of Education
RFTACT Monitoring Tool on the School Readiness for School Year 2021-2022 Opening of Classes
Objectives:
1. Conduct monitoring on the preparation for the opening of classes for SY 2021-2022.
2. Harvest significant experiences relative to the preparations for the opening of classes as basis for technical assistance.
A. Public
1. Elementary
a. Monograde
b. Multigrade
c. SPED
Page 1 of 8
Government Center, Candahug, Palo, Leyte
(053) 832-2997| [email protected]
ISO 9001:2015 Certified
Department of Education Regional Office VIII (Eastern Visayas)
Non-graded
Graded
2. JHS
a. Monograde
b. SPED
Non-graded
Graded
3. SHS
4. ALS
5. IPED
6. MEP
B. Private
1. Elementary
a. Monograde
b. SPED
Non-graded
Graded
2. JHS
3. SHS
IB. Enrolment Data per MD ODL TVBI RBI Blended
Distance Learning L MDL+ MDL MDL MDL+ MDL+ ODL+
ODL +TVI +RBI ODL+ TVBI+ TVBI+
Modality (LDM) TVBI+ RBI RBI
RBI
A. Public
1. Elementary
a. Monograde
b. Multigrade
c. SPED
Non-graded
Graded
2. JHS
a. Monograde
b. SPED
Non-graded
Graded
3. SHS
4. ALS
5. IPED
6. MEP
TOTAL
B. Private
1. Elementary
a. Monograde
b. SPED
Non-graded
Graded
2. JHS
3. SHS
TOTAL
II. Tools & Materials No. of No. of schools with 1:1 Percentage (%) of Challenges Actions Taken / Ways Recommen
Developed in Support schools Learner-Module/LAS schools implementing and Implementing Forward dations
of Curriculum using the Ratio the program/material Threats Measures (To be undertaken
Instruction material by the SDO on
challenges and
threats not acted
upon yet.)
A. Copy of the MELCS-
based Curriculum
Guide
(Printed/Digitized)
B. Printed Modular
DLM
SLMs
LAS
Textbooks
Parents’
Teaching Guides
[PTGs]
Home-based
Learning
Facilitators Tool
Kit for
Kindergarten)
C. Other supplemental
DLM
Online DLM
RBI
TVBI
Audio/Video
Blended DLM
D. Waray Primer
E. Sinugbuanong
Binisaya Primer
F. Modified
Monitoring &
Supervision Tools
G. Budget of Lessons
per Learning Area
H. Weekly Home
Learning Plan
III. School, Health, and No. of Schools with existing facility
Safety Facilities
A. Handwashing &
Tooth brushing
Facility
B. Thermal Scanner
C. Disinfection
equipment
D. QR Code for contact
tracing purposes
E. Mechanism on the
Observance of
Health Protocols
F. Supply of alcohol
and other
disinfectants
G. Distribution and
Retrieval Areas:
Barangay
School
H. Resource Room for
Learners with
Disabilities (LWDs)
I. Functional School
Clinic
J. Canteen
K. DRR Facility & Office
L. Gulayan sa Paaralan
M. ELLN Hub/Reading
Center
N. Lab for specific
purpose (Ex. Lab for
TVL, Speech Lab,
etc.)
D. Conduct of SLAC on
the Interim Policy
on Assessment
VI. Partnerships Amount
Amount generated
through partnership
VII. Preparation for No. of Schools
Face-to-Face Classes
A. Student-seat ratio
B. Toilet-student ratio
C. Gender-segregated
toilet
D. LGU Approved
Documents
E. IATF Permit
F. Parents’ Consent
G. Classroom Set-up
following Health
Protocols
H. Availability of
Transpo Facilities
VIII. Special/Other
Projects
A. Lactating Area
B. Prayer Room for
Muslim Learners
C. Chickens sa Paaralan
IX. Innovations and
Best Practices
Prepared by:
RFTAC Team Member RFTAC Team Member RFTAC Team Member RFTAC Team Member
RFTAC Team Member RFTAC Team Member RFTAC Team Member RFTAC Team Member
Conformed:
Chief, CID Chief, SGOD Assistant Schools Division Superintendent Schools Division Superintendent