Pages From Method Statement For Excavation 3

Uploaded by

jen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Pages From Method Statement For Excavation 3

Uploaded by

jen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

excavated soil by the approved third party for waste management by the Consultant Representative “M/S

Technical Overseas General Transport EST”.

2.0 REFERENCE

All related codes and standards referenced in the Project Specifications.


Contract drawings.
Approved shop drawings.
Program of works.
Approved project safety plan and procedures.

3.0 HEALTH AND SAFETY HAZARDS

Specific safety measures have to followed as applicable, and all the safety measures are covered
separately in the Project Safety Plan.

4.0 DEFINITIONS

ACE - WHITE SPACE


ASQ - INEX Contracting & Interiors LLC
MS - Method Statement
ITP - Inspection & Test Plan.
TBA - To be advised.

5.0 RESPONSIBILITIES

Project Procedure - QA/QC Engineer


Review of Procedure - Construction Manager
Approval of Procedure - Project Manager
Execution of Procedure - As described in the procedure

The Construction Manager will be responsible for the delegation of works to designated persons and
QA/QC Department will be the responsible for inspection and acceptance of any works.

6.0 PROCEDURE / METHOD TO BE EMPLOYED

6.1 Excavation Works

a. Before commencement of work ascertain the nature and location of all existing (above and underground)
services on site by visual survey or by reviewing the service layout drawing.