0% found this document useful (0 votes)
39 views

Pages From Method Statement For Excavation 5

Uploaded by

jen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Pages From Method Statement For Excavation 5

Uploaded by

jen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8 MATERIAL REQUIREMENTS

No materials for this activity.

9 EQUIPMENT

Excavator
Bobcat
Level machine& total station
Dump/hauling trucks
Hand Tools (Shovel, Pick Axe…etc.)

10 HEALTH AND SAFETY PROVISIONS

o All Works shall be controlled as the Safety Procedures. Safety equipment will be
worn at all times.
o Site Safety Officer will check and ensure all safety precautions are taken prior to
commencement of work.
o All the working platforms will be inspected by Site Safety Engineer
o The working area must be clearly marked with sufficient hazard boards, alarming
tape and cones if needed.
o Safety procedures are to be considered before, through and after completion of
the work to avoid any possibility of danger to the Humans or to the Construction.
o All work places will be cleaned from waste materials and ensuring clean and
healthy work environment, as well as maintained pre-access and egress in the
event of emergency.

11 QC APPROVALS AND OTHER DOCUMENTS

o Project HSE Plan


o All drawings shall be approved
o Calibration certificates for equipment and instruments
o Approved Contractor(s) for waste management