Column End Support Reaction For Footing Design Under Service Condition
Column End Support Reaction For Footing Design Under Service Condition
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 1 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
C3 5
MTon-m MTon-m MTon-m
Page 2 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 3 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 4 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 5 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 6 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 7 of 76
COLUM
Node L/C Hori. Vert. Hori. Moment
N NO.
Page 8 of 76
COMBINED SF1
DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF1 FOR COLUMN
12.2
0.5 8 0.5
1.6 1.6
1.25
2.8
0.3
1.25
0.85
1.2
0.6 BEAM
0.35 FOUNDATION
Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3
With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.8 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)
2.8 0.5
d
COMBINED SF1
4.25
8.5
At Width
Depth 350 mm
Length at critical section = 1150 mm
Width at critical section = 1000 mm
Shear Force = 47.939 x 1.15 x 1
Allowable Shear Stress = 56 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =
Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 71.989 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 298.9 + 335.99 ) / ( 12.2 x 2.8 )
= 18.59 kN/m2
Net causing moment = 53.399 kN/m2
Maximum Projection of fdn = 1.15 m
Bending Moment = 53.399 x 1.15 x 1.15 / 2
Design Bending Moment = 52.965 kN.m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement
Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement
DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF2 FOR COLUMN
12.2
0.5 8 0.5
1.6 1.6
0.95
2.2
0.3
0.95
0.85
1.2
0.6 BEAM
0.35 FOUNDATION
Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3
With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.2 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)
2.2 0.5
d
COMBINED SF3
4.25
8.5
At Width
Depth 350 mm
Length at critical section = 850 mm
Width at critical section = 1000 mm
Shear Force = 37.841 x 0.85 x 1
Allowable Shear Stress = 33 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =
Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 61.891 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 234.85 + 223.99 ) / ( 12.2 x 2.2 )
= 17.1 kN/m2
Net causing moment = 44.791 kN/m2
Maximum Projection of fdn = 0.85 m
Bending Moment = 44.791 x 0.85 x 0.85 / 2
Design Bending Moment = 24.27 kN.m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement
Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement
DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF2 FOR COLUMN
12.2
0.5 8 0.5
1.6 1.6
1.1
2.5
0.3
1.1
0.85
1.2
0.6 BEAM
0.35 FOUNDATION
Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3
With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.5 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)
2.5 0.5
d
4.25
8.5
At Width
Depth 350 mm
Length at critical section = 1000 mm
Width at critical section = 1000 mm
Shear Force = 48.017 x 1 x 1
Allowable Shear Stress = 49 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =
Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 72.067 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 266.88 + 279.99 ) / ( 12.2 x 2.5 )
= 17.93 kN/m2
Net causing moment = 54.137 kN/m2
Maximum Projection of fdn = 1 m
Bending Moment = 54.137 x 1 x 1 / 2
Design Bending Moment = 40.605 kN.m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement
Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement
DESIGN OF COMBINED FOOTING :- FOR COLUMN C29, C30, C40 & C41
13 Z
z
1.500 0.75 z
C30 C41
0.6 x x
1.5
3 X 6
C29 C40
1.500 3.5
3.000 7 3.000
FGL
1.5
2.5
Length Of Foundation Lf = 13 m
Width Of Foundation Wf = 6 m
Thickness Of Foundation Tf = 1 m
Founding Depth Df = 2.5 m `
Length Of Pedestal Lp = 0.75 m
Width Of Pedestal Wp = 0.6 m
Height Of Pedestal Hp = 1.5 m
Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C30 50 50 1.0(DL+LL+EQUP) 0.207 104.688 -0.728 -1.156 0.05 -0.252
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 22.464 116.926 6.355 16.275 1.709 39.646
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -22.085 78.4 -7.611 -18.3 -1.614 -40.076
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 22.431 102.876 6.555 16.563 1.704 39.719
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -22.119 64.35 -7.411 -18.012 -1.618 -40.003
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 7.318 105.194 20.513 51.463 1.617 12.562
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -6.939 90.133 -21.769 -53.488 -1.521 -12.993
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 7.285 91.144 20.713 51.751 1.612 12.636
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -6.973 76.082 -21.569 -53.2 -1.526 -12.919
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 7.039 103.963 5.969 15.312 0.807 12.046
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -6.66 91.364 -7.224 -17.337 -0.712 -12.476
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 7.006 89.913 6.169 15.6 0.802 12.12
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -6.694 77.313 -7.024 -17.049 -0.716 -12.403
63 63 1.0(DL+ EQUP +WIND X) -0.944 84.476 -0.448 -0.774 0.067 1.767
64 64 1.0(DL+ EQUP -WIND X) 1.256 82.75 -0.408 -0.675 0.019 -2.05
65 65 1.0(DL+ EQUP+LL +WIND X) -0.877 112.576 -0.848 -1.349 0.076 1.62
66 66 1.0(DL+ EQUP+LL -WIND X) 1.323 110.851 -0.808 -1.25 0.028 -2.197
67 67 1.0(DL+ EQUP +WIND Z) 0.14 83.722 0.825 2.184 0.059 -0.122
68 68 1.0(DL+ EQUP -WIND Z) 0.172 83.504 -1.681 -3.633 0.027 -0.161
69 69 1.0(DL+ EQUP+LL +WIND Z) 0.207 111.822 0.425 1.609 0.068 -0.27
70 70 1.0(DL+ EQUP+LL -WIND Z) 0.239 111.604 -2.081 -4.208 0.037 -0.308
Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C41 50 50 1.0(DL+LL+EQUP) 0.563 75.158 -1.839 -2.155 0.108 -0.63
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 16.8 94.95 2.167 8.841 0.981 32.542
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -15.747 48.313 -5.951 -13.006 -0.789 -33.675
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 16.726 87.898 2.061 8.986 0.956 32.669
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -15.821 41.261 -6.057 -12.861 -0.814 -33.548
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 6.274 98.948 10.373 31.002 1.799 11.111
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -5.221 44.315 -14.157 -35.166 -1.608 -12.244
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 6.2 91.896 10.268 31.147 1.775 11.238
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -5.295 37.263 -14.263 -35.021 -1.632 -12.117
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 5.66 83.39 1.933 8.212 0.71 9.874
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -4.607 59.873 -5.717 -12.377 -0.519 -11.007
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 5.586 76.338 1.827 8.357 0.686 10.001
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -4.681 52.821 -5.822 -12.232 -0.543 -10.88
63 63 1.0(DL+ EQUP +WIND X) -0.361 65.551 -2.012 -1.976 0.035 1.187
64 64 1.0(DL+ EQUP -WIND X) 1.266 63.608 -1.983 -1.899 0.107 -2.066
65 65 1.0(DL+ EQUP+LL +WIND X) -0.213 79.655 -1.801 -2.266 0.084 0.933
66 66 1.0(DL+ EQUP+LL -WIND X) 1.413 77.712 -1.772 -2.189 0.156 -2.321
67 67 1.0(DL+ EQUP +WIND Z) 0.476 63.456 -1.258 0.014 0.068 -0.466
68 68 1.0(DL+ EQUP -WIND Z) 0.429 65.703 -2.738 -3.889 0.075 -0.413
69 69 1.0(DL+ EQUP+LL +WIND Z) 0.624 77.56 -1.046 -0.276 0.117 -0.721
70 70 1.0(DL+ EQUP+LL -WIND Z) 0.576 79.807 -2.526 -4.179 0.123 -0.667
Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C29 50 50 1.0(DL+LL+EQUP) -1.215 98.241 0.24 -0.395 0.039 0.854
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 19.517 134.614 7.981 17.209 2.302 39.691
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -22.093 49.571 -7.64 -17.939 -2.231 -37.827
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 19.37 122.317 7.841 17.268 2.294 39.847
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -22.24 37.274 -7.78 -17.88 -2.239 -37.671
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 5.385 134.345 24.183 53.504 1.42 13.371
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -7.961 49.84 -23.842 -54.235 -1.349 -11.507
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 5.238 122.048 24.043 53.563 1.412 13.527
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -8.108 37.543 -23.982 -54.176 -1.357 -11.351
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 5.13 112.221 7.591 16.29 0.891 12.866
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -7.706 71.965 -7.25 -17.02 -0.821 -11.002
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 4.983 99.923 7.451 16.349 0.884 13.022
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -7.853 59.668 -7.389 -16.961 -0.828 -10.847
63 63 1.0(DL+ EQUP +WIND X) -2.534 78.387 0.028 -0.325 -0.062 3.057
64 64 1.0(DL+ EQUP -WIND X) -0.336 81.204 0.033 -0.288 0.117 -0.882
65 65 1.0(DL+ EQUP+LL +WIND X) -2.24 102.982 0.307 -0.443 -0.047 2.746
66 66 1.0(DL+ EQUP+LL -WIND X) -0.042 105.798 0.312 -0.406 0.132 -1.194
67 67 1.0(DL+ EQUP +WIND Z) -1.451 81.643 1.491 2.826 0.027 1.108
68 68 1.0(DL+ EQUP -WIND Z) -1.419 77.949 -1.43 -3.438 0.028 1.068
69 69 1.0(DL+ EQUP+LL +WIND Z) -1.158 106.237 1.77 2.708 0.042 0.796
70 70 1.0(DL+ EQUP+LL -WIND Z) -1.125 102.543 -1.151 -3.556 0.043 0.756
Col. No. Comb No. Load Combination FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z
C40 50 50 1.0(DL+LL+EQUP) -2.815 99.359 -0.337 -0.612 0.093 1.791
51 51 1.0(DL+EQUP+LL+EQX+0.3EQZ 12.316 139.347 5.129 11.184 1.915 33.929
52 52 1.0(DL+EQUP+LL-EQX-0.3EQZ- -17.785 51.371 -5.75 -12.272 -1.746 -30.391
53 53 1.0(DL+EQUP+EQX+0.3EQZ+0. 12.476 131.347 5.183 11.318 1.898 33.885
54 54 1.0(DL+EQUP-EQX-0.3EQZ-0.3 -17.626 43.37 -5.696 -12.138 -1.763 -30.434
55 55 1.0(DL+EQUP+LL+EQZ+0.3EQX 2.609 165.922 15.966 35.125 1.585 13.143
56 56 1.0(DL+EQUP+LL-EQZ-0.3EQX- -8.078 24.795 -16.586 -36.213 -1.416 -9.605
57 57 1.0(DL+EQUP+EQZ+0.3EQX+0. 2.768 157.922 16.02 35.259 1.568 13.099
58 58 1.0(DL+EQUP-EQZ-0.3EQX-0.3 -7.919 16.795 -16.532 -36.079 -1.433 -9.648
59 59 1.0(DL+EQUP+LL+EQY+0.3EQX 2.02 122.039 4.751 10.504 0.867 11.917
60 60 1.0(DL+EQUP+LL-EQY-0.3EQX- -7.489 68.679 -5.372 -11.593 -0.699 -8.379
61 61 1.0(DL+EQUP+EQY+0.3EQX+0. 2.179 114.039 4.806 10.639 0.85 11.874
62 62 1.0(DL+EQUP-EQY-0.3EQX-0.3 -7.329 60.678 -5.318 -11.458 -0.715 -8.423
63 63 1.0(DL+ EQUP +WIND X) -3.368 86.17 -0.273 -0.432 0.28 3.368
64 64 1.0(DL+ EQUP -WIND X) -1.782 88.547 -0.239 -0.387 -0.145 0.082
65 65 1.0(DL+ EQUP+LL +WIND X) -3.688 102.171 -0.382 -0.702 0.313 3.456
66 66 1.0(DL+ EQUP+LL -WIND X) -2.101 104.547 -0.347 -0.657 -0.111 0.17
67 67 1.0(DL+ EQUP +WIND Z) -2.552 83.66 0.78 1.826 0.187 1.698
68 68 1.0(DL+ EQUP -WIND Z) -2.598 91.057 -1.292 -2.645 -0.052 1.752
69 69 1.0(DL+ EQUP+LL +WIND Z) -2.872 99.66 0.671 1.556 0.221 1.786
70 70 1.0(DL+ EQUP+LL -WIND Z) -2.918 107.058 -1.4 -2.915 -0.019 1.84
Moment On C.G :
Due to Fy
JOINT LOAD FX FY FZ MX MY MZ
C30 50 0.207 104.688 -0.728 -157.032 - -366.408
51 22.464 116.926 6.355 -175.389 - -409.241
52 -22.085 78.4 -7.611 -117.6 - -274.4
53 22.431 102.876 6.555 -154.314 - -360.066
54 -22.119 64.35 -7.411 -96.525 - -225.225
55 7.318 105.194 20.513 -157.791 - -368.179
56 -6.939 90.133 -21.769 -135.2 - -315.466
57 7.285 91.144 20.713 -136.716 - -319.004
58 -6.973 76.082 -21.569 -114.123 - -266.287
59 7.039 103.963 5.969 -155.945 - -363.871
60 -6.66 91.364 -7.224 -137.046 - -319.774
61 7.006 89.913 6.169 -134.87 - -314.696
62 -6.694 77.313 -7.024 -115.97 - -270.596
63 -0.944 84.476 -0.448 -126.714 - -295.666
64 1.256 82.75 -0.408 -124.125 - -289.625
65 -0.877 112.576 -0.848 -168.864 - -394.016
66 1.323 110.851 -0.808 -166.277 - -387.979
67 0.14 83.722 0.825 -125.583 - -293.027
68 0.172 83.504 -1.681 -125.256 - -292.264
69 0.207 111.822 0.425 -167.733 - -391.377
70 0.239 111.604 -2.081 -167.406 - -390.614
TOTAL
LOAD FX FY FZ Mxx1 Mxx2 Mxx Mzz1 Mzz2 Mzz
due to FY External Mxx1+Mxx2 due to FY External Mzz1+Mzz2
50 -3.26 377.446 -2.664 26.632 4.318 30.95 -99.442 1.763 -97.679
51 71.097 485.837 21.632 93.128 -53.509 39.619 -60.35 145.808 85.458
52 -77.71 227.655 -26.952 -38.656 61.517 22.861 -99.004 -141.969 -240.973
53 71.003 444.438 21.64 94.336 -54.135 40.201 -20.818 146.12 125.302
54 -77.806 186.255 -26.944 -37.451 60.891 23.44 -59.475 -141.656 -201.131
55 21.586 504.409 71.035 144.188 -171.094 -26.906 88.658 50.187 138.845
56 -28.199 209.083 -76.354 -89.72 179.102 89.382 -248.02 -46.349 -294.369
57 21.491 463.01 71.044 145.395 -171.72 -26.325 128.191 50.5 178.691
58 -28.295 167.683 -76.346 -88.51 178.476 89.966 -208.484 -46.035 -254.519
59 19.849 421.613 20.244 70.361 -50.318 20.043 -37.643 46.703 9.06
60 -26.462 291.881 -25.563 -15.889 58.327 42.438 -121.719 -42.864 -164.583
61 19.754 380.213 20.253 71.567 -50.945 20.622 1.893 47.017 48.91
62 -26.557 250.48 -25.553 -14.683 57.7 43.017 -82.187 -42.553 -124.74
63 -7.207 314.584 -2.705 21.795 3.507 25.302 -38.997 9.379 -29.618
64 0.404 316.109 -2.597 35.09 3.249 38.339 -41.296 -4.916 -46.212
65 -7.018 397.384 -2.724 19.383 4.76 24.143 -118.061 8.755 -109.306
66 0.593 398.908 -2.615 32.673 4.502 37.175 -120.365 -5.542 -125.907
67 -3.387 312.481 1.838 27.188 -6.85 20.338 -63.872 2.218 -61.654
68 -3.416 318.213 -7.141 29.699 13.605 43.304 -16.425 2.246 -14.179
69 -3.199 395.279 1.82 24.773 -5.597 19.176 -142.937 1.591 -141.346
70 -3.228 401.012 -7.158 27.285 14.858 42.143 -95.487 1.621 -93.866
Load Fy From Soil+ Fdn Fy Mxx Mzz Fy/A Mxx/Zxx Mzz/Zzz 1+2-3 1+2+3 1-2+3 1-2-3
Load +Ped 1 2 3
50 377.446 212.49 589.936 30.95 -97.679 7.56 0.4 0.58 7.38 8.54 7.74 6.58
51 485.837 212.49 698.327 39.619 85.458 8.95 0.51 0.51 8.95 9.97 8.95 7.93
52 227.655 212.49 440.145 22.861 -240.973 5.64 0.29 1.43 4.5 7.36 6.78 3.92
53 444.438 212.49 656.928 40.201 125.302 8.42 0.52 0.74 8.2 9.68 8.64 7.16
54 186.255 212.49 398.745 23.44 -201.131 5.11 0.3 1.19 4.22 6.6 6 3.62
55 504.409 212.49 716.899 -26.906 138.845 9.19 0.34 0.82 8.71 10.35 9.67 8.03
56 209.083 212.49 421.573 89.382 -294.369 5.4 1.15 1.74 4.81 8.29 5.99 2.51
57 463.01 212.49 675.5 -26.325 178.691 8.66 0.34 1.06 7.94 10.06 9.38 7.26
58 167.683 212.49 380.173 89.966 -254.519 4.87 1.15 1.51 4.51 7.53 5.23 2.21
59 421.613 212.49 634.103 20.043 9.06 8.13 0.26 0.05 8.34 8.44 7.92 7.82
60 291.881 212.49 504.371 42.438 -164.583 6.47 0.54 0.97 6.04 7.98 6.9 4.96
61 380.213 212.49 592.703 20.622 48.91 7.6 0.26 0.29 7.57 8.15 7.63 7.05
62 250.48 212.49 462.97 43.017 -124.74 5.94 0.55 0.74 5.75 7.23 6.13 4.65
63 314.584 212.49 527.074 25.302 -29.618 6.76 0.32 0.18 6.9 7.26 6.62 6.26
64 316.109 212.49 528.599 38.339 -46.212 6.78 0.49 0.27 7 7.54 6.56 6.02
65 397.384 212.49 609.874 24.143 -109.306 7.82 0.31 0.65 7.48 8.78 8.16 6.86
66 398.908 212.49 611.398 37.175 -125.907 7.84 0.48 0.75 7.57 9.07 8.11 6.61
67 312.481 212.49 524.971 20.338 -61.654 6.73 0.26 0.36 6.63 7.35 6.83 6.11
68 318.213 212.49 530.703 43.304 -14.179 6.8 0.56 0.08 7.28 7.44 6.32 6.16
69 395.279 212.49 607.769 19.176 -141.346 7.79 0.25 0.84 7.2 8.88 8.38 6.7
70 401.012 212.49 613.502 42.143 -93.866 7.87 0.54 0.56 7.85 8.97 7.89 6.77
Load Fy From Soil+ Fdn Fy Mxx Mzz Fy/A Mxx/Zxx Mzz/Zzz 1+2-3 1+2+3 1-2+3 1-2-3
Load +Ped 1 2 3
50 377.446 407.49 784.936 30.95 -97.679 10.06 0.4 0.58 9.88 11.04 10.24 9.08
51 485.837 407.49 893.327 39.619 85.458 11.45 0.51 0.51 11.45 12.47 11.45 10.43
52 227.655 407.49 635.145 22.861 -240.973 8.14 0.29 1.43 7 9.86 9.28 6.42
53 444.438 407.49 851.928 40.201 125.302 10.92 0.52 0.74 10.7 12.18 11.14 9.66
54 186.255 407.49 593.745 23.44 -201.131 7.61 0.3 1.19 6.72 9.1 8.5 6.12
55 504.409 407.49 911.899 -26.906 138.845 11.69 0.34 0.82 11.21 12.85 12.17 10.53
56 209.083 407.49 616.573 89.382 -294.369 7.9 1.15 1.74 7.31 10.79 8.49 5.01
57 463.01 407.49 870.5 -26.325 178.691 11.16 0.34 1.06 10.44 12.56 11.88 9.76
58 167.683 407.49 575.173 89.966 -254.519 7.37 1.15 1.51 7.01 10.03 7.73 4.71
59 421.613 407.49 829.103 20.043 9.06 10.63 0.26 0.05 10.84 10.94 10.42 10.32
60 291.881 407.49 699.371 42.438 -164.583 8.97 0.54 0.97 8.54 10.48 9.4 7.46
61 380.213 407.49 787.703 20.622 48.91 10.1 0.26 0.29 10.07 10.65 10.13 9.55
62 250.48 407.49 657.97 43.017 -124.74 8.44 0.55 0.74 8.25 9.73 8.63 7.15
63 314.584 407.49 722.074 25.302 -29.618 9.26 0.32 0.18 9.4 9.76 9.12 8.76
64 316.109 407.49 723.599 38.339 -46.212 9.28 0.49 0.27 9.5 10.04 9.06 8.52
65 397.384 407.49 804.874 24.143 -109.306 10.32 0.31 0.65 9.98 11.28 10.66 9.36
66 398.908 407.49 806.398 37.175 -125.907 10.34 0.48 0.75 10.07 11.57 10.61 9.11
67 312.481 407.49 719.971 20.338 -61.654 9.23 0.26 0.36 9.13 9.85 9.33 8.61
68 318.213 407.49 725.703 43.304 -14.179 9.3 0.56 0.08 9.78 9.94 8.82 8.66
69 395.279 407.49 802.769 19.176 -141.346 10.29 0.25 0.84 9.7 11.38 10.88 9.2
70 401.012 407.49 808.502 42.143 -93.866 10.37 0.54 0.56 10.35 11.47 10.39 9.27
d/2
6
d/2
3 3.5
Critical Section = At distance d/2 from face of column
Concrete Grade = 30 N/mm2
Column Details
Length = 750 mm
Width = 600 mm
Foundation Details
Length = 6500 mm
Width = 6000 mm
Effective Depth = 925 mm
Percentage Of Steel = 0.17 %
Punching Load
Maximum Load on Column = 165.922 T
Punching Shear = 165.922 x ( 6.5 x 6 - 1.675 x 1.525 )
6.5 x 6
P= 156 Ton
600
=
750
= 0.8
ks = 1
tc = 1.37 N/mm2
2340000
Depth Required =
1.37 x6400
= 266.88 mm
1.775
d
6
d
At Length
Length at critical section = 6000 mm
Width at critical section = 2200 mm
Shear Force = 7.65 x 6 x 2.2
= 101 T
At Width
Length at critical section = 6500 mm
Width at critical section = 1775 mm
Shear Force = 7.65 x 6.5 x 1.775
= 89 T
% Ast = 0.16
Allowable Shear Stress = 0.30 N/mm2 ----Refer Table 19 of IS 456
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.298 N/mm2
Depth Required = 1515000
0.298 x 6000
= 848 mm
Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 12.85 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 195 + 205.74 ) / ( 13 x 6 )
= 5.14 T/m2
Net causing moment = 7.71 T/m2
Maximum Projection of fdn = 2.625 m
Bending Moment = 7.71 x 2.625 x 2.625 / 2
= 26.56 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
fy 1 - fck x b x d2
Summary Of Design :-
Length Of Footing :- 13000 mm
WIdth Of Footing :- 6000 mm
Depth Of Footing :- 1000 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 215 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 200 mm spacing bothways
Y ex Cx
My
Cy
P
Mx ey
X X B= 6 4Cy
L= 13 m
4.23
6
1.77 8.9
2.9
4.98 8.02
Z
0.65
6.1
X
0.75 6.1
1.55 3 1.55
0.3
1.65
2.5
0.85
Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Shape Of Foundation :-
Length Of Foundation Lf = 6.1 m
Width Of Foundation W f = 6.1 m
Thickness Of Foundation Tf = 0.85 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)
Bearing Pressure for Without Buoyancy Case :- pmax = 17.394 T/sq.M pmin = 11.027 T/sq.M
Bearing Pressure for With Buoyancy Case :- pmax = 14.894 T/sq.M pmin = 8.527 T/sq.M
COMBINED FOOTING C10 & C11
1-2+3 1+2+3 X
X
1-2-3 1+2-3
d/2
6.1
d/2
1.55 1.5
Foundation Details
Length = 3050 mm
Width = 6100 mm
Effective Depth = 775 mm
Percentage Of Steel = 0.27 %
Punching Load
Maximum Load on Column = 151.079 T
Punching Shear = 151.079 x ( 3.05 x 6.1 - 1.425 x 1.525 )
3.05 x 6.1
P= 134 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1
650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1425 mm
Width of critical section = 1525 mm
Perimeter of critical section = 5900 mm
2010000
Depth Required =
1.37 x5900
= 248.67 mm
1.9
6.1 d
At Length
Length at critical section = 6100 mm
Width at critical section = 1550 mm
Shear Force = 12.299 x 6.1 x 1.55
= 117 T
At Width
Length at critical section = 3050 mm
Width at critical section = 1900 mm
Shear Force = 12.299 x 3.05 x 1.9
= 72 T
% Ast = 0.28
Allowable Shear Stress = 0.386 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.3856 N/mm2
Depth Required = 1755000
0.3856 x 6100
= 747 mm
Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 17.394 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 79.07 + 107.62 ) / ( 6.1 x 6.1 )
= 5.02 T/m2
Net causing moment = 12.374 T/m2
Maximum Projection of fdn = 2.675 m
Bending Moment = 12.374 x 2.675 x 2.675 / 2
= 44.27 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2
Summary Of Design :-
Length Of Footing :- 6100 mm
WIdth Of Footing :- 6100 mm
Depth Of Footing :- 850 mm
Reinforcement :-
At Top :- Provide 16 mm dia Bars @ 135 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C19 & C20
Z
0.65
6.2
X
0.75 6
1.6 3 1.6
0.3
1.45
2.5
1.05
Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Shape Of Foundation :-
Length Of Foundation Lf = 6.2 m
Width Of Foundation Wf = 6 m
Thickness Of Foundation Tf = 1.05 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)
Bearing Pressure for Without Buoyancy Case :- pmax = 18.905 T/sq.M pmin = 10.801 T/sq.M
Bearing Pressure for With Buoyancy Case :- pmax = 16.405 T/sq.M pmin = 8.301 T/sq.M
COMBINED FOOTING C19 & C20
1-2+3 1+2+3
X X
1-2-3 1+2-3
d/2
d/2
1.6 1.5
Foundation Details
Length = 3100 mm
Width = 6000 mm
Effective Depth = 975 mm
Percentage Of Steel = 0.21 %
Punching Load
Maximum Load on Column = 172.605 T
Punching Shear = 172.605 x ( 3.1 x 6 - 1.625 x 1.725 )
3.1 x 6
P= 147 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1
650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1625 mm
Width of critical section = 1725 mm
Perimeter of critical section = 6700 mm
2205000
Depth Required =
1.37 x6700
= 240.22 mm
1.65
6 d
At Length
Length at critical section = 6000 mm
Width at critical section = 1600 mm
Shear Force = 13.67 x 6 x 1.6
= 132 T
At Width
Length at critical section = 3100 mm
Width at critical section = 1650 mm
Shear Force = 13.67 x 3.1 x 1.65
= 70 T
% Ast = 0.22
Allowable Shear Stress = 0.346 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.346 N/mm2
Depth Required = 1980000
0.346 x 6000
= 954 mm
Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 18.905 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 97.65 + 94.55 ) / ( 6.2 x 6 )
= 5.17 T/m2
Net causing moment = 13.735 T/m2
Maximum Projection of fdn = 2.625 m
Bending Moment = 13.735 x 2.625 x 2.625 / 2
= 47.32 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2
Summary Of Design :-
Length Of Footing :- 6200 mm
WIdth Of Footing :- 6000 mm
Depth Of Footing :- 1050 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 175 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C25 & C26
Z
0.65
9.4
X
0.75 7.4
3.2 3 3.2
0.3
1.3
2.5
1.2
Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Shape Of Foundation :-
Length Of Foundation Lf = 9.4 m
Width Of Foundation Wf = 7.4 m
Thickness Of Foundation Tf = 1.2 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)
Bearing Pressure for Without Buoyancy Case :- pmax = 12.641 T/sq.M pmin = 8.536 T/sq.M
Bearing Pressure for With Buoyancy Case :- pmax = 10.141 T/sq.M pmin = 6.036 T/sq.M
COMBINED FOOTING C25 & C26
1-2+3 1+2+3
X X
1-2-3 1+2-3
d/2
7.4
d/2
3.2 1.5
Foundation Details
Length = 4700 mm
Width = 7400 mm
Effective Depth = 1125 mm
Percentage Of Steel = 0.19 %
Punching Load
Maximum Load on Column = 203.049 T
Punching Shear = 203.049 x ( 4.7 x 7.4 - 1.775 x 1.875 )
4.7 x 7.4
P= 184 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1
650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1775 mm
Width of critical section = 1875 mm
Perimeter of critical section = 7300 mm
2760000
Depth Required =
1.37 x7300
= 275.97 mm
2.2
7.4 d
3.2 1.5 0
3.2 3
At Length
Length at critical section = 7400 mm
Width at critical section = 3200 mm
Shear Force = 7.301 x 7.4 x 3.2
= 173 T
At Width
Length at critical section = 4700 mm
Width at critical section = 2200 mm
Shear Force = 7.301 x 4.7 x 2.2
= 76 T
% Ast = 0.19
Allowable Shear Stress = 0.322 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.322 N/mm2
Depth Required = 2595000
0.322 x 7400
= 1090 mm
Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 12.641 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 208.68 + 160.49 ) / ( 9.4 x 7.4 )
= 5.31 T/m2
Net causing moment = 7.331 T/m2
Maximum Projection of fdn = 3.325 m
Bending Moment = 7.331 x 3.325 x 3.325 / 2
= 40.52 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2
Summary Of Design :-
Length Of Footing :- 9400 mm
WIdth Of Footing :- 7400 mm
Depth Of Footing :- 1200 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 150 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED FOOTING C35 & C36
Z
0.65
7.8
X
0.75 6.2
2.4 3 2.4
0.3
1.3
2.5
1.2
Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Shape Of Foundation :-
Length Of Foundation Lf = 7.8 m
Width Of Foundation Wf = 6.2 m
Thickness Of Foundation Tf = 1.2 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.65 m
Width Of Pedestal Wp = 0.75 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)
Bearing Pressure for Without Buoyancy Case :- pmax = 14.41 T/sq.M pmin = 9.835 T/sq.M
Bearing Pressure for With Buoyancy Case :- pmax = 11.91 T/sq.M pmin = 7.335 T/sq.M
COMBINED FOOTING C35 & C36
1-2+3 1+2+3
X X
1-2-3 1+2-3
d/2
6.2
d/2
2.4 1.5
Foundation Details
Length = 3900 mm
Width = 6200 mm
Effective Depth = 1125 mm
Percentage Of Steel = 0.19 %
Punching Load
Maximum Load on Column = 169.443 T
Punching Shear = 169.443 x ( 3.9 x 6.2 - 1.775 x 1.875 )
3.9 x 6.2
P= 147 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1
650
=
750
= 0.867
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1775 mm
Width of critical section = 1875 mm
Perimeter of critical section = 7300 mm
2205000
Depth Required =
1.37 x7300
= 220.48 mm
1.6
6.2 d
2.4 1.5 0
2.4 3
At Length
Length at critical section = 6200 mm
Width at critical section = 2400 mm
Shear Force = 9.07 x 6.2 x 2.4
= 135 T
At Width
Length at critical section = 3900 mm
Width at critical section = 1600 mm
Shear Force = 9.07 x 3.9 x 1.6
= 57 T
% Ast = 0.19
Allowable Shear Stress = 0.322 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.322 N/mm2
Depth Required = 2025000
0.322 x 6200
= 1015 mm
Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 14.41 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 145.08 + 110.88 ) / ( 7.8 x 6.2 )
= 5.29 T/m2
Net causing moment = 9.12 T/m2
Maximum Projection of fdn = 2.725 m
Bending Moment = 9.12 x 2.725 x 2.725 / 2
= 33.86 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2
Summary Of Design :-
Length Of Footing :- 7800 mm
WIdth Of Footing :- 6200 mm
Depth Of Footing :- 1200 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 150 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 150 mm spacing bothways
COMBINED SF2
DESIGN OF FOUNDATION
COMBINED STRIP FOUNDATION TYPE: SF2 FOR COLUMN
12.2
0.5 8 0.5
1.6 1.6
1.1
2.5
0.3
1.1
0.85
1.2
0.6 BEAM
0.35 FOUNDATION
Constants :-
Unit Wt Of Soil = 18 kN/m3
Density Of Water = 10 kN/m3
Unit Weight Of Concrete = 25 kN/m3
Comp. strength of concrete fc = 20 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 50 kN/m3
With Buoyancy :
Gross SBC = 50 + (18 - 10) x 1.2
59.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + (18 - 10) x 1.2
72.1 kN/m2 --- Where increase in SBC is allowed.
(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 50 + 18 x 1.2
71.6 kN/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 50 + 18 x 1.2
84.1 kN/m2 --- Where increase in SBC is allowed.
Shape Of Foundation :- (Wind / EQ 25% increase)
Length Of Foundation Lf = 12.2 m
Width Of Foundation Wf = 2.5 m
Thickness Of Foundation Tf = 0.35 m
Founding Depth Df = 1.2 m
Length Of Strip beam Lp = 12.2 m
Width Of Strip Wp = 0.5 m
Height Of Strip Beam Hp = 0.6 m --(Support Reaction Considered at Base of footing)
2.5 0.5
d
COMBINED SF2
4.25
8.5
At Width
Depth 350 mm
Length at critical section = 1000 mm
Width at critical section = 1000 mm
Shear Force = 48.017 x 1 x 1
Allowable Shear Stress = 49 kN
456","----Refer Table 21 of IS
without Shear R/f= 0.360 N/mm2 456")
k = 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.36 N/mm2 Designed Shear Stress =
Shear Strength 115.2 kN ok Corresponding Length =
Design Of Foundation
a) Calculation of Reinforcement at Bottom Strip Slab
Maximum Pressure = 72.067 kN/m2 --- Without Buoyancy Load Case
Pre. due to Soil & fdn wt = ( 266.88 + 279.99 ) / ( 12.2 x 2.5 )
= 17.93 kN/m2
Net causing moment = 54.137 kN/m2
Maximum Projection of fdn = 1 m
Bending Moment = 54.137 x 1 x 1 / 2
Design Bending Moment = 40.605 kN.m
Design for area of steel and shear for singly reinforced beam by limit state design method
Calculation of Ast req for beams
Ref IS 456-2000 Cl G-1.1b & G-1.1c For sections without compression reinforcement
Design for area of steel and shear for doubly reinforced beam by limit state design method
Ref IS 456-2000 Cl G-1.2 For sections with compression reinforcement
Z
0.75
6.6
X
0.6 6.2
1.8 3 1.8
0.3
1.5
2.5
Constants :-
Unit Wt Of Soil = 1.8 T/m3
Density Of Water = 1 T/m3
Unit Weight Of Concrete = 2.5 T/m3
Comp. strength of concrete fc = 30 N/mm2
Yield strength of steel fy = 500 N/mm2
Coefficient Of Friction m = 0.5
Net SBC = 15 T/m2
With Buoyancy :
Gross SBC = 15 + (1.8 - 1) x 2.5
17 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + (1.8 - 1) x 2.5
20.75 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Without Buoyancy :
Gross SBC = 15 + 1.8 x 2.5
19.5 T/m2 ------ Where increase in SBC is not allowed.
Gross SBC = 1.25 x 15 + 1.8 x 2.5
23.25 T/m2 ------ Where increase in SBC is allowed.(Wind / EQ 25% increase)
Shape Of Foundation :-
Length Of Foundation Lf = 6.6 m
Width Of Foundation Wf = 6.2 m
Thickness Of Foundation Tf = 1 m
Founding Depth Df = 2.5 m
Length Of Pedestal Lp = 0.75 m
Width Of Pedestal Wp = 0.6 m
Height Of Pedestal Hp = 0 m (Support Reaction Considered at Base of footing)
Bearing Pressure for Without Buoyancy Case :- pmax = 12.449 T/sq.M pmin = 8.919 T/sq.M
Bearing Pressure for With Buoyancy Case :- pmax = 9.949 T/sq.M pmin = 6.419 T/sq.M
COMBINED FOOTING C46 & C47
1-2+3 1+2+3
X X
1-2-3 1+2-3
d/2
6.2
d/2
1.8 1.5
Foundation Details
Length = 3300 mm
Width = 6200 mm
Effective Depth = 925 mm
Percentage Of Steel = 0.19 %
Punching Load
Maximum Load on Column = 101.704 T
Punching Shear = 101.704 x ( 3.3 x 6.2 - 1.675 x 1.525 )
3.3 x 6.2
P= 90 Ton
Shear Resistance Of Concrete (Vc)
= vc x bc x d -----Refer to clause no. 31.6.3.1 of IS 456
where vc = ks x tc
ks = 0.5 + bc -----should not be greater than 1
600
=
750
= 0.8
ks = 1
tc = 1.37 N/mm2
bc = Appropriate perimeter at distance d/2
Length of critical section = 1675 mm
Width of critical section = 1525 mm
Perimeter of critical section = 6400 mm
1350000
Depth Required =
1.37 x6400
= 153.97 mm
1.875
6.2 d
At Length
Length at critical section = 6200 mm
Width at critical section = 1800 mm
Shear Force = 7.249 x 6.2 x 1.8
= 81 T
At Width
Length at critical section = 3300 mm
Width at critical section = 1875 mm
Shear Force = 7.249 x 3.3 x 1.875
= 45 T
% Ast = 0.2
Allowable Shear Stress = 0.330 N/mm2 ----Refer Table 21 of IS 456 Check Stress
k= 1 ---- Refer clause no. 40.2 of IS 456
tc = 0.33 N/mm2
Depth Required = 1215000
0.33 x 6200
= 594 mm
Design Of Foundation
a) Calculation of reinforcement at bottom
Maximum Pressure = 12.449 T/m2 --- Without Buoyancy Load Case
Pre. due to pcc & fdn wt = ( 102.3 + 108.05 ) / ( 6.6 x 6.2 )
= 5.14 T/m2
Net causing moment = 7.309 T/m2
Maximum Projection of fdn = 2.8 m
Bending Moment = 7.309 x 2.8 x 2.8 / 2
= 28.65 Tm
Ast = 0.5 x fck x b x d 1- (4.6 x Mu )
1-
fy fck x b x d2
Summary Of Design :-
Length Of Footing :- 6600 mm
WIdth Of Footing :- 6200 mm
Depth Of Footing :- 1000 mm
Reinforcement :-
At Top :- Provide 20 mm dia Bars @ 180 mm spacing bothways
At Bottom :- Provide 20 mm dia Bars @ 175 mm spacing bothways
DESIGN SHEAR STRENGTH OF CONCRETE Tc N/mm2
% pt M15 M20 M25 M30 M35 M40 & ABOVE
0 15 20 25 30 35 40
0.15 0.280 0.280 0.290 0.290 0.290 0.300
0.16 0.287 0.288 0.297 0.298 0.298 0.308
0.17 0.294 0.296 0.304 0.306 0.306 0.316
0.18 0.301 0.304 0.311 0.314 0.314 0.324
0.19 0.308 0.312 0.318 0.322 0.322 0.332
0.2 0.315 0.320 0.325 0.330 0.330 0.340
0.21 0.322 0.328 0.332 0.338 0.338 0.348
0.22 0.329 0.336 0.339 0.346 0.346 0.356
0.23 0.336 0.344 0.346 0.354 0.354 0.364
0.24 0.343 0.352 0.353 0.362 0.362 0.372
0.25 0.350 0.360 0.360 0.370 0.370 0.380
0.26 0.354 0.365 0.365 0.375 0.375 0.385
0.27 0.359 0.370 0.370 0.380 0.380 0.390
0.28 0.363 0.374 0.376 0.386 0.386 0.396
0.29 0.368 0.379 0.381 0.391 0.391 0.401
0.3 0.372 0.384 0.386 0.396 0.396 0.406
0.31 0.376 0.389 0.391 0.401 0.401 0.411
0.32 0.381 0.394 0.396 0.406 0.406 0.416
0.33 0.385 0.398 0.402 0.412 0.412 0.422
0.34 0.390 0.403 0.407 0.417 0.417 0.427
0.35 0.394 0.408 0.412 0.422 0.422 0.432
0.36 0.398 0.413 0.417 0.427 0.427 0.437
0.37 0.403 0.418 0.422 0.432 0.432 0.442
0.38 0.407 0.422 0.428 0.438 0.438 0.448
0.39 0.412 0.427 0.433 0.443 0.443 0.453
0.4 0.416 0.432 0.438 0.448 0.448 0.458
0.41 0.420 0.437 0.443 0.453 0.453 0.463
0.42 0.425 0.442 0.448 0.458 0.458 0.468
0.43 0.429 0.446 0.454 0.464 0.464 0.474
0.44 0.434 0.451 0.459 0.469 0.469 0.479
0.45 0.438 0.456 0.464 0.474 0.474 0.484
0.46 0.442 0.461 0.469 0.479 0.479 0.489
0.47 0.447 0.466 0.474 0.484 0.484 0.494
0.48 0.451 0.470 0.480 0.490 0.490 0.500
0.49 0.456 0.475 0.485 0.495 0.495 0.505
0.5 0.460 0.480 0.490 0.500 0.500 0.510
0.51 0.463 0.483 0.493 0.504 0.504 0.514
0.52 0.466 0.486 0.496 0.507 0.507 0.517
0.53 0.470 0.490 0.500 0.511 0.511 0.521
0.54 0.473 0.493 0.503 0.514 0.514 0.524
0.55 0.476 0.496 0.506 0.518 0.518 0.528
0.56 0.479 0.499 0.509 0.522 0.522 0.532
0.57 0.482 0.502 0.512 0.525 0.525 0.535
0.58 0.486 0.506 0.516 0.529 0.529 0.539
0.59 0.489 0.509 0.519 0.532 0.532 0.542
0.6 0.492 0.512 0.522 0.536 0.536 0.546
0.61 0.495 0.515 0.525 0.540 0.540 0.550
0.62 0.498 0.518 0.528 0.543 0.543 0.553
0.63 0.502 0.522 0.532 0.547 0.547 0.557
0.64 0.505 0.525 0.535 0.550 0.550 0.560
0.65 0.508 0.528 0.538 0.554 0.554 0.564
0.66 0.511 0.531 0.541 0.558 0.558 0.568
0.67 0.514 0.534 0.544 0.561 0.561 0.571
0.68 0.518 0.538 0.548 0.565 0.565 0.575
0.69 0.521 0.541 0.551 0.568 0.568 0.578
0.7 0.524 0.544 0.554 0.572 0.572 0.582
0.71 0.527 0.547 0.557 0.576 0.576 0.586
0.72 0.530 0.550 0.560 0.579 0.579 0.589
0.73 0.534 0.554 0.564 0.583 0.583 0.593
0.74 0.537 0.557 0.567 0.586 0.586 0.596
0.75 0.540 0.560 0.570 0.590 0.590 0.600
0.76 0.542 0.562 0.573 0.593 0.593 0.603
0.77 0.545 0.565 0.576 0.596 0.596 0.606
0.78 0.547 0.567 0.578 0.598 0.600 0.610
0.79 0.550 0.570 0.581 0.601 0.603 0.613
0.8 0.552 0.572 0.584 0.604 0.606 0.616
0.81 0.554 0.574 0.587 0.607 0.609 0.619
0.82 0.557 0.577 0.590 0.610 0.612 0.622
0.83 0.559 0.579 0.592 0.612 0.616 0.626
0.84 0.562 0.582 0.595 0.615 0.619 0.629
0.85 0.564 0.584 0.598 0.618 0.622 0.632
0.86 0.566 0.586 0.601 0.621 0.625 0.635
0.87 0.569 0.589 0.604 0.624 0.628 0.638
0.88 0.571 0.591 0.606 0.626 0.632 0.642
0.89 0.574 0.594 0.609 0.629 0.635 0.645
0.9 0.576 0.596 0.612 0.632 0.638 0.648
0.91 0.578 0.598 0.615 0.635 0.641 0.651
0.92 0.581 0.601 0.618 0.638 0.644 0.654
0.93 0.583 0.603 0.620 0.640 0.648 0.658
0.94 0.586 0.606 0.623 0.643 0.651 0.661
0.95 0.588 0.608 0.626 0.646 0.654 0.664
0.96 0.590 0.610 0.629 0.649 0.657 0.667
0.97 0.593 0.613 0.632 0.652 0.660 0.670
0.98 0.595 0.615 0.634 0.654 0.664 0.674
0.99 0.598 0.618 0.637 0.657 0.667 0.677
1 0.600 0.620 0.640 0.660 0.670 0.680
1.01 0.602 0.622 0.642 0.662 0.672 0.682
1.02 0.603 0.624 0.645 0.664 0.675 0.685
1.03 0.605 0.626 0.647 0.666 0.677 0.687
1.04 0.606 0.628 0.650 0.668 0.680 0.690
1.05 0.608 0.630 0.652 0.670 0.682 0.692
1.06 0.610 0.632 0.654 0.672 0.684 0.694
1.07 0.611 0.634 0.657 0.674 0.687 0.697
1.08 0.613 0.636 0.659 0.676 0.689 0.699
1.09 0.614 0.638 0.662 0.678 0.692 0.702
1.1 0.616 0.640 0.664 0.680 0.694 0.704
1.11 0.618 0.642 0.666 0.682 0.696 0.706
1.12 0.619 0.644 0.669 0.684 0.699 0.709
1.13 0.621 0.646 0.671 0.686 0.701 0.711
1.14 0.622 0.648 0.674 0.688 0.704 0.714
1.15 0.624 0.650 0.676 0.690 0.706 0.716
1.16 0.626 0.652 0.678 0.692 0.708 0.718
1.17 0.627 0.654 0.681 0.694 0.711 0.721
1.18 0.629 0.656 0.683 0.696 0.713 0.723
1.19 0.630 0.658 0.686 0.698 0.716 0.726
1.2 0.632 0.660 0.688 0.700 0.718 0.728
1.21 0.634 0.662 0.690 0.702 0.720 0.730
1.22 0.635 0.664 0.693 0.704 0.723 0.733
1.23 0.637 0.666 0.695 0.706 0.725 0.735
1.24 0.638 0.668 0.698 0.708 0.728 0.738
1.25 0.640 0.670 0.700 0.710 0.730 0.740
1.26 0.642 0.672 0.702 0.712 0.732 0.742
1.27 0.643 0.674 0.703 0.714 0.734 0.744
1.28 0.645 0.676 0.705 0.716 0.736 0.746
1.29 0.646 0.678 0.706 0.718 0.738 0.748
1.3 0.648 0.680 0.708 0.720 0.740 0.750
1.31 0.650 0.682 0.710 0.722 0.742 0.752
1.32 0.651 0.684 0.711 0.724 0.744 0.754
1.33 0.653 0.686 0.713 0.726 0.746 0.756
1.34 0.654 0.688 0.714 0.728 0.748 0.758
1.35 0.656 0.690 0.716 0.730 0.750 0.760
1.36 0.658 0.692 0.718 0.732 0.752 0.762
1.37 0.659 0.694 0.719 0.734 0.754 0.764
1.38 0.661 0.696 0.721 0.736 0.756 0.766
1.39 0.662 0.698 0.722 0.738 0.758 0.768
1.4 0.664 0.700 0.724 0.740 0.760 0.770
1.41 0.666 0.702 0.726 0.742 0.762 0.772
1.42 0.667 0.704 0.727 0.744 0.764 0.774
1.43 0.669 0.706 0.729 0.746 0.766 0.776
1.44 0.670 0.708 0.730 0.748 0.768 0.778
1.45 0.672 0.710 0.732 0.750 0.770 0.780
1.46 0.674 0.712 0.734 0.752 0.772 0.782
1.47 0.675 0.714 0.735 0.754 0.774 0.784
1.48 0.677 0.716 0.737 0.756 0.776 0.786
1.49 0.678 0.718 0.738 0.758 0.778 0.788
1.5 0.680 0.720 0.740 0.760 0.780 0.790
1.51 0.681 0.721 0.742 0.762 0.782 0.792
1.52 0.682 0.722 0.743 0.763 0.783 0.794
1.53 0.684 0.724 0.745 0.765 0.785 0.796
1.54 0.685 0.725 0.746 0.766 0.786 0.798
1.55 0.686 0.726 0.748 0.768 0.788 0.800
1.56 0.687 0.727 0.750 0.770 0.790 0.802
1.57 0.688 0.728 0.751 0.771 0.791 0.804
1.58 0.690 0.730 0.753 0.773 0.793 0.806
1.59 0.691 0.731 0.754 0.774 0.794 0.808
1.6 0.692 0.732 0.756 0.776 0.796 0.810
1.61 0.693 0.733 0.758 0.778 0.798 0.812
1.62 0.694 0.734 0.759 0.779 0.799 0.814
1.63 0.696 0.736 0.761 0.781 0.801 0.816
1.64 0.697 0.737 0.762 0.782 0.802 0.818
1.65 0.698 0.738 0.764 0.784 0.804 0.820
1.66 0.699 0.739 0.766 0.786 0.806 0.822
1.67 0.700 0.740 0.767 0.787 0.807 0.824
1.68 0.702 0.742 0.769 0.789 0.809 0.826
1.69 0.703 0.743 0.770 0.790 0.810 0.828
1.7 0.704 0.744 0.772 0.792 0.812 0.830
1.71 0.705 0.745 0.774 0.794 0.814 0.832
1.72 0.706 0.746 0.775 0.795 0.815 0.834
1.73 0.708 0.748 0.777 0.797 0.817 0.836
1.74 0.709 0.749 0.778 0.798 0.818 0.838
1.75 0.710 0.750 0.780 0.800 0.820 0.840
1.76 0.710 0.752 0.782 0.802 0.822 0.842
1.77 0.710 0.753 0.783 0.803 0.823 0.843
1.78 0.710 0.755 0.785 0.805 0.825 0.845
1.79 0.710 0.756 0.786 0.806 0.826 0.846
1.8 0.710 0.758 0.788 0.808 0.828 0.848
1.81 0.710 0.760 0.790 0.810 0.830 0.850
1.82 0.710 0.761 0.791 0.811 0.831 0.851
1.83 0.710 0.763 0.793 0.813 0.833 0.853
1.84 0.710 0.764 0.794 0.814 0.834 0.854
1.85 0.710 0.766 0.796 0.816 0.836 0.856
1.86 0.710 0.768 0.798 0.818 0.838 0.858
1.87 0.710 0.769 0.799 0.819 0.839 0.859
1.88 0.710 0.771 0.801 0.821 0.841 0.861
1.89 0.710 0.772 0.802 0.822 0.842 0.862
1.9 0.710 0.774 0.804 0.824 0.844 0.864
1.91 0.710 0.776 0.806 0.826 0.846 0.866
1.92 0.710 0.777 0.807 0.827 0.847 0.867
1.93 0.710 0.779 0.809 0.829 0.849 0.869
1.94 0.710 0.780 0.810 0.830 0.850 0.870
1.95 0.710 0.782 0.812 0.832 0.852 0.872
1.96 0.710 0.784 0.814 0.834 0.854 0.874
1.97 0.710 0.785 0.815 0.835 0.855 0.875
1.98 0.710 0.787 0.817 0.837 0.857 0.877
1.99 0.710 0.788 0.818 0.838 0.858 0.878
2 0.710 0.790 0.820 0.840 0.860 0.880
2.01 0.710 0.791 0.821 0.842 0.862 0.882
2.02 0.710 0.792 0.822 0.843 0.863 0.883
2.03 0.710 0.792 0.824 0.845 0.865 0.885
2.04 0.710 0.793 0.825 0.846 0.866 0.886
2.05 0.710 0.794 0.826 0.848 0.868 0.888
2.06 0.710 0.795 0.827 0.850 0.870 0.890
2.07 0.710 0.796 0.828 0.851 0.871 0.891
2.08 0.710 0.796 0.830 0.853 0.873 0.893
2.09 0.710 0.797 0.831 0.854 0.874 0.894
2.1 0.710 0.798 0.832 0.856 0.876 0.896
2.11 0.710 0.799 0.833 0.858 0.878 0.898
2.12 0.710 0.800 0.834 0.859 0.879 0.899
2.13 0.710 0.800 0.836 0.861 0.881 0.901
2.14 0.710 0.801 0.837 0.862 0.882 0.902
2.15 0.710 0.802 0.838 0.864 0.884 0.904
2.16 0.710 0.803 0.839 0.866 0.886 0.906
2.17 0.710 0.804 0.840 0.867 0.887 0.907
2.18 0.710 0.804 0.842 0.869 0.889 0.909
2.19 0.710 0.805 0.843 0.870 0.890 0.910
2.2 0.710 0.806 0.844 0.872 0.892 0.912
2.21 0.710 0.807 0.845 0.874 0.894 0.914
2.22 0.710 0.808 0.846 0.875 0.895 0.915
2.23 0.710 0.808 0.848 0.877 0.897 0.917
2.24 0.710 0.809 0.849 0.878 0.898 0.918
2.25 0.710 0.810 0.850 0.880 0.900 0.920
2.26 0.710 0.810 0.851 0.881 0.901 0.921
2.27 0.710 0.811 0.852 0.882 0.902 0.922
2.28 0.710 0.811 0.854 0.884 0.904 0.924
2.29 0.710 0.812 0.855 0.885 0.905 0.925
2.3 0.710 0.812 0.856 0.886 0.906 0.926
2.31 0.710 0.812 0.857 0.887 0.907 0.927
2.32 0.710 0.813 0.858 0.888 0.908 0.928
2.33 0.710 0.813 0.860 0.890 0.910 0.930
2.34 0.710 0.814 0.861 0.891 0.911 0.931
2.35 0.710 0.814 0.862 0.892 0.912 0.932
2.36 0.710 0.814 0.863 0.893 0.913 0.933
2.37 0.710 0.815 0.864 0.894 0.914 0.934
2.38 0.710 0.815 0.866 0.896 0.916 0.936
2.39 0.710 0.816 0.867 0.897 0.917 0.937
2.4 0.710 0.816 0.868 0.898 0.918 0.938
2.41 0.710 0.816 0.869 0.899 0.919 0.939
2.42 0.710 0.817 0.870 0.900 0.920 0.940
2.43 0.710 0.817 0.872 0.902 0.922 0.942
2.44 0.710 0.818 0.873 0.903 0.923 0.943
2.45 0.710 0.818 0.874 0.904 0.924 0.944
2.46 0.710 0.818 0.875 0.905 0.925 0.945
2.47 0.710 0.819 0.876 0.906 0.926 0.946
2.48 0.710 0.819 0.878 0.908 0.928 0.948
2.49 0.710 0.820 0.879 0.909 0.929 0.949
2.5 0.710 0.820 0.880 0.910 0.930 0.950
2.51 0.710 0.820 0.881 0.911 0.931 0.951
2.52 0.710 0.820 0.882 0.912 0.932 0.952
2.53 0.710 0.820 0.882 0.914 0.934 0.954
2.54 0.710 0.820 0.883 0.915 0.935 0.955
2.55 0.710 0.820 0.884 0.916 0.936 0.956
2.56 0.710 0.820 0.885 0.917 0.937 0.957
2.57 0.710 0.820 0.886 0.918 0.938 0.958
2.58 0.710 0.820 0.886 0.920 0.940 0.960
2.59 0.710 0.820 0.887 0.921 0.941 0.961
2.6 0.710 0.820 0.888 0.922 0.942 0.962
2.61 0.710 0.820 0.889 0.923 0.943 0.963
2.62 0.710 0.820 0.890 0.924 0.944 0.964
2.63 0.710 0.820 0.890 0.926 0.946 0.966
2.64 0.710 0.820 0.891 0.927 0.947 0.967
2.65 0.710 0.820 0.892 0.928 0.948 0.968
2.66 0.710 0.820 0.893 0.929 0.949 0.969
2.67 0.710 0.820 0.894 0.930 0.950 0.970
2.68 0.710 0.820 0.894 0.932 0.952 0.972
2.69 0.710 0.820 0.895 0.933 0.953 0.973
2.7 0.710 0.820 0.896 0.934 0.954 0.974
2.71 0.710 0.820 0.897 0.935 0.955 0.975
2.72 0.710 0.820 0.898 0.936 0.956 0.976
2.73 0.710 0.820 0.898 0.938 0.958 0.978
2.74 0.710 0.820 0.899 0.939 0.959 0.979
2.75 0.710 0.820 0.900 0.940 0.960 0.980
2.76 0.710 0.820 0.901 0.941 0.961 0.981
2.77 0.710 0.820 0.902 0.942 0.962 0.982
2.78 0.710 0.820 0.902 0.942 0.964 0.984
2.79 0.710 0.820 0.903 0.943 0.965 0.985
2.8 0.710 0.820 0.904 0.944 0.966 0.986
2.81 0.710 0.820 0.905 0.945 0.967 0.987
2.82 0.710 0.820 0.906 0.946 0.968 0.988
2.83 0.710 0.820 0.906 0.946 0.970 0.990
2.84 0.710 0.820 0.907 0.947 0.971 0.991
2.85 0.710 0.820 0.908 0.948 0.972 0.992
2.86 0.710 0.820 0.909 0.949 0.973 0.993
2.87 0.710 0.820 0.910 0.950 0.974 0.994
2.88 0.710 0.820 0.910 0.950 0.976 0.996
2.89 0.710 0.820 0.911 0.951 0.977 0.997
2.9 0.710 0.820 0.912 0.952 0.978 0.998
2.91 0.710 0.820 0.913 0.953 0.979 0.999
2.92 0.710 0.820 0.914 0.954 0.980 1.000
2.93 0.710 0.820 0.914 0.954 0.982 1.002
2.94 0.710 0.820 0.915 0.955 0.983 1.003
2.95 0.710 0.820 0.916 0.956 0.984 1.004
2.96 0.710 0.820 0.917 0.957 0.985 1.005
2.97 0.710 0.820 0.918 0.958 0.986 1.006
2.98 0.710 0.820 0.918 0.958 0.988 1.008
2.99 0.710 0.820 0.919 0.959 0.989 1.009
3 0.710 0.820 0.920 0.960 0.990 1.010
Fck = 30 % pt = 0.2 Tc = 0.33
Fck = 30 % pt = 0.14 Tc = 30
DESIGN SHEAR STRENGTH OF CONCRETE Tc N/mm2
% pt M15 M20 M25 M30 M35 M40 & ABOVE
15 20 25 30 35 40
0.15 0.280 0.280 0.290 0.290 0.290 0.300
0.25 0.350 0.360 0.360 0.370 0.370 0.380
0.5 0.460 0.480 0.490 0.500 0.500 0.510
0.75 0.540 0.560 0.570 0.590 0.590 0.600
1 0.600 0.620 0.640 0.660 0.670 0.680
1.25 0.640 0.670 0.700 0.710 0.730 0.740
1.5 0.680 0.720 0.740 0.760 0.780 0.790
1.75 0.710 0.750 0.780 0.800 0.820 0.840
2 0.710 0.790 0.820 0.840 0.860 0.880
2.25 0.710 0.810 0.850 0.880 0.900 0.920
2.5 0.710 0.820 0.880 0.910 0.930 0.950
2.75 0.710 0.820 0.900 0.940 0.960 0.980
3 0.710 0.820 0.920 0.960 0.990 1.010
ex/L
0 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 0.22 0.24 0.26 0.28 0.30 0.32 0.34
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0 1.00 1.12 1.24 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.22 2.38 2.56 2.78 3.03 3.33 3.70 4.17
0.02 1.12 1.24 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.36 2.53 2.72 2.95 3.22 3.54 3.93 4.42
0.04 1.24 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.35 2.50 2.68 2.88 3.13 3.41 3.75 4.17 4.69
0.06 1.36 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.34 2.49 2.66 2.84 3.06 3.32 3.62 3.98 4.43 4.98
0.08 1.48 1.60 1.72 1.84 1.96 2.08 2.21 2.34 2.48 2.64 2.82 3.02 3.25 3.52 3.84 4.23 4.70 5.28
0.10 1.60 1.72 1.84 1.96 2.08 2.20 2.34 2.48 2.63 2.80 2.99 3.20 3.46 3.74 4.08 4.49 4.99 5.62
0.12 1.72 1.84 1.96 2.08 2.21 2.34 2.48 2.63 2.80 2.98 3.18 3.41 3.68 3.98 4.35 4.78 5.31 5.97
eY/B 0.14 1.84 1.96 2.08 2.21 2.34 2.48 2.63 2.79 2.97 3.17 3.39 3.64 3.92 4.24 4.63 5.09 5.66
0.16 1.96 2.08 2.21 2.34 2.48 2.63 2.80 2.97 3.17 3.38 3.62 3.88 4.18 4.53 4.94 5.43 6.04
0.18 2.08 2.21 2.35 2.49 2.64 2.80 2.98 3.17 3.38 3.61 3.86 4.15 4.47 4.84 5.28 5.81 6.46
0.20 2.22 2.36 2.50 2.66 2.82 2.99 3.18 3.39 3.62 3.86 4.14 4.44 4.79 5.19 5.66 6.23
0.22 2.38 2.53 2.68 2.84 3.02 3.20 3.41 3.64 3.88 4.15 4.44 4.77 5.15 5.57 6.08 6.69
0.24 2.56 2.72 2.88 3.06 3.25 3.46 3.68 3.92 4.18 4.47 4.79 5.15 5.55 6.01 6.56
0.26 2.78 2.95 3.13 3.32 3.52 3.74 3.98 4.24 4.53 4.84 5.19 5.57 6.01 6.51
0.28 3.03 3.22 3.41 3.62 3.84 4.08 4.35 4.63 4.94 5.28 5.66 6.08 6.56
0.30 3.33 3.54 3.75 3.98 4.23 4.49 4.78 5.09 5.43 5.81 6.23 6.69
0.32 3.70 3.93 4.17 4.43 4.70 4.99 5.31 5.66 6.04 6.46
0.34 4.17 4.42 4.69 4.98 5.28 5.62 5.97
Values indicates resultant inside the kern
Values provide a minimum factor of safety of 1.5 against over-turning.
FOR ex/L
0.13
0.00 1.720
0.02 1.840
0.04 1.960
0.06 2.080
0.08 2.210
0.10 2.340
FOR eY/B 0.12 2.480
0.15 0.14 2.630
µ= 0.16 2.800
2.630 0.18 2.980
0.20 3.180
0.22 3.410
0.24 3.680
0.26 3.980
0.28 4.350
0.30 4.780
0.32 5.310
0.34 5.970