0% found this document useful (0 votes)
358 views

Dokumen - Tips Design Calculation Report Pipe Rack and Foundation

This document provides a 3 sentence summary of a design calculation report for a pipe rack and foundation: 1) The report describes the geometry, structural systems, design approach, codes, and materials for a proposed metering shelter/building with dimensions of 11.5m by 8.25m and a height of 4.8m. 2) The structural systems include reinforced concrete frames, 250mm thick CMU block walls, a reinforced concrete slab roof, 150mm thick parapet, and isolated spread footings founded on concrete slab on grade. 3) The design was performed using STAAD PRO software to analyze the structure for dead loads, live loads, wind loads, seismic loads based on codes

Uploaded by

zahirshah1436923
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
358 views

Dokumen - Tips Design Calculation Report Pipe Rack and Foundation

This document provides a 3 sentence summary of a design calculation report for a pipe rack and foundation: 1) The report describes the geometry, structural systems, design approach, codes, and materials for a proposed metering shelter/building with dimensions of 11.5m by 8.25m and a height of 4.8m. 2) The structural systems include reinforced concrete frames, 250mm thick CMU block walls, a reinforced concrete slab roof, 150mm thick parapet, and isolated spread footings founded on concrete slab on grade. 3) The design was performed using STAAD PRO software to analyze the structure for dead loads, live loads, wind loads, seismic loads based on codes

Uploaded by

zahirshah1436923
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 128

8/18/2019 Design calculation report - Pipe rack - and foundation

Saudi Aramco 2616-ENG (03/99)


   S  
   N
   R
   P
SAUDI ARABIAN OIL COMPANY
   O
   T
   M    S  
   P    A
   S
   T  
   R    G
   E    A
   C    M
 
   G    M
   G    A
   N
   E    A
Saudi Aramco, Northern Area Projects Dep.
/NAOO & BGP Project’s Division
   N    N
   O
   I    O
   T
   P
   I
   R
   I
   T
   C
   U
J.O #-21-00052-0001
   C    R
   S    T
   E    S
   D    N
   O
   C
   R
   O
   F
   D
   E
   U
   S
Structural Calculation
   S
   I
  -
   E
Metering Building
   R  
   O   -
   W   2
   5
   0   1
   E
   /    0
   0
   0
   0    
  -    0
   O    2
   1
   J
   E    3
   T    1
   /
   A    9
   0
   D    /
   9
   0
 
 .
   V   O    1
   E   N
   R
   F
   0
DISCIPLINE
   B  
Sales Gas Delivery System for Saudi Electricity
ENGINEER

A. MACAUMBANG

04/03/13
Co. PP12
DATE:
PROJECT
ENGINEER

M. GHANIM

09/09/13
DATE:
CERTIFIED
M. GHANIM

DATE:
09/09/13 RE-ISSUED FOR CONSTRUCTION
CONSTRUCTION
AGENCY
S.A SAKKAK

09/09/13
DATE:
OPERATIONS

DATE:
   R
   N    E
   O    B PREPARED BY: 
   I    M
   T    U
  D
   A
  S
   C
   I
  D
  
   L
   N
   F
  E    O MUSTANG-HDP
   I    R   :
   R    T    E
   E
   V
   N   :
   O    Y
   T
   A
Al-Khobar, Saudi Arabia
   C    B    D
   N _  ,
   S
   E __    L    T
   O
   I    N    E
   T   1
   T _    L
_    A
   E    T
   A    F
_    R    M    A
   A
   C
   0
_    O    E
_
   C
   R    I
   F _
   I
   C _    F    I    I
   T _
   I
   F _  ,    U
 .    D    Q    R    1_
_
   I
   F
   I    O    E    E    E    0_
   T
   T
   N    R    R    C    0
 .    E
_
  -_
   R    V    N    N    1_
   V    O _
   R
 
   E
   E
   R    O    T
   O
   I    I
   T
   0
   0_
_
   E    C    A    E    0
   C   A    S
   T    L   -_
_
   C
   C   H    I    F
   I    P    2_
   5_
   N   T    G    I    M   0
   N    T    O   0 _ STRUCTURAL CALCULATIONS DWG.TYPE  PLANT NO.  INDEX  DRAWING NO.  SHT.NO. 
   N
   O    S    I    R    C    0_
_
REV.N
   I    T    A
   O    E    W    E   -_  
   I
   S    C
   A    R    /
   I    I
   G    1
   L    I  ._
   N    2
_
METERING BUILDING DOC
   S
   I
   C    D    A
   O
V73 CAL-STR-001 1
   V   N    I
   V
   D
   E   I
   S    V    W
   A    N
   H    O    R    ) PIPELINE BETWEEN SHEDGUM & YANBU Q 0F
   E    S    T    R
   R   I    F
   P    D    C
   C
Of
   R     T    O    A    Y
   H    P
   B    D
   ( SAUDI ARABIA JO / EWO:  21-00052-0001
SHEDGUM 1
EDSD/2616-0399.d
http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 1/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

1.0 BUILDING GEOMETRY

INTRODUCTION

This specification list the design criteria used while performing calculations for design of all structural items related

to Metering Shelter/Building. Briefly described herein are the structural systems of the building, design

approach adopted, various codes used, material properties, loads, allowable limits in deflections and stability and the

soil properties. This criterion complies with all relevant engineering standards, latest editions of engineering and industry

codes and Saudi Arabian Government codes.

BUILDING DIMENSIONS:

The proposed Metering Shelter/Building has following dimensions:

From Ground Floor to roof:

Length: 11.5.0m clear between grid line 1 & 1.

Width: 8.25m clear between grid line A & C

Height: 4.8m from finish floor line to top of roof slab.

STRUCTURAL SYSTEMS DESCRIPTION

The structural system consists of :

Structure: Reinforced concrete frames


Walls: 250mm thick cmu block walls above ground level

Roof: reinforced concrete slab.

Parapet 150mm thick reinforced concrete

Foundation: Isolated footing

Floor slab: Concrete slab on grade

DESIGN APPROACH

Metering Shelter/Building is modeled and analyzed using STAAD PRO software.The structure will be analyzed and

designed for conventional static loads such as dead load, live load, wind load & seismic load. Isolated spread footing

will be designed according to anticipated column load or supprt reactions and allowable soil bearing

capacity.Other governing codes and standards applicable to the structure are used in preparation of the design.

APPLICABLE CODES AND STANDARDS

The following codes and standards are used in the design:

SEI/ASCE 7 – 02 Minimum design loads for buildings and other structures.

SAES M-100 Saudi Aramco Building Code


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 2/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

UBC - 1997 Uniform Building code

ACI-318-2005 American Concrete Institute, Building Requirements for Reinforced Concrete.

MATERIALS

Concrete

f’c = 28 MPa Minimum concrete compressive strength at 28 days for all cast-in-situ reinforced concrete

structural elements.

f’c = 28 MPa Minimum concrete compressive strength at 28 days for all cast-in-situ reinforced concrete

slabs on grade

f’c = 17 MPa Minimum structural plain or lean concrete compressive strength at 28 days.

Reinforcing Steel:

 fy = 420 MPa (60 Ksi) Minimum yield strength of all reinforcing steel. Reinforcing bars shall conform to

SASO-SSA-2, ASTM A615/A615M grade 60.

Cement:

Portland cement shall be of type V Cement in all cases, Ready mixed concrete shall have a minimum specified

compressive strength fc' = 28 Mpa (4000 psi) after 28 days.

Welded Wire Fabric


Shall conform to SASO SSA 224/1981(cold drawn) plain fabric wire with minimum yield strength of 240 MPa.

DESIGN LOAD BASIS

Dead Loads

Unit Weights of different building materials

Reinforced concrete= = 24 kN/m3

Mortar, cement = 20.4 kN/m3

Gravel = 16.3 kN/m3

Soil = 18.0 kN/m3

2.0 LOAD COMPUTATION & DISTRIBUTION

2.1 DEAD LOAD:

2.1.1 Dead Loads on Roof:


2
DL of 200mm thick concrete slab = 4.80 KN/M
2
DL of water proofing (2 ply) + 50mm thick rigid insulation = 0.55 KN/M

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 3/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

2
DL of 50mm thick gravel finish = 0.82 KN/M
2
DL of 50mm thick structural screed = 1.02 KN/M
2
Collateral Loads (ceiling & lighting) = 0.50 KN/M
2
Additional roof load 0.70 KN/M
2
Total Dead Loads = 8.39 KN/M

2.1.2 Parapet Loads:


2
DL of 150mm thick reinforced concrete parapet = 3.60 KN/M

2.1.3 Wall Loads:

External Walls:
2
KN/M
DL of 250mm thick cmu wall = 5.75
2
DL of 50mm thick insulation = 0.15 KN/M
2
DL of 12mm plaster one side = 0.25 KN/M
2
Total Dead Load of Built-up Walls  = 6.15 KN/M

2.2 LIVE LOAD:


2
2.2.1 Live Load on roof  = 1.00 KN/M

2
2.2.2 Live Load on Ground Floor (slab on grade) = 4.80 KN/M

2.4 SEISMIC LOAD:

Seismic Load will be generated by Staad using DEFINE UBC LOAD command with the
following parameters:
Ss 0.70: S1 = 0.2: I 1.0: RWX 3.0: RWZ 3.0: SCL 4

Where:

I- Importance Factor
Rx & Rz - Response Modification Coefficient for Intermediate Moment Resisting Frame

SCL site class


2.5 WIND LOAD:
Wind Load Calculated in accordance with ASCE-7-05 based on a maximum wind velocity
of 145Km/hr.
2
qz = 0.613 *Kz *Kzt* Kd*V * I (Eq-6-15 of ASCE-7-05)

Where V = 145 km/h = 40.6 m/sec


Exposure C , Category III G = 0.85
I = 1.15 kzt = 1.00

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 4/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

kz = 1.00 kd = 1.00
2
qz = 1.16 KN/M

2.5.1 Wind force


P = qz(GCpf –GCpi)

GCpf = External Pressure Coefficient


= 0.40 Fig-6.10-ASCE-7-05

GCpi = Internal Pressure Coefficient


= +0.18 Fig-6.10-ASCE-7-05

= -0.18 Fig-6.5-ASCE-7-05
2
P1 = 0.67 KN/M
2
P2 = 0.26 KN/M

3.0 LOAD COMBINATIONS

Allowable Stress Combinations

1 DL + LL Where:
3 0.6DL + WL DL Dead Load
4  DL + 0.75(LL +WL) LL Live Load
5 DL +0.75 (LL +E) WL Wind Load

6 DL + 0.75(LL +0.707WLX+0.707WLZ) , E Earthquake


7 0.6DL + 0.7E
8 DL + 0.75( LL +E/1.4)
Strength Design Load Combinations.
1 1.4D
2 1.2DL + 1.6LL
5 1.2 DL + 1.6 LL + 0.8 WL
6 1.2DL + 0.5LL + 1.6WL
7
1.2DL +LL + E
8 0.9 DL + 1.6 WL
9 0.9DL + E

4.0 BEAM DEFLECTION


Allowable beam defelection as per code :  L / 240 25.00 mm
 

Maximum beam deflection as per staad output beam 114 : 4.58   mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 5/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

5.0 STRUCTURAL DESIGN ANALYSIS

STRUCTURE & LOAD DIAGRAM 


3.0 COMPUTER INPUT FILE 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 6/128
8/18/2019 Design calculation report - Pipe rack - and foundation

STRUCTURE 3D RENDERED VIEW

Y
X
Z Load 6

STRUCTURE 3D VIEW

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 7/128
8/18/2019 Design calculation report - Pipe rack - and foundation

15
2

13 9

28
19
5

11
8
25

22 3
18
7

20
14
1
17

27
12

16
26

Y 29
23
X 24
Z Load 6
21

STRUCTURE W/ NODE NUMBER

10

23

9 6

24

20
5

22
38
25 3 16
4 19
39
8
36

37 2 41 15
7 27

26 13
1 14
31 18

21
29 34 12

17
35

40 33
32 30
Y
X
Z 28 Load 6

STRUCTURE W/ BEAM NUMBER

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 8/128
8/18/2019 Design calculation report - Pipe rack - and foundation

5.75 m

6m

5.75 m 4.8 m

6m

5.75 m
4.8 m

6m
2.85 m
3m 1m 4.8 m
4.8 m
2.9 m
2.25
2.75m
m
6m

2.25 m 1 m2.9 m 4.8 m 6m


5.75 m

3m 1m
1m 4.8 m
4.8 m 2.75 m

6m
4.8 m 2.85 m 1m

2.9 m
2.25 m

1 m 2.25 m
2.9 m 1m
Y
X
Z 1m Load 6

STRUCTURE W/ DIMENSIONS

1 3 5

29 12 14

Y X
Load 1
Z
21 24

STRUCTURE W/ NODE NUMBER @ SUPPORT

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 9/128
8/18/2019 Design calculation report - Pipe rack - and foundation

0.562

1.011

0.562

0.562

0.135

0.854
0.389 0.168

0.128
0.486 0.162

0.162
0.135
0.175

0.168

0.087

0.076

0.128
0.075

0.075
Y
X
Z Load 1

SEISMIC LOAD @ X DIRECTION

0.562

1.011

0.562
0.562

0.854

0.389 0.135

0.486 0.168

0.128 0.162

0.162
0.135
0.175

0.168

0.087

0.076

0.128
0.075

0.075
Y
X
Z Load 2

SEISMIC LOAD @ Z DIRECTION

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 10/128
8/18/2019 Design calculation report - Pipe rack - and foundation

-24.121 (GY)
-2.160
-24.121 (GY)
-24.121 (GY)

-24.121 (GY) -2.160


2*-24.121
2*-24.121(GY)
(GY)

-24.121 (GY)
-2.160
-29.520
-24.121
-24.121(GY)
(GY)

-24.121
-23.912 (GY)
(GY) -29.520
-2.160

-29.520
-9.439 (GY)
-2.160
-9.439 (GY) -9.439 (GY)

-2.160
-9.439 (GY) -9.439 (GY)
-29.520 -9.439 (GY)

-2.160 -29.520

-29.520

-29.520

-29.520

Y
X
Z Load 3

DEAD LOAD

-2.875 (GY)

-2.875
-2.875(GY)
(GY)

-2.875 (GY)

2*-2.875
2*-2.875(GY)
(GY)

-2.875 (GY)

-2.875 (GY)
-2.875 (GY)
-2.850 (GY)
-2.875 (GY)
-1.125 (GY)
-1.125 (GY) -1.125 (GY)

-1.125 (GY) -1.125 (GY)


-1.125 (GY)

Y
X
Z Load 4

ROOF LIVE LOAD

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 11/128
8/18/2019 Design calculation report - Pipe rack - and foundation

11.834

16.271

4.438

16.955

23.313

Y 6.358
X
Z Load 5

WIND LOAD @ X DIRECTIONS

5.230

5.230

4.264

4.264

Y
X
Z Load 6

WIND LOAD @ -X DIRECTIONS

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 12/128
8/18/2019 Design calculation report - Pipe rack - and foundation

11.341

22.681

11.341

12.363

28.258
8.124

16.249

Y
X
Z Load 7

WIND LOAD @ Z DIRECTIONS

5.013

7.497

2.484

2.528

2.528
3.109

2.043

5.046

2.026

2.061

2.061
Y
X
Z Load 8

WIND LOAD @ -Z DIRECTIONS

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 13/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

DESIGN OF METERING SHELTER 


3.0A COMPUTER INPUT FILE 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 14/128
ProV8i\STAAD\Plugins\METERING BUILDING-1642K.std 09/09/13 07:39:41
8/18/2019
D SPACE Design calculation report - Pipe rack - and foundation
T JOB INFORMATION
NEER DATE 30-Mar-13
JOB INFORMATION
T WIDTH 79
METER KN
T COORDINATES
0 0; 2 0 5.8 0; 3 5.75 0 0; 4 5.75 5.8 0; 5 11.5 0 0; 6 11.5 5.8 0;
1 0; 8 5.75 1 0; 9 11.5 1 0; 11 0 5.8 6; 12 5.75 0 6; 13 5.75 5.8 6;
1.5 0 6; 15 11.5 5.8 6; 16 0 1 6; 17 5.75 1 6; 18 11.5 1 6; 19 8.5 1 0;
.5 1 6; 21 0 0 8.25; 22 0 5.8 8.25; 23 0 1 8.25; 24 2.9 0 8.25;
.9 5.8 8.25; 26 2.9 1 8.25; 27 2.9 1 6; 28 2.9 5.8 6; 29 0 0 6;
ER INCIDENCES
7; 2 3 8; 3 5 9; 4 7 2; 5 8 4; 6 9 6; 7 7 8; 8 8 19; 9 2 4; 10 4 6;
2 17; 13 14 18; 14 16 11; 15 17 13; 16 18 15; 17 16 27; 18 17 20; 19 11 28;
3 15; 21 7 16; 22 2 11; 23 6 15; 24 4 13; 25 19 9; 26 20 18; 27 19 20;
1 23; 29 23 22; 30 24 26; 31 26 25; 32 23 26; 33 23 16; 34 27 17; 35 27 26;
18; 37 11 22; 38 28 13; 39 28 25; 40 29 16; 41 22 25;
NE MATERIAL START
ROPIC CONCRETE
17185e+007
SON 0.17
ITY 23.5616
A 1e-005
0.05
CONCRETE
NGTH FCU 27579
DEFINE MATERIAL
ER PROPERTY AMERICAN
6 12 TO 16 28 TO 31 40 PRIS YD 0.35 ZD 0.35
17 18 21 25 TO 27 34 36 PRIS YD 0.8 ZD 0.25
19 20 22 23 38 PRIS YD 0.5 ZD 0.35
3 35 PRIS YD 0.4 ZD 0.25
9 41 PRIS YD 0.4 ZD 0.3
RIS YD 0.6 ZD 0.35
TANTS
RIAL CONCRETE ALL
ORTS
5 12 14 21 24 29 FIXED
NE IBC 2003
0.007 SD1 0.003 S1 0.002 IE 1 RX 3 RZ 3 SCLASS 4
WEIGHT 1
ER WEIGHT
18 21 25 TO 27 32 TO 36 UNI 29.52
20 22 TO 24 37 TO 39 41 UNI 2.16
R WEIGHT
GE 3 6 FLOAD 8.39
NE WIND LOAD
1 WIND 1
TAAD PRO GENERATED DATA DO NOT MODIFY !!!
-7-2010:PARAMS 145.000 KMPH 0 2 1 0 0.000 FT 0.000 FT 0.000 FT 1 -
800 M 11.500 M 8.250 M 2.000 0.010 0 -
0 0 0.858 1.000 1.000 0.850 0 -
0 0.888 0.800 -0.550
ND GENERATED DATA BLOCK
2.35486 2.35486 2.35592 2.35698 2.35804 2.3591 2.36015 2.3612 2.36225 -
6329 2.36433 2.36537 2.36641 2.36744 2.36847 0.646088 HEIG 0 4.572 -
8954 4.60708 4.62462 4.64215 4.65969 4.67723 4.69477 4.71231 -
2985 4.74739 4.76492 4.78246 4.8 4.8
2 WIND 2
TAAD PRO GENERATED DATA DO NOT MODIFY !!!
-7-2010:PARAMS 145.000 KMPH 0 2 1 0 0.000 FT 0.000 FT 0.000 FT 1 -
800 M 11.500 M 8.250 M 2.000 0.010 1 -
0 0 0.858 1.000 1.000 0.850 0 -
0 0.888 -0.300 0.550
ND GENERATED DATA BLOCK
-0.592267 -0.592267 -0.914308 HEIG 0 4.8 40
1 LOADTYPE None TITLE LOAD CASE 1
LOAD X 1
ORM ANALYSIS
GE
2 LOADTYPE None TITLE LOAD CASE 2
LOAD Z 1
ORM ANALYSIS
GE
3 LOADTYPE None TITLE LOAD CASE 3
WEIGHT Y -1
ER LOAD
18 21 25 TO 27 32 TO 36 UNI GY -29.52
http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 15/128
: 1
ProV8i\STAAD\Plugins\METERING BUILDING-1642K.std 09/09/13 07:39:41
18 218/18/2019
25 TO 27 32 TO 36 UNI GY -29.52 Design calculation report - Pipe rack - and foundation
R LOAD
GE 3 6 FLOAD -8.39 GY
ER LOAD
20 22 23 37 TO 39 41 UNI GY -2.16
4 LOADTYPE None TITLE LOAD CASE 4
R LOAD
GE 3 6 FLOAD -1 GY
5 LOADTYPE None TITLE LOAD CASE 5
LOAD X 1 TYPE 1 YR 1 6
6 LOADTYPE None TITLE LOAD CASE 6
LOAD -X 1 TYPE 2 YR 1 6
7 LOADTYPE None TITLE LOAD CASE 7
LOAD Z 1 TYPE 1 YR 1 6 ZR 0 1
8 LOADTYPE None TITLE LOAD CASE 8
LOAD -Z 1 TYPE 2 YR 1 6 ZR 1 9
RVICE STRESS DESIGN LOAD COMBINATIONS
COMB 101 COMBINATION LOAD CASE 101
0 4 1.0
COMB 102 COMBINATION LOAD CASE 102
0 4 0.75 5 0.75
COMB 103 COMBINATION LOAD CASE 103
0 4 1.0 6 0.75
COMB 104 COMBINATION LOAD CASE 104
0 4 1.0 7 0.75
COMB 105 COMBINATION LOAD CASE 105
0 4 1.0 8 0.75
COMB 106 COMBINATION LOAD CASE 106
0 4 1.0 5 1.0
COMB 107 COMBINATION LOAD CASE 107
0 4 1.0 6 1.0
COMB 108 COMBINATION LOAD CASE 108
0 4 1.0 7 1.0
COMB 109 COMBINATION LOAD CASE 109
0 4 1.0 8 1.0
COMB 110 COMBINATION LOAD CASE 110
0 4 0.75 5 0.53
COMB 111 COMBINATION LOAD CASE 111
0 4 1.0 6 0.53
COMB 112 COMBINATION LOAD CASE 112
0 4 1.0 7 0.53
COMB 113 COMBINATION LOAD CASE 113
0 4 1.0 8 0.53
COMB 114 COMBINATION LOAD CASE 114
6 5 1.0
COMB 115 COMBINATION LOAD CASE 115
6 6 1.0
COMB 116 COMBINATION LOAD CASE 116
6 7 1.0
COMB 117 COMBINATION LOAD CASE 117
6 8 1.0
COMB 118 COMBINATION LOAD CASE 118
0 4 0.75 1 1.0
COMB 119 COMBINATION LOAD CASE 119
0 4 0.75 2 1.0
COMB 120 COMBINATION LOAD CASE 120
6 1 0.7
COMB 121 COMBINATION LOAD CASE 121
6 2 0.7
RENGTH DESIGN LOAD COMBINATIONS
COMB 201 COMBINATION LOAD CASE 201
4
COMB 202 COMBINATION LOAD CASE 202
2 4 1.6
COMB 203 COMBINATION LOAD CASE 203
2 4 1.6 5 0.8
COMB 204 COMBINATION LOAD CASE 204
2 4 1.6 6 0.8
COMB 205 COMBINATION LOAD CASE 205
2 4 1.6 7 0.8
COMB 206 COMBINATION LOAD CASE 206
2 4 1.6 8 0.8
COMB 207 COMBINATION LOAD CASE 207
2 4 0.5 5 1.6
COMB 208 COMBINATION LOAD CASE 208
2 4 0.5 6 1.6
COMB 209 COMBINATION LOAD CASE 209
2 4 0.5 7 1.6
COMB 210 COMBINATION LOAD CASE 210
http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 16/128
: 2
ProV8i\STAAD\Plugins\METERING BUILDING-1642K.std 09/09/13 07:39:41
COMB8/18/2019
210 COMBINATION LOAD CASE 210 Design calculation report - Pipe rack - and foundation
2 4 0.5 8 1.6
COMB 211 COMBINATION LOAD CASE 211
2 4 1.0 1 1.0
COMB 212 COMBINATION LOAD CASE 212
2 4 1.0 2 1.0
COMB 213 COMBINATION LOAD CASE 213
9 5 1.6
COMB 214 COMBINATION LOAD CASE 214
9 6 1.6
COMB 215 COMBINATION LOAD CASE 215
9 7 1.6
COMB 216 COMBINATION LOAD CASE 216
9 8 1.6
COMB 217 COMBINATION LOAD CASE 217
9 1 1.0
COMB 218 COMBINATION LOAD CASE 218
9 2 1.0
ORM ANALYSIS
LIST 101 TO 121 201 TO 218
T CONCRETE DESIGN
ACI
8000 ALL
IN 420000 ALL
C 420000 ALL
AIN 20 ALL
AIN 16 ALL
EC 10 ALL
F 0 MEMB 1 TO 6 12 TO 16 28 TO 31 40
N 0.01 MEMB 1 TO 6 12 TO 16 28 TO 31 40
K 0 ALL
GN COLUMN 1 TO 6 12 TO 16 28 TO 31 40
GN BEAM 7 TO 10 17 TO 27 32 TO 39 41
CONCRETE DESIGN
FACTORED LOAD
LIST 101 TO 121
T SUPPORT REACTION ALL
CTORED LOAD
LIST 201 TO 218
T SUPPORT REACTION ALL
T JOINT DISPLACEMENTS ALL
SH

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 17/128
: 3
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

DESIGN OF BEAMS & COLUMNS


4.0 COMPUTER OUTPUT FILE 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 18/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
PAGE NO. 1

****************************************************
* *
* STAAD.Pro V8i SELECTseries3 *
* Version 20.07.08.20 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= SEP 9, 2013 *
* Time= 7:58: 3 *
* *
* USER ID: Mustang Engineering *
****************************************************

1. STAAD SPACE
NPUT FILE: METERING BUILDING-1642K.STD
2. START JOB INFORMATION
3. ENGINEER DATE 30-MAR-13
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN

7. JOINT COORDINATES
8. 1 0 0 0; 2 0 5.8 0; 3 5.75 0 0; 4 5.75 5.8 0; 5 11.5 0 0; 6 11.5 5.8 0
9. 7 0 1 0; 8 5.75 1 0; 9 11.5 1 0; 11 0 5.8 6; 12 5.75 0 6; 13 5.75 5.8 6
10. 14 11.5 0 6; 15 11.5 5.8 6; 16 0 1 6; 17 5.75 1 6; 18 11.5 1 6; 19 8.5 1 0
11. 20 8.5 1 6; 21 0 0 8.25; 22 0 5.8 8.25; 23 0 1 8.25; 24 2.9 0 8.25
12. 25 2.9 5.8 8.25; 26 2.9 1 8.25; 27 2.9 1 6; 28 2.9 5.8 6; 29 0 0 6
13. MEMBER INCIDENCES
14. 1 1 7; 2 3 8; 3 5 9; 4 7 2; 5 8 4; 6 9 6; 7 7 8; 8 8 19; 9 2 4; 10 4 6
15. 12 12 17; 13 14 18; 14 16 11; 15 17 13; 16 18 15; 17 16 27; 18 17 20; 19 11 28
16. 20 13 15; 21 7 16; 22 2 11; 23 6 15; 24 4 13; 25 19 9; 26 20 18; 27 19 20
17. 28 21 23; 29 23 22; 30 24 26; 31 26 25; 32 23 26; 33 23 16; 34 27 17; 35 27 26
18. 36 9 18; 37 11 22; 38 28 13; 39 28 25; 40 29 16; 41 22 25
19. DEFINE MATERIAL START
20. ISOTROPIC CONCRETE
21. E 2.17185E+007
22. POISSON 0.17
23. DENSITY 23.5616
24. ALPHA 1E-005
25. DAMP 0.05
26. TYPE CONCRETE
27. STRENGTH FCU 27579
28. END DEFINE MATERIAL
29. MEMBER PROPERTY AMERICAN
30. 1 TO 6 12 TO 16 28 TO 31 40 PRIS YD 0.35 ZD 0.35
31. 7 8 17 18 21 25 TO 27 34 36 PRIS YD 0.8 ZD 0.25
32. 9 10 19 20 22 23 38 PRIS YD 0.5 ZD 0.35
33. 32 33 35 PRIS YD 0.4 ZD 0.25
34. 37 39 41 PRIS YD 0.4 ZD 0.3
35. 24 PRIS YD 0.6 ZD 0.35

36. CONSTANTS
37. MATERIAL CONCRETE ALL
38. SUPPORTS
39. 1 3 5 12 14 21 24 29 FIXED
40. DEFINE IBC 2003

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 1 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 19/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 2

41. SDS 0.007 SD1 0.003 S1 0.002 IE 1 RX 3 RZ 3 SCLASS 4


42. SELFWEIGHT 1
43. MEMBER WEIGHT
44. 7 8 18 21 25 TO 27 32 TO 36 UNI 29.52
45. 9 10 20 22 TO 24 37 TO 39 41 UNI 2.16
46. FLOOR WEIGHT
**WARNING** about Floor/OneWay Loads/Weights.
Please note that depending on the shape of the floor you may
have to break up the FLOOR/ONEWAY LOAD into multiple commands.
For details please refer to Technical Reference Manual
Section 5.32.4 Note 6.

47. YRANGE 3 6 FLOAD 8.39


48. DEFINE WIND LOAD
49. TYPE 1 WIND 1
50. <! STAAD PRO GENERATED DATA DO NOT MODIFY !!!
51. ASCE-7-2010:PARAMS 145.000 KMPH 0 2 1 0 0.000 FT 0.000 FT 0.000 FT 1 -
52. 1 4.800 M 11.500 M 8.250 M 2.000 0.010 0 -
53. 0 0 0 0 0.858 1.000 1.000 0.850 0 -
54. 0 0 0 0.888 0.800 -0.550
55. !> END GENERATED DATA BLOCK
56. INT 2.35486 2.35486 2.35592 2.35698 2.35804 2.3591 2.36015 2.3612 2.36225 -
57. 2.36329 2.36433 2.36537 2.36641 2.36744 2.36847 0.646088 HEIG 0 4.572 -

58. 4.58954 4.60708 4.62462 4.64215 4.65969 4.67723 4.69477 4.71231 -


59. 4.72985 4.74739 4.76492 4.78246 4.8 4.8
60. TYPE 2 WIND 2
61. <! STAAD PRO GENERATED DATA DO NOT MODIFY !!!
62. ASCE-7-2010:PARAMS 145.000 KMPH 0 2 1 0 0.000 FT 0.000 FT 0.000 FT 1 -
63. 1 4.800 M 11.500 M 8.250 M 2.000 0.010 1 -
64. 0 0 0 0 0.858 1.000 1.000 0.850 0 -
65. 0 0 0 0.888 -0.300 0.550
66. !> END GENERATED DATA BLOCK
67. INT -0.592267 -0.592267 -0.914308 HEIG 0 4.8 40
68. LOAD 1 LOADTYPE NONE TITLE LOAD CASE 1
69. IBC LOAD X 1
70. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

 NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 28/ 40/ 8

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER 

ORIGINAL/FINAL BAND-WIDTH= 17/ 6/ 36 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 120
SIZE OF STIFFNESS MATRIX = 5 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.1/ 331966.0 MB

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 2 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 20/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 3

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
* CT = 0.016 Cu = 1.700 *
* TIME PERIODS : *
* Ta = 0.227 T = 0.479 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.386 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.002 X 2614.59 *
* = 6.10 KN *
************************************************************

71. CHANGE
72. LOAD 2 LOADTYPE NONE TITLE LOAD CASE 2
73. IBC LOAD Z 1
74. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.016 Cu = 1.700 *
* TIME PERIODS : *
* Ta = 0.227 T = 0.499 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.386 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.002 X 2614.59 *
* = 6.10 KN *
************************************************************

75. CHANGE
76. LOAD 3 LOADTYPE NONE TITLE LOAD CASE 3
77. SELFWEIGHT Y -1
78. MEMBER LOAD
79. 7 8 18 21 25 TO 27 32 TO 36 UNI GY -29.52
80. FLOOR LOAD
81. YRANGE 3 6 FLOAD -8.39 GY
82. MEMBER LOAD
83. 9 10 20 22 23 37 TO 39 41 UNI GY -2.16
84. LOAD 4 LOADTYPE NONE TITLE LOAD CASE 4
85. FLOOR LOAD

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 3 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 21/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 4

86. YRANGE 3 6 FLOAD -1 GY


87. LOAD 5 LOADTYPE NONE TITLE LOAD CASE 5
88. WIND LOAD X 1 TYPE 1 YR 1 6
89. LOAD 6 LOADTYPE NONE TITLE LOAD CASE 6
90. WIND LOAD -X 1 TYPE 2 YR 1 6
91. LOAD 7 LOADTYPE NONE TITLE LOAD CASE 7
92. WIND LOAD Z 1 TYPE 1 YR 1 6 ZR 0 1
93. LOAD 8 LOADTYPE NONE TITLE LOAD CASE 8
94. WIND LOAD -Z 1 TYPE 2 YR 1 6 ZR 1 9
95. **SERVICE STRESS DESIGN LOAD COMBINATIONS
96. LOAD COMB 101 COMBINATION LOAD CASE 101
97. 3 1.0 4 1.0
98. LOAD COMB 102 COMBINATION LOAD CASE 102
99. 3 1.0 4 0.75 5 0.75
100. LOAD COMB 103 COMBINATION LOAD CASE 103
101. 3 1.0 4 1.0 6 0.75
102. LOAD COMB 104 COMBINATION LOAD CASE 104
103. 3 1.0 4 1.0 7 0.75
104. LOAD COMB 105 COMBINATION LOAD CASE 105
105. 3 1.0 4 1.0 8 0.75
106. LOAD COMB 106 COMBINATION LOAD CASE 106
107. 3 1.0 4 1.0 5 1.0
108. LOAD COMB 107 COMBINATION LOAD CASE 107

109. 3 1.0 4 1.0 6 1.0


110. LOAD COMB 108 COMBINATION LOAD CASE 108
111. 3 1.0 4 1.0 7 1.0
112. LOAD COMB 109 COMBINATION LOAD CASE 109
113. 3 1.0 4 1.0 8 1.0
114. LOAD COMB 110 COMBINATION LOAD CASE 110
115. 3 1.0 4 0.75 5 0.53
116. LOAD COMB 111 COMBINATION LOAD CASE 111
117. 3 1.0 4 1.0 6 0.53
118. LOAD COMB 112 COMBINATION LOAD CASE 112
119. 3 1.0 4 1.0 7 0.53
120. LOAD COMB 113 COMBINATION LOAD CASE 113
121. 3 1.0 4 1.0 8 0.53
122. LOAD COMB 114 COMBINATION LOAD CASE 114
123. 3 0.6 5 1.0
124. LOAD COMB 115 COMBINATION LOAD CASE 115
125. 3 0.6 6 1.0
126. LOAD COMB 116 COMBINATION LOAD CASE 116

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 4 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 22/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 5

127. 3 0.6 7 1.0


128. LOAD COMB 117 COMBINATION LOAD CASE 117
129. 3 0.6 8 1.0
130. LOAD COMB 118 COMBINATION LOAD CASE 118
131. 3 1.0 4 0.75 1 1.0
132. LOAD COMB 119 COMBINATION LOAD CASE 119
133. 3 1.0 4 0.75 2 1.0
134. LOAD COMB 120 COMBINATION LOAD CASE 120
135. 3 0.6 1 0.7
136. LOAD COMB 121 COMBINATION LOAD CASE 121
137. 3 0.6 2 0.7
138. **STRENGTH DESIGN LOAD COMBINATIONS
139. LOAD COMB 201 COMBINATION LOAD CASE 201
140. 3 1.4
141. LOAD COMB 202 COMBINATION LOAD CASE 202
142. 3 1.2 4 1.6
143. LOAD COMB 203 COMBINATION LOAD CASE 203
144. 3 1.2 4 1.6 5 0.8
145. LOAD COMB 204 COMBINATION LOAD CASE 204
146. 3 1.2 4 1.6 6 0.8
147. LOAD COMB 205 COMBINATION LOAD CASE 205
148. 3 1.2 4 1.6 7 0.8
149. LOAD COMB 206 COMBINATION LOAD CASE 206

150. 3 1.2 4 1.6 8 0.8


151. LOAD COMB 207 COMBINATION LOAD CASE 207
152. 3 1.2 4 0.5 5 1.6
153. LOAD COMB 208 COMBINATION LOAD CASE 208
154. 3 1.2 4 0.5 6 1.6
155. LOAD COMB 209 COMBINATION LOAD CASE 209
156. 3 1.2 4 0.5 7 1.6
157. LOAD COMB 210 COMBINATION LOAD CASE 210
158. 3 1.2 4 0.5 8 1.6
159. LOAD COMB 211 COMBINATION LOAD CASE 211
160. 3 1.2 4 1.0 1 1.0
161. LOAD COMB 212 COMBINATION LOAD CASE 212
162. 3 1.2 4 1.0 2 1.0
163. LOAD COMB 213 COMBINATION LOAD CASE 213
164. 3 0.9 5 1.6
165. LOAD COMB 214 COMBINATION LOAD CASE 214
166. 3 0.9 6 1.6
167. LOAD COMB 215 COMBINATION LOAD CASE 215
168. 3 0.9 7 1.6
169. LOAD COMB 216 COMBINATION LOAD CASE 216
170. 3 0.9 8 1.6
171. LOAD COMB 217 COMBINATION LOAD CASE 217
172. 3 0.9 1 1.0
173. LOAD COMB 218 COMBINATION LOAD CASE 218
174. 3 0.9 2 1.0
175. PERFORM ANALYSIS

176. LOAD LIST 101 TO 121 201 TO 218

177. START CONCRETE DESIGN

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 5 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 23/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 6

178. CODE ACI


179. FC 28000 ALL
180. FYMAIN 420000 ALL
181. FYSEC 420000 ALL
182. MAXMAIN 25 ALL
183. MINMAIN 16 ALL
184. MINSEC 10 ALL
185. REINF 0 MEMB 1 TO 6 12 TO 16 28 TO 31 40
186. RHOMN 0.01 MEMB 1 TO 6 12 TO 16 28 TO 31 40
187. TRACK 0 ALL
188. DESIGN COLUMN 1 TO 6 12 TO 16 28 TO 31 40

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 6 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 24/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 7

====================================================================

COLUMN NO. 1 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 2 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 3 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


AREA OF STEEL REQUIRED = 1911.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 25 MM 1.603 201 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 7 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 25/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 8

====================================================================

COLUMN NO. 4 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 5 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 6 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


AREA OF STEEL REQUIRED = 1568.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

8 - 16 MM 1.313 207 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 256.00 MM

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 8 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 26/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 9

====================================================================

COLUMN NO. 12 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 13 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


AREA OF STEEL REQUIRED = 1911.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 25 MM 1.603 201 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 14 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 9 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 27/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 10

====================================================================

COLUMN NO. 15 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 16 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


AREA OF STEEL REQUIRED = 1911.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 25 MM 1.603 209 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 256.00 MM

====================================================================

COLUMN NO. 28 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 10 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 28/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 11

====================================================================

COLUMN NO. 29 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 30 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

====================================================================

COLUMN NO. 31 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 11 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 29/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 12

====================================================================

COLUMN NO. 40 DESIGN PER ACI 318-05 - AXIAL + BENDING

FY - 420.0 FC - 28.0 MPA, SQRE SIZE - 350.0 X 350.0 MMS, TIED


ONLY MINIMUM STEEL IS REQUIRED.
AREA OF STEEL REQUIRED = 1225.0 SQ. MM

BAR CONFIGURATION REINF PCT. LOAD LOCATION PHI


----------------------------------------------------------

4 - 20 MM 1.026 101 END 0.650


(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER 10 SPACING 320.00 MM

********************END OF COLUMN DESIGN RESULTS********************

189. DESIGN BEAM 7 TO 10 17 TO 27 32 TO 39 41

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 12 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 30/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 13

=====================================================================

BEAM NO. 7 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 5750. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 0. 4235. YES NO


2 744. 2 - 16MM 0. 1076. YES NO
3 744. 4 - 16MM 3286. 5750. NO YES

B E A M N O. 7 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 53.69 KNS Vc= 235.06 KNS Vs= 0.00 KNS
Tu= 3.27 KN-MET Tc= 6.5 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 92.35 KNS Vc= 161.51 KNS Vs= 0.00 KNS
Tu= 3.27 KN-MET Tc= 6.5 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 372. MM C/C FOR 2133. MM

___ 7J____________________ 5750X 250X 800_____________________ 8J____ 


||============= ================================||
| 2No16 H 744. 0.TO 1076 4No16|H 744.3286.TO 5750 |
| | | | |
| | | | 7*10c/c372 |
| | | | |
| 2No16 H 56. 0.TO 4235 | | | |
||====================================================== |
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ 
|oo | |oo | |oo | | | | | | | | | |ooo| |ooo| |ooo| |ooo| |ooo|
| 2#16| 2#16| 2#16| | | | | | | | | 4#16| 4#16| 4#16| 4#16 | 4#1
| | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | |
| 2#16| 2#16| 2#16| 2#16| 2#16| 2#16| 2#16| 2#16| 2#16| | | | | |
|oo | |oo | |oo | |oo | |oo | |oo | |oo | |oo | |oo | | | | | | |
|___| |___| |___| |___| |___| |___| |___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 13 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 31/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 14

=====================================================================

BEAM NO. 8 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2750. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 58. 3 - 20MM 685. 2750. NO YES


2 739. 2 - 25MM 0. 2106. YES NO

B E A M N O. 8 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 203.31 KNS Vc= 186.64 KNS Vs= 84.44 KNS

Tu= 19.19 KN-MET Tc= 6.9 KN-MET Ts= 25.6 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR SHEAR AND TORSION.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 178. MM C/C FOR 633. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 5.38 SQ.CM.

AT END SUPPORT - Vu= 142.63 KNS Vc= 169.19 KNS Vs= 20.98 KNS
Tu= 19.19 KN-MET Tc= 6.9 KN-MET Ts= 25.6 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR SHEAR AND TORSION.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 633. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 5.38 SQ.CM.

___ 8J____________________ 2749X 250X 800_____________________ 19J____ 


||========================================================= |
| 2No25 H 739. 0.TO 2106 | |
| | | |
| 5*10c/c178 | | 4*10c/c219 |
| | | |
| 3No20 H 58. 685.TO 2750 | |
| =========================================================||
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ 
|oo | |oo | |oo | |oo | |oo | |oo | |oo | |oo | |oo | | | | | | |
| 2#25| 2#25| 2#25| 2#25| 2#25| 2#25| 2#25| 2#25| 2#25| | | | | |
| | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | 3#20| 3#20| 3#20| 3#20| 3#20| 3#20| 3#20| 3#20 | 3#2
| | | | | | |ooo| |ooo| |ooo| |ooo| |ooo| |ooo| |ooo| |ooo| |ooo|

|___| |___| |___| |___| |___| |___| |___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 14 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 32/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 15

=====================================================================

BEAM NO. 9 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 5750. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 0. 4700. YES NO


2 444. 2 - 16MM 0. 1076. YES NO
3 444. 4 - 16MM 3956. 5750. NO YES

B E A M N O. 9 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 43.65 KNS Vc= 240.43 KNS Vs= 0.00 KNS
Tu= 3.03 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 63.42 KNS Vc= 134.71 KNS Vs= 0.00 KNS
Tu= 3.03 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 222. MM C/C FOR 2433. MM

___ 2J____________________ 5750X 350X 500_____________________ 4J____ 


| |
||============= =======================||
| 2No16 H 444. 0.TO 1076 4No16|H 444.3956.TO 5750 |
| | | | 12*10c/c222 |
| 3No16 H 56. 0.TO 4700 | | | | |
||============================================================= |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | | | | | | | oooo | | oooo |
| 2#16 | | | | | | | | 4#16 | | 4#16 |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| ooo | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 15 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 33/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 16

=====================================================================

BEAM NO. 10 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 5750. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 820. 5169. NO NO


2 444. 4 - 16MM 0. 1555. YES NO
3 444. 2 - 16MM 4435. 5750. NO YES

B E A M N O. 10 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 63.71 KNS Vc= 134.32 KNS Vs= 0.00 KNS
Tu= 2.09 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 222. MM C/C FOR 2433. MM

AT END SUPPORT - Vu= 43.36 KNS Vc= 185.99 KNS Vs= 0.00 KNS
Tu= 2.09 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.

___ 4J____________________ 5750X 350X 500_____________________ 6J____ 


| |
||=================== =================||
| 4No16 H 444.| 0.TO 1555 2No16 H 444.4435.TO 5750 |
| 12*10c/c222 | | | |
| 3No16 H 56. 820.TO 5169 |
| =========================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oooo | | oooo | | | | | | oo | | oo |
| 4#16 | | 4#16 | | | | | | 2#16 | | 2#16 |
| | | | | | | | | | | |
| | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 16 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 34/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 17

=====================================================================

BEAM NO. 17 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2900. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 0. 2900. YES YES


2 744. 2 - 16MM 0. 1322. YES NO

B E A M N O. 17 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 25.46 KNS Vc= 222.33 KNS Vs= 0.00 KNS

Tu= 4.17 KN-MET


Tc= 6.4 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 18.78 KNS Vc= 157.95 KNS Vs= 0.00 KNS
Tu= 4.17 KN-MET Tc= 6.4 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.

___ 16J____________________ 2900X 250X 800_____________________ 27J____ 


||================================= |
| 2No16 H 744. 0.TO 1322 |
| |
| |
| |
| 2No16 H 56. 0.TO 2900 |
||=========================================================================||
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
|oo | |oo | |oo | | | | | | |
| 2#16 | 2#16 | 2#16 | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| 2#16 | 2#16 | 2#16 | 2#16 | 2#16 | 2#1
|oo | |oo | |oo | |oo | |oo | |oo |
|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 17 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 35/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 18

=====================================================================

BEAM NO. 18 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2750. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 58. 3 - 20MM 447. 2750. NO YES


2 742. 3 - 20MM 0. 2006. YES NO

B E A M N O. 18 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 174.21 KNS Vc= 190.98 KNS Vs= 41.30 KNS

Tu= 22.75 KN-MET Tc= 6.8 KN-MET Ts= 30.3 KN-MET LOAD 209
STIRRUPS ARE REQUIRED FOR SHEAR AND TORSION.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 183. MM C/C FOR 633. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 6.38 SQ.CM.

AT END SUPPORT - Vu= 122.20 KNS Vc= 168.30 KNS Vs= 0.00 KNS
Tu= 22.75 KN-MET Tc= 6.8 KN-MET Ts= 30.3 KN-MET LOAD 209
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 216. MM C/C FOR 633. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 6.38 SQ.CM.

___ 17J____________________ 2749X 250X 800_____________________ 20J____ 


||====================================================== |
| 3No20 H 742.| 0.TO 2006| |
| | | | |
| 5*10c/c183 | | | 4*10c/c216 |
| | | | |
| 3No20 H| 58. 447.TO 2750 |
| ===============================================================||
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
|ooo| |ooo| |ooo| |ooo| | | | |
| 3#20 | 3#20 | 3#20 | 3#20 | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | 3#20 | 3#20 | 3#20 | 3#20 | 3#2

| | |ooo| |ooo| |ooo| |ooo| |ooo|


|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 18 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 36/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 19

=====================================================================

BEAM NO. 19 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2900. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 0. 2900. YES YES


2 444. 2 - 16MM 0. 1080. YES NO

B E A M N O. 19 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 55.33 KNS Vc= 193.76 KNS Vs= 0.00 KNS

Tu= 4.01 KN-MET


Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 0.68 KNS Vc= 129.75 KNS Vs= 0.00 KNS
Tu= 4.01 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.

___ 11J____________________ 2900X 350X 500_____________________ 28J____ 


| |
||=========================== |
| 2No16 H 444. 0.TO 1080 |
| |
| 3No16 H 56. 0.TO 2900 |
||=========================================================================||
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | oo | | | | | | | | |
| 2#16 | | 2#16 | | | | | | | | |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 |
| ooo | | ooo | | ooo | | ooo | | ooo | | ooo |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 19 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 37/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 20

=====================================================================

BEAM NO. 20 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 5750. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 829. 5160. NO NO


2 444. 4 - 16MM 0. 2034. YES NO
3 444. 2 - 16MM 4435. 5750. NO YES

B E A M N O. 20 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 64.44 KNS Vc= 134.00 KNS Vs= 0.00 KNS
Tu= 1.96 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 222. MM C/C FOR 2433. MM

AT END SUPPORT - Vu= 42.63 KNS Vc= 191.59 KNS Vs= 0.00 KNS
Tu= 1.96 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.

___ 13J____________________ 5750X 350X 500_____________________ 15J____ 


| |
||========================= =================||
| 4No16 H 444.| 0.TO 2034| 2No16 H 444.4435.TO 5750 |
| 12*10c/c222 | | | | | |
| 3No16 H 56.|829.TO 5160 |
| =========================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oooo | | oooo | | | | | | oo | | oo |
| 4#16 | | 4#16 | | | | | | 2#16 | | 2#16 |
| | | | | | | | | | | |
| | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 20 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 38/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 21

=====================================================================

BEAM NO. 21 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 6000. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 0. 5426. YES NO


2 744. 3 - 16MM 0. 1097. YES NO
3 744. 3 - 16MM 4153. 6000. NO YES

B E A M N O. 21 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 74.43 KNS Vc= 293.13 KNS Vs= 0.00 KNS
Tu= 0.80 KN-MET Tc= 6.6 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 85.55 KNS Vc= 220.32 KNS Vs= 0.00 KNS
Tu= 0.93 KN-MET Tc= 6.7 KN-MET Ts= 0.0 KN-MET LOAD 108
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 372. MM C/C FOR 2258. MM

___ 7J____________________ 6000X 250X 800_____________________ 16J____ 


||============ =======================||
| 3No16 H 744. 0.TO 1097 3No16 H 744.4153.TO 6000 |
| | | | |
| | | 8*10c/c372 |
| | | | |
| 3No16 H 56. 0.TO 5426 | | | |
||=================================================================== |
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
|ooo| | | | | | | |ooo| |ooo|
| 3#16 | | | | | | | 3#16 | 3#1
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| 3#16 | 3#16 | 3#16 | 3#16 | 3#16 | |
|ooo| |ooo| |ooo| |ooo| |ooo| | |
|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 21 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 39/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 22

=====================================================================

BEAM NO. 22 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 6000. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 0. 5410. YES NO


2 444. 2 - 16MM 0. 1097. YES NO
3 444. 3 - 16MM 4153. 6000. NO YES

B E A M N O. 22 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 53.02 KNS Vc= 187.06 KNS Vs= 0.00 KNS
Tu= 0.67 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 62.42 KNS Vc= 138.95 KNS Vs= 0.00 KNS
Tu= 0.67 KN-MET Tc= 6.0 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 222. MM C/C FOR 2558. MM

___ 2J____________________ 6000X 350X 500_____________________ 11J____ 


| |
||============ =======================||
| 2No16 H 444. 0.TO 1097 3No16|H 444.4153.TO 6000 |
| | | | 13*10c/c222 |
| 3No16 H 56. 0.TO 5410 | | | | | | |
||=================================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | | | | | | | ooo | | ooo |
| 2#16 | | | | | | | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 | | |
| ooo | | ooo | | ooo | | ooo | | ooo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 22 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 40/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 23

=====================================================================

BEAM NO. 23 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 6000. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 58. 2 - 20MM 0. 5563. YES NO


2 444. 2 - 16MM 0. 1097. YES NO
3 444. 3 - 16MM 4653. 6000. NO YES

B E A M N O. 23 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 74.82 KNS Vc= 168.61 KNS Vs= 0.00 KNS
Tu= 0.20 KN-MET Tc= 6.1 KN-MET Ts= 0.0 KN-MET LOAD 201
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 221. MM C/C FOR 2558. MM

AT END SUPPORT - Vu= 61.58 KNS Vc= 147.98 KNS Vs= 0.00 KNS
Tu= 0.07 KN-MET Tc= 6.1 KN-MET Ts= 0.0 KN-MET LOAD 104
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 221. MM C/C FOR 2558. MM

___ 6J____________________ 6000X 350X 500_____________________ 15J____ 


| |
||============ =================||
| 2No16 H 444. 0.TO 1097 3No16 H 444.4653.TO 6000 |
| 13*10c/c221 | 13*10c/c221 |
| 2No20 H 58. 0.TO 5563 | | | | |
||===================================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | | | | | | | ooo | | ooo |
| 2#16 | | | | | | | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| 2#20 | | 2#20 | | 2#20 | | 2#20 | | 2#20 | | |
| oo | | oo | | oo | | oo | | oo | | |

| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 23 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 41/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 24

=====================================================================

BEAM NO. 24 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 6000. MM FY - 420. FC - 28. MPA, SIZE - 350. X 600. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 61. 2 - 25MM 0. 6000. YES YES


2 544. 2 - 16MM 0. 597. YES NO
3 544. 3 - 16MM 4653. 6000. NO YES

B E A M N O. 24 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 90.41 KNS Vc= 215.90 KNS Vs= 0.00 KNS
Tu= 0.47 KN-MET Tc= 7.9 KN-MET Ts= 0.0 KN-MET LOAD 104
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 270. MM C/C FOR 2458. MM

AT END SUPPORT - Vu= 120.05 KNS Vc= 285.48 KNS Vs= 0.00 KNS
Tu= 0.86 KN-MET Tc= 7.8 KN-MET Ts= 0.0 KN-MET LOAD 201
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 270. MM C/C FOR 2458. MM

___ 4J____________________ 6000X 350X 600_____________________ 13J____ 


| |
||====== =================||
| 2No16 H 544. 0.TO 597 3No16 H|544.4653.TO|6000 |
| 11*10c/c270 | 11*10c/c270 | |
| 2No25 H 61. 0.TO 6000 | | | | | |
||=========================================================================||
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | | | | | | | ooo | | ooo |
| 2#16 | | | | | | | | 3#16 | | 3#16 |
| | | | | | | | | | | |
| 2#25 | | 2#25 | | 2#25 | | 2#25 | | 2#25 | | 2#25 |
| oo | | oo | | oo | | oo | | oo | | oo |

| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 24 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 42/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 25

=====================================================================

BEAM NO. 25 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 3000. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 58. 3 - 20MM 0. 2826. YES NO


2 744. 3 - 16MM 1528. 3000. NO YES

B E A M N O. 25 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 72.43 KNS Vc= 159.69 KNS Vs= 0.00 KNS

Tu= 8.21 KN-MET Tc= 6.9 KN-MET Ts= 10.9 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 758. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.30 SQ.CM.

AT END SUPPORT - Vu= 145.09 KNS Vc= 300.89 KNS Vs= 0.00 KNS
Tu= 8.21 KN-MET Tc= 6.9 KN-MET Ts= 10.9 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 758. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.30 SQ.CM.

___ 19J____________________ 3000X 250X 800_____________________ 9J____ 


| =====================================||
| 3No16 H 744.1528.TO 3000 | |
| | | | | |
| 5*10c/c219 | | 5*10c/c219 |
| | | | | |
| 3No20 H 58. 0.TO 2826 | | | | |
||====================================================================== |
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
| | | | | | |ooo| |ooo| |ooo|
| | | | | | | 3#16 | 3#16 | 3#1
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |

| 3#20 | 3#20 | 3#20 | 3#20 | 3#20 | |


|ooo| |ooo| |ooo| |ooo| |ooo| | |
|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 25 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 43/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 26

=====================================================================

BEAM NO. 26 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 3000. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 58. 3 - 20MM 0. 2834. YES NO


2 744. 3 - 16MM 1528. 3000. NO YES

B E A M N O. 26 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 65.06 KNS Vc= 159.82 KNS Vs= 0.00 KNS

Tu= 8.13 KN-MET Tc= 6.8 KN-MET Ts= 10.8 KN-MET LOAD 209
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 758. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.28 SQ.CM.

AT END SUPPORT - Vu= 127.34 KNS Vc= 298.45 KNS Vs= 0.00 KNS
Tu= 8.13 KN-MET Tc= 6.8 KN-MET Ts= 10.8 KN-MET LOAD 209
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 758. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.28 SQ.CM.

___ 20J____________________ 3000X 250X 800_____________________ 18J____ 


| =====================================||
| 3No16 H 744.1528.TO 3000 | |
| | | | | |
| 5*10c/c219 | | 5*10c/c219 |
| | | | | |
| 3No20 H 58. 0.TO 2834 | | | | |
||====================================================================== |
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
| | | | | | |ooo| |ooo| |ooo|
| | | | | | | 3#16 | 3#16 | 3#1
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |

| 3#20 | 3#20 | 3#20 | 3#20 | 3#20 | |


|ooo| |ooo| |ooo| |ooo| |ooo| | |
|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 26 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 44/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 27

=====================================================================

BEAM NO. 27 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 6000. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 4 - 16MM 0. 6000. YES YES


2 744. 2 - 16MM 0. 597. YES NO
3 744. 2 - 16MM 5153. 6000. NO YES

B E A M N O. 27 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 77.43 KNS Vc= 163.20 KNS Vs= 0.00 KNS
Tu= 0.02 KN-MET Tc= 6.3 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 372. MM C/C FOR 2258. MM

AT END SUPPORT - Vu= 77.17 KNS Vc= 163.20 KNS Vs= 0.00 KNS
Tu= 0.02 KN-MET Tc= 6.3 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 372. MM C/C FOR 2258. MM

___ 19J____________________ 6000X 250X 800_____________________ 20J____ 


||====== ==========||
| 2No16|H 744. 0.TO 597 2No16 H 744.5153.TO 6000 |
| | | | | |
| 8*10c/c372 8*10c/c372| |
| | | | | |
| 4No16|H 56. 0.TO 6000 | | |
||=========================================================================||
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
|oo | | | | | | | | | |oo |
| 2#16 | | | | | | | | | 2#1
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| 4#16 | 4#16 | 4#16 | 4#16 | 4#16 | 4#1

|ooo| |ooo| |ooo| |ooo| |ooo| |ooo|


|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 27 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 45/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 28

=====================================================================

BEAM NO. 32 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2900. MM FY - 420. FC - 28. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 0. 2655. YES NO


2 344. 2 - 16MM 0. 1080. YES NO
3 344. 2 - 16MM 1458. 2900. NO YES

B E A M N O. 32 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 35.48 KNS Vc= 84.71 KNS Vs= 0.00 KNS
Tu= 0.44 KN-MET Tc= 2.6 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 172. MM C/C FOR 1108. MM

AT END SUPPORT - Vu= 35.17 KNS Vc= 86.04 KNS Vs= 0.00 KNS
Tu= 0.44 KN-MET Tc= 2.6 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 172. MM C/C FOR 1108. MM

___ 23J____________________ 2900X 250X 400_____________________ 26J____ 


| |
||=========================== =====================================||
| 2No16|H 344. 0.TO 1080 | 2No16 H 344.1458.TO 2900 | |
| 8*10c/c172 | | | | | | | 8*10c/c172 |
| 2No16|H 56. 0.TO 2655 | | | | | | | |
||==================================================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | oo | | | | oo | | oo | | oo |
| 2#16 | | 2#16 | | | | 2#16 | | 2#16 | | 2#16 |
| | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | |
| oo | | oo | | oo | | oo | | oo | | |

| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 28 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 46/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 29

=====================================================================

BEAM NO. 33 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2250. MM FY - 420. FC - 28. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 201. 1393. NO NO


2 344. 2 - 16MM 0. 1347. YES NO
3 344. 2 - 16MM 810. 2250. NO YES

B E A M N O. 33 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 13.99 KNS Vc= 76.37 KNS Vs= 0.00 KNS
Tu= 0.31 KN-MET Tc= 2.6 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 35.94 KNS Vc= 72.78 KNS Vs= 0.00 KNS
Tu= 0.31 KN-MET Tc= 2.6 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 172. MM C/C FOR 783. MM

___ 23J____________________ 2250X 250X 400_____________________ 16J____ 


| |
||=========================================================================||
| 2No16 H 344. 0.TO 1347 2No16 H 344. 810.TO 2250 |
| | 6*10c/c172 |
| 2No16 H 56. 201.TO 1393 | |
| ========================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | oo | | oo | | oo | | oo | | oo |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 |
| | | | | | | | | | | |
| | | 2#16 | | 2#16 | | 2#16 | | | | |
| | | oo | | oo | | oo | | | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 29 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 47/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 30

=====================================================================

BEAM NO. 34 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2850. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 0. 1251. YES NO


2 744. 4 - 16MM 282. 2850. NO YES

B E A M N O. 34 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 42.69 KNS Vc= 165.26 KNS Vs= 0.00 KNS

Tu= 7.39 KN-MET Tc= 6.4 KN-MET Ts= 9.9 KN-MET LOAD 209
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 683. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.07 SQ.CM.

AT END SUPPORT - Vu= 98.81 KNS Vc= 159.66 KNS Vs= 0.00 KNS
Tu= 7.39 KN-MET Tc= 6.4 KN-MET Ts= 9.9 KN-MET LOAD 209
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 219. MM C/C FOR 683. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.07 SQ.CM.

___ 27J____________________ 2850X 250X 800_____________________ 17J____ 


| ====================================================================||
| 4No16 H 744.|282.TO 2850 |
| | | | | |
| 5*10c/c219 | | | 5*10c/c219 |
| | | | | |
| 2No16 H 56.| 0.TO 1251| |
||================================ |
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
| | |ooo| |ooo| |ooo| |ooo| |ooo|
| | | 4#16 | 4#16 | 4#16 | 4#16 | 4#1
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |

| 2#16 | 2#16 | 2#16 | | | | | |


|oo | |oo | |oo | | | | | | |
|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 30 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 48/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 31

=====================================================================

BEAM NO. 35 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2250. MM FY - 420. FC - 28. MPA, SIZE - 250. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 0. 1855. YES NO


2 344. 2 - 16MM 0. 597. YES NO
3 344. 2 - 16MM 810. 2250. NO YES

B E A M N O. 35 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 18.32 KNS Vc= 75.29 KNS Vs= 0.00 KNS
Tu= 0.63 KN-MET Tc= 2.5 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.
AT END SUPPORT - Vu= 31.60 KNS Vc= 76.90 KNS Vs= 0.00 KNS
Tu= 0.63 KN-MET Tc= 2.5 KN-MET Ts= 0.0 KN-MET LOAD 101
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 172. MM C/C FOR 783. MM

___ 27J____________________ 2250X 250X 400_____________________ 26J____ 


| |
||=================== ================================================||
| 2No16 H 344. 0.TO 597 2No16 H 344. 810.TO 2250 | | |
| | | | 6*10c/c172 |
| 2No16 H 56. 0.TO 1855 | | | | |
||============================================================= |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ _________ 
| | | | | | | | | | | |
| oo | | oo | | oo | | oo | | oo | | oo |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 |
| | | | | | | | | | | |
| 2#16 | | 2#16 | | 2#16 | | 2#16 | | 2#16 | | |
| oo | | oo | | oo | | oo | | oo | | |
| | | | | | | | | | | |
|_________| |_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 31 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 49/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 32

=====================================================================

BEAM NO. 36 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 6000. MM FY - 420. FC - 28. MPA, SIZE - 250. X 800. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 58. 2 - 20MM 0. 5556. YES NO


2 744. 3 - 16MM 0. 1097. YES NO
3 744. 3 - 16MM 4153. 6000. NO YES

B E A M N O. 36 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 81.06 KNS Vc= 207.94 KNS Vs= 0.00 KNS
Tu= 0.27 KN-MET Tc= 6.8 KN-MET Ts= 0.0 KN-MET LOAD 209
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 371. MM C/C FOR 2258. MM

AT END SUPPORT - Vu= 77.11 KNS Vc= 293.87 KNS Vs= 0.00 KNS
Tu= 0.09 KN-MET Tc= 6.6 KN-MET Ts= 0.0 KN-MET LOAD 101
STIRRUPS ARE NOT REQUIRED.

___ 9J____________________ 6000X 250X 800_____________________ 18J____ 


||============ =======================||
| 3No16|H 744. 0.TO 1097 3No16 H 744.4153.TO 6000 |
| | | | |
| 8*10c/c371 |
| | | | |
| 2No20|H 58. 0.TO 5556 |
||===================================================================== |
|___________________________________________________________________________|
___ ___ ___ ___ ___ ___ 
|ooo| | | | | | | |ooo| |ooo|
| 3#16 | | | | | | | 3#16 | 3#1
| | | | | | | | | | | |
| | | | | | | | | | | |
| | | | | | | | | | | |
| 2#20 | 2#20 | 2#20 | 2#20 | 2#20 | |
|oo | |oo | |oo | |oo | |oo | | |
|___| |___| |___| |___| |___| |___|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 32 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 50/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 33

=====================================================================

BEAM NO. 37 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2250. MM FY - 420. FC - 28. MPA, SIZE - 300. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 1720. 2250. NO YES


2 344. 3 - 16MM 0. 2250. YES YES

B E A M N O. 37 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 36.87 KNS Vc= 86.44 KNS Vs= 0.00 KNS

Tu= 7.17 KN-MET Tc= 3.4 KN-MET Ts= 9.6 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 132. MM C/C FOR 783. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.11 SQ.CM.

AT END SUPPORT - Vu= 12.83 KNS Vc= 90.19 KNS Vs= 0.00 KNS
Tu= 7.17 KN-MET Tc= 3.4 KN-MET Ts= 9.6 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 132. MM C/C FOR 783. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.11 SQ.CM.

___ 11J____________________ 2250X 300X 400_____________________ 22J____ 


| |
||=========================================================================||
| 3No16 H 344. 0.TO 2250 | | | | |
| 7*10c/c132 | 7*10c/c132 | |
| 2No16 H |56.1720.TO 2250 |
| =================||
| |
|___________________________________________________________________________|
___________ ___________ ___________ ___________ ___________ 
| | | | | | | | | |
| ooo | | ooo | | ooo | | ooo | | ooo |
| 3#16 | | 3#16 | | 3#16 | | 3#16 | | 3#16 |
| | | | | | | | | |
| | | | | | | | | 2#16 |

| | | | | | | | | oo |
| | | | | | | | | |
|___________| |___________| |___________| |___________| |___________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 33 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 51/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 34

=====================================================================

BEAM NO. 38 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2850. MM FY - 420. FC - 28. MPA, SIZE - 350. X 500. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 3 - 16MM 0. 1813. YES NO


2 444. 4 - 16MM 947. 2850. NO YES

B E A M N O. 38 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 35.09 KNS Vc= 132.07 KNS Vs= 0.00 KNS

Tu= 9.04 KN-MET Tc= 6.0 KN-MET Ts= 12.1 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 169. MM C/C FOR 983. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.10 SQ.CM.

AT END SUPPORT - Vu= 88.16 KNS Vc= 134.75 KNS Vs= 0.00 KNS
Tu= 9.04 KN-MET Tc= 6.0 KN-MET Ts= 12.1 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 169. MM C/C FOR 983. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.10 SQ.CM.

___ 28J____________________ 2850X 350X 500_____________________ 13J____ 


| |
| ==================================================||
| 4No16 H 444. 947.TO 2850 |
| 7*10c/c169 | | | 7*10c/c169 |
| 3No16 H 56. 0.TO 1813 | | | |
||=============================================== |
| |
|___________________________________________________________________________|
_________ _________ _________ _________ _________ 
| | | | | | | | | |
| | | | | oooo | | oooo | | oooo |
| | | | | 4#16 | | 4#16 | | 4#16 |
| | | | | | | | | |
| 3#16 | | 3#16 | | 3#16 | | | | |

| ooo | | ooo | | ooo | | | | |


| | | | | | | | | |
|_________| |_________| |_________| |_________| |_________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 34 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 52/128
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 53/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 36

=====================================================================

BEAM NO. 41 DESIGN RESULTS - FLEXURE PER CODE ACI 318-05

LEN - 2900. MM FY - 420. FC - 28. MPA, SIZE - 300. X 400. MMS

LEVEL HEIGHT BAR INFO FROM TO ANCHOR 


(MM) (MM) (MM) STA END
_____________________________________________________________________ 

1 56. 2 - 16MM 0. 2835. YES NO


2 344. 2 - 16MM 0. 838. YES NO
3 344. 2 - 16MM 1458. 2900. NO YES

B E A M N O. 41 D E S I G N R E S U L T S - SHEAR 

AT START SUPPORT - Vu= 17.05 KNS Vc= 91.36 KNS Vs= 0.00 KNS
Tu= 5.72 KN-MET Tc= 3.4 KN-MET Ts= 7.6 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 132. MM C/C FOR 1108. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.68 SQ.CM.

AT END SUPPORT - Vu= 20.46 KNS Vc= 159.41 KNS Vs= 0.00 KNS
Tu= 5.72 KN-MET Tc= 3.4 KN-MET Ts= 7.6 KN-MET LOAD 201
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 132. MM C/C FOR 1108. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.68 SQ.CM.

___ 22J____________________ 2900X 300X 400_____________________ 25J____ 


| |
||==================== =====================================||
| 2No16 H 344.| 0.TO 838 |2No16 H|344.1458.TO|2900 | | | |
| 10*10c/c132 | | | | | | | | 10*10c/c132 | |
| 2No16 H |56.| 0.TO 2835 | | | | | | | | | | |
||========================================================================= |
| |
|___________________________________________________________________________|
___________ ___________ ___________ ___________ ___________ 
| | | | | | | | | |
| oo | | oo | | | | oo | | oo |
| 2#16 | | 2#16 | | | | 2#16 | | 2#16 |
| | | | | | | | | |

| 2#16 | | 2#16 | | 2#16 | | 2#16 | | |


| oo | | oo | | oo | | oo | | |
| | | | | | | | | |
|___________| |___________| |___________| |___________| |___________|

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 36 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 54/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 37

********************END OF BEAM DESIGN**************************

190. END CONCRETE DESIGN


191. **UNFACTORED LOAD
192. LOAD LIST 101 TO 121
193. PRINT SUPPORT REACTION ALL

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 37 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 55/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

PRINT SUPPORT REACTIONS


5.0 COMPUTER OUTPUT FILE 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 56/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 38

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1 101 29.15 298.98 47.01 11.42 -0.19 -7.62


102 21.54 292.50 47.22 11.51 -0.20 -2.36
103 27.53 297.47 47.19 11.56 -0.16 -6.34
104 29.09 292.51 37.69 4.81 0.28 -7.46
105 29.09 296.40 44.76 9.62 -0.11 -7.53

106 18.96 292.88 47.18 11.54 -0.22 -0.60


107 26.99 296.97 47.25 11.60 -0.16 -5.92
108 29.07 290.35 34.59 2.61 0.43 -7.40
109 29.07 295.54 44.01 9.02 -0.08 -7.50
110 23.78 293.84 47.18 11.48 -0.20 -3.90
111 28.01 297.91 47.14 11.52 -0.17 -6.72
112 29.11 294.41 40.43 6.75 0.14 -7.51
113 29.11 297.15 45.42 10.15 -0.13 -7.56
114 7.38 168.72 28.57 6 .96 -0.13 2.45
115 15.41 172.81 28.65 7.03 -0.06 -2.86

116 17.50 166.19 15.98 -1.97 0.53 -4.35


117 17.49 171.38 25.40 4.44 0.02 -4.45
118 28.50 296.22 47.16 11.47 -0.17 -7.03
119 29.17 296.22 46.33 10.80 -0.15 -7.61
120 17.09 174.22 28.45 6.88 -0.08 -4.15
121 17.56 174.22 27.87 6.41 -0.07 -4.56
3 101 36.27 537.90 10.32 9.53 0.27 -11.08
102 26.92 533.45 10.08 9.09 0.26 -5.91
103 33.21 537.78 10.26 9.40 0.29 -9.37
104 35.42 532.88 -15.24 -15.80 1.02 -10.72
105 35.89 535.72 7.90 4.64 0.56 -10.91
106 23.80 538.17 10.25 9.37 0.28 -4.19
107 32.19 537.74 10.25 9.36 0.29 -8.80

108 35.14 531.20 -23.76 -24.24 1.27 -10.61

109 35.76 534.99 7.10 3.01 0.66 -10.86


110 29.66 533.39 10.10 9.13 0.26 -7.43

111 34.11 537.82 10.28 9.44 0.28 -9.87


112 35.67 534.35 -7.74 -8.37 0.80 -10.83
113 36.00 536.36 8.61 6.07 0.48 -10.96
114 9.29 311.83 5.68 4.80 0.14 0.25
115 17.67 311.40 5.68 4 .78 0. 15 -4.36
116 20.62 304.86 -28.33 -28.81 1.13 -6.17

117 21.24 308.65 2.53 -1.56 0.52 -6.42


118 34.94 533.22 10.11 9.16 0.26 -10.32
119 36.18 532.59 9.35 7.71 0.31 -11.05
120 20.83 311.55 5.74 4 .92 0. 13 -6.11
121 21.69 311.11 5.20 3 .91 0. 16 -6.62
5 101 -65.07 356.72 55.75 13.97 0.02 13.05
102 -70.22 359.25 55.95 14.02 0.00 16.88
103 -67.31 358.30 55.63 13.88 0.03 14.68
104 -64.65 346.87 43.51 5.69 -1.00 13.07
105 -64.96 352.75 51.92 11.24 -0.30 13.09
106 -71.90 362.74 55.79 14.00 -0.01 18.16

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 38 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 57/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 39

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

107 -68.06 358.83 55.59 13.84 0.04 15.23


108 -64.52 343.59 39.43 2.94 -1.34 13.07
109 -64.92 351.42 50.64 10.33 -0.41 13.10
110 -68.72 357.92 55.94 14.02 0.01 15.76
111 -66.65 357.84 55.66 13.90 0.03 14.20

112 -64.78 349.76 47.10 8.12 -0.70 13.06


113 -64.99 353.91 53.04 12.04 -0.21 13.07
114 -45.94 215.29 33.89 8.49 -0.01 12.94
115 -42.10 211.37 33.69 8.33 0.04 10.01
116 -38.56 196.14 17.53 -2.58 -1.33 7.85
117 -38.97 203.97 28.75 4.82 -0.41 7.88
118 -65.79 355.60 55.87 13.97 0.03 13.64
119 -65.06 353.57 54.99 13.31 -0.05 13.05
120 -39.60 209.87 33.82 8.43 0.03 8.24
121 -39.09 208.45 33.21 7.97 -0.02 7.82

12 101 45.03 536.56 -7.90 -7.01 0.30 -14.40


102 33.74 532.06 -7.82 -6.84 0.30 -8.21
103 42.39 536.50 -7.96 -7.13 0.31 -12.92
104 46.49 536.31 -14.84 -18.71 1.54 -14.76
105 45.68 536.06 -13.89 -14.06 0.50 -14.53
106 30.02 536.95 -7.99 -7.13 0.29 -6.16
107 41.50 536.49 -7.97 -7.17 0.31 -12.43
108 46.98 536.22 -17.15 -22.62 1.96 -14.89
109 45.90 535.89 -15.88 -16.42 0.56 -14.57
110 37.05 531.98 -7.79 -6.82 0.30 -10.02
111 43.16 536.52 -7.94 -7.09 0.30 -13.36
112 46.06 536.38 -12.80 -15.28 1.18 -14.66
113 45.49 536.20 -12.13 -11.99 0.44 -14.49

114 11.94 310.83 -4.47 -3.71 0.18 -0.37

115 23.42 310.37 -4.45 -3.75 0.20 -6.65


116 28.89 310.11 -13.62 -19.19 1.85 -9.10

117 27.81 309.77 -12.36 -12.99 0.45 -8.79


118 43.80 531.77 -7.76 -6.79 0.31 -13.70
119 45.18 531.68 -8.53 -8.16 0.36 -14.43
120 26.10 310.44 -4.38 -3.62 0.19 -8.14
121 27.07 310.38 -4.92 -4.57 0.23 -8.65
14 101 -63.62 356.05 -55.36 -13.64 0.02 11.86

102 -70.03 358.94 -55.51 -13.65 -0.01 16.45


103 -65.69 357.68 -55.48 -13.73 0.03 13.32
104 -64.49 366.90 -66.80 -21.39 -1.19 12.13
105 -64.05 360.58 -59.41 -16.51 -0.28 12.02
106 -72.13 362.52 -55.32 -13.61 -0.01 17.99
107 -66.38 358.22 -55.52 -13.76 0.04 13.81
108 -64.78 370.52 -70.61 -23.97 -1.59 12.21
109 -64.20 362.08 -60.75 -17.46 -0.38 12.07
110 -68.16 357.52 -55.52 -13.66 0.00 15.10
111 -65.08 357.20 -55.45 -13.71 0.03 12.89
112 -64.24 363.72 -63.44 -19.12 -0.84 12.05

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 39 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 58/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 40

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

113 -63.93 359.25 -58.22 -15.67 -0.19 11.97


114 -46.75 215.39 -33.60 -8.24 -0.03 13.24
115 -40.99 211.09 -33.80 -8.40 0.01 9.06
116 -39.40 223.39 -48.89 -18.61 -1.61 7.46
117 -38.81 214.96 -39.03 -12.10 -0.40 7.32

118 -64.29 354.98 -55.58 -13.71 0.02 12.40


119 -63.75 355.38 -56.46 -14.37 -0.06 11.89
120 -38.69 209.55 -33.67 -8.30 0.00 7.49
121 -38.31 209.82 -34.28 -8.76 -0.06 7.13
21 101 17.16 95.36 -3.66 0.17 -0.29 -4.24
102 12.21 87.44 -3.63 0 .24 -0.24 0.95
103 16.59 93.28 -3.64 0.28 -0.25 -3.40
104 17.83 107.06 -6.15 -4.09 -0.01 -5.11
105 17.66 100.58 -4.18 -1.34 -0.07 -4.82
106 10.51 84.79 -3.64 0 .27 -0.22 2.69

107 16.41 92.58 -3.63 0.31 -0.23 -3.12


108 18.06 110.96 -6.98 -5.51 0.09 -5.40
109 17.82 102.33 -4.36 -1.85 0.00 -5.01
110 13.67 89.76 -3.63 0.22 -0.25 -0.58
111 16.76 93.89 -3.64 0.25 -0.26 -3.65
112 17.64 103.63 -5.42 -2.84 -0.09 -4.86
113 17.51 99.05 -4.03 -0.90 -0.14 -4.65
114 3.74 46.66 -2.14 0.19 -0.10 4.36
115 9.64 54.45 -2.13 0 .23 -0.12 -1.45
116 11.29 72.83 -5.48 -5.59 0.21 -3.73
117 11.05 64.19 -2.85 -1.92 0.12 -3.34
118 16.74 94.03 -3.64 0.21 -0.29 -3.63
119 17.28 96.99 -3.73 -0.29 -0.26 -4.36

120 10.07 56.29 -2.15 0.12 -0.17 -2.14

121 10.45 58.36 -2.22 -0.22 -0.15 -2.64


24 101 -16.58 142.26 -6.79 1.55 -0.39 4.07

102 -21.38 149.95 -6.90 1.56 -0.35 9.05


103 -17.17 144.19 -6.89 1.49 -0.34 4.92
104 -15.90 149.05 -10.25 -4.27 -0.19 3.19
105 -16.07 145.58 -11.38 -3.17 -0.19 3.49
106 -22.91 153.36 -7.06 1.45 -0.34 10.70
107 -17.36 144.83 -6.92 1.47 -0.32 5.20

108 -15.67 151.32 -11.41 -6.21 -0.13 2.90


109 -15.90 146.69 -12.91 -4.74 -0.12 3.30
110 -19.98 147.51 -6.84 1.58 -0.36 7.59
111 -16.99 143.62 -6.86 1.50 -0.35 4.67
112 -16.10 147.06 -9.24 -2.57 -0.25 3.45
113 -16.22 144.61 -10.04 -1.79 -0.25 3.66
114 -16.40 94.94 -4.13 1.03 -0.18 9.09
115 -10.85 86.41 -3.98 1.05 -0.15 3.59
116 -9.16 92.90 -8.47 -6.63 0.04 1.29
117 -9.39 88.26 -9.98 -5.16 0.04 1.69
118 -17.09 142.94 -6.74 1.61 -0.38 4.70

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 40 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 59/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 41

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

119 -16.54 142.63 -7.35 0.70 -0.36 3.97


120 -10.39 84.75 -3.89 1.11 -0.22 2.90
121 -10.00 84.54 -4.31 0.48 -0.21 2.39
29 101 17.67 353.32 -39.36 -9.90 -0.33 -6.10
102 7.84 344.68 -39.40 -9.86 -0.32 0.47

103 16.20 351.95 -39.12 -9.74 -0.30 -4.99


104 16.21 345.57 -50.69 -16.58 -0.24 -5.73
105 16.77 349.49 -43.02 -12.15 -0.16 -5.83
106 4.48 345.73 -39.20 -9.78 -0.31 2.67
107 15.72 351.49 -39.04 -9.69 -0.29 -4.62
108 15.72 342.98 -54.46 -18.81 -0.21 -5.60
109 16.47 348.22 -44.24 -12.90 -0.10 -5.75
110 10.75 346.35 -39.43 -9.89 -0.32 -1.46
111 16.63 352.35 -39.19 -9.79 -0.31 -5.31
112 16.63 347.84 -47.37 -14.62 -0.27 -5.84

113 17.03 350.61 -41.95 -11.49 -0.21 -5.91


114 -2.42 197.31 -23.82 -5.94 -0.18 5.09
115 8.81 203.07 -23.66 -5.85 -0.15 -2.19
116 8.82 194.56 -39.08 -14.97 -0.08 -3.18
117 9.57 199.80 -28.86 -9.06 0.03 -3.32
118 17.09 349.50 -39.43 -9.89 -0.32 -5.56
119 17.53 349.21 -40.70 -10.68 -0.31 -6.05
120 10.31 204.30 -23.92 -6.02 -0.19 -3.29
121 10.62 204.09 -24.81 -6.57 -0.18 -3.63

************** END OF LATEST ANALYSIS RESULT **************

194. **FACTORED LOAD


195. LOAD LIST 201 TO 218

196. PRINT SUPPORT REACTION ALL

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 41 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 60/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 42

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1 201 40.99 407.91 66.28 15.96 -0.21 -10.66


202 34.92 361.82 56.28 13.71 -0.24 -9.15
203 26.78 356.94 56.41 13.81 -0.27 -3.54
204 33.20 360.21 56.47 13.86 -0.21 -7.79
205 34.87 354.92 46.34 6.66 0.26 -8.98
206 34.86 359.07 53.88 11.79 -0.15 -9.05
207 18.77 343.69 56.91 13.89 -0.25 2.09
208 31.62 350.23 57.04 13.99 -0.15 -6.41
209 34.95 339.64 36.77 -0.41 0.79 -8.79
210 34.94 347.93 51.84 9.85 -0.03 -8.95
211 34.32 356.40 56.55 13.75 -0.21 -8.55
212 35.00 356.40 55.71 13.09 -0.19 -9.13
213 10.06 252.47 42.88 10.46 -0.19 4.38
214 22.91 259.01 43.00 10.56 -0.09 -4.12
215 26.24 248.42 22.73 -3.84 0.86 -6.50
216 26.23 256.72 37.81 6.42 0.04 -6.66
217 25.67 261.38 42.68 10.31 -0.13 -6.26
218 26.35 261.38 41.84 9.65 -0.11 -6.84
3 201 50.75 726.98 13.42 11.56 0.30 -15.51
202 43.53 652.94 12.67 11.94 0.35 -13.30
203 33.56 653.15 12.62 11.82 0.35 -7.79
204 40.27 652.81 12.62 11.80 0.37 -11.47
205 42.63 647.58 -14.59 -15.07 1.15 -12.92
206 43.12 650.60 10.10 6.73 0.66 -13.12
207 23.57 632.87 11.76 10.29 0.30 -2.27
208 36.98 632.19 11.75 10.27 0.32 -9.64
209 41.70 621.72 -42.66 -43.48 1.89 -12.53
210 42.69 627.78 6.71 0.12 0.91 -12.93
211 42.20 641.74 12.21 11.13 0.32 -12.54

212 43.44 641.10 11.45 9.68 0.36 -13.27


213 12.68 467.78 8.52 7.18 0.21 1.06
214 26.10 467.09 8.51 7 .16 0. 23 -6.31
215 30.82 456.63 -45.90 -46.59 1.80 -9.20
216 31.81 462.68 3.47 -3.00 0.82 -9.60
217 31.30 467.33 8.61 7 .38 0. 20 -9.21
218 32.54 466.69 7.84 5 .94 0. 24 -9.94
5 201 -91.27 488.28 78.98 19.73 0.06 18.26
202 -78.04 431.24 66.63 16.72 0.02 15.66
203 -83.50 436.06 66.66 16.74 -0.01 19.75
204 -80.42 432.93 66.50 16.61 0.03 17.40
205 -77.59 420.74 53.58 7.89 -1.07 15.68
206 -77.91 427.01 62.54 13.80 -0.33 15.70
207 -89.10 432.14 67.43 16.90 -0.02 23.83
208 -82.95 425.88 67.11 16.65 0.06 19.14
209 -77.28 401.50 41.26 -0.81 -2.13 15.70
210 -77.93 414.03 59.20 11.03 -0.65 15.74
211 -78.80 427.34 66.99 16.76 0.03 16.25
212 -78.07 425.31 66.11 16.10 -0.04 15.66

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 42 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 61/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 43

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

213 -69.60 323.53 50.84 12.73 -0.02 19.92


214 -63.45 317.27 50.52 12.48 0.06 15.23
215 -57.79 292.89 24.67 -4.97 -2.13 11.78
216 -58.43 305.42 42.61 6.86 -0.65 11.82
217 -59.36 314.76 50.73 12.65 0.04 12.33
218 -58.64 312.73 49.85 11.99 -0.03 11.74
12 201 62.87 724.36 -10.20 -8.36 0.44 -20.11
202 54.09 651.53 -9.72 -8.82 0.35 -17.29
203 42.08 651.85 -9.80 -8.92 0.34 -10.70
204 51.26 651.47 -9.78 -8.95 0.36 -15.72
205 55.65 651.26 -17.12 -21.31 1.68 -17.68
206 54.78 651.00 -16.11 -16.35 0.56 -17.43
207 29.94 631.09 -9.20 -7.89 0.36 -4.06
208 48.31 630.35 -9.17 -7.95 0.39 -14.10
209 57.07 629.93 -23.85 -32.66 3.03 -18.03
210 55.34 629.39 -21.83 -22.74 0.79 -17.53
211 52.81 640.04 -9.37 -8.25 0.36 -16.58
212 54.20 639.95 -10.14 -9.61 0.42 -17.32
213 16.40 466.29 -6.71 -5.58 0.27 0.26
214 34.77 465.55 -6.68 -5.64 0.30 -9.78
215 43.53 465.13 -21.36 -30.35 2.95 -13.70
216 41.81 464.59 -19.34 -20.43 0.71 -13.21
217 39.22 465.67 -6.57 -5.42 0.29 -12.24
218 40.60 465.57 -7.34 -6.79 0.34 -12.97
14 201 -89.22 487.49 -78.49 -19.30 -0.01 16.59
202 -76.31 430.40 -66.15 -16.31 0.03 14.24
203 -83.12 435.57 -66.12 -16.28 0.01 19.14
204 -78.51 432.14 -66.28 -16.41 0.04 15.80
205 -77.24 441.97 -78.35 -24.57 -1.26 14.52

206 -76.77 435.23 -70.47 -19.37 -0.28 14.40


207 -90.04 432.12 -66.86 -16.42 -0.04 24.03
208 -80.83 425.24 -67.18 -16.67 0.03 17.34
209 -78.28 444.91 -91.32 -33.01 -2.57 14.79
210 -77.34 431.42 -75.55 -22.59 -0.62 14.56
211 -77.01 426.59 -66.62 -16.43 0.02 14.78
212 -76.47 426.98 -67.50 -17.09 -0.06 14.27
213 -70.97 323.73 -50.39 -12.36 -0.05 20.46
214 -61.76 316.86 -50.71 -12.61 0.02 13.78
215 -59.21 336.53 -74.85 -28.94 -2.58 11.23
216 -58.27 323.04 -59.09 -18.53 -0.63 11.00
217 -58.00 314.28 -50.50 -12.44 0.00 11.21
218 -57.46 314.67 -51.38 -13.10 -0.08 10.70
21 201 24.24 133.53 -5.02 0.22 -0.41 -6.00
202 20.53 114.43 -4.41 0.21 -0.35 -5.07
203 15.21 105.97 -4.40 0.29 -0.29 0.48
204 19.93 112.20 -4.40 0.32 -0.30 -4.17
205 21.25 126.91 -7.08 -4.34 -0.05 -6.00
206 21.06 120.00 -4.98 -1.40 -0.12 -5.68

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 43 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 62/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 44

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE

-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

207 10.06 97.54 -4.32 0.35 -0.23 5.97


208 19.50 110.00 -4.31 0.42 -0.26 -3.33
209 22.14 139.40 -9.66 -8.90 0.26 -6.98
210 21.76 125.59 -5.46 -3.03 0.12 -6.35
211 20.16 113.10 -4.37 0.24 -0.34 -4.48
212 20.71 116.06 -4.47 -0.25 -0.31 -5.20
213 4.95 68.93 -3.21 0.29 -0.14 7.23
214 14.38 81.39 -3.19 0.36 -0.17 -2.06
215 17.03 110.80 -8.55 -8.96 0.35 -5.72
216 16.65 96.98 -4.35 -3.09 0.21 -5.08
217 15.13 84.50 -3.23 0.18 -0.26 -3.24
218 15.67 87.46 -3.32 -0.31 -0.23 -3.96
24 201 -23.48 195.62 -9.02 2.63 -0.53 5.74
202 -19.81 171.73 -8.30 1.72 -0.48 4.87
203 -24.88 180.61 -8.50 1.64 -0.44 10.17
204 -20.44 173.78 -8.39 1.66 -0.41 5.77
205 -19.09 178.97 -11.98 -4.48 -0.26 3.93
206 -19.27 175.27 -13.19 -3.31 -0.26 4.25
207 -30.17 186.70 -8.32 1.93 -0.38 15.52
208 -21.29 173.05 -8.10 1.96 -0.34 6.71
209 -18.58 183.43 -15.28 -10.32 -0.04 3.04
210 -18.95 176.02 -17.69 -7.97 -0.03 3.67
211 -20.40 171.52 -8.11 1.90 -0.46 5.51
212 -19.84 171.21 -8.73 0.99 -0.44 4.78
213 -25.23 143.52 -6.21 1.53 -0.26 14.30
214 -16.35 129.87 -5.99 1.56 -0.22 5.50
215 -13.65 140.25 -13.17 -10.72 0.08 1.82
216 -14.01 132.84 -15.58 -8.37 0.09 2.46
217 -15.56 127.07 -5.83 1.67 -0.33 4.31

218 -15.01 126.76 -6.44 0.76 -0.31 3.58


29 201 25.12 478.11 -55.96 -14.14 -0.46 -8.57
202 21.09 428.71 -46.99 -11.80 -0.40 -7.31
203 10.54 422.64 -46.87 -11.70 -0.38 -0.30
204 19.53 427.24 -46.74 -11.63 -0.36 -6.12
205 19.53 420.44 -59.07 -18.93 -0.30 -6.92
206 20.13 424.63 -50.89 -14.20 -0.21 -7.03
207 0.29 403.57 -47.41 -11.82 -0.37 6.69
208 18.27 412.78 -47.15 -11.69 -0.33 -4.96
209 18.28 399.17 -71.82 -26.28 -0.20 -6.54
210 19.48 407.54 -55.46 -16.82 -0.03 -6.77
211 20.61 420.76 -47.27 -11.86 -0.39 -6.78
212 21.05 420.46 -48.54 -12.66 -0.37 -7.27
213 -4.95 295.21 -35.72 -8.89 -0.27 8.52
214 13.03 304.42 -35.46 -8.76 -0.23 -3.13
215 13.03 290.81 -60.13 -23.35 -0.10 -4.71
216 14.23 299.18 -43.77 -13.89 0.07 -4.94
217 15.50 306.49 -35.89 -9.03 -0.29 -4.96
218 15.94 306.19 -37.16 -9.82 -0.27 -5.45

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 44 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 63/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 45

************** END OF LATEST ANALYSIS RESULT **************

197. PRINT JOINT DISPLACEMENTS ALL

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 45 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 64/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

PRINT JOINT DISPLACEMENT 


6.0 COMPUTER OUTPUT FILE 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 65/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 46

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

1 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2 201 -0.0241 -0.0413 -0.0054 0.0016 0.0000 -0.0011
202 -0.0205 -0.0379 -0.0039 0.0015 0.0000 -0.0011
203 0.1314 -0.0374 -0.0083 0.0015 0.0000 -0.0012
204 0.0382 -0.0377 -0.0106 0.0015 0.0000 -0.0011
205 -0.0052 -0.0372 0.1818 0.0017 -0.0001 -0.0011
206 -0.0134 -0.0376 0.0747 0.0016 0.0000 -0.0011
207 0.2832 -0.0351 -0.0131 0.0014 0.0000 -0.0012
208 0.0968 -0.0358 -0.0176 0.0014 0.0000 -0.0011
209 0.0100 -0.0347 0.3672 0.0017 -0.0003 -0.0010
210 -0.0063 -0.0356 0.1529 0.0015 -0.0001 -0.0010
211 0.0101 -0.0369 -0.0066 0.0015 0.0000 -0.0010
212 -0.0194 -0.0369 0.0212 0.0015 0.0000 -0.0010
213 0.2883 -0.0255 -0.0121 0.0010 0.0000 -0.0009
214 0.1019 -0.0261 -0.0167 0.0010 0.0000 -0.0008
215 0.0151 -0.0251 0.3681 0.0013 -0.0003 -0.0007
216 -0.0012 -0.0259 0.1538 0.0011 -0.0001 -0.0007
217 0.0152 -0.0264 -0.0059 0.0010 0.0000 -0.0007
218 -0.0143 -0.0264 0.0220 0.0010 0.0000 -0.0007
3 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 46 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 66/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 47

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
4 201 -0.0256 -0.0831 -0.0405 0.0022 0.0000 0.0001
202 -0.0219 -0.0778 -0.0372 0.0021 0.0000 0.0001
203 0.1289 -0.0778 -0.0337 0.0021 0.0000 0.0000
204 0.0370 -0.0778 -0.0333 0.0021 0.0000 0.0001
205 -0.0068 -0.0768 0.2732 0.0022 0.0000 0.0001
206 -0.0149 -0.0773 0.0941 0.0022 0.0000 0.0001
207 0.2798 -0.0732 -0.0284 0.0019 0.0000 0.0000
208 0.0958 -0.0732 -0.0277 0.0019 0.0000 0.0000

209 0.0084 -0.0713 0.5853 0.0021 -0.0001 0.0000


210 -0.0078 -0.0724 0.2272 0.0020 0.0000 0.0001
211 0.0088 -0.0753 -0.0348 0.0020 0.0000 0.0001
212 -0.0208 -0.0752 0.0000 0.0020 0.0000 0.0001
213 0.2853 -0.0534 -0.0189 0.0014 0.0000 0.0000
214 0.1013 -0.0534 -0.0183 0.0014 0.0000 0.0000
215 0.0139 -0.0514 0.5948 0.0016 -0.0001 0.0000
216 -0.0023 -0.0525 0.2367 0.0015 0.0000 0.0000
217 0.0142 -0.0534 -0.0246 0.0014 0.0000 0.0000
218 -0.0153 -0.0533 0.0102 0.0014 0.0000 0.0000
5 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
6 201 -0.0276 -0.0453 -0.0128 0.0018 0.0000 0.0010

202 -0.0237 -0.0416 -0.0120 0.0017 0.0000 0.0010


203 0.1267 -0.0421 -0.0131 0.0017 0.0000 0.0008
204 0.0356 -0.0418 -0.0068 0.0017 0.0000 0.0009
205 -0.0088 -0.0404 0.2567 0.0019 0.0000 0.0009
206 -0.0168 -0.0411 0.1005 0.0018 0.0000 0.0010

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 47 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 67/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 48

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

207 0.2771 -0.0408 -0.0135 0.0016 0.0000 0.0006


208 0.0950 -0.0401 -0.0008 0.0016 -0.0001 0.0008
209 0.0063 -0.0374 0.5262 0.0019 0.0000 0.0009
210 -0.0097 -0.0388 0.2138 0.0017 0.0000 0.0009
211 0.0070 -0.0406 -0.0099 0.0016 0.0000 0.0009
212 -0.0226 -0.0404 0.0194 0.0017 0.0000 0.0009
213 0.2831 -0.0302 -0.0104 0.0011 0.0000 0.0004
214 0.1009 -0.0295 0.0022 0.0011 0.0000 0.0005
215 0.0122 -0.0269 0.5293 0.0015 0.0000 0.0006
216 -0.0038 -0.0282 0.2169 0.0013 0.0000 0.0006
217 0.0129 -0.0292 -0.0065 0.0011 0.0000 0.0006
218 -0.0166 -0.0290 0.0228 0.0012 0.0000 0.0006
7 201 0.0013 -0.0153 0.0044 0.0006 0.0000 -0.0004
202 0.0010 -0.0135 0.0035 0.0005 0.0000 -0.0003

203 0.0072 -0.0134 0.0034 0.0005 0.0000 -0.0004


204 0.0026 -0.0135 0.0033 0.0005 0.0000 -0.0003
205 0.0013 -0.0133 0.0114 0.0006 0.0000 -0.0003
206 0.0011 -0.0134 0.0058 0.0006 0.0000 -0.0003
207 0.0134 -0.0129 0.0035 0.0005 0.0000 -0.0004
208 0.0043 -0.0131 0.0034 0.0005 0.0000 -0.0003
209 0.0017 -0.0127 0.0195 0.0007 0.0000 -0.0003
210 0.0014 -0.0130 0.0083 0.0006 0.0000 -0.0003
211 0.0018 -0.0133 0.0035 0.0005 0.0000 -0.0003
212 0.0010 -0.0133 0.0043 0.0005 0.0000 -0.0003
213 0.0132 -0.0094 0.0026 0.0004 0.0000 -0.0003
214 0.0041 -0.0097 0.0025 0.0004 0.0000 -0.0003
215 0.0014 -0.0093 0.0187 0.0006 0.0000 -0.0002
216 0.0011 -0.0096 0.0075 0.0005 0.0000 -0.0002
217 0.0016 -0.0098 0.0028 0.0004 0.0000 -0.0002
218 0.0009 -0.0098 0.0036 0.0004 0.0000 -0.0002
8 201 -0.0027 -0.0272 -0.0144 -0.0002 0.0000 -0.0004
202 -0.0023 -0.0245 -0.0155 -0.0002 0.0000 -0.0003
203 0.0028 -0.0245 -0.0153 -0.0002 0.0000 -0.0003
204 -0.0006 -0.0245 -0.0153 -0.0002 0.0000 -0.0003
205 -0.0020 -0.0243 0.0203 0.0003 -0.0001 -0.0003
206 -0.0022 -0.0244 -0.0072 -0.0001 0.0000 -0.0003
207 0.0078 -0.0237 -0.0129 -0.0002 0.0000 -0.0004
208 0.0011 -0.0237 -0.0129 -0.0002 0.0000 -0.0003
209 -0.0018 -0.0233 0.0583 0.0008 -0.0001 -0.0003
210 -0.0020 -0.0235 0.0032 0.0001 0.0000 -0.0003
211 -0.0016 -0.0241 -0.0143 -0.0002 0.0000 -0.0003
212 -0.0023 -0.0240 -0.0120 -0.0001 0.0000 -0.0003
213 0.0084 -0.0175 -0.0089 -0.0001 0.0000 -0.0003

214 0.0017 -0.0175 -0.0088 -0.0001 0.0000 -0.0002


215 -0.0012 -0.0171 0.0624 0.0009 -0.0001 -0.0002
216 -0.0015 -0.0173 0.0073 0.0002 0.0000 -0.0002
217 -0.0010 -0.0175 -0.0092 -0.0001 0.0000 -0.0002
218 -0.0017 -0.0175 -0.0069 -0.0001 0.0000 -0.0002

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 48 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 68/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 49

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

9 201 -0.0130 -0.0183 0.0040 0.0007 0.0000 0.0010


202 -0.0110 -0.0161 0.0032 0.0006 0.0000 0.0009
203 -0.0062 -0.0163 0.0032 0.0006 0.0000 0.0008
204 -0.0090 -0.0162 0.0033 0.0006 0.0000 0.0008
205 -0.0107 -0.0157 0.0128 0.0007 0.0001 0.0009
206 -0.0108 -0.0160 0.0065 0.0006 0.0000 0.0009
207 -0.0016 -0.0162 0.0033 0.0006 0.0000 0.0008
208 -0.0071 -0.0159 0.0036 0.0006 0.0000 0.0008
209 -0.0105 -0.0150 0.0225 0.0008 0.0001 0.0008
210 -0.0108 -0.0155 0.0099 0.0007 0.0000 0.0009
211 -0.0103 -0.0160 0.0033 0.0006 0.0000 0.0009
212 -0.0110 -0.0159 0.0041 0.0006 0.0000 0.0009
213 0.0012 -0.0121 0.0025 0.0005 0.0000 0.0005
214 -0.0043 -0.0119 0.0028 0.0005 0.0000 0.0006

215 -0.0078 -0.0110 0.0217 0.0006 0.0001 0.0006


216 -0.0080 -0.0114 0.0091 0.0005 0.0000 0.0006
217 -0.0076 -0.0118 0.0026 0.0005 0.0000 0.0006
218 -0.0083 -0.0117 0.0034 0.0005 0.0000 0.0006
11 201 -0.0244 -0.0558 -0.0078 -0.0011 0.0001 -0.0012
202 -0.0200 -0.0520 -0.0061 -0.0010 0.0001 -0.0012
203 0.1420 -0.0514 -0.0105 -0.0010 0.0001 -0.0013
204 0.0261 -0.0519 -0.0128 -0.0010 0.0001 -0.0012
205 -0.0206 -0.0507 0.1785 -0.0010 0.0000 -0.0012
206 -0.0182 -0.0514 0.0726 -0.0010 0.0000 -0.0012
207 0.3035 -0.0478 -0.0153 -0.0010 0.0001 -0.0013
208 0.0717 -0.0488 -0.0198 -0.0010 0.0000 -0.0012
209 -0.0217 -0.0465 0.3628 -0.0009 -0.0001 -0.0010
210 -0.0170 -0.0479 0.1510 -0.0009 -0.0001 -0.0011
211 0.0065 -0.0504 -0.0088 -0.0010 0.0001 -0.0012
212 -0.0201 -0.0503 0.0191 -0.0010 0.0001 -0.0011
213 0.3085 -0.0346 -0.0138 -0.0007 0.0000 -0.0010
214 0.0766 -0.0355 -0.0183 -0.0007 0.0000 -0.0009
215 -0.0167 -0.0332 0.3643 -0.0006 -0.0001 -0.0007
216 -0.0120 -0.0347 0.1525 -0.0007 -0.0001 -0.0008
217 0.0112 -0.0358 -0.0074 -0.0007 0.0001 -0.0008
218 -0.0154 -0.0357 0.0204 -0.0007 0.0001 -0.0008
12 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 49 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 69/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 50

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
13 201 -0.0261 -0.0843 -0.0425 -0.0022 -0.0001 0.0002
202 -0.0217 -0.0791 -0.0392 -0.0021 -0.0001 0.0002
203 0.1392 -0.0791 -0.0356 -0.0021 -0.0001 0.0001
204 0.0248 -0.0791 -0.0353 -0.0021 -0.0001 0.0002
205 -0.0220 -0.0793 0.2697 -0.0020 -0.0002 0.0001
206 -0.0198 -0.0792 0.0926 -0.0021 -0.0001 0.0001
207 0.2995 -0.0744 -0.0301 -0.0019 0.0000 0.0001
208 0.0707 -0.0744 -0.0295 -0.0019 -0.0001 0.0001

209 -0.0229 -0.0749 0.5805 -0.0017 -0.0003 0.0001


210 -0.0183 -0.0746 0.2263 -0.0018 -0.0001 0.0001
211 0.0050 -0.0765 -0.0367 -0.0020 -0.0001 0.0002
212 -0.0217 -0.0765 -0.0019 -0.0020 -0.0001 0.0002
213 0.3049 -0.0542 -0.0202 -0.0014 0.0000 0.0000
214 0.0761 -0.0542 -0.0195 -0.0014 -0.0001 0.0001
215 -0.0175 -0.0547 0.5904 -0.0012 -0.0003 0.0000
216 -0.0130 -0.0544 0.2363 -0.0013 -0.0001 0.0001
217 0.0101 -0.0542 -0.0259 -0.0014 0.0000 0.0001
218 -0.0165 -0.0542 0.0089 -0.0014 -0.0001 0.0001
14 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
15 201 -0.0282 -0.0450 -0.0155 -0.0018 0.0000 0.0010

202 -0.0236 -0.0413 -0.0146 -0.0017 0.0000 0.0009


203 0.1368 -0.0419 -0.0157 -0.0017 0.0000 0.0008
204 0.0234 -0.0415 -0.0094 -0.0017 0.0000 0.0009
205 -0.0238 -0.0426 0.2535 -0.0016 0.0000 0.0009
206 -0.0216 -0.0418 0.0983 -0.0017 0.0000 0.0009

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 50 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 70/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 51

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

207 0.2967 -0.0406 -0.0159 -0.0016 0.0000 0.0006


208 0.0699 -0.0398 -0.0033 -0.0016 0.0000 0.0008
209 -0.0244 -0.0420 0.5224 -0.0012 0.0001 0.0009
210 -0.0201 -0.0405 0.2120 -0.0014 0.0000 0.0009
211 0.0031 -0.0404 -0.0124 -0.0017 0.0000 0.0009
212 -0.0235 -0.0404 0.0169 -0.0016 0.0000 0.0009
213 0.3026 -0.0301 -0.0122 -0.0011 0.0000 0.0004
214 0.0758 -0.0293 0.0005 -0.0011 0.0000 0.0005
215 -0.0186 -0.0315 0.5262 -0.0008 0.0001 0.0006
216 -0.0142 -0.0300 0.2158 -0.0010 0.0000 0.0006
217 0.0088 -0.0291 -0.0083 -0.0011 0.0000 0.0006
218 -0.0179 -0.0291 0.0211 -0.0011 0.0000 0.0006
16 201 -0.0030 -0.0179 -0.0025 -0.0005 0.0000 -0.0001
202 -0.0027 -0.0160 -0.0022 -0.0004 0.0000 -0.0001

203 0.0048 -0.0158 -0.0024 -0.0004 0.0000 -0.0002


204 -0.0013 -0.0160 -0.0024 -0.0004 0.0000 -0.0001
205 -0.0028 -0.0157 0.0047 -0.0004 0.0000 -0.0001
206 -0.0027 -0.0159 0.0002 -0.0004 0.0000 -0.0001
207 0.0125 -0.0151 -0.0024 -0.0004 0.0000 -0.0003
208 0.0002 -0.0154 -0.0025 -0.0004 0.0000 -0.0002
209 -0.0027 -0.0149 0.0117 -0.0004 0.0000 -0.0001
210 -0.0025 -0.0153 0.0027 -0.0004 0.0000 -0.0001
211 -0.0020 -0.0157 -0.0023 -0.0004 0.0000 -0.0001
212 -0.0026 -0.0157 -0.0015 -0.0004 0.0000 -0.0001
213 0.0132 -0.0110 -0.0019 -0.0003 0.0000 -0.0002
214 0.0009 -0.0114 -0.0020 -0.0003 0.0000 -0.0001
215 -0.0020 -0.0109 0.0123 -0.0002 0.0000 -0.0001
216 -0.0018 -0.0112 0.0032 -0.0003 0.0000 -0.0001
217 -0.0012 -0.0115 -0.0017 -0.0003 0.0000 -0.0001
218 -0.0019 -0.0115 -0.0009 -0.0003 0.0000 -0.0001
17 201 -0.0049 -0.0272 0.0102 0.0001 0.0000 -0.0004
202 -0.0042 -0.0244 0.0113 0.0001 0.0000 -0.0004
203 0.0018 -0.0244 0.0114 0.0001 0.0000 -0.0004
204 -0.0028 -0.0244 0.0115 0.0001 0.0000 -0.0004
205 -0.0042 -0.0244 0.0305 0.0005 -0.0001 -0.0004
206 -0.0041 -0.0244 0.0219 0.0003 0.0000 -0.0004
207 0.0078 -0.0237 0.0098 0.0001 0.0000 -0.0004
208 -0.0013 -0.0236 0.0099 0.0001 0.0000 -0.0004
209 -0.0041 -0.0236 0.0480 0.0008 -0.0002 -0.0004
210 -0.0040 -0.0236 0.0307 0.0004 0.0000 -0.0004
211 -0.0036 -0.0240 0.0104 0.0001 0.0000 -0.0004
212 -0.0042 -0.0240 0.0125 0.0002 0.0000 -0.0004
213 0.0089 -0.0175 0.0069 0.0001 0.0000 -0.0003

214 -0.0003 -0.0174 0.0070 0.0001 0.0000 -0.0003


215 -0.0030 -0.0174 0.0450 0.0007 -0.0002 -0.0003
216 -0.0030 -0.0174 0.0278 0.0004 0.0000 -0.0003
217 -0.0025 -0.0175 0.0066 0.0001 0.0000 -0.0003
218 -0.0032 -0.0175 0.0088 0.0001 0.0000 -0.0003

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 51 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 71/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 52

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

18 201 -0.0150 -0.0182 -0.0045 -0.0007 0.0000 0.0010


202 -0.0127 -0.0161 -0.0037 -0.0006 0.0000 0.0009
203 -0.0072 -0.0163 -0.0038 -0.0006 0.0000 0.0008
204 -0.0110 -0.0162 -0.0036 -0.0006 0.0000 0.0009
205 -0.0127 -0.0165 0.0053 -0.0005 0.0001 0.0009
206 -0.0126 -0.0163 -0.0003 -0.0006 0.0000 0.0009
207 -0.0017 -0.0162 -0.0039 -0.0006 0.0000 0.0008
208 -0.0093 -0.0159 -0.0036 -0.0006 0.0000 0.0008
209 -0.0127 -0.0167 0.0142 -0.0005 0.0001 0.0009
210 -0.0127 -0.0162 0.0030 -0.0006 0.0000 0.0009
211 -0.0121 -0.0160 -0.0037 -0.0006 0.0000 0.0009
212 -0.0128 -0.0160 -0.0030 -0.0006 0.0000 0.0009
213 0.0015 -0.0121 -0.0030 -0.0005 0.0000 0.0006
214 -0.0061 -0.0119 -0.0027 -0.0005 0.0000 0.0006

215 -0.0095 -0.0126 0.0151 -0.0003 0.0001 0.0007


216 -0.0095 -0.0121 0.0040 -0.0004 0.0000 0.0007
217 -0.0090 -0.0118 -0.0029 -0.0005 0.0000 0.0007
218 -0.0096 -0.0118 -0.0021 -0.0005 0.0000 0.0007
19 201 -0.0076 -0.2650 0.0000 0.0015 0.0000 -0.0002
202 -0.0064 -0.2277 -0.0001 0.0013 0.0000 -0.0002
203 -0.0015 -0.2258 0.0001 0.0013 0.0000 -0.0002
204 -0.0046 -0.2269 0.0001 0.0013 0.0000 -0.0002
205 -0.0062 -0.2258 0.0420 0.0013 0.0000 -0.0002
206 -0.0063 -0.2270 0.0123 0.0013 0.0000 -0.0002
207 0.0033 -0.2235 0.0003 0.0013 0.0000 -0.0001
208 -0.0028 -0.2256 0.0003 0.0013 0.0000 -0.0002
209 -0.0060 -0.2235 0.0841 0.0014 0.0001 -0.0002
210 -0.0062 -0.2258 0.0247 0.0013 0.0000 -0.0002
211 -0.0057 -0.2271 0.0000 0.0013 0.0000 -0.0002
212 -0.0064 -0.2273 0.0028 0.0013 0.0000 -0.0002
213 0.0049 -0.1665 0.0004 0.0010 0.0000 -0.0001
214 -0.0012 -0.1687 0.0004 0.0010 0.0000 -0.0001
215 -0.0044 -0.1665 0.0841 0.0011 0.0001 -0.0001
216 -0.0046 -0.1688 0.0247 0.0010 0.0000 -0.0001
217 -0.0041 -0.1700 0.0001 0.0010 0.0000 -0.0001
218 -0.0049 -0.1702 0.0028 0.0010 0.0000 -0.0001
20 201 -0.0097 -0.2704 0.0002 -0.0015 0.0000 -0.0002
202 -0.0083 -0.2324 0.0001 -0.0013 0.0000 -0.0002
203 -0.0025 -0.2304 0.0003 -0.0013 0.0000 -0.0002
204 -0.0067 -0.2318 0.0003 -0.0013 0.0000 -0.0002
205 -0.0082 -0.2350 0.0416 -0.0013 0.0000 -0.0002
206 -0.0082 -0.2336 0.0126 -0.0013 0.0001 -0.0002
207 0.0032 -0.2279 0.0005 -0.0013 0.0000 -0.0001

208 -0.0051 -0.2306 0.0005 -0.0013 0.0000 -0.0002


209 -0.0082 -0.2371 0.0831 -0.0013 0.0001 -0.0002
210 -0.0082 -0.2342 0.0251 -0.0013 0.0001 -0.0002
211 -0.0076 -0.2319 0.0002 -0.0013 0.0000 -0.0002
212 -0.0083 -0.2325 0.0029 -0.0013 0.0000 -0.0002

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 52 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 72/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 53

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

213 0.0053 -0.1697 0.0004 -0.0010 0.0000 -0.0001


214 -0.0031 -0.1725 0.0005 -0.0010 0.0000 -0.0001
215 -0.0061 -0.1789 0.0831 -0.0009 0.0000 -0.0001
216 -0.0061 -0.1761 0.0251 -0.0009 0.0000 -0.0001
217 -0.0056 -0.1735 0.0002 -0.0010 0.0000 -0.0001
218 -0.0062 -0.1741 0.0029 -0.0010 0.0000 -0.0001
21 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
22 201 0.0070 -0.0086 -0.0079 0.0000 0.0001 -0.0003
202 0.0089 -0.0073 -0.0062 0.0000 0.0001 -0.0003
203 0.1579 -0.0062 -0.0107 0.0000 0.0001 -0.0004
204 0.0437 -0.0070 -0.0129 0.0000 0.0001 -0.0004
205 -0.0235 -0.0090 0.1782 0.0001 0.0000 -0.0003
206 -0.0102 -0.0081 0.0726 0.0001 0.0000 -0.0003
207 0.3049 -0.0051 -0.0154 0.0000 0.0000 -0.0005
208 0.0766 -0.0067 -0.0199 0.0000 0.0001 -0.0004
209 -0.0578 -0.0108 0.3623 0.0003 -0.0002 -0.0003
210 -0.0312 -0.0089 0.1512 0.0001 -0.0001 -0.0003
211 0.0303 -0.0072 -0.0089 0.0000 0.0001 -0.0003
212 0.0045 -0.0076 0.0190 0.0000 0.0001 -0.0003
213 0.3025 -0.0033 -0.0139 0.0000 0.0000 -0.0004
214 0.0742 -0.0049 -0.0184 0.0000 0.0000 -0.0003
215 -0.0602 -0.0090 0.3638 0.0003 -0.0002 -0.0002
216 -0.0336 -0.0071 0.1527 0.0001 -0.0001 -0.0002
217 0.0270 -0.0053 -0.0075 0.0000 0.0001 -0.0002
218 0.0012 -0.0058 0.0203 0.0000 0.0001 -0.0002
23 201 0.0013 -0.0049 -0.0030 -0.0001 0.0000 -0.0002

202 0.0011 -0.0042 -0.0026 -0.0001 0.0000 -0.0002


203 0.0086 -0.0039 -0.0028 -0.0001 0.0000 -0.0003
204 0.0025 -0.0042 -0.0028 -0.0001 0.0000 -0.0002
205 -0.0002 -0.0047 0.0044 0.0000 0.0000 -0.0002
206 0.0003 -0.0044 0.0000 0.0000 0.0000 -0.0002

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 53 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 73/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 54

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

207 0.0161 -0.0036 -0.0028 -0.0001 0.0000 -0.0004


208 0.0038 -0.0041 -0.0030 -0.0001 0.0000 -0.0002
209 -0.0016 -0.0052 0.0115 0.0001 0.0000 -0.0002
210 -0.0006 -0.0047 0.0028 0.0000 0.0000 -0.0002
211 0.0020 -0.0042 -0.0027 -0.0001 0.0000 -0.0002
212 0.0010 -0.0043 -0.0018 -0.0001 0.0000 -0.0002
213 0.0158 -0.0025 -0.0022 -0.0001 0.0000 -0.0004
214 0.0035 -0.0030 -0.0023 -0.0001 0.0000 -0.0002
215 -0.0018 -0.0041 0.0121 0.0002 0.0000 -0.0001
216 -0.0009 -0.0036 0.0035 0.0000 0.0000 -0.0001
217 0.0018 -0.0031 -0.0020 -0.0001 0.0000 -0.0002
218 0.0007 -0.0032 -0.0011 0.0000 0.0000 -0.0001
24 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
25 201 0.0065 -0.0178 -0.0579 -0.0009 0.0002 0.0002
202 0.0085 -0.0161 -0.0528 -0.0009 0.0002 0.0002
203 0.1573 -0.0172 -0.0495 -0.0009 0.0001 0.0001
204 0.0433 -0.0163 -0.0514 -0.0009 0.0001 0.0002
205 -0.0240 -0.0170 0.1806 -0.0007 0.0000 0.0002
206 -0.0106 -0.0165 0.0629 -0.0008 0.0001 0.0002
207 0.3041 -0.0178 -0.0440 -0.0008 0.0001 0.0000
208 0.0763 -0.0161 -0.0477 -0.0008 0.0001 0.0001
209 -0.0584 -0.0173 0.4163 -0.0004 -0.0001 0.0002
210 -0.0316 -0.0163 0.1807 -0.0006 -0.0001 0.0002
211 0.0299 -0.0159 -0.0510 -0.0008 0.0001 0.0002
212 0.0041 -0.0159 -0.0203 -0.0008 0.0001 0.0002
213 0.3018 -0.0138 -0.0306 -0.0006 0.0000 0.0000

214 0.0740 -0.0120 -0.0343 -0.0006 0.0000 0.0001


215 -0.0607 -0.0132 0.4297 -0.0001 -0.0001 0.0002
216 -0.0339 -0.0122 0.1941 -0.0004 -0.0001 0.0002
217 0.0267 -0.0116 -0.0366 -0.0006 0.0001 0.0001
218 0.0009 -0.0116 -0.0059 -0.0006 0.0001 0.0001

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 54 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 74/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 55

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

26 201 -0.0014 -0.0073 -0.0094 -0.0003 0.0000 0.0002


202 -0.0011 -0.0064 -0.0074 -0.0002 0.0000 0.0002
203 0.0060 -0.0067 -0.0074 -0.0002 0.0000 0.0001
204 0.0002 -0.0065 -0.0073 -0.0002 0.0000 0.0002
205 -0.0025 -0.0067 0.0021 -0.0001 0.0000 0.0002
206 -0.0020 -0.0065 -0.0006 -0.0001 0.0000 0.0002
207 0.0132 -0.0070 -0.0078 -0.0002 0.0000 0.0000
208 0.0015 -0.0064 -0.0077 -0.0002 0.0000 0.0001
209 -0.0039 -0.0068 0.0112 0.0001 0.0000 0.0002
210 -0.0029 -0.0066 0.0056 0.0000 0.0000 0.0002
211 -0.0003 -0.0064 -0.0076 -0.0002 0.0000 0.0002
212 -0.0013 -0.0064 -0.0063 -0.0002 0.0000 0.0002
213 0.0135 -0.0053 -0.0060 -0.0002 0.0000 -0.0001
214 0.0018 -0.0048 -0.0059 -0.0002 0.0000 0.0001

215 -0.0036 -0.0052 0.0130 0.0002 0.0000 0.0002


216 -0.0026 -0.0049 0.0075 0.0000 0.0000 0.0002
217 0.0000 -0.0047 -0.0061 -0.0002 0.0000 0.0001
218 -0.0011 -0.0047 -0.0047 -0.0001 0.0000 0.0001
27 201 -0.0040 -0.0645 -0.0092 0.0000 0.0000 0.0001
202 -0.0035 -0.0554 -0.0072 0.0000 0.0000 0.0000
203 0.0033 -0.0581 -0.0072 0.0000 0.0000 0.0001
204 -0.0020 -0.0559 -0.0071 0.0000 0.0000 0.0000
205 -0.0035 -0.0508 0.0023 0.0001 0.0000 0.0000
206 -0.0034 -0.0529 -0.0003 0.0000 0.0000 0.0000
207 0.0101 -0.0607 -0.0076 0.0000 0.0000 0.0001
208 -0.0006 -0.0564 -0.0075 0.0000 0.0000 0.0001
209 -0.0034 -0.0462 0.0114 0.0001 0.0000 0.0000
210 -0.0033 -0.0504 0.0062 0.0000 0.0000 0.0000
211 -0.0028 -0.0557 -0.0074 0.0000 0.0000 0.0000
212 -0.0034 -0.0548 -0.0061 0.0000 0.0000 0.0000
213 0.0110 -0.0469 -0.0058 0.0000 0.0000 0.0001
214 0.0003 -0.0426 -0.0058 0.0000 0.0000 0.0000
215 -0.0025 -0.0323 0.0131 0.0001 0.0000 0.0000
216 -0.0024 -0.0365 0.0079 0.0000 0.0000 0.0000
217 -0.0019 -0.0418 -0.0059 0.0000 0.0000 0.0000
218 -0.0025 -0.0409 -0.0045 0.0000 0.0000 0.0000
28 201 -0.0253 -0.3153 -0.0574 -0.0015 0.0001 0.0002
202 -0.0208 -0.3017 -0.0523 -0.0014 0.0001 0.0002
203 0.1406 -0.3066 -0.0490 -0.0014 0.0001 0.0002
204 0.0254 -0.3032 -0.0509 -0.0014 0.0001 0.0002
205 -0.0212 -0.2896 0.1815 -0.0014 -0.0002 0.0002
206 -0.0189 -0.2962 0.0634 -0.0014 0.0000 0.0002
207 0.3015 -0.2898 -0.0435 -0.0013 0.0000 0.0003

208 0.0712 -0.2830 -0.0472 -0.0013 0.0000 0.0002


209 -0.0221 -0.2559 0.4176 -0.0013 -0.0004 0.0002
210 -0.0176 -0.2691 0.1813 -0.0013 -0.0001 0.0002
211 0.0058 -0.2908 -0.0506 -0.0014 0.0001 0.0002
212 -0.0209 -0.2884 -0.0198 -0.0014 0.0001 0.0002

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 55 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 75/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 56

JOINT DISPLACEMENT (CM RADIANS) STRUCTURE TYPE = SPACE


------------------

JOINT LOAD X- TRANS Y-TR ANS Z-TRAN S X-ROTAN Y-ROTAN Z-ROTAN

213 0.3066 -0.2124 -0.0303 -0.0010 0.0000 0.0002


214 0.0763 -0.2056 -0.0340 -0.0010 0.0000 0.0002
215 -0.0170 -0.1785 0.4308 -0.0009 -0.0004 0.0001
216 -0.0124 -0.1917 0.1946 -0.0009 -0.0002 0.0001
217 0.0107 -0.2036 -0.0363 -0.0009 0.0000 0.0001
218 -0.0160 -0.2011 -0.0056 -0.0009 0.0000 0.0001
29 201 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
202 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
203 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
204 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
207 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
208 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

209 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000


210 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
211 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
212 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
213 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
214 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
215 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
216 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
217 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
218 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

************** END OF LATEST ANALYSIS RESULT **************

198. FINISH

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 56 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 76/128
8/18/2019 Design calculation report - Pipe rack - and foundation
Monday, September 09, 2013, 08:0
STAAD SPACE -- PAGE NO. 57

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= SEP 9,2013 TIME= 7:58: 4 ****

************************************************************
* For questions on STAAD.Pro, please contact *
* Bentley Systems or Partner offices *
* *
* Telephone Web / Email *
* USA +1 (714) 974-2500 *
* UK +44 (0) 808 101 9246 *
* SINGAPORE +65 6225-6158 *
* FRANCE +33 (0) 1 55238400 *
* GERMANY +49 0931 40468 *
* INDIA +91 (033) 4006-2021 *
* JAPAN +81 (03)5952-6500 http://www.ctc-g.co.jp *
* CHINA +86 21 6288 4040 *
* THAILAND +66 (0)2645-1018/19 [email protected]*
* *
* Worldwide http://selectservices.bentley.com/en-US/ *
* *

************************************************************

:\SProV8i\STAAD\Plugins\METERING BUILDING-1642K.anl Page 57 o


http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 77/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

FOUNDATION DESIGN (F1 , F2 & F3


!.0 COMPUTER OUTPUT FILE 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 78/128
Isolated Footing Design Page 1 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

FOOTING C1/F1

Isolated Footing Design(ACI 318-05)


Design For Isolated Footing 5 

Footing No. Group ID Foundation Geometry


- - Length Width Thickness
5  !"""."""mm !"""."""mm #5"."""mm

Footing No. Footing $ein%orcement &edestal $ein%orcement


- 'ottom $ein%orcement()*+ 'ottom $ein%orcement(),+ Top $ein%orcement()*+ Top $ein%orcement(),+ )ain teel Trans teel
5 / 0 !"" mm c1c / 0 !"" mm c1c / 0 !"" mm c1c / 0 !"" mm c1c N12 N12  

Isolated Footing 5

Input Values

Footing Geomtery

Design Type 3 et Dimension


Footing Thickness (Ft+ 3 #5"."""mm
Footing Length - 4 (Fl+ 3 !"""."""mm
Footing Width -  (F6+ 3 !"""."""mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 79/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 2 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

;ccentricity along 4 (9,d+ 3 "."""mm


;ccentricity along  (9*d+ 3 "."""mm
 
7olumn Dimensions

7olumn hape 3 $ectangular


7olumn Length - 4 (D col+ 3 <5"."""mm

7olumn Width -  (' col+ 3 <5"."""mm

&edestal

Include &edestal= No
&edestal hape 3 N12 
&edestal >eight (&h+ 3 N12 
&edestal Length - 4 (&l+ 3 N12 
&edestal Width -  (&6+ 3 N12 

Design &arameters

7oncrete and $e8ar &roperties

?nit Weight o% 7oncrete 3 !#."""kN1m<


trength o% 7oncrete 3 !@."""N1mm!
 Aield trength o% teel 3 #!"."""N1mm!
)inimum 'ar i*e 3 /
)a,imum 'ar i*e 3 /
&edestal )inimum 'ar i*e 3 /
&edestal )a,imum 'ar i*e 3 @
)inimum 'ar pacing 3 ""."""mm
)a,imum 'ar pacing 3 !""."""mm
&edestal 7lear 7o:er (&B 7L+ 3 5"."""mm
Footing 7lear 7o:er (FB 7L+ 3 5"."""mm

oil &roperties

oil Type 3 Drained


?nit Weight 3 @."""kN1m<
oil 'earing 7apacity 3 !""."""kN1m!
oil 'earing 7apacity Type3 Gross 'earing 7apacity

oil urcharge 3 "."""kN1m!


Depth o% oil a8o:e Footing 3 """."""mm
7ohesion 3 "."""kN1m!

liding and 9:erturning

7oe%%icient o% Friction 3 ".5""


Factor o% a%ety 2gainst liding 3 .5""
Factor o% a%ety 2gainst 9:erturning 3 .5""

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 80/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 81/128
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 82/128
Isolated Footing Design Page 5 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

!" !"E.@/@ <E.5E@ -<<.@!! -@.#<< -@.!#


! !"@.#5 <E."@E -<<.!"5 -.E" -.@!5
 
$eduction o% %orce due to 8uoyancy C "."""kN
;%%ect due to adhesion C "."""kN
 2rea %rom initial length and 6idthB 2 o C L  4 W  C #""""""."""mm!
o o
)in. area reuired %rom 8earing pressureB 2 min C & 1   C !<@//.5</mm!
ma,

!ote. Amin is an initial estimation


  Critial Fatored Aial Load(2it'o"t sel% 2eig't/b"oan/soil)
4ma  esetive Fatored $earing Caait

Final Footing i*e

Length (L!+ C !""".""" mm Go:erning Load 7ase 3  "

Width (W!+ C !""".""" mm Go:erning Load 7ase 3  "

Depth (D!+ C #5".""" mm Go:erning Load 7ase 3  "/


Depth is go:erned 8y ?ltimate Load 7ase
(er:ice check is per%ormed 6ith %ooting thickness reuirements %rom concrete check+
 2rea (2 !+ C #"""""".""" mm!

Final oil >eight C """.""" mm


Footing el% Weight C #<.E@ kN
oil Weight 9n Top 9%
/E.E< kN
Footing C

&ressures at Four 7orners

ress"re at ress"re at ress"re at ress"re at  Area o% %ooting


orner 1 orner 6 orner 3 orner 7
Load Case (41) (46) (43) (47) in "li%t (A")
(mm6)
(*!/mm6) (*!/mm6) (*!/mm6) (*!/mm6)

" 00001 "."""! ".""" ".""" "."""

"/ ".""" 00006 ".""" ".""" "."""

"@ ".""" "."""! 00001 ".""" "."""

"@ ".""" "."""! ".""" 00001 "."""

I% 2 u is *eroB there is no upli%t and no pressure adustment is necessary. 9ther6iseB to account %or upli%tB areas o% negati:e

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 83/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 84/128
Isolated Footing Design Page 7 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Go:erning $estoring Force 3 !<.@//kN


)inimum liding $atio %or the 7ritical Load 7ase 3 <.<"@
7ritical Load 7ase %or 9:erturning a8out 4-Direction 3 @
Go:erning 9:erturning )oment 3 -<E.kNm
Go:erning $esisting )oment 3 #/@.5@kNm
)inimum 9:erturning $atio %or the 7ritical Load 7ase 3 .E@

 
7ritical Load 7ase 2nd The Go:erning Factor 9% a%ety For 9:erturning 2nd liding -  Direction

7ritical Load 7ase %or liding along -Direction 3 @


Go:erning Distur8ing Force 3 -55.@#kN
Go:erning $estoring Force 3 !<#.!E<kN
)inimum liding $atio %or the 7ritical Load 7ase 3 #.E<
7ritical Load 7ase %or 9:erturning a8out -Direction 3 "/
Go:erning 9:erturning )oment 3 -5".55kNm
Go:erning $esisting )oment 3 #5.!#kNm
)inimum 9:erturning $atio %or the 7ritical Load 7ase 3 E.#@
7ritical Load 7ase 2nd The Go:erning Factor 9% a%ety For liding 2long $esultant Direction
7ritical Load 7ase %or liding along $esultant "/
Direction 3
Go:erning Distur8ing Force 3 E.""#kN
Go:erning $estoring Force 3 !<.@//kN
)inimum liding $atio %or the 7ritical Load 7ase 3 !./#

7ompression De:elopment Length 7heck  


De:elopment length skipped as column rein%orcement is not speci%ied in input (7olumn Dimnesion Task &ane+

hear 7alculation
&unching hear 7heck

Total Footing DepthB D C #5"."""mm


7alculated ;%%ecti:e DepthB de%%  C D - 7co:er - ".5 H d8 C <E!."""mm

For rectangular columnB C 'col 1 Dcol C ."""


 
;%%ecti:e depthB de%% B increased until ".54Vc  &unching hear Force

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 85/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 8 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

&unching hear ForceB Vu C #".!5!kNB Load 7ase  "/  

From 27I 7l..!.!.B 8o %or columnC !E/@."""mm

;uation -<<B V c C <"/.@#kN

;uation -<#B V c! C <!<."/"kN

;uation -<5B V c< C !"##.@EkN

&unching shear strengthB Vc C ".5 4 minimum o% (VcB Vc!B Vc<+ C 5<<.5E!kN

".5 4 Vc  Vu henceB 9J 

9ne-Way hear 7heck

 2long 4 Direction

(hear &lane &arallel to Glo8al 4 2,is+

From 27I 7l..<..B Vc C  /@@.E#5kN

Distance along 4 to design %or shearB


D, C #<<."""mm

7heck that ".5 4 Vc  Vu, 6here Vu, is the shear %orce %or the critical load cases at a distance de%%  %rom the %ace o% the column
caused 8y 8ending a8out the 4 a,is.

From a8o:e calculationsB ".5 4 Vc C 5/."E kN

7ritical load case %or V u, is  "/ !!.@E kN

".5 4 V   V  henceB 9J
c u,

9ne-Way hear 7heck

 2long  Direction

(hear &lane &arallel to Glo8al  2,is+

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 86/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 9 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

From ACI Cl.11.3.1.1, Vc = 

/@@.E#5 kN

Distance along 4 to design %or shearB D * C #<<.""" mm

7heck that 05 + 9  : 9 "; 6here Vu* is the shear %orce %or the critical load cases at a distance de%%  %rom the %ace o% the
column caused 8y 8ending a8out the  a,is.

From a8o:e calculationsB ".5 4 Vc C 5/."E kN

7ritical load case %or V u* is  "/ !@."< kN

".5 4 Vc  Vu* henceB 9J

Design %or Fle,ure a8out  2,is

(For $ein%orcement &arallel to 4 2,is+

7alculate the %le,ural rein%orcement along the 4 direction o% the %ooting. Find the area o% steel reuiredB 2B as per ection <.@ o%
$ein%orced 7oncrete Design (5th ed.+ 8y almon and Wang ($e%. +

7ritical Load 7ase  "/

The strength :alues o% steel and concrete used in the %ormulae are in ksi

'ars parallel to 4 Direction are placed at 8ottom


;%%ecti:e Depth de%% C <E!.""" mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 87/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 10 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Factor %rom 27I 7l.".!..< C ".@#

From 27I 7l. ".<.!B C "."!@!<

From 27I 7l. ".<.<B C "."!

From 27I 7l. .!.!B C ".""@"

From $e%. B ;. <.@.#aB constant m C ./#

Cal"late rein%orement ratio %or ritial load ase

Design %or %le,ure a8out  a,is is


per%ormed at the %ace o% the column @!5.""" mm
at a distanceB D, C

?ltimate momentB EE./5E kNm

Nominal moment capacityB )n C ".<! kNm

('ased on e%%ecti:e depth+ $euired "."""@/


C

('ased on gross depth+ , de%%  1 Depth C "."""5

ince K Kmin Kmin Go:erns

 2rea o% teel $euiredB 2 s C /!".""# mm!

elected 8ar i*e C /


)inimum spacing allo6ed (min+ C C ""."""mm

elected spacing (+ C !""."""mm

minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...


The rein%orcement is accepted.
 2ccording to 27I <@ 7lause No- "./.#
)a, spacing %or 7racking 7onsideration C !5".!!mm

a%e %or 7racking 2spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

$euired de:elopment length %or 8ars C C<"#.@"" mm

 2:aila8le de:elopment length %or 8arsB DL 


5.""" mm
C
Try 8ar si*e  / 2rea o% one 8ar C !"."/# mm!

Num8er o% 8ars reuiredB N8ar C E

 
$ea"se t'e n"mber o% bars is ro"nded "= ma*e s"re ne2 rein%orement ratio > ?ma

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 88/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 11 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Total rein%orcement areaB 2 stotal C N8ar 4 (2rea o% one 8ar+ C @"E.5 mm!
de%%  C D - 7co:er - ".5 4 (dia. o% one 8ar+ C <E!.""" mm

$ein%orcement ratioB C ".""!<

From 27I 7l../.B minimum reOd clear distance 8et6een 8ars


7  C ma, (Diameter o% one 8arB ."P (!5.#mm+B )in. ?ser pacing+ C ""."""mm
d

C'e* to see i% 2idt' is s"%%iient to aomodate bars 

Design %or Fle,ure a8out 4 a,is

(For $ein%orcement &arallel to  2,is+

7alculate the %le,ural rein%orcement along the  direction o% the %ooting. Find the area o% steel reuiredB 2B as per ection <.@ o%
$ein%orced 7oncrete Design (5th ed.+ 8y almon and Wang ($e%. +

7ritical Load 7ase  "/

The strength :alues o% steel and concrete used in the %ormulae are in ksi

'ars parallel to 4 Direction are placed at 8ottom


;%%ecti:e Depth de%% C </.""" mm

Factor %rom 27I 7l.".!..< C ".@#

From 27I 7l. ".<.!B C "."!@!<

From 27I 7l. ".<.<B C "."!

From 27I 7l..!.!B C ".""@"


From $e%. B ;. <.@.#aB constant m C ./#

Cal"late rein%orement ratio %or ritial load ase 

Design %or %le,ure a8out 4 a,is is


per%ormed at the %ace o% the column @!5.""" mm
at a distanceB D* C

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 89/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 12 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

?ltimate momentB E5.#/ kNm

Nominal moment capacityB )n C "/." kNm

('ased on e%%ecti:e depth+ $euired


"."""E"
C

('ased on gross depth+ , d  1 Depth C "."""5


e%% 
ince K Kmin Kmin Go:erns

 2rea o% teel $euiredB 2 s C /!".""# mm!

elected 'ar i*e C /


)inimum spacing allo6ed (min+ C ""."""mm

elected spacing (+ C !""."""mm


minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...

The rein%orcement is accepted.


 2ccording to 27I <@ 7lause No- "./.#

)a, spacing %or 7racking 7onsideration C !5".!!mm


a%e %or 7racking 2spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

$euired de:elopment length %or 8ars C <"#.@"" mm

 2:aila8le de:elopment length %or 8arsB DL 


5.""" mm
C
Try 8ar si*e  / 2rea o% one 8ar C !"."/# mm!

Num8er o% 8ars reuiredB N8ar C E

 
$ea"se t'e n"mber o% bars is ro"nded "= ma*e s"re ne2 rein%orement ratio > ?ma

Total rein%orcement areaB 2 stotal C N8ar 4 (2rea o% one 8ar+ C @"E.5 mm!
de%%  C D - 7co:er - .5 4 (dia. o% one 8ar+ </.""" mm
C

$ein%orcement ratioB C ".""!#

From 27I 7l../.B minimum reOd clear distance 8et6een 8ars


7d C ma, (Diameter o% one 8arB ."P (!5.#mm+B )in. ?ser pacing+ C ""."""mm

C'e* to see i% 2idt' is s"%%iient to aomodate bars 

'ending moment %or upli%t cases 6ill 8e calculated 8ased solely on sel%6eightB soil depth and surcharge loading.

 2s the %ooting si*e has already 8een determined 8ased on all ser:ice8ility load casesB and design moment calculation is 8ased
on sel%6eightB soil depth and surcharge onlyB top rein%orcement :alue %or all pure upli%t load cases 6ill 8e the same.

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 90/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 13 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

 
Design For Top $ein%orcement &arallel to  2,is

 
Cal"late t'e %le"ral rein%orement %or   Find t'e area o% steel re4"ired

The strength :alues o% steel and concrete used in the %ormulae are in ksi

Factor %rom 27I 7l.".!..< C ".@#

From 27I 7l. ".<.!B C "."!@!<

From 27I 7l. ".<.<B C "."!

From 27I 7l. .!.!B C ".""@"

From $e%. B ;. <.@.#aB constant m C ./#

Cal"late rein%orement ratio %or ritial load ase 

Design %or %le,ure a8out 4 a,is is


per%ormed at the %ace o% the column @!5.""" mm
at a distanceB D, C

?ltimate momentB E./" kNm

Nominal moment capacityB )n C !.E kNm

('ased on e%%ecti:e depth+ $euired


"."""@
C

('ased on gross depth+ , de%%  1 Depth C "."""5

ince K Kmin Kmin Go:erns

 2rea o% teel $euiredB 2 s C /!".""# mm!

elected 8ar i*e C /


)inimum spacing allo6ed (min+ C ""."""mm

elected spacing (+ C !""."""mm


minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 91/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 14 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

The rein%orcement is accepted.


 2ccording to 27I <@ 7lause No- "./.#
)a, spacing %or 7racking 7onsideration C !5".!!mm

a%e %or 7racking 2spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

Design For Top $ein%orcement &arallel to 4 2,is

First load case to 8e in pure upli%t  "


 
Cal"late t'e %le"ral rein%orement %or  ; Find t'e area o% steel re4"ired

The strength :alues o% steel and concrete used in the %ormulae are in ksi

Factor %rom 27I 7l.".!..< C ".@#

From 27I 7l. ".<.!B C "."!@!<

From 27I 7l. ".<.<B C "."!

From 27I 7l..!.!B C ".""@"

From $e%. B ;. <.@.#aB constant m C ./#

7alculate rein%orcement ratio %or critical load case

Design %or %le,ure a8out  a,is is


per%ormed at the %ace o% the column @!5.""" mm
at a distanceB D, C

?ltimate momentB E./" kNm

Nominal moment capacityB )n C !.E kNm

('ased on e%%ecti:e depth+$euired


"."""@
C

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 92/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 15 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

('ased on gross depth+ , de%%  1 Depth C "."""5

ince K Kmin Kmin Go:erns

 2rea o% teel $euiredB 2 s C /!".""# mm!


 
elected 8ar i*e C /
)inimum spacing allo6ed ( + C ""."""mm
min
elected spacing (+ C !""."""mm
minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...

The rein%orcement is accepted.


 2ccording to 27I <@ 7lause No- "./.#
)a, spacing %or 7racking 7onsideration C !5".!!mm

a%e %or 7racking 2spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

Print Calculation Sheet

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 93/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 1 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

FOOTING C2/F2

Isolated Footing Design(ACI 318-05)


Design For Isolated Footing 3 

Footing No. Group ID Foundation Geometry


- - Length Width Thickness
3  !!""."""mm !!""."""mm #$"."""mm

Footing No. Footing %ein&orcement 'edestal %ein&orcement


- (ottom %ein&orcement)*+, (ottom %ein&orcement)*, Top %ein&orcement)*+, Top %ein&orcement)*, *ain teel Trans teel
3 /0 1 !"" mm c2c /0 1 !"" mm c2c /0 1 !"" mm c2c /0 1 !"" mm c2c N2 N2  

Isolated Footing 3

Input Values

Footing Geomtery

Design Type 4 et Dimension


Footing Thickness )Ft, 4 #$"."""mm
Footing Length - 5 )Fl, 4 !!""."""mm
Footing Width - 6 )F7, 4 !!""."""mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 94/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 2 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

<ccentricity along 5 ):d, 4 "."""mm


<ccentricity along 6 ):+d, 4 "."""mm
 
8olumn Dimensions

8olumn hape 4 %ectangular


8olumn Length - 5 )D col, 4 3$"."""mm

8olumn Width - 6 )( col, 4 3$"."""mm

'edestal

Include 'edestal= No
'edestal hape 4 N2 
'edestal >eight )'h, 4 N2 
'edestal Length - 5 )'l, 4 N2 
'edestal Width - 6 )'7, 4 N2 

Design 'arameters

8oncrete and %e9ar 'roperties

?nit Weight o& 8oncrete 4 !#."""kN2m3


trength o& 8oncrete 4 !@."""N2mm!
 Aield trength o& teel 4 #!"."""N2mm!
*inimum (ar i+e 4 /0
*aimum (ar i+e 4 /0
'edestal *inimum (ar i+e 4 B
'edestal *aimum (ar i+e 4 @
*inimum (ar pacing 4 ""."""mm
*aimum (ar pacing 4 !""."""mm
'edestal 8lear 8o;er )'C 8L, 4 $"."""mm
Footing 8lear 8o;er )FC 8L, 4 $"."""mm

oil 'roperties

oil Type 4 Drained


?nit Weight 4 @."""kN2m3
oil (earing 8apacity 4 !""."""kN2m!
oil (earing 8apacity Type4 Gross (earing 8apacity

oil urcharge 4 "."""kN2m!


Depth o& oil a9o;e Footing 4 """."""mm
8ohesion 4 "."""kN2m!

liding and :;erturning

8oe&&icient o& Friction 4 ".$""


Factor o& a&ety gainst liding 4 .$""
Factor o& a&ety gainst :;erturning 4 .$""

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 95/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 96/128
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 97/128
Isolated Footing Design Page 5 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

!" 3.$#E -!".@!0 -$.B3B -#.E@ 0.#


! 3."B -!.0E! -$.!"3 -3.E"B 0.0!3
 
%eduction o& &orce due to 9uoyancy  "."""kN
<&&ect due to adhesion  "."""kN
 rea &rom initial length and 7idthC  o  L  5 W   #@#""""."""mm!
o o
*in. area reuired &rom 9earing pressureC  min  ' 2 
ma
  33B0BB!.3$#mm!

!ote. Amin is an initial estimation


  Critial Fatored Aial Load(2it'o"t sel% 2eig't/b"oan/soil)
4ma  esetive Fatored $earing Caait

Final Footing i+e

Length )L!,  !!"".""" mm Go;erning Load 8ase 4 / "

Width )W!,  !!"".""" mm Go;erning Load 8ase 4 / "

Depth )D!,  #$".""" mm Go;erning Load 8ase 4 / "@


Depth is go;erned 9y ?ltimate Load 8ase
)er;ice check is per&ormed 7ith &ooting thickness reuirements &rom concrete check,
 rea ) !,  #@#"""".""" mm!

Final oil >eight  """.""" mm


Footing el& Weight  $!.!B" kN
oil Weight :n Top :&
@#.E! kN
Footing 

'ressures at Four 8orners

ress"re at ress"re at ress"re at ress"re at  Area o% %ooting


orner 1 orner 6 orner 3 orner 7
Load Case (41) (46) (43) (47) in "li%t (A")
(mm6)
(*!/mm6) (*!/mm6) (*!/mm6) (*!/mm6)

" 00006 ".""" ".""" ".""" "."""

"0 "."""! 00001 ".""" ".""" "."""

"@ ".""" ".""" 00001 "."""! "."""

"@ ".""" ".""" ".""" 00006 "."""

I&  u is +eroC there is no upli&t and no pressure adustment is necessary. :ther7iseC to account &or upli&tC areas o& negati;e

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 98/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 99/128
Isolated Footing Design Page 7 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Go;erning %estoring Force 4 33#.@@BkN


*inimum liding %atio &or the 8ritical Load 8ase 4 E.!$0
8ritical Load 8ase &or :;erturning a9out 5-Direction 4 0
Go;erning :;erturning *oment 4 #.$$BkNm
Go;erning %esisting *oment 4 #@0.!#3kNm
*inimum :;erturning %atio &or the 8ritical Load 8ase 4 .B"

 
8ritical Load 8ase nd The Go;erning Factor :& a&ety For :;erturning nd liding - 6 Direction

8ritical Load 8ase &or liding along 6-Direction 4 0


Go;erning Distur9ing Force 4 [email protected]!BkN
Go;erning %estoring Force 4 !!."!3kN
*inimum liding %atio &or the 8ritical Load 8ase 4 B.@"3
8ritical Load 8ase &or :;erturning a9out 6-Direction 4 E
Go;erning :;erturning *oment 4 !B.3!EkNm
Go;erning %esisting *oment 4 B30.B3EkNm
*inimum :;erturning %atio &or the 8ritical Load 8ase 4 !0.E$@
8ritical Load 8ase nd The Go;erning Factor :& a&ety For liding long %esultant Direction
8ritical Load 8ase &or liding along %esultant 0
Direction 4
Go;erning Distur9ing Force 4 3$."3@kN
Go;erning %estoring Force 4 !!."!3kN
*inimum liding %atio &or the 8ritical Load 8ase 4 0.3"@

8ompression De;elopment Length 8heck  


De;elopment length skipped as column rein&orcement is not speci&ied in input )8olumn Dimnesion Task 'ane,

hear 8alculation
'unching hear 8heck

Total Footing DepthC D  #$"."""mm


8alculated <&&ecti;e DepthC de&&   D - 8co;er - ".$ H d9  3E!."""mm

For rectangular columnC  (col 2 Dcol  ."""


 
<&&ecti;e depthC de&& C increased until ".B$5Vc  'unching hear Force

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 100/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 8 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

'unching hear ForceC Vu  $E@.$3kNC Load 8ase / "0  

From 8I 8l..!.!.C 9o &or column !E0@."""mm

<uation -33C V c  3"0B.@#kN

<uation -3#C V c!  3B!3."0"kN

<uation -3$C V c3  !"##.B@EkN

'unching shear strengthC Vc  ".B$ 5 minimum o& )VcC Vc!C Vc3,  $33.$E!kN

".B$ 5 Vc  Vu henceC :J 

:ne-Way hear 8heck

 long 5 Direction

)hear 'lane 'arallel to Glo9al 5 is,

From 8I 8l..3..C Vc   B$B.@#"kN

Distance along 5 to design &or shearC


D  $33."""mm

8heck that ".B$ 5 Vc  Vu 7here Vu is the shear &orce &or the critical load cases at a distance de&&  &rom the &ace o& the column
caused 9y 9ending a9out the 5 ais.

From a9o;e calculationsC ".B$ 5 Vc  [email protected]@" kN

8ritical load case &or V u is / "@ BE.#!" kN

".B$ 5 V   V  henceC :J
c u

:ne-Way hear 8heck

 long 6 Direction

)hear 'lane 'arallel to Glo9al 6 is,

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 101/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 9 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

From ACI Cl.11.3.1.1, Vc = 

B$B.@#" kN

Distance along 5 to design &or shearC D +  $33.""" mm

8heck that 05 + 9  : 9 "; 7here Vu+ is the shear &orce &or the critical load cases at a distance de&&  &rom the &ace o& the
column caused 9y 9ending a9out the 6 ais.

From a9o;e calculationsC ".B$ 5 Vc  [email protected]@" kN

8ritical load case &or V u+ is / " BB.!B$ kN

".B$ 5 Vc  Vu+ henceC :J

Design &or Fleure a9out 6 is

)For %ein&orcement 'arallel to 5 is,

8alculate the &leural rein&orcement along the 5 direction o& the &ooting. Find the area o& steel reuiredC C as per ection 3.@ o&
%ein&orced 8oncrete Design )$th ed., 9y almon and Wang )%e&. ,

8ritical Load 8ase / "

The strength ;alues o& steel and concrete used in the &ormulae are in ksi

(ars parallel to 5 Direction are placed at 9ottom


<&&ecti;e Depth de&&  3E!.""" mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 102/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 10 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Factor &rom 8I 8l.".!.B.3  ".@#B

From 8I 8l. ".3.!C  "."!@!3

From 8I 8l. ".3.3C  "."!B

From 8I 8l. B.!.!C  ".""@"

From %e&. C <. 3.@.#aC constant m  B.0#B

Cal"late rein%orement ratio %or ritial load ase

Design &or &leure a9out 6 ais is


per&ormed at the &ace o& the column E!$.""" mm
at a distanceC D 

?ltimate momentC #.B3 kNm

Nominal moment capacityC *n  $B.#BE kNm

)(ased on e&&ecti;e depth, %euired ".""!


)(ased on gross depth,  de&&  2 Depth  "."""E@

ince K Kmin Kmin Go;erns

 rea o& teel %euiredC  s  B@!.""$ mm!

elected 9ar i+e  /0


*inimum spacing allo7ed )min,   ""."""mm

elected spacing ),  !""."""mm

minM  M ma and selected 9ar si+e M selected maimum 9ar si+e...


The rein&orcement is accepted.
 ccording to 8I 3@ 8lause No- ".0.#
*a spacing &or 8racking 8onsideration  !$".!B!mm

a&e &or 8racking spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

%euired de;elopment length &or 9ars  3"#.@"" mm

 ;aila9le de;elopment length &or 9arsC DL 


@B$.""" mm

Try 9ar si+e / 0 rea o& one 9ar  !"."0# mm!

Num9er o& 9ars reuiredC N9ar  "

 
$ea"se t'e n"mber o% bars is ro"nded "= ma*e s"re ne2 rein%orement ratio > ?ma

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 103/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 11 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Total rein&orcement areaC  stotal  N9ar 5 )rea o& one 9ar,  !"".0# mm!
de&&   D - 8co;er - ".$ 5 )dia. o& one 9ar,  3E!.""" mm

%ein&orcement ratioC  ".""!33

From 8I 8l.B.0.C minimum reOd clear distance 9et7een 9ars


8   ma )Diameter o& one 9arC ."P )!$.#mm,C *in. ?ser pacing,  ""."""mm
d

C'e* to see i% 2idt' is s"%%iient to aomodate bars 

Design &or Fleure a9out 5 ais

)For %ein&orcement 'arallel to 6 is,

8alculate the &leural rein&orcement along the 6 direction o& the &ooting. Find the area o& steel reuiredC C as per ection 3.@ o&
%ein&orced 8oncrete Design )$th ed., 9y almon and Wang )%e&. ,

8ritical Load 8ase / "@

The strength ;alues o& steel and concrete used in the &ormulae are in ksi

(ars parallel to 5 Direction are placed at 9ottom


<&&ecti;e Depth de&&  3B0.""" mm

Factor &rom 8I 8l.".!.B.3  ".@#B

From 8I 8l. ".3.!C  "."!@!3

From 8I 8l. ".3.3C  "."!B

From 8I 8l.B.!.!C  ".""@"


From %e&. C <. 3.@.#aC constant m  B.0#B

Cal"late rein%orement ratio %or ritial load ase 

Design &or &leure a9out 5 ais is


per&ormed at the &ace o& the column E!$.""" mm
at a distanceC D+ 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 104/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 12 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

?ltimate momentC #3.3$ kNm

Nominal moment capacityC *n  $E.!3E kNm

)(ased on e&&ecti;e depth, %euired


".""!3

)(ased on gross depth,  d  2 Depth  "."""3


e&& 
ince K Kmin Kmin Go;erns

 rea o& teel %euiredC  s  B@!.""$ mm!

elected (ar i+e  /0


*inimum spacing allo7ed )min,  ""."""mm

elected spacing ),  !""."""mm


minM  M ma and selected 9ar si+e M selected maimum 9ar si+e...

The rein&orcement is accepted.


 ccording to 8I 3@ 8lause No- ".0.#

*a spacing &or 8racking 8onsideration  !$".!B!mm


a&e &or 8racking spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

%euired de;elopment length &or 9ars  3"#.@"" mm

 ;aila9le de;elopment length &or 9arsC DL 


@B$.""" mm

Try 9ar si+e / 0 rea o& one 9ar  !"."0# mm!

Num9er o& 9ars reuiredC N9ar  "

 
$ea"se t'e n"mber o% bars is ro"nded "= ma*e s"re ne2 rein%orement ratio > ?ma

Total rein&orcement areaC  stotal  N9ar 5 )rea o& one 9ar,  !"".0# mm!
de&&   D - 8co;er - .$ 5 )dia. o& one 9ar, 3B0.""" mm

%ein&orcement ratioC  ".""!#3

From 8I 8l.B.0.C minimum reOd clear distance 9et7een 9ars


8d  ma )Diameter o& one 9arC ."P )!$.#mm,C *in. ?ser pacing,  ""."""mm

C'e* to see i% 2idt' is s"%%iient to aomodate bars 

(ending moment &or upli&t cases 7ill 9e calculated 9ased solely on sel&7eightC soil depth and surcharge loading.

 s the &ooting si+e has already 9een determined 9ased on all ser;ice9ility load casesC and design moment calculation is 9ased
on sel&7eightC soil depth and surcharge onlyC top rein&orcement ;alue &or all pure upli&t load cases 7ill 9e the same.

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 105/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 13 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

 
Design For Top %ein&orcement 'arallel to 6 is

 
Cal"late t'e %le"ral rein%orement %or   Find t'e area o% steel re4"ired

The strength ;alues o& steel and concrete used in the &ormulae are in ksi

Factor &rom 8I 8l.".!.B.3  ".@#B

From 8I 8l. ".3.!C  "."!@!3

From 8I 8l. ".3.3C  "."!B

From 8I 8l. B.!.!C  ".""@"

From %e&. C <. 3.@.#aC constant m  B.0#B

Cal"late rein%orement ratio %or ritial load ase 

Design &or &leure a9out 5 ais is


per&ormed at the &ace o& the column E!$.""" mm
at a distanceC D 

?ltimate momentC !B."$ kNm

Nominal moment capacityC *n  3".0 kNm

)(ased on e&&ecti;e depth, %euired


"."""!3

)(ased on gross depth,  de&&  2 Depth  "."""E

ince K Kmin Kmin Go;erns

 rea o& teel %euiredC  s  B@!.""$ mm!

elected 9ar i+e  /0


*inimum spacing allo7ed )min,  ""."""mm

elected spacing ),  !""."""mm


minM  M ma and selected 9ar si+e M selected maimum 9ar si+e...

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 106/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 14 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

The rein&orcement is accepted.


 ccording to 8I 3@ 8lause No- ".0.#
*a spacing &or 8racking 8onsideration  !$".!B!mm

a&e &or 8racking spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

Design For Top %ein&orcement 'arallel to 5 is

First load case to 9e in pure upli&t / "


 
Cal"late t'e %le"ral rein%orement %or  ; Find t'e area o% steel re4"ired

The strength ;alues o& steel and concrete used in the &ormulae are in ksi

Factor &rom 8I 8l.".!.B.3  ".@#B

From 8I 8l. ".3.!C  "."!@!3

From 8I 8l. ".3.3C  "."!B

From 8I 8l.B.!.!C  ".""@"

From %e&. C <. 3.@.#aC constant m  B.0#B

8alculate rein&orcement ratio &or critical load case

Design &or &leure a9out 6 ais is


per&ormed at the &ace o& the column E!$.""" mm
at a distanceC D 

?ltimate momentC !B."$ kNm

Nominal moment capacityC *n  3".0 kNm

)(ased on e&&ecti;e depth,%euired


"."""!3

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 107/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 15 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

)(ased on gross depth,  de&&  2 Depth  "."""E

ince K Kmin Kmin Go;erns

 rea o& teel %euiredC  s  B@!.""$ mm!


 
elected 9ar i+e  /0
*inimum spacing allo7ed ) ,  ""."""mm
min
elected spacing ),  !""."""mm
minM  M ma and selected 9ar si+e M selected maimum 9ar si+e...

The rein&orcement is accepted.


 ccording to 8I 3@ 8lause No- ".0.#
*a spacing &or 8racking 8onsideration  !$".!B!mm

a&e &or 8racking spect.

$ased on saing rein%orement inrement< rovided rein%orement is 

@1 B 600000mm o

Print Calculation Sheet

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 108/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 1 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

FOOTING C3/F3

Isolated Footing Design(ACI 318-05)


Design For Isolated Footing 24 

Footing No. Group ID Foundation Geometry


- - Length Width Thicness
24 ! !"##.###mm !"##.###mm 4"#.###mm

Footing No. Footing $ein%orcement &edestal $ein%orcement


- 'ottom $ein%orcement()*+ 'ottom $ein%orcement(),+ Top $ein%orcement()*+ Top $ein%orcement(),+ )ain teel Trans teel
24 !/ 0 2## mm c1c !/ 0 2## mm c1c !/ 0 2## mm c1c !/ 0 2## mm c1c N1 N1  

Isolated Footing 24

Input Values

Footing Geomtery

Design Type 3 et Dimension


Footing Thicness (Ft+ 3 4"#.###mm
Footing Length -  (Fl+ 3 !"##.###mm
Footing Width - 5 (F6+ 3 !"##.###mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 109/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 2 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

;ccentricity along  (9,d+ 3 #.###mm


;ccentricity along 5 (9*d+ 3 #.###mm
 
7olumn Dimensions

7olumn hape 3 $ectangular


7olumn Length -  (D col+ 3 <"#.###mm

7olumn Width - 5 (' col+ 3 <"#.###mm

&edestal

Include &edestal= No
&edestal hape 3 N1 
&edestal >eight (&h+ 3 N1 
&edestal Length -  (&l+ 3 N1 
&edestal Width - 5 (&6+ 3 N1 

Design &arameters

7oncrete and $e8ar &roperties

?nit Weight o% 7oncrete 3 2".###N1m<


trength o% 7oncrete 3 2@.###N1mm2
 Aield trength o% teel 3 42#.###N1mm2
)inimum 'ar i*e 3 !/
)a,imum 'ar i*e 3 !/
&edestal )inimum 'ar i*e 3 /
&edestal )a,imum 'ar i*e 3 !@
)inimum 'ar pacing 3 !##.###mm
)a,imum 'ar pacing 3 2##.###mm
&edestal 7lear 7o:er (&B 7L+ 3 "#.###mm
Footing 7lear 7o:er (FB 7L+ 3 "#.###mm

oil &roperties

oil Type 3 Drained


?nit Weight 3 !@.###N1m<
oil 'earing 7apacity 3 2##.###N1m2
oil 'earing 7apacity Type3 Gross 'earing 7apacity

oil urcharge 3 #.###N1m2


Depth o% oil a8o:e Footing 3 !###.###mm
7ohesion 3 #.###N1m2

liding and 9:erturning

7oe%%icient o% Friction 3 #."##


Factor o% a%ety gainst liding 3 !."##
Factor o% a%ety gainst 9:erturning 3 !."##

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 110/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 111/128
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 112/128
Isolated Footing Design Page 5 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

!2# @4."4 !#.<E! <.@@ -!.!!" -2.@E/


!2! @4."4# !#.##! 4.<!" -#.4 -2.<@/
 
$eduction o% %orce due to 8uoyancy C #.###N
;%%ect due to adhesion C #.###N
 rea %rom initial length and 6idthB  o C L   W  C 22"####.###mm2
o o
)in. area reuired %rom 8earing pressureB  min C & 1   C !#@4@<<.@2@mm2
ma,

#ote Amin is an initial estimation


  Citi"al Fa"toed A+ial Load(ito$t sel' eigt/b$oan"/soil)
6ma+  7es*e"ti!e Fa"toed &eaing Ca*a"it

Final Footing i*e

Length (L2+ C !"##.### mm Go:erning Load 7ase 3  !#!

Width (W2+ C !"##.### mm Go:erning Load 7ase 3  !#!

Depth (D2+ C 4"#.### mm Go:erning Load 7ase 3  !#@


Depth is go:erned 8y ?ltimate Load 7ase
(er:ice chec is per%ormed 6ith %ooting thicness reuirements %rom concrete chec+
 rea ( 2+ C 22"####.### mm2

Final oil >eight C !###.### mm


Footing el% Weight C 2".<!2 N
oil Weight 9n Top 9%
<@.2E4 N
Footing C

&ressures at Four 7orners

ess$e at ess$e at ess$e at ess$e at  Aea o' 'ooting


"one 1 "one 2 "one 3 "one 4
Load Case (61) (62) (63) (64) in $*li't (A$)
(mm2)
(,#/mm2) (,#/mm2) (,#/mm2) (,#/mm2)

!#! 00001 #.###! #.###! #.###! #.###

!#/ #.###! 00001 #.###! #.###! #.###

!#/ #.###! #.###! 00001 #.###! #.###

!#@ #.###! #.###! #.###! 00001 #.###

I%  u is *eroB there is no upli%t and no pressure adustment is necessary. 9ther6iseB to account %or upli%tB areas o% negati:e

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 113/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 114/128
Isolated Footing Design Page 7 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Go:erning $estoring Force 3 !#@.4@<N


)inimum liding $atio %or the 7ritical Load 7ase 3 4.<4
7ritical Load 7ase %or 9:erturning a8out -Direction 3 !!/
Go:erning 9:erturning )oment 3 !#.444Nm
Go:erning $esisting )oment 3 !!.<4Nm
)inimum 9:erturning $atio %or the 7ritical Load 7ase 3 !!.2<@

 
7ritical Load 7ase nd The Go:erning Factor 9% a%ety For 9:erturning nd liding - 5 Direction

7ritical Load 7ase %or liding along 5-Direction 3 !!


Go:erning Distur8ing Force 3 E.E@N
Go:erning $estoring Force 3 ".E<"N
)inimum liding $atio %or the 7ritical Load 7ase 3 ./!#
7ritical Load 7ase %or 9:erturning a8out 5-Direction 3 !!4
Go:erning 9:erturning )oment 3 -!/.44Nm
Go:erning $esisting )oment 3 [email protected]#"Nm
)inimum 9:erturning $atio %or the 7ritical Load 7ase 3 .2!@
7ritical Load 7ase nd The Go:erning Factor 9% a%ety For liding long $esultant Direction
7ritical Load 7ase %or liding along $esultant !#/
Direction 3
Go:erning Distur8ing Force 3 2<.E/N
Go:erning $estoring Force 3 !#@.4@<N
)inimum liding $atio %or the 7ritical Load 7ase 3 4."2"

7ompression De:elopment Length 7hec  


De:elopment length sipped as column rein%orcement is not speci%ied in input (7olumn Dimnesion Tas &ane+

hear 7alculation
&unching hear 7hec

Total Footing DepthB D C 4"#.###mm


7alculated ;%%ecti:e DepthB de%%  C D - 7co:er - #." H d8 C <E2.###mm

For rectangular columnB C 'col 1 Dcol C !.###


 
;%%ecti:e depthB de%% B increased until #."Vc  &unching hear Force

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 115/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 8 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

&unching hear ForceB Vu C !/<.@/NB Load 7ase  !#/  

From 7I 7l.!!.!2.2.!B 8o %or columnC 2E/@.###mm

;uation !!-<<B V c! C <#/.!@4N

;uation !!-<4B V c2 C <2<.#/#N

;uation !!-<"B V c< C 2#44.@EN

&unching shear strengthB Vc C #."  minimum o% (Vc!B Vc2B Vc<+ C !"<<."E2N

#."  Vc  Vu henceB 9J 

9ne-Way hear 7hec

 long  Direction

(hear &lane &arallel to Glo8al  ,is+

From 7I 7l.!!.<.!.!B Vc C  "!/.#EN

Distance along  to design %or shearB


D, C !@<.###mm

7hec that #."  Vc  Vu, 6here Vu, is the shear %orce %or the critical load cases at a distance de%%  %rom the %ace o% the column
caused 8y 8ending a8out the  a,is.

From a8o:e calculationsB #."  Vc C <@."<2 N

7ritical load case %or V u, is  !#@ <!.#@2 N

#."  V   V  henceB 9J
c u,

9ne-Way hear 7hec

 long 5 Direction

(hear &lane &arallel to Glo8al 5 ,is+

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 116/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 9 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

From ACI Cl.11.3.1.1, Vc = 

"!/.#E N

Distance along  to design %or shearB D * C !@<.### mm

7hec that 05  9 " : 9 $; 6here Vu* is the shear %orce %or the critical load cases at a distance de%%  %rom the %ace o% the
column caused 8y 8ending a8out the 5 a,is.

From a8o:e calculationsB #."  Vc C <@."<2 N

7ritical load case %or V u* is  !#/ <".4< N

#."  Vc  Vu* henceB 9J

Design %or Fle,ure a8out 5 ,is

(For $ein%orcement &arallel to  ,is+

7alculate the %le,ural rein%orcement along the  direction o% the %ooting. Find the area o% steel reuiredB B as per ection <.@ o%
$ein%orced 7oncrete Design ("th ed.+ 8y almon and Wang ($e%. !+

7ritical Load 7ase  !#/

The strength :alues o% steel and concrete used in the %ormulae are in si

'ars parallel to  Direction are placed at 8ottom


;%%ecti:e Depth de%% C <E2.### mm

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 117/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 10 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Factor %rom 7I 7l.!#.2..< C #.@4

From 7I 7l. !#.<.2B C #.#2@2<

From 7I 7l. !#.<.<B C #.#2!!

From 7I 7l. .!2.2B C #.##!@#

From $e%. !B ;. <[email protected] constant m C !./4

Cal"$late ein'o"ement atio 'o "iti"al load "ase

Design %or %le,ure a8out 5 a,is is


per%ormed at the %ace o% the column "".### mm
at a distanceB D, C

?ltimate momentB <#.@!" Nm

Nominal moment capacityB )n C <4.2<@ Nm

('ased on e%%ecti:e depth+ $euired #.###<"


C

('ased on gross depth+ , de%%  1 Depth C #.###<!

ince K Kmin Kmin Go:erns

 rea o% teel $euiredB  s C !2!".##< mm2

elected 8ar i*e C !/


)inimum spacing allo6ed (min+ C C !##.###mm

elected spacing (+ C 2##.###mm

minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...


The rein%orcement is accepted.
 ccording to 7I <!@ 7lause No- !#./.4
)a, spacing %or 7racing 7onsideration C 2"#.22mm

a%e %or 7racing spect.

&ased on s*a"ing ein'o"ement in"ement< *o!ided ein'o"ement is 

@1 B 200000mm o"

$euired de:elopment length %or 8ars C C<#4.@## mm

 :aila8le de:elopment length %or 8arsB DL 


"2".### mm
C
Try 8ar si*e  !/ rea o% one 8ar C 2#!.#/4 mm2

Num8er o% 8ars reuiredB N8ar C 

 
&e"a$se te n$mbe o' bas is o$nded $*= ma,e s$e ne ein'o"ement atio > ?ma+

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 118/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 11 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

Total rein%orcement areaB  stotal C N8ar  (rea o% one 8ar+ C !4#.44E mm2
de%%  C D - 7co:er - #."  (dia. o% one 8ar+ C <E2.### mm

$ein%orcement ratioB C #.##2<E

From 7I 7l../.!B minimum reOd clear distance 8et6een 8ars


7  C ma, (Diameter o% one 8arB !.#P (2".4mm+B )in. ?ser pacing+ C !##.###mm
d

Ce", to see i' idt is s$''i"ient to a""omodate bas 

Design %or Fle,ure a8out  a,is

(For $ein%orcement &arallel to 5 ,is+

7alculate the %le,ural rein%orcement along the 5 direction o% the %ooting. Find the area o% steel reuiredB B as per ection <.@ o%
$ein%orced 7oncrete Design ("th ed.+ 8y almon and Wang ($e%. !+

7ritical Load 7ase  !#@

The strength :alues o% steel and concrete used in the %ormulae are in si

'ars parallel to  Direction are placed at 8ottom


;%%ecti:e Depth de%% C </.### mm

Factor %rom 7I 7l.!#.2..< C #.@4

From 7I 7l. !#.<.2B C #.#2@2<

From 7I 7l. !#.<.<B C #.#2!!

From 7I 7l..!2.2B C #.##!@#


From $e%. !B ;. <[email protected] constant m C !./4

Cal"$late ein'o"ement atio 'o "iti"al load "ase 

Design %or %le,ure a8out  a,is is


per%ormed at the %ace o% the column "".### mm
at a distanceB D* C

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 119/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 12 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

?ltimate momentB 2.4!< Nm

Nominal moment capacityB )n C <#.4"E Nm

('ased on e%%ecti:e depth+ $euired


#.###<4
C

('ased on gross depth+ , d  1 Depth C #.###2E


e%% 
ince K Kmin Kmin Go:erns

 rea o% teel $euiredB  s C !2!".##< mm2

elected 'ar i*e C !/


)inimum spacing allo6ed (min+ C !##.###mm

elected spacing (+ C 2##.###mm


minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...

The rein%orcement is accepted.


 ccording to 7I <!@ 7lause No- !#./.4

)a, spacing %or 7racing 7onsideration C 2"#.22mm


a%e %or 7racing spect.

&ased on s*a"ing ein'o"ement in"ement< *o!ided ein'o"ement is 

@1 B 200000mm o"

$euired de:elopment length %or 8ars C <#4.@## mm

 :aila8le de:elopment length %or 8arsB DL 


"2".### mm
C
Try 8ar si*e  !/ rea o% one 8ar C 2#!.#/4 mm2

Num8er o% 8ars reuiredB N8ar C 

 
&e"a$se te n$mbe o' bas is o$nded $*= ma,e s$e ne ein'o"ement atio > ?ma+

Total rein%orcement areaB  stotal C N8ar  (rea o% one 8ar+ C !4#.44E mm2
de%%  C D - 7co:er - !."  (dia. o% one 8ar+ </.### mm
C

$ein%orcement ratioB C #.##2"#

From 7I 7l../.!B minimum reOd clear distance 8et6een 8ars


7d C ma, (Diameter o% one 8arB !.#P (2".4mm+B )in. ?ser pacing+ C !##.###mm

Ce", to see i' idt is s$''i"ient to a""omodate bas 

'ending moment %or upli%t cases 6ill 8e calculated 8ased solely on sel%6eightB soil depth and surcharge loading.

 s the %ooting si*e has already 8een determined 8ased on all ser:ice8ility load casesB and design moment calculation is 8ased
on sel%6eightB soil depth and surcharge onlyB top rein%orcement :alue %or all pure upli%t load cases 6ill 8e the same.

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 120/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 13 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

 
Design For Top $ein%orcement &arallel to 5 ,is

 
Cal"$late te 'le+$al ein'o"ement 'o  + Find te aea o' steel e6$ied

The strength :alues o% steel and concrete used in the %ormulae are in si

Factor %rom 7I 7l.!#.2..< C #.@4

From 7I 7l. !#.<.2B C #.#2@2<

From 7I 7l. !#.<.<B C #.#2!!

From 7I 7l. .!2.2B C #.##!@#

From $e%. !B ;. <[email protected] constant m C !./4

Cal"$late ein'o"ement atio 'o "iti"al load "ase 

Design %or %le,ure a8out  a,is is


per%ormed at the %ace o% the column "".### mm
at a distanceB D, C

?ltimate momentB .2"< Nm

Nominal moment capacityB )n C @.#"E Nm

('ased on e%%ecti:e depth+ $euired


#.####E
C

('ased on gross depth+ , de%%  1 Depth C #.####@

ince K Kmin Kmin Go:erns

 rea o% teel $euiredB  s C !2!".##< mm2

elected 8ar i*e C !/


)inimum spacing allo6ed (min+ C !##.###mm

elected spacing (+ C 2##.###mm


minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 121/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 14 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

The rein%orcement is accepted.


 ccording to 7I <!@ 7lause No- !#./.4
)a, spacing %or 7racing 7onsideration C 2"#.22mm

a%e %or 7racing spect.

&ased on s*a"ing ein'o"ement in"ement< *o!ided ein'o"ement is 

@1 B 200000mm o"

Design For Top $ein%orcement &arallel to  ,is

First load case to 8e in pure upli%t  #


 
Cal"$late te 'le+$al ein'o"ement 'o  ; Find te aea o' steel e6$ied

The strength :alues o% steel and concrete used in the %ormulae are in si

Factor %rom 7I 7l.!#.2..< C #.@4

From 7I 7l. !#.<.2B C #.#2@2<

From 7I 7l. !#.<.<B C #.#2!!

From 7I 7l..!2.2B C #.##!@#

From $e%. !B ;. <[email protected] constant m C !./4

7alculate rein%orcement ratio %or critical load case

Design %or %le,ure a8out 5 a,is is


per%ormed at the %ace o% the column "".### mm
at a distanceB D, C

?ltimate momentB .2"< Nm

Nominal moment capacityB )n C @.#"E Nm

('ased on e%%ecti:e depth+$euired


#.####E
C

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 122/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
Isolated Footing Design Page 15 of 15
8/18/2019 Design calculation report - Pipe rack - and foundation

('ased on gross depth+ , de%%  1 Depth C #.####@

ince K Kmin Kmin Go:erns

 rea o% teel $euiredB  s C !2!".##< mm2


 
elected 8ar i*e C !/
)inimum spacing allo6ed ( + C !##.###mm
min
elected spacing (+ C 2##.###mm
minMC  MC ma, and selected 8ar si*e M selected ma,imum 8ar si*e...

The rein%orcement is accepted.


 ccording to 7I <!@ 7lause No- !#./.4
)a, spacing %or 7racing 7onsideration C 2"#.22mm

a%e %or 7racing spect.

&ased on s*a"ing ein'o"ement in"ement< *o!ided ein'o"ement is 

@1 B 200000mm o"

Print Calculation Sheet

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 123/128
file://C:\Staad Foundation Advanced\CalcXsl\footing.xml 09/12/2013
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

ROOF SLAB DESIGN 


".0 COMPUTER SPREADSHEET 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 124/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT TITLE CALCULATION BY AAM DATE 09/09/13


CHECKED BY SAM DATE 09/09/13
PROJECT NO. 1642K REVISION No. 00 DATE
SUBJECT Two Way Slab
SHEET No OF

DESIGN OF TWO WAY SLAB WITH DROP BEAMS

Case 7
ne s ort e ge s ont nuous

Top Long Bar


Discontinuous Top Short Bar
B1 Discontinuous (Typ)

  s
  r Top Long Bar
  a Continuous
   B
   t
  r
      4   o       2
     a
      L
     n
      B
   h
      S    S       B
  m Bottom Long Bars
  o
   t
   t
  o B3
   B

Ln

Lb

Slab Data :
Shorter span (c/c) La = 6.00 m
Longer span (c/c) Lb = 5.75 m

Thickness ts = 200 mm
Concrete Cover C = 40 mm

Beam Data : Width Depth


B1 = 0.35 x 0.50 m
B2 = 0.35 x 0.50 m
B3 = 0.35 x 0.50 m
B4 = 0.35 x 0.60 m
Loads :
Slab Self Weight = 0.20 x 24 = 4.80 KN/m2
Floor Finish & attachment = 3.59 KN/m2
Partition Load = 0.00 KN/m2
Service Equepment Load = 0.00 KN/m2
Total Dead Load - Service DLs. = 8.39 kN/m

Live Load - Service LLs. = 1.00 kN/m

Materials :
Steel Yield Strength fy = 420.00 MPa 60,000.0 psi 
Concrete Compression Strength fc' = 28.00 MPa 4,000.0 psi 

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 125/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT TITLE CALCULATION BY AAM DATE 09/09/13


CHECKED BY SAM DATE 09/09/13
PROJECT NO. 1642K REVISION No. 00 DATE
SUBJECT Two Way Slab
SHEET No OF

CHECK SLAB THICKNESS FOR DEFLECTION

bE bE
   t    t a = min. value of:  
   b a a (4 t) or   (h W  - t)
   h    W    b    W
   h   h
   h ACI (13.2.4)

bW bW

MIDDLE BEAM EDGE BEAM

"α" Ratio of Flexural Stiffnesses (beam to slab)


α
 α  = (E cb  x I b  ) / (E cs x I s  ), ACI (13.1) Where, Ecb = Ecs

Beam number B1 B2 B3 B4
Beam location Discont. Edg. Cont. Edg. Discont. Edg. Discont. Edg.
Beam width, m  bW 0.35 0.35 0.35 0.35
Beam height, m  hb 0.50 0.50 0.50 0.60
Effective flange width, m  bE 0.650 0.950 0.650 0.750
Parameter for calculation of "k" Value ( bE / bW ) -1 0.857 1.714 0.857 1.143
Parameter for calculation of "k" Value  ts / hb 0.400 0.400 0.400 0.333
Given below, value for calculation of Ib,  k 1.331 1.549 1.331 1.410
Beam Moment of Inertia, cm 3

 Ib = k x(bW x h  /12) 485260.4 564739.6 485260.4 888300.0


Slab Width, m  bs = La or Lb 3.00 5.75 3.00 2.88
Slab Moment of Inertia, cm  Is = bs t / 12 200000 383333 200000 191667
Ratio of Flexural Stiffnesses α = Ib / Is
 α 2.43 1.47 2.43 4.63
Average value of α for all beams on edges of a panel, αm 2.74

   b E      t        t      t   
2
  b E      t   
3
     b E      t   
1 +  x x 4 − 6  + 4        1 +  
k  =
b −1
 +
 b  −1
x  b −1
x 

   W      h       h   h    W      h  
     W      h 

Clear Span in Short Direction Sn = la = 5.65 m

Clear Span in Long Direction Ln = lb = 5.40 m


Ratio of "Ln / Sn" β = 0.96
Ratio of "Sn / Ln" m = 1.05

Minimum slab thickness

for αm >2 Ln(0.8+fy/200,000) AC1 Eq. (9-13)


tmin = = 133.2 mm
36+9β where fy = 60000 psi 

< 200.0 mm OK

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 126/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT TITLE CALCULATION BY AAM DATE 09/09/13


CHECKED BY SAM DATE 09/09/13
PROJECT NO. 1642K REVISION No. 00 DATE
SUBJECT Two Way Slab
SHEET No OF

CONCRETE DESIGN
kN/m
DL u = 8.39 x 1.2 = 10.07
LLu = 1.00 x 1.6 = 1.60 kN/m
Wu = 11.67 kN/m

For :  CASE 7  m = 1.05

MOMENT COEFFICIENTS FROM ACI


Short Span Long Span
Negative Moment Coefficient Ca,neg = 0.000 Cb,neg = 0.071
Positive Moment Coefficient, Dead Load Ca,dl = 0.027 Cb,dl = 0.033
Positive Moment Coefficient, Live Load Ca,ll = 0.032 Cb,ll = 0.035

Negative Moment
Ma,neg = Ca,neg x W x la2 = 0.000 x 11.67 x 5.65 ^2 = 0.00 kN.m
Mb,neg = Cb,neg x W x lb2 = 0.071 x 11.67 x 5.40 ^2 = 24.16 kN.m

Positive Moment
Ma,pos,dl = Ca,dl x DL x la2 = 0.027 x 10.07 x 5.65 ^2 = 8.68 kN.m
Ma,pos,ll = Ca,ll x LL x la2 = 0.032 x 1.60 x 5.65 ^2 = 1.63 kN.m
Ma,pos,total 10.31 kN.m

Mb,pos,dl = Cb,dl x DL x lb2 = 0.033 x 10.07 x 5.40 ^2 = 9.69 kN.m


Mb,pos,ll = Cb,ll x LL x lb2 = 0.035 x 1.60 x 5.40 ^2 = 1.63 kN.m

Mb,pos,total = 11.32 kN.m

STEEL REINFORCEMENT
B Bar A Bar
Long Span Short Span
Maximum and Minimum Steel Ratio

0.75[0.85(fc')β(600)]    d
   B    A
   d    h
ρmax  = = 0.0213
  fy(fy + 600)

ρmin = As req'd by Temp = 0.0018 1000 mm

Moment Effective Steel Area Bar Bar Spacing


Depth Ratio  of Steel Dia. Required Provided
2
 kN.m d, mm ρ As, cm Φ, mm mm mm
  n
  a Neg. Mom @ Contin. Edge 0.00 154 0.0023 3.60 12 310 150  Dia12 @ 150mm Top Bar
  p
   S
   t Pos. Mom @ Midspan 10.31 154 0.0023 3.60 12 310 150  Dia12 @ 150mm Bott. Bar
  r
  o
   h
   S Neg. Mom @ Discont. Edge - - 3.60 12 310 -  Dia12 @ -mm Top Bar
  n
  a Neg. Mom @ Contin. Edge 24.16 142 0.0033 4.63 12 240 150  Dia12 @ 150mm Top Bar
  p
   S
  g Pos. Mom @ Midspan 11.32 142 0.0025 3.60 12 310 150  Dia12 @ 150mm Bott. Bar
  n
  o
   L Neg. Mom @ Discont. Edge − - 3.60 12 310 -  Dia12 @ -mm Top Bar

http://slidepdf.com/reader/full/design-calculation-report-pipe-rack-and-foundation 127/128
8/18/2019 Design calculation report - Pipe rack - and foundation

PROJECT: SALES GAS DELIVERY SYSTEM JOB NO.: BI-21-00052 SHEET NO.:
LOCATION: RIYADH DESIGN BY: AAM DATE: 09/09/2013
CLIENT: SAUDI ARAMCO CHECKED BY: SAM APPROVED BY: MAG

END OF ANAL#SIS 