0% found this document useful (0 votes)
44 views

Key Sheet DRG 2

The document provides details of construction materials and quantities for various parts of an excavation and building project. It includes quantities in cubic meters or square meters of earthwork excavation, PCC, SSM masonry, block masonry, internal and external plastering, RCC, binding wire, shuttering, and joinery work. Specific dimensions and quantities are provided for excavation of foundation walls and construction of rooms including a bedroom, master bedroom, toilet, kitchen, and hall.

Uploaded by

Mohammed Muzamil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Key Sheet DRG 2

The document provides details of construction materials and quantities for various parts of an excavation and building project. It includes quantities in cubic meters or square meters of earthwork excavation, PCC, SSM masonry, block masonry, internal and external plastering, RCC, binding wire, shuttering, and joinery work. Specific dimensions and quantities are provided for excavation of foundation walls and construction of rooms including a bedroom, master bedroom, toilet, kitchen, and hall.

Uploaded by

Mohammed Muzamil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Drawing No: 2 (07.02.

2013)
Length in Breadth in Depth/Height
S.No Description Unit Nos Quantity Remarks
metre metre in metre

ABSTRACT:
1 Earthwork Excavation Cum 55.83
2 PCC Cum 12.88
3 SSM Cum 23.31
4 Block Masonry Cum 27.97
5 Plastering - Internal Sqm 291.96
6 Plasering - External Sqm 107.76
7 RCC Cum 10.59
8 BBS Kg 928.14
9 Shuttering Sqm 84.17
10 Joineries Sqm 19.50

1 Earth work excavation


Long wall Cum 2.00 10.02 0.90 1.30 23.45
Short wall Cum 2.00 6.50 0.90 1.30 15.21
Bed Room Long Wall Cum 1.00 3.125 0.70 1.30 2.84
Bed Room Short Wall Cum 1.00 2.075 0.70 1.30 1.89
M. Bed Room Long Wall Cum 1.00 3.625 0.70 1.30 3.30
M. Bed Room Short Wall Cum 1.00 2.475 0.70 1.30 2.25
Toilet front wall Cum 1.00 2.270 0.70 1.30 2.07
Toilet partition wall Cum 1.00 2.425 0.70 1.30 2.21
Kitchen wall Cum 1.00 2.875 0.70 1.30 2.62
Total Qty Cum 55.83
2 PCC 1:4:8
Long wall Cum 2.00 10.02 0.90 0.30 5.41
Short wall Cum 2.00 6.50 0.90 0.30 3.51
Bed Room Long Wall Cum 1.00 3.125 0.70 0.30 0.66
Bed Room Short Wall Cum 1.00 2.075 0.70 0.30 0.44
M. Bed Room Long Wall Cum 1.00 3.625 0.70 0.30 0.76
M. Bed Room Short Wall Cum 1.00 2.475 0.70 0.30 0.52
Toilet front wall Cum 1.00 2.270 0.70 0.30 0.48
Toilet partition wall Cum 1.00 2.425 0.70 0.30 0.51
Kitchen wall Cum 1.00 2.875 0.70 0.30 0.60
Total Qty Cum 12.88
3 SS Masonry
I st Footing
Long wall Cum 2.00 9.82 0.70 0.20 2.75
Short wall Cum 2.00 6.70 0.70 0.20 1.88
Bed Room Long Wall Cum 1.00 3.125 0.50 0.20 0.31
Bed Room Short Wall Cum 1.00 2.275 0.50 0.20 0.23
M. Bed Room Long Wall Cum 1.00 3.625 0.50 0.20 0.36
M. Bed Room Short Wall Cum 1.00 2.675 0.50 0.20 0.27
Toilet front wall Cum 1.00 2.470 0.50 0.20 0.25
Toilet partition wall Cum 1.00 2.625 0.50 0.20 0.26
Kitchen wall Cum 1.00 3.075 0.50 0.20 0.31
2 nd Footing
Long wall Cum 2.00 9.62 0.50 0.20 1.92
Short wall Cum 2.00 6.90 0.50 0.20 1.38
Bed Room Long Wall Cum 1.00 3.175 0.40 0.20 0.25
Bed Room Short Wall Cum 1.00 2.425 0.40 0.20 0.19
M. Bed Room Long Wall Cum 1.00 3.675 0.40 0.20 0.29
M. Bed Room Short Wall Cum 1.00 2.825 0.40 0.20 0.23
Toilet front wall Cum 1.00 2.570 0.40 0.20 0.21
Toilet partition wall Cum 1.00 2.775 0.40 0.20 0.22
Kitchen wall Cum 1.00 3.225 0.40 0.20 0.26
3 rd Footing
Long wall Cum 2.00 9.52 0.40 0.60 4.57
Short wall Cum 2.00 7.00 0.40 0.60 3.36
Bed Room Long Wall Cum 1.00 3.175 0.30 0.60 0.57
Bed Room Short Wall Cum 1.00 2.525 0.30 0.60 0.45
M. Bed Room Long Wall Cum 1.00 3.675 0.30 0.60 0.66
M. Bed Room Short Wall Cum 1.00 2.925 0.30 0.60 0.53
Toilet front wall Cum 1.00 2.670 0.30 0.60 0.48
Toilet partition wall Cum 1.00 2.875 0.30 0.60 0.52
Kitchen wall Cum 1.00 3.325 0.30 0.60 0.60
Total Qty Cum 23.31
4 Brick / Block work
Long wall Cum 2.00 9.320 0.20 3.20 11.93
Short wall Cum 2.00 7.200 0.20 3.20 9.22
Bed Room Long Wall Cum 1.00 3.200 0.15 3.20 1.54
Bed Room Short Wall Cum 1.00 2.700 0.15 3.20 1.30
M. Bed Room Long Wall Cum 1.00 3.700 0.15 3.20 1.78
M. Bed Room Short Wall Cum 1.00 3.100 0.15 3.20 1.49
Toilet front wall Cum 1.00 2.820 0.15 3.20 1.35
Toilet partition wall Cum 1.00 3.050 0.15 3.20 1.46
Kitchen wall Cum 1.00 3.500 0.15 3.20 1.68
Total Qty 31.74
Deductions
Main Door Cum 1.00 1.20 0.20 2.10 0.50
D Cum 2.00 1.10 0.15 2.10 0.69
D1 Cum 2.00 1.00 0.15 2.10 0.63
W1 Cum 2.00 1.20 0.20 1.00 0.48
W2 Cum 3.00 1.40 0.20 1.20 1.01
ventilator Cum 2.00 0.60 0.20 0.60 0.14
Opening Cum 1.00 1.00 0.15 2.10 0.32
Total Qty 3.77
Net Qty Cum 27.97
5 Internal Plastering
Wall
Bed Room Sqm 2.00 2.70 3.375 18.23
Sqm 2.00 3.05 3.375 20.59
M. Bed Room Sqm 2.00 3.10 3.375 20.93
Sqm 2.00 3.55 3.375 23.96
Kitchen Sqm 2.00 2.07 3.375 13.97
Sqm 2.00 3.50 3.375 23.63
Toilet -1 Sqm 2.00 1.27 3.375 8.57
Sqm 2.00 3.05 3.375 20.59
Toilet - 2 Sqm 2.00 1.40 3.375 9.45
Sqm 2.00 3.05 3.375 20.59
Hall Sqm 2.00 6.70 3.375 45.23
Sqm 2.00 4.00 3.375 27.00
Ceiling Plastering
Bed Room Sqm 1.00 2.70 3.05 8.24
M. Bed Room Sqm 1.00 3.10 3.55 11.01
Kitchen Sqm 1.00 2.07 3.50 7.25
Toilet -1 Sqm 1.00 1.27 3.05 3.87
Toilet - 2 Sqm 1.00 1.40 3.05 4.27
Hall Sqm 1.00 4.00 5.67 22.68
Sqm 1.00 1.03 3.50 3.61
Jamb finishing
Main Door Sqm 1.00 5.40 0.20 1.08
D Sqm 2.00 5.30 0.15 1.59
D1 Sqm 2.00 5.20 0.15 1.56
W1 Sqm 2.00 4.40 0.20 1.76
W2 Sqm 3.00 5.20 0.20 3.12
ventilator Sqm 2.00 2.40 0.20 0.96
Opening Sqm 1.00 5.20 0.15 0.78
Deductions
Main Door Cum -1.00 1.20 2.10 -2.52
D Cum -4.00 1.10 2.10 -9.24
D1 Cum -4.00 1.00 2.10 -8.40
W1 Cum -2.00 1.20 1.00 -2.40
W2 Cum -3.00 1.40 1.20 -5.04
ventilator Cum -2.00 0.60 0.60 -0.72
Opening Cum -2.00 1.00 2.10 -4.20
Total Qty Sqm 291.96
6 External Plastering
Long wall Sqm 2.00 9.32 3.50 65.24
Short wall Sqm 2.00 7.60 3.50 53.20
Deductions
Main Door Sqm -1.00 1.20 2.10 -2.52
W1 Sqm -2.00 1.20 1.00 -2.40
W2 Sqm -3.00 1.40 1.20 -5.04
Ventilator Sqm -2.00 0.60 0.60 -0.72
Total Qty Sqm 107.76
7 Concrete Work
Roof Beams
Long wall Cum 2.00 9.320 0.20 0.30 1.12
Short wall Cum 2.00 7.200 0.20 0.30 0.86
Bed Room Long Wall Cum 1.00 3.200 0.15 0.30 0.14
Bed Room Short Wall Cum 1.00 2.700 0.15 0.30 0.12
M. Bed Room Long Wall Cum 1.00 3.700 0.15 0.30 0.17
M. Bed Room Short Wall Cum 1.00 3.100 0.15 0.30 0.14
Toilet front wall Cum 1.00 2.820 0.15 0.30 0.13
Toilets partition wall Cum 1.00 3.050 0.15 0.30 0.14
Kitchen wall Cum 1.00 3.500 0.15 0.30 0.16
Slab
Bed Room Cum 1.00 2.70 3.05 0.125 1.03
M. Bed Room Cum 1.00 3.10 3.55 0.125 1.38
Kitchen Cum 1.00 2.07 3.50 0.125 0.91
Toilet -1 Cum 1.00 1.27 3.05 0.125 0.48
Toilet - 2 Cum 1.00 1.40 3.05 0.125 0.53
Hall Cum 1.00 4.00 5.67 0.125 2.84
Cum 1.00 1.03 3.50 0.125 0.45
Total Qty 10.59
8 Shuttering work
Roof Beams
Beam Outer Side
Sq.m 2.00 9.32 0.30 5.59
All round
Sq.m 2.00 7.60 0.30 4.56
Beam Inner Side
Bed Room Sqm 2.00 2.70 0.175 0.95
Sqm 2.00 3.05 0.175 1.07
M. Bed Room Sqm 2.00 3.10 0.175 1.09
Sqm 2.00 3.55 0.175 1.24
Kitchen Sqm 2.00 2.07 0.175 0.72
Sqm 2.00 3.50 0.175 1.23
Toilet -1 Sqm 2.00 1.27 0.175 0.44
Sqm 2.00 3.05 0.175 1.07
Toilet - 2 Sqm 2.00 1.40 0.175 0.49
Sqm 2.00 3.05 0.175 1.07
Hall Sqm 2.00 6.70 0.175 2.35
Sqm 2.00 4.00 0.175 1.40
Slab Bottom
Bed Room Sqm 1.00 2.70 3.05 8.24
M. Bed Room Sqm 1.00 3.10 3.55 11.01
Kitchen Sqm 1.00 2.07 3.50 7.25
Toilet -1 Sqm 1.00 1.27 3.05 3.87
Toilet - 2 Sqm 1.00 1.40 3.05 4.27
Hall Sqm 1.00 4.00 5.67 22.68
Sqm 1.00 1.03 3.50 3.61
Total Qty Sqm 84.17
9 Joineries
Main Door Cum 1.00 1.20 2.10 2.52
D Cum 2.00 1.10 2.10 4.62
D1 Cum 2.00 1.00 2.10 4.20
W1 Cum 2.00 1.20 1.00 2.40
W2 Cum 3.00 1.40 1.20 5.04
ventilator Cum 2.00 0.60 0.60 0.72
Total Qty Sqm 19.50