ECM Check List Genting Sanyen Doc No: ECM-03 Check List No:1 Electrical Department Rev.2

This document is a checklist for inspecting equipment in an air compressor room. It lists various components to check, including two ML132 compressors, three air receiver tanks, plant water drains, and traps. Measurement points include loading amps, pressures, temperatures, oil levels, and checking for leaks, abnormal noises or other issues. Space is provided for comments on the analysis of the checklist.

Uploaded by

Mohd A Ishak
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

ECM Check List Genting Sanyen Doc No: ECM-03 Check List No:1 Electrical Department Rev.2

This document is a checklist for inspecting equipment in an air compressor room. It lists various components to check, including two ML132 compressors, three air receiver tanks, plant water drains, and traps. Measurement points include loading amps, pressures, temperatures, oil levels, and checking for leaks, abnormal noises or other issues. Space is provided for comments on the analysis of the checklist.

Uploaded by

Mohd A Ishak
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

ECM Check List Genting Sanyen Doc No: ECM-03

Check list no:1 Electrical Department Rev.2

NAME :
DATE : PM1 AIR COMPRESSOR ROOM

Description
Compressor unit: ML132 NO:1 ML132 NO:2 Index
Comp.H/R meter
Loading amp. 240amp.
Loading press. Max: 7 bar
Unloading press. Min: 6 Bar
Loadind Temp. Max:109'C
Unloading Temp. 86'C
Loading time
Unloading time
Oil level Max: 75%/S.glass
Lamp test
Pipe leak
Hose leak
Fitting condition
Tubing condition
Abnormal noise

Air Receiver Tank water purge YES NO


Tank no:1
Tank no:2
Tank no:3

Plant water drain YES NO


Post 1
Post 2
Post 3
Post 4
Drain trap 1
Drain trap 2
Drain trap 3

Check list Analysis:

Comment by:
Genting Sanyen Doc No: ECM-03
Electrical Department Rev.3

NAME :
DATE : PM1 AIR COMPRESSOR ROOM

Description
Compressor unit: ML132 NO:1 ML132 NO:2 Index
Comp.H/R meter
Loading amp. 240amp.
Loading press. Max: 7 bar
Unloading press. Min: 6 Bar
Loading Temp. Max:109'C
Unloading Temp. 86'C
Loading time
Unloading time
Oil level Max: 75%/S.glass
Lamp test
Pipe leak
Hose leak
Fitting condition
Tubing condition
Abnormal noise

Air Receiver Tank water purge YES NO


Tank no:1
Tank no:2
Tank no:3

Plant water drain YES NO


Post 1
Post 2
Post 3
Post 4
Drain trap 1
Drain trap 2
Drain trap 3

Check list Analysis:

Comment by:
GS Paper & Packaging Sdn Bhd Doc No: ECM-03
Electrical Department Rev.4

NAME :
DATE : PM1 AIR COMPRESSOR ROOM

Description
Compressor unit: ML132 NO:1 ML132 NO:2 GA 132 ML30 No1 ML30 No.2 Index
Comp.H/R meter
Loading amp. 240amp.
Loading press. Max: 7 bar
Unloading press. Min: 6 Bar
Loadind Temp. Max:109'C
Unloading Temp. 86'C
Loading time
Unloading time
Oil level Max: 75%/S.glass
Lamp test
Pipe leak
Hose leak
Fitting condition
Tubing condition
Abnormal noise

Air Receiver Tank water purge YES NO


Tank no:1
Tank no:2
Tank no:3

Plant water drain YES NO


Post 1
Post 2
Post 3
Post 4
Drain trap 1
Drain trap 2
Drain trap 3

Check list Analysis:

Comment by: