20 MVA TF Test Report
20 MVA TF Test Report
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
At
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Report Reviewed by
________________
Dr. Aradhana Ray
Engineering Consultant
PURPOSE OF DISTRIBUTION:
This document is distributed to JUUNL for their own commercial and maintenance
purposes. Rights to copy or distribute this document are only granted for the stated
purpose. The document may not otherwise be used or distributed without the prior written
permission of Laxmi Associates.
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Contents:
1.0. Background …………………………………………………………………. 4
2.0. Scope of work………………………………………………………………. 4
3.0. Reference……………………………………………………………………… 4
4.0. Instrument used…………………………………………………………… 5
5.0. Transformer Details……………………………………………………… 5
6.0. Details of Test & Data Analysis……………………………………. 6
Tan Delta & Capacitance Measurement of Winding & Bushings
Insulation Resistance Test
Magnetizing Current Test
Turns Ratio Test
Magnetic Balance Test
Floating Neutral Test
Short Circuit Test
Vector Group Test
Winding Resistance Test
Dynamic Contact Resistance Measurement of OLTC
SFRA Test
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
1. Background:
For the stated purpose JUUNL, appointed Laxmi Associates as service provider & The
detailed test results and analysis are given in this document.
2. Scope of work:
Carry out diagnostic testing on Transformer and submit a detailed test report
according to work order for “Testing and Condition monitoring of outdoor
electrical equipment in 132kV Switchyard, Sikidiri. (Work Order No: 31)”
3. Reference:
IEEE.62.1995. IEEE Guide for diagnostic field testing of electric power apparatus
Part-1: Oil filled Power transformers, Regulators and Reactors.
IEEE Std C57.12.90-1999.IEEE Standard test code for liquid immersed distribution
power and regulating transformer
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
b. Combination: HV/TV
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
c. Combination: LV/TV
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
IR Value(in GΩ) at 5 kV PI
Connection
15 Sec 60 Sec 600 Sec (600/60 Sec)
HV/LV 2.55 5.03 24.6 4.89
HV/TV 4.34 7.95 33.3 4.19
LV/TV 2.08 4.18 21.1 5.05
HV/E 3.29 4.84 9.10 1.88
LV/E 2.48 4.30 18.9 4.40
TV/E 3.45 6.95 27.2 3.91
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
a. Combination: HV/LV
MEASURED RATIO
TAP POS. 1U-N/ 1V-N/ 1W-N/
2U-N 2V-N 2W-N
1 4.2128 4.2108 4.2110
2 4.1593 4.1589 4.1575
3 4.1079 4.1080 4.1067
4 4.0560 4.0560 4.0558
5 4.0049 4.0049 4.0041
6 3.9535 3.9528 3.9522
7 3.9022 3.9031 3.9027
8 3.8541 3.8547 3.8531
9 3.8026 3.8026 3.8023
10 3.7518 3.7512 3.7508
11 3.7037 3.7033 3.7033
12 3.6519 3.6517 3.6505
13 3.6010 3.6011 3.6030
14 3.5522 3.5532 3.5519
15 3.5004 3.5015 3.5015
16 3.4484 3.4496 3.4491
17 3.4018 3.4076 3.0080
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
b. Combination: HV/TV
MEASURED RATIO
TAP POS. 1U-N/ 1V-N/ 1W-N/
3U-3W 3V-3U 3W-3V
1 7.2864 7.2868 7.2878
2 7.2003 7.1966 7.1978
3 7.1098 7.1072 7.1097
4 7.0199 7.0188 7.0190
5 6.9314 6.9298 6.9299
6 6.8429 6.8394 6.8403
7 6.7518 6.7483 6.7492
8 6.6668 6.6669 6.6666
9 6.5771 6.5789 6.5776
10 6.4837 6.4863 6.4823
11 6.4010 6.4038 6.4018
12 6.3146 6.3148 6.3115
13 6.2238 6.2247 6.2229
14 6.1397 6.1403 6.1375
15 6.0496 6.0514 6.0514
16 5.9642 5.9612 5.9615
17 5.8809 5.8789 5.8799
c. Combination: LV/TV
MEASURED RATIO
TAP POS. 2U-N/ 2V-N/ 2W-N/
3U-3W 3V-3U 3W-3V
5 1.7278 1.7278 1.7280
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
6.6 Magnetic Balance Test:
HV SIDE 1-PHASE
LV SIDE 1-PHASE
TV SIDE 3-PHASE
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Voltage Applied
HV Winding Voltage Measured (V)
(V)
1U-N 246.3
1V-N 246.1 N-EARTH 0.381
1W-N 246.5
Applied 1 phase Voltage in HV Side and Measured Current in HV & LV Side. While LV
kept shorted.
HV/LV
HV Side
HV Side (Applied Volts) LV Side
TAP POS. (Current in Amp)
Isc (A)
1U-N 1V-N 1W-N 1U 1V 1W
1 246.2 244.4 249.0 2.40 2.36 2.40 10.30
5 246.9 244.4 249.2 2.74 2.69 2.76 11.06
17 244.5 244.7 248.4 4.11 4.06 4.10 14.01
Applied 1 phase Voltage in HV Side and Measured Current in HV & TV Side. While TV
kept shorted.
HV/TV
HV Side
HV Side (Applied Volts) TV Side
TAP POS. (Current in Amp)
Isc (A)
1U-N 1V-N 1W-N 1U 1V 1W
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
1 243.2 242.9 245.0 1.5 1.5 1.5 20.5
5 242.9 243.1 245.6 1.7 1.7 1.7 20.0
17 242.0 242.1 245.1 2.6 2.6 2.6 26.0
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
a. HV Side WTI=39⁰C
b. LV Side WTI=32⁰C
WINDING RESISTANCE IN mOhms
TAP
2U-N 2V-N 2W-N
NO.
At 32 ◦C At 75 ◦C At 32 ◦C At 75 ◦C At 32 ◦C At 75 ◦C
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
5 61.47 71.370 61.82 71.776 61.78 71.730
c. TV Side WTI=32⁰C
WINDING RESISTANCE IN mOhms
TAP
3U-3W 3V-3U 3W-3V
NO.
At 32 ◦C At 75 ◦C At 32 ◦C At 75 ◦C At 32 ◦C At 75 ◦C
- 58.50 67.921 58.77 68.235 58.34 67.735
U-PHASE REVERSE
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
V-PHASE FORWARD
V-PHASE REVERSE
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
W-PHASE FORWARD
W-PHASE REVERSE
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
3U-3V AT TAP-5
3V-3W AT TAP-5
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
3W-3U AT TAP-5
3-PHASE COMPARISION
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
1U-N, 1V-N & 1W-N ALL OPEN TAP-1
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
Consultancy |Third party Inspection |RLA | Testing & Commissioning |Training in Power Sector
For & on behalf of Laxmi Associates