Rates - 2010

The document provides guidelines and rates for building works in North Central Province and Anuradhapura District of Sri Lanka. It lists specifications and standards for various construction works. The rates are based on local material prices and include overhead, profit, transport and wastage costs. Demolition, excavation, masonry, concreting, formwork, reinforcement and other construction items and their unit rates are provided in imperial and metric measurements.

Uploaded by

Nazee 122333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views

Rates - 2010

The document provides guidelines and rates for building works in North Central Province and Anuradhapura District of Sri Lanka. It lists specifications and standards for various construction works. The rates are based on local material prices and include overhead, profit, transport and wastage costs. Demolition, excavation, masonry, concreting, formwork, reinforcement and other construction items and their unit rates are provided in imperial and metric measurements.

Uploaded by

Nazee 122333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 75

Building Rates - 2010- NCP

GUIDELINES FOR USERS

* Rates have been prepared using market prices of materials in North Central Province and
Anuradhapura District Buying Committee Rates.

General Specifications :-

1. Specifications for Building Works - Volume I - ICTAD Publication No. SCA/4/I - Revised
Edition - July 2004

2. Specifications for Building Works - Volume II - Sanitary Installations - ICTAD Publication


No. SCA/4/II - Revised Edition - October 2001

3. Specifications for Water Supply, Sewerage & Storm Water Drainage Works - ICTAD
Publication No. SCA/3/2- Revised Edition - April 2002

4. Specifications for Electrical & Mechanical works Associated with Building & Civil
Engineering - ICTAD Publication No. SCA/8 - Revised Edition (Revised) - August 2000

* The Particular Specification shall be read in conjunction with the General Specification where
applicable. In the event the Particular Specification is in conflict with the General
Specification, the Particular Specification shall be prevail.

* Particular Specifications for each category are mentioned above. Full description and relevant
notes mentioned above for each category in the rate book should be given for each item when
preparing estimates.

* In the specifications, if any materials/fittings are described by using a trade name, it is only for
the purpose of indicating the minimum level of quality and standard required. It may be used
any other material/ fitting, which are considered as equivalent in quality and standard to those
specified therein subject to the approval of the Engineer.

* Rates can be used as guidance and adjustment could be made to suit the specific site
conditions subjected to approval.

* Overhead and profit applied is 20%.

* Transport, loading, unloading and material wastage also included the rates.

* Prices used are exclusive of VAT.

Page 1 of 75
Building Rates - 2010- NCP

LEDGEND

No. ITEM Page

A. DEMOLISHER 3-5

B. EXCAVATOR 5-6

C. MASON 7

D. CONCRETOR 7-9

E. FORMWORK 10

F. REINFORCEMENT 11-12

G. BRICKLAYER 12-13

H. PLASTERER 13-14

I. PAVIOR 15-17

J. ROOFER 17-28

K. CARPENTER & JOINER 28-31

L. IRONWORK 31-33

M. PAINTER 33-35

N. PLUMBER 35-40

O. DRAINLAYER 40-42

P. ELECTRICAL INSTALLATION 42-45

Q. MISCELLANEOUS 46

R. ALUMINIUM WORK 46-49

UNITS PRICES OF MATERIAL, LABOUR AND 50-62


PLANT FOR 2010

Page 2 of 75
Building Rates - 2010- NCP

A - DEMOLISHER
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
A-1 Brickwork in cement mortar demolished, brick cube 1,298.00 cum 459.00
stacked and debris cleared.

A-2 Brickwork in lime demolished, brick stacked cube 1,730.00 cum 611.00
and debris cleared.

A-3 Ceiling existing removed, materials stacked sqr. 556.00 sqm 60.00
and debris cleared

A-4 Cement concrete demolished and debris cube 7,560.00 cum 2,671.00
cleared away.

A-5 Reinforced concrete demolished, cube 16,545.00 cum 5,846.00


reinforcement removed and debris cleared.

A-6 Corrugated sheets (Iron, asbestos or sqr. 633.00 sqm 68.00


aluminium) removed from roof or walls and
stacked - single storied building

A-7 Corrugated sheets (Iron, asbestos or sqr. 687.00 sqm 74.00


aluminium) removed from roofs or walls and
stacked - 2 storied building.

A-8 Corrugated sheets (Iron, asbestos or sqr. 742.00 sqm 80.00


aluminium) removed from roofs or walls and
stacked - 3 storied buildings.

A-9 Door or window with frame size up to 40 sqft. no. 840.00 no. 840.00
removed from existing walls and stacked.

A-10 Door or window with frame size over 40 sqft. no. 1,260.00 no. 1,260.00
removed from existing walls and stacked.

A-11 Door or window sash only, up to 40 sqft. no. 126.00 no. 126.00
removed from existing walls and stacked.

A-12 Door or window sash only, over 40 sqft. no. 190.00 no. 190.00
removed from existing walls and stacked.

A-13 Down pipes, 4" to 6" dia. old or decayed, Lft. 9.00 Lm 30.00
removed from existing building and stacked.

A-14 Drains demolished and debris cleared. Lft. 17.00 Lm 56.00

A-15 Fence uprooted, barbed wire rolled up and all Lft. 35.00 Lm 115.00
materials stacked (Length of fencing to be
measured)

Page 3 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
A-16 Floors brick paved, demolished and debris sqr. 630.00 sqm 68.00
cleared away.

A-17 Gate sash removed and stacked after no 840.00 no. 840.00
demolishing cement concrete blocks or
removing posts and separating pintos
(demolishing brickwork where necessary paid
for separately)

A-18 Glass panes in doors and windows and sqft. 37.00 sqm 398.00
fanlights removed and stacked.

A-19 Gutter, eaves removed and stacked from roof Lft. 5.00 Lm 16.00
of single storied building.

A-20 Gutter, eaves removed and stacked from roof Lft. 8.00 Lm 26.00
of 2 storied building

A-21 Gutter, eaves removed and stacked from roof Lft. 11.00 Lm 36.00
of 3 storied building.

A-22 Partitions removed and stacked at site, sqft. 24.00 sqm 258.00
including making good to walls and floors.

A-23 Cement, lime plastering chipped and debris sqr. 465.00 sqm 50.00
cleared away.

A-24 Rendering, cement chipped and debris cleared sqr. 945.00 sqm 102.00
away from brick walls and floors.

A-25 Rendering, cement chipped and debris cleared sqr. 1,420.00 sqm 153.00
away from cement concrete floors and walls.

A-26 Roof, removing tiles and timber, stacking sqr. 1,260.00 sqm 136.00
usable material and clearing debris in single
storied building.

A-27 Roof, removing tiles and timber, stacking sqr. 1,607.00 sqm 173.00
usable material and clearing debris in 2 storied
building.

A-28 Roof, removing tiles and timber, stacking sqr. 2,039.00 sqm 219.00
usable material and clearing debris in 3 storied
and above

A-29 Rubble masonry in cement demolished, rubble cube 2,704.00 cum 955.00
stacked and debris cleared.
A-30 Tiles, glazed demolished and debris cleared. sqr. 1,680.00 sqm 181.00

Page 4 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
A-31 Tiles Calicut or half round, removed from roof sqr. 433.00 sqm 47.00
of single storied buildings and stacked at site.

A-32 Tiles Calicut or half round removed from roof sqr. 649.00 sqm 70.00
of 2 storied building and stacked at site.

A-33 Tiles Calicut or half round, removed from sqr. 865.00 sqm 93.00
roofs of 3 storied and above buildings and
stacked at site.
A-34 Waterproof Treatment of hot bitumen taken off sqr. 1,680.00 sqm 181.00
from flat roof and debris cleared away.

A-35 Ceiling asbestos removed including timber sqr. 2,101.00 sqm 226.00
framework stacking usable materials and
debris cleared away in single storied building.

A-36 Ceiling asbestos removed including timber sqr. 2,534.00 sqm 273.00
frame work, stacking usable materials and
debris cleared away in 2 storied building.

A-37 Valance/Barge boarding removed, materials Lft. 5.00 Lm 16.00


stacked and debris cleared away in single
storied building.

A-38 Valance/Barge board removed, materials Lft. 8.00 Lm 26.00


stacked and debris cleared away in 2 storied
building.

A-39 Cement plastering in soffit chipped and debris sqr. 1,211.00 sqm 130.00
cleared away.

A-40 Roof trusses span up to 30' 0" removed from no. 2,596.00 no. 2,596.00
roof and stacked

B - EXCAVATOR

Rates for Excavation and Earthwork shall include for:


(a) Trimming sides, keeping clean, leveling, grading and consolidating bottom of bases and
trenches etc.
(b) Leveling and consolidating where required under slabs or sub-floor layers.
(c) Back filling and well ramming around foundation.
(d) Keeping all excavations free from storm or percolating water to keep excavation dry at all
stages of construction.
(e) Any necessary additional excavation for working spaces, planking and strutting etc.
(f) Providing shoring work where necessary.

Page 5 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
B-1 Removing Top soil to a depth of 6" and sqr. 714.00 sqm 77.00
depositing as directed within the site

B-2 Excavation for foundation in any material cube 1,305.00 cum 461.00
except rock requiring blasting, part return fill
in and ram, and surplus dispose within the site
as directed.

B-3 Excavation in any material except rock cube 1,065.00 cum 376.00
requiring blasting including transporting up to
1/4 mile, depositing and leveling.

B-4 Excavation in trenches for walls and column cube 1,764.00 cum 623.00
pits in soft disintegrated rock (not requiring
blasting) up to a depth of 5'0" and depositing
excavated materials to distance not exceeding
30'0"

B-5 Excavation in trenches for walls and column cube 4,980.00 cum 1,760.00
pits in hard rock requiring blasting up to a
depth of 5'0" and depositing excavated
materials to distance not exceeding 30'0"

B-6 Filling under floors with gravel or other cube 1,578.00 cum 558.00
approved quality of filling, spread, watered
and well rammed in 3" layers (material
available at site)

B-7 Filling under floors with gravel or other cube 4,444.00 cum 1,570.00
approved quality of filling, spread, watered
and well rammed in 3" layers (material not
available at site)

B-8 Anti termite treatment on excavated sqr. 3,245.00 sqm 349.00


foundation and compacted soil under floors
(Treatment should be done according to the
instructions given by the Engineer) - Warranty
period 10 years

B-9 Drains, earth in any soil except rock requiring cube 1,137.00 cum 402.00
blasting cut to gradient and shaped as directed,
soil deposited within site.

C - MASON

Rates for Masonry work shall include for:


(a) All joggles, cramps, dowels, ties, and templates.
(b) Rough and fair cutting forming splays.

Page 6 of 75
Building Rates - 2010- NCP

(c) Angles, reveals and returns.


(d) Cement used should be SLS Certified Products for Masonry work

Page 7 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
Rubble Masonry
C-1 Random Rubble Masonry in cement mortar 1:5 cube 26,608.00 cum 9,402.00
above 1 cube

C-2 Random Rubble Masonry in cement mortar 1:5 cube 28,833.00 cum 10,188.00
up to 1 cube

Block Masonry
C-3 8" thick Hollow block work in cement and sqr. 16,307.00 sqm 1,755.00
sand mortar 1: 5 with 16"x8"x8" blocks
(Cavities unfilled)

C-4 4" thick Hollow block work in cement and sqr. 8,621.00 sqm 928.00
sand mortar 1: 5 with 16"x8"x4" blocks
(Cavities unfilled)

D - CONCRETOR
Grade of concrete used in the construction and recommended mixes as
follows.
(a) Grade 25 Recommended Mix 1 : 1 ½ : 3 (3/4")
(b) Grade 20 Recommended Mix 1 : 2 : 4 (3/4")
(c) Grade 15 Recommended Mix 1 : 2 1/2 : 5 (1")
(d) Grade 10 Recommended Mix 1 : 3: 6 (1 1/2")
Rate shall include,
(a) Mixing, hoisting, placing and compacting on the surfaces of any material or on formwork.
(b) Forming any construction joint.
(c) Vibrating, curing and protecting concrete surfaces from harmful weather conditions.
(d) Forming sloping on upper surfaces where required.
(e) Grouting the earlier concreted edges.
(f) Making good after removal of formwork.
Instructions
(a) Testing for workability and strength of concrete should be done from Quality Control lab,
Kekirawa.
(b) Cement used should be SLS certified products approved for concrete.
(c) Reinforcement and formwork paid separately where not mentioned.

Page 8 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
D-1 Cement concrete grade 10 above one cube. cube 33,134.00 cum 11,708.00

D-2 Cement concrete grade 10 up to 1 cube. cube 35,114.00 cum 12,408.00

D-3 3" thick cement concrete 1:2 1/2:5 (1") in sqr. 9,828.00 sqm 1,058.00
floors using concrete mixer and vibrator
including laying of gauge 1000 polythene
sheet

D-4 Cement concrete grade 20 in column cube 43,045.00 cum 15,210.00


foundation, column shaft and plinth beams
using mixer and vibrator - up to first floor level

D-5 Cement concrete grade 20 in column shaft cube 44,962.00 cum 15,888.00
using mixer and vibrator - up to second floor
level

D-6 Cement concrete grade 20 in column shaft cube 47,558.00 cum 16,805.00
using mixer and vibrator - up to third floor
level

D-7 Cement concrete grade 20 in slab, beams and cube 44,209.00 cum 15,622.00
stair case using mixer and vibrator - up to first
floor level

D-8 Cement concrete grade 20 in slab, beams and cube 45,074.00 cum 15,927.00
stair case using mixer and vibrator - up to
second floor level

D-9 Cement concrete grade 20 in slab, beams and cube 46,372.00 cum 16,386.00
stair case using mixer and vibrator - up to
third floor level

D-10 Cement concrete grade 25 in column cube 46,275.00 cum 16,352.00


foundation, column shaft and plinth beams
using mixer and vibrator - up to first floor level

D-11 Cement concrete grade 25 in column shaft cube 48,192.00 cum 17,029.00
using mixer and vibrator - up to second floor
level

D-12 Cement concrete grade 25 in column shaft cube 50,788.00 cum 17,946.00
using mixer and vibrator - up to third floor
level

D-13 Cement concrete grade 25 in slab, beams and cube 48,479.00 cum 17,130.00
stair case using mixer and vibrator - up to first
floor level

Page 9 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
D-14 Cement concrete grade 25 in slab, beams and cube 49,344.00 cum 17,436.00
stair case using mixer and vibrator - up to
second floor level

D-15 Cement concrete grade 25 in slab, beams and cube 50,642.00 cum 17,895.00
stair case using mixer and vibrator - up to
third floor level

D-16 Cement concrete grade 20 in lintels cube 39,024.00 cum 13,789.00


(reinforcement and shuttering paid separately)
using mixer and vibrator - up to first floor
level
D-17 Cement concrete grade 20 in lintels cube 40,754.00 cum 14,401.00
(reinforcement and shuttering paid separately)
using mixer and vibrator - up to second floor
level

D-18 Cement concrete grade 20 in lintels cube 43,350.00 cum 15,318.00


(reinforcement and shuttering paid separately)
using mixer and vibrator - up to third floor
level

D-19 Lintel, cement concrete grade 20, 4 1/2"x6" Lft. 311.00 Lm 1,020.00
with 2 nos. 12 mm dia. tor steel bars and form
work - up to first floor level

D-20 Lintel, cement concrete grade 20, 4 1/2"x6" Lft. 321.00 Lm 1,053.00
with 2 nos. 12 mm dia. tor steel bars and form
work - up to second floor level

D-21 Lintel, cement concrete grade 20, 4 1/2"x6" Lft. 327.00 Lm 1,073.00
with 2 nos. 12 mm dia. tor steel bars and form
work - up to third floor level

D-22 Lintel, cement concrete grade 20, 9"x6" with Lft. 375.00 Lm 1,230.00
2 nos. 12 mm dia. tor steel bars and form work
- up to first floor level

D-23 Lintel, cement concrete grade 20, 9"x6" with Lft. 385.00 Lm 1,263.00
2 nos. 12 mm dia. tor steel bars and form work
- up to second floor level

D-24 Lintel, cement concrete grade 20, 9"x6" with Lft. 391.00 Lm 1,282.00
2 nos. 12 mm dia. tor steel bars and form work
- up to third floor level

Page 10 of 75
Building Rates - 2010- NCP

D-25 Coble stone in cement concrete 1:2:4 (3/4") no. 2,606.00 no. 2,606.00
reinforced with 4 no 10mm dia. Tor steel, up to
1 cuft. in volume

Page 11 of 75
Building Rates - 2010- NCP

E - FORMWORK

Rates for formwork shall include for:


(a) All framing, propping, bracing, cutting angles, bolting, wedging, cleaning, wetting and
treating before pouring concrete.
(b) Erecting, Striking off and cleaning of formwork.
(c) Rubbing down, filling and making good the surface of concrete after removal of formwork.
(d) All the formwork for slabs should be done in such a way that it is good enough to apply a
layer of skim coat or suitable pillar and painting, without soffit plastering.

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
E-1 12mm Plywood shuttering for slab, beams and sqr. 11,096.00 sqm 1,194.00
staircase including dismantling - up to first
floor level

E-2 12mm Plywood shuttering for slab, beams and sqr. 11,654.00 sqm 1,254.00
staircase including dismantling - up to second
floor level

E-3 12mm Plywood shuttering for slab, beams and sqr. 11,726.00 sqm 1,262.00
staircase including dismantling - up to third
floor level

E-4 12mm Plywood shuttering for column shaft sqr. 12,246.00 sqm 1,318.00
including dismantling - up to first floor level

E-5 12mm Plywood shuttering for column shaft sqr. 12,614.00 sqm 1,358.00
including dismantling - up to second floor
level
E-6 12mm Plywood shuttering for column shaft sqr. 12,859.00 sqm 1,384.00
including dismantling - up to third floor level

E-7 Shuttering for plinth beams and lintels sqr. 6,860.00 sqm 738.00
including dismantling - up to first floor level

E-8 Shuttering for lintels including dismantling - sqr. 8,037.00 sqm 865.00
up to second floor level

E-9 Shuttering for lintels including dismantling - sqr. 8,142.00 sqm 876.00
up to third floor level

E-10 Class III timber shuttering for small works sqr. 4,232.00 sqm 456.00
including dismantling

Page 12 of 75
Building Rates - 2010- NCP

F- REINFORCEMENT

Rates for Reinforcement shall include for:


(a) Rolling margin and waste.
(b) Bending, Cutting, Fabricating, Hoisting, and placing in position.
(c) Holding and supporting including temporary fixing supports, hangers.
(d) Cleaning and wire brushing.
(e) All spacing, laps etc. in reinforced steel other than design laps.
(f) Tensile strength of Tor Steel should be not less than 460 N/mm2 and Mild Steel should be not
less than 250 N/mm2
Instructions
(a) Inevitable laps should be measured.
(b) Unless otherwise specified laps to be 52 times the diameter of the bar.
(c) Preparation, supplying & binding of cover blocks such that specified cover is maintained at
outer-most rod.
(d) Should be used GTB or Lanwa. If another brands are used, It should be checked from
Quality Control lab at Kekirawa with Contractor's Expence.

(e) Some trade names are used only for the purpose of indicating the minimum level of quality
and standards.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
F-1 Tor steel rods reinforcing in Column cwt. 8,583.00 M.Ton 171,652.00
foundation and plinth beams upto DPC,
bent to shape laid in position and tied with G.I.
Wire as directed

F-2 Tor steel rods reinforcing in columns, beams, cwt. 8,886.00 M.Ton 177,712.00
slabs and lintels up to first floor level bent to
shape laid in position and tied with G.I. Wire
as directed

F-3 Tor steel rods reinforcing in columns, beams, cwt. 9,161.00 M.Ton 183,220.00
slabs and lintels up to second floor level bent
to shape laid in position and tied with G.I.
Wire as directed

F-4 Tor steel rods reinforcing in columns, beams, cwt. 9,345.00 M.Ton 186,892.00
slabs and lintels up to third floor level bent
to shape laid in position and tied with G.I.
Wire as directed

Page 13 of 75
Building Rates - 2010- NCP

F-5 Mild steel rods, shape into stirrups and laid in cwt. 8,712.00 M.Ton 174,232.00
position and tied with GI wires as directed - up
to first floor level

Page 14 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
F-6 Mild steel rods, shape into stirrups and laid in cwt. 8,987.00 M.Ton 179,740.00
position and tied with GI wires as directed - up
to second floor level

F-7 Mild steel rod, shape into stirrups and laid in cwt. 9,171.00 M.Ton 183,412.00
position and tied with GI wires as directed - up
to third floor level

G - BRICK LAYER

Rates for Brickwork shall include for:


(a) Wetting well all the surfaces of the bricks before using.
(b) Plumbing angles.
(c) Normal straight cuttings.
(d) Ranking of joints for plastering.
(e) All the necessary scaffolding.
(f) Ranking of joints for plastering.
(g) Cement used should be SLS Certified Products for masonry work.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
G-1 Arch, segmental, brick in cement 1:3, cube 35,995.00 cum 12,719.00
including plumbing angles, normal straight
cutting, forming rebated reveals and raking of
joints for plastering

G-2 9" thick brick work in cement mortar 1:8 (up to cube 27,271.00 cum 9,636.00
first floor level)

G-3 9" thick brick work in cement mortar 1:8 (up to cube 28,569.00 cum 10,095.00
second floor level)

G-4 9" thick brick work in cement mortar 1:8 (up to cube 31,165.00 cum 11,012.00
third floor level)
G-5 Brick 4 1/2" thick in cement mortar 1:5 (up to sqr. 10,783.00 sqm 1,161.00
first floor level)
G-6 Brick 4 1/2" thick in cement mortar 1:5 (up to sqr. 12,080.00 sqm 1,300.00
second floor level)
G-7 Brick 4 1/2" thick in cement mortar 1:5 (up to sqr. 14,676.00 sqm 1,580.00
third floor level)

Page 15 of 75
Building Rates - 2010- NCP

G-8 Coping, brick in cement 1:5, weathered and Lft. 235.00 Lm 771.00
throated on 4 1/2" walls, cement rendered 1/2"
thick 1:3 complete

Page 16 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
G-9 Coping, brick in cement 1:5 , weathered and Lft. 321.00 Lm 1,053.00
throated on 9" walls , cement rendered 1/2"
thick 1:3 complete

G-10 Widening R.C.C Column by placing one Lft. 164.00 Lm 538.00


brick on both side of column to size 1' 6" x 9"

H- PLASTERER
Rates for wall finishing shall include for:
(a) Temporary rules, screeds, ground etc.
(b) Ranking out joints of brickwork and backing concrete surface for forming key.
(c) Joints between different surfaces.
(d) Forming arises and stopping against joinery work, metal work etc.
(e) Making good around pipes, sanitary fittings and fixtures.
(f) Straight cutting and raking cutting holes, notching and other sundries Labour of a like nature.
(g) Preparing sample panel of different finishes described below for the approval of the Engineer.
Each panel not less than 0.5 m2 in area.
(h) Cement used should be SLS Certified Products for masonry work.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
H-1 D.P.C., 3/4" thick, in cement and sand 1:2 sqr. 6,425.00 sqm 692.00
finished with two coats of hot tar

H-2 3/4" thick plinth plaster in 1:3 cement and sqr. 5,301.00 sqm 571.00
sand finished smooth with neat cement
floating.
H-3 3/4" thick plinth plaster in 1:3 cement and sqr. 5,553.00 sqm 598.00
sand finished smooth with red cement floating.

H-4 Cement plastering 1:5, 5/8" thick finished semi sqr. 3,458.00 sqm 372.00
rough in external walls - up to first floor level

H-5 Cement plastering 1:5, 5/8" thick finished semi sqr. 3,759.00 sqm 405.00
rough in external walls - up to second floor
level

H-6 Cement plastering 1:5, 5/8" thick finished semi sqr. 3,960.00 sqm 426.00
rough in external walls - up to third floor level

H-7 Cement plaster 1:5, 5/8" thick finished smooth sqr. 5,254.00 sqm 566.00
with skim coat in internal walls - up to first
floor level

Page 17 of 75
Building Rates - 2010- NCP

H-8 Cement plaster 1:5, 5/8" thick finished smooth sqr. 5,724.00 sqm 616.00
with skim coat in internal walls - up to second
floor level

Page 18 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
H-9 Cement plaster 1:5, 5/8" thick finished smooth sqr. 5,987.00 sqm 644.00
with skim coat in internal walls - up to third
floor level
H-10 Cement lime plaster 1:1:5, 5/8" thick finished sqr. 4,628.00 sqm 498.00
smooth with lime putty in internal walls - up to
first floor level

H-11 Cement lime plaster 1:1:5, 5/8" thick finished sqr. 5,054.00 sqm 544.00
smooth with lime putty in internal walls - up to
second floor level

H-12 Cement lime plaster 1:1:5, 5/8" thick finished sqr. 5,337.00 sqm 574.00
smooth with lime putty in internal walls - up to
third floor level

H-13 Reveals or plaster band 6" in walls with Lft. 59.00 Lm 194.00
cement lime and sand 1:1:5 finished to match
existing
H-14 Finish smooth soffit of slab by applying skim sqr. 2,922.00 sqm 315.00
coat and 2 coats of emulsion paint - up to first
floor level

H-15 Finish smooth soffit of slab by applying skim sqr. 3,048.00 sqm 328.00
coat and 2 coats of emulsion paint - up to
second level

H-16 Finish smooth soffit of slab by applying skim sqr. 3,132.00 sqm 337.00
coat and 2 coats of emulsion paint - up to third
floor level

H-17 3/8" plaster to R.C.C. columns, beams and sqr. 5,189.00 sqm 559.00
soffit of slab in cement and sand 1:3 including
floating with lime putty - up to first floor level

H-18 3/8" plaster to R.C.C. columns, beams and sqr. 5,756.00 sqm 620.00
soffit of slab in cement and sand 1:3 including
floating with lime putty - up to second floor
level

H-19 3/8" plaster to R.C.C. columns, beams and sqr. 6,134.00 sqm 660.00
soffit of slab in cement and sand 1:3 including
floating with lime putty - up to third floor level

H-20 5/8" thick plastering to wall in cement and sqr. 3,643.00 sqm 392.00
sand 1:3 including cement floating

H-21 Cracks in walls plastered in cement, sand 1:3 Lft. 22.00 Lm 72.00
after chipping to 2"- 4" wide

Page 19 of 75
Building Rates - 2010- NCP

I - PAVIOR

Rates for paving and tiling shall include for:


(a) Preparing surfaces of concrete / brick to receive rendering plaster bedding etc.
(b) Joints between different surfaces.
(c) Finishing to slopes and cross falls.
(d) Straight cutting and waste of tiles and other types of floor finishes.
(e) Protecting finished surfaces.
(f) For temporary rules, screeds, ground etc.
(g) All normal cutting arises, rounded edges, bedding and pointing.
(h) Slope should be maintained to a suitable direction to flow the water towards out side.
(i) Expansion joints so that no cracks propagated.
(j) Tiles should be approved by the Architect

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
I -1 Floors, cement concrete 1:2 1/2: 5 (1"), 3" sqr. 13,301.00 sqm. 1,432.00
thick, cement rendered 1/2" thick, 1:5 with
expansion joints filled with cement and sand
(including laying gauge 1000 polythene sheet)

I -2 Rendering cement 1/2", in 1:5 cement and sand sqr. 3,610.00 sqm 389.00
on existing concrete, finished smooth

I -3 Rendering cement 1/2", in 1:5 cement and sand sqr. 4,715.00 sqm 508.00
on existing concrete, floating coat using red
cement finished smooth

I -4 Rendering cement 1/2", in 1:5 cement and sand sqr. 3,211.00 sqm 346.00
on existing concrete, finished rough

I -5 Tile glazed 8"x8", Sri Lankan made of sqr. 25,915.00 sqm 2,790.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2, with
tile beadings on top and edges - Ground floor

I -6 Tile glazed 8"x8", Sri Lankan made of sqr. 26,167.00 sqm 2,817.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2, with
tile beadings on top and edges - First floor

Page 20 of 75
Building Rates - 2010- NCP

I -7 Tile glazed 8"x8", Sri Lankan made of sqr. 26,335.00 sqm 2,835.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2, with
tile beadings on top and edges - Second floor

Page 21 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
I -8 Tile glazed, 12"x8", Sri Lankan made of sqr. 24,374.00 sqm 2,624.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2 with
tile beadings on top and edges - Ground floor

I -9 Tile glazed, 12"x8", Sri Lankan made of sqr. 24,626.00 sqm 2,651.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2 with
tile beadings on top and edges - First floor

I -10 Tile glazed, 12"x8", Sri Lankan made of sqr. 24,794.00 sqm 2,669.00
approved type and colour, with all specials,
supplied and fixed to wall including raking
plaster and bedding in cement mortar 1:2 with
tile beadings on top and edges - Second floor

I -11 Floor tile, 12"x12", Sri Lankan made, sqr. 21,440.00 sqm 2,308.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
Ground floor

I -12 Floor tile, 12"x12", Sri Lankan made, sqr. 21,692.00 sqm 2,335.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
First floor

I -13 Floor tile, 12"x12", Sri Lankan made, sqr. 21,860.00 sqm 2,353.00
nonskid pattern of approved type and colour
supplied and laid including plaster bedding
1:2 with skirting and tile beadings on top -
Second floor

I -14 Floor tile, 8"x8", Sri Lankan made, nonskid sqr. 23,831.00 sqm 2,565.00
pattern of approved type and colour supplied
and laid including plaster bedding 1:2 with
skirting and tile beadings on top - Ground floor

I -15 Floor tile, 8"x8", Sri Lankan made, nonskid sqr. 24,083.00 sqm 2,592.00
pattern of approved type and colour supplied
and laid including plaster bedding 1:2 with
skirting and tile beadings on top - First floor

Page 22 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
I -16 Floor tile, 8"x8", Sri Lankan made, nonskid sqr. 24,251.00 sqm 2,610.00
pattern of approved type and colour supplied
and laid including plaster bedding 1:2 with
skirting and tile beadings on top - Second floor

I -17 Homogeneous Floor tile, 12"x12", Sri sqr. 24,668.00 sqm 2,655.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Ground floor

I -18 Homogeneous Floor tile, 12"x12", Sri sqr. 24,920.00 sqm 2,682.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - First floor

I -19 Homogeneous Floor tile, 12"x12", Sri sqr. 25,088.00 sqm 2,701.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Second floor

I -20 Homogeneous Floor tile, 16"x16", Sri sqr. 24,709.00 sqm 2,660.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Ground floor

I -21 Homogeneous Floor tile, 16"x16", Sri sqr. 24,961.00 sqm 2,687.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - First floor

I -22 Homogeneous Floor tile, 16"x16", Sri sqr. 25,129.00 sqm 2,705.00
Lankan made, nonskid pattern of approved
type and colour supplied and laid including
plaster bedding 1:2 with skirting and tile
beadings on top - Second floor

I -23 Floor tiles Tera cota of approved type laid on sqr. 17,788.00 sqm 1,915.00
existing concrete floor including plaster bed in
1:2 cement and sand

Page 23 of 75
Building Rates - 2010- NCP

I -24 Skirting 1/2" x6" in 1:5, projected or flush with Lft. 73.00 Lm 239.00
walls and including forming groove

Page 24 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
I -25 Skirting 1/2" x6" in 1:5, projected or flush with Lft. 102.00 Lm 335.00
walls and including forming groove finished
with red cement

I -26 Skirting 1/2" x4" in 1:5, projected or flush with Lft. 47.00 Lm 154.00
walls and including forming groove

I -27 Skirting 1/2" x4" in 1:53, projected or flush Lft. 66.00 Lm 216.00
with walls and including forming groove
finished with red cement

I -28 9" width surface drain with 3" thick 1:2 Lft. 436.00 Lm 1,430.00
1/2:5(1") concrete base, side walls of 4 1/2"
brick work in 1:5 cement sand rendering in 1:5
match to existing floor/ramp complete with
expansion joints and necessary excavation

J - ROOFER

Rates for Roof work shall include for:


(a) Hoisting and placing roofing materials in position.
(b) Laps, straight cutting and waste.
(c) Galvanized iron “J” bolts, nuts, limpets and bituminous felt washers, nails screw clips, rivets
straps and the like.
(d) Rafter hooks fixing rafters to the wall.
Rates for joinery work shall include for:
(a) Framing together all works in accordance with the best practices.
(b) Nails Screws, Glue, plugs etc.
(c) Priming backs before fixing.
(d) Rawl plugs, brass screws etc.
(e) Drilling and making goods.
Instructions
(a) All the timber used to be treated with wood preservative to the specifications.
(b) Ceiling sheets to be painted with one coat of acetic filler and two coats of emulsion paints.
(c) All the beading to be painted with one coat of wood primer and two coats of enamel paints.
(d) For exposed rafter roofs, timber should be well planed and varnished. Timber sizes indicated
in the description are the sizes before planning.

Page 25 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION UNIT RATE UNIT RATE
Roof including Timber frame
J-1 Corrugated asbestos sheet roof (sloping to sqr. 18,206.00 sqm 1,960.00
two directions) including 2"x4" imported
treated timber rafters at 3' c/c and 2"x2"
imported treated timber bearers with necessary
coach screws and limpet washers or hook
bolts, prepare and apply one coat of wood
preservative (black) to structural timber work,
including touching up cut end etc. after fixing
(Timber used other than those mentioned
above measured separately)

J-2 Calicut tile roof (sloping to four directions) sqr. 27,852.00 sqm 2,998.00
on imported treated timber framework
including 4"x4" struts, 2"x7" ridge, 2"x6" hip
and valley rafters, 4"x3" wall plate, 3"x5"
purling, 2"x4" rafters, 2"x1" reapers including
nuts and bolts and, prepare and apply one coat
of wood preservative (black) to structural
timber work (Timber beams measured and
paid separately)

J-3 Zink Alum sheet -colour- (guage 0.47 mm, sqr. 18,009.00 sqm. 1,939.00
strength 550Mpa) roof on existing
framework including necessary fastners as per
Manufacturer's Specifications

J-4 Zink Alum Non-Colour Roofing on existing sqr. 14,860.00 sqm 1,600.00
framework including necessary fastners as per
Manufacturer's Specifications

J-5 Asbestos corrugated sheet fixed on existing sqr. 7,552.00 sqm 813.00
frame with necessary bolt and nuts (single
storeyed building)

J-6 Asbestos corrugated sheet fixed on existing sqr. 7,763.00 sqm 836.00
roof with necessary bolt and nuts (2 storeyed
building)

Page 26 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
J-7 Corrugated G.I . Roofing sheet 20 BWG on sqr. 14,074.00 sqm 1,515.00
class 1 timber frame work, including 2"x4"
rafters at 3' c/c and 2"x2" bearers at 3' c/c
complete with G.I. ridging, washers, hook
bolts or clips including treating timber with
wood preservative (sheets to have 6" end laps
and 1 1/2 corrugation side laps)

Ceiling including Timber frame


J-8 Asbestos ceiling -to existing rafters
Asbestos ceiling fixed to existing rafters, sqr. 16,890.00 sqm 1,818.00
with 2"x2" imported treated timber framework,
interior beading 1 1/2"x1/2" and outer
moulding 1 1/2"x1 1/2" including prepare and
apply one coat of wood preservative to
structural timber work and application of one
coat of Alkali resitant primer and two coats of
Emulsion paint to ceiling sheets including
necessary nails and screws.

J-9 Asbestos ceiling -with rafters


Asbestos ceiling with 2"x4" imported timber sqr. 22,718.00 sqm 2,445.00
framework at 4' c/c and 2"x2" imported treated
timber bearer at 2' c/c, interior beading 1
1/2"x1/2" and outer moulding 1 1/2"x1 1/2"
including prepare and apply one coat of wood
preservative to structural timber work and
application of one coat of Alkali resitant
primer and two coats of emulsion paint to
ceiling sheets including necessary nails and
screws.

J-10 Plywood ceiling - with rafters


9mm plywood flat ceiling with 2"x4" sqr. 28,218.00 sqm 3,037.00
imported timber framework at 4' c/c and 2"x2"
imported treated timber bearer at 2' c/c, prepare
and apply one coat of wood preservative to
structural timber work and painting plywood
sheets with two coats of varnish including
necessary nails and screws.

Page 27 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
J-11 Lunumidella ceiling - to existing rafters
Lunumidella slope ceiling under existing sqr. 14,659.00 sqm 1,578.00
rafters with outer molding to the accepted
design (All the beading and Lunumidella
planks should be painted with one coat of
wood sealer mixing with approved colour die
and two coats of varnish)

J-12 Lunumidella ceiling -With rafters


Lunumidella flat ceiling on 2"x4" imported sqr. 25,358.00 sqm 2,730.00
timber framework at 2' centers, with outer
molding to the accepted design (All the
beading and Lunumidella planks should be
painted with one coat of wood sealer mixing
with approved colour die and two coats of
varnish)

Exposed rafter roof with ceiling


J-13 Corrugated asbestos sheet roof with sqr. 34,867.00 sqm 3,753.00
exposed rafter asbestos ceiling on 2"x4"
imported treated tiimber rafters at 2' centers
and 2"x2" imported treated timber bearer and
2"x1" reepers for the joints of ceiling sheets
with necessary coarch screws and limpet
washers,including prepare and apply one coat
of wood preservative (clear) and varnish to
structural timber work and application of one
coat of Alkali resitant primer and two coats of
emulsion paint to ceiling sheets including
touching up cut end etc. after fixing (Timber
used other than those mensioned above
measured seperately)

Page 28 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
J-14 Corrugated abestos sheet roof with exposed sqr. 35,870.00 sqm 3,861.00
rafter Lunumidella ceiling on 2"x4"
imported treated tiimber rafters at 2' c/c and
2"x2" imported treated timber bearer, with
necessary coarch screws and limpet washers,
including prepare and apply one coat of wood
preservative and varnish to structural timber
work, including touching up cut end etc. after
fixing - Lunumidella planks should be
painted with one coat of wood sealer mixing
with approved colour die and two coats of
varnish (Timber used other than those
mensioned above measured seperately)

J-15 Corrugated abestos sheet roof with exposed sqr. 38,850.00 sqm 4,182.00
rafter plywood (9mm) ceiling on 2"x4"
imported treated tiimber rafters at 2' c/c and
2"x2" imported treated tiimber bearer at 2' c/c
with necessary coarch screws and limpet
washers, prepare and apply one coat of wood
preservative (clear) to structural timber work
and painting plywood sheets with two coats
of varnish including touching up cut end etc.
after fixing (Timber used other than those
mensioned above measured seperately)

J-16 Calicut tile roofing (sloping to four sqr. 39,158.00 sqm 4,215.00
directions) on imported treated timber
framework with exposed rafter asbestoes
ceiling including 4"x4" struts, 2"x7" ridge,
2"x6" hip and valley rafters, 4"x3" wall plate,
3"x5" purlins, 2"x4" rafters, 2"x1" reepers
including nuts and bolts and prepare and apply
one coat of wood preservative prepare and
apply one coat of wood preservative(clear) and
varnish to structural timber work and
application of one coat of Alkali resitant
primer and two coats of emulsion paint to
ceiling sheets (Timber beams measured and
paid seperately)

Page 29 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
Ridging
J-17 Ridging, Calicut pattern bedded in cement and L.ft 143.00 Lm 469.00
sand lime mortar 1:1:4 . Colour to match tiles

J-18 Riding G.I. 24 BWG 18" wide overall fixed L.ft 157.00 Lm 515.00
complete
J-19 Ridging with asbestos bedded in cement and L.ft 188.00 Lm 617.00
sand motar 1:4

J-20 Supply and fix Zink Alum ridging (colour) - Lft. 387.00 Lm 1,269.00
0.47 mm thick with necessary bolts and nuts

J-21 Supply and fix Zink Alum ridging (non- Lft. 360.00 Lm 1,181.00
colour) - 0.47 mm thick with necessary bolts
and nuts

Gutters & Downpipes


J-22 Eaves gutter 6", rectangular, PVC fixed with Lft. 165.00 Lm 541.00
PVC brackets with all necessary specials

J-23 Down pipes 3 1/2" dia. PVC fixed with Lft. 169.00 Lm 554.00
wooden plug to wall including all necessary
specials

J-24 Supply and fix Zink Alum eave gutter (colour) Lft. 385.00 Lm 1,263.00
- 0.47 mm thick with necessary bolts and nuts

J-25 Supply and fix Zink Alum eave gutter (non- Lft. 358.00 Lm 1,174.00
colour) - 0.47 mm thick with necessary bolts
and nuts

J-26 Supply and fix Zink Alum down pipes Lft. 242.00 Lm 794.00
(colour) - 0.47 mm thick to wall with
necessary bracket clips

J-27 Supply and fix Zink Alum down pipes (non- Lft. 261.00 Lm 856.00
colour) - 0.47 mm thick to wall with necessary
bracket clips

J-28 Supply and fix standard Zink Alum gutter box no. 893.00 no. 893.00
- colour - (0.47mm thick)

J-29 Supply and fix standard Zink Alum gutter box no. 834.00 no. 834.00
- non-colour - (0.47mm thick)

Page 30 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
Valley gutter
J-30 Supply and fix Aluminium valley gutter, 3' Lft. 913.00 Lm 2,995.00
girth bent with end laps not less than 9" width
including 3/4" tongued and grooved planks
laid to slope and profile on timber members

J-31 Supply and fix Zn-Al valley gutter (Colour), Lft. 363.00 Lm 1,191.00
on existing steel members as per
Manufacturer's Specifications

J-32 Supply and fix Zn-Al valley gutter (non- Lft. 334.00 Lm 1,096.00
colour), on existing steel members as per
Manufacturer's Specifications

Flashing
J-33 Supplying and fixing gauge 24 GI wall Lft. 398.00 Lm 1,305.00
flashing all complete
J-34 Supplying and fixing Zn Alum wall flashing Lft. 375.00 Lm 1,230.00
(colour)
J-35 Supplying and fixing Zn Alum wall flashing Lft. 341.00 Lm 1,118.00
(non-colour)

Valance & Barge Board


J-36 Barge board, Valance, facia, 3/4" thick 9" Lft. 227.00 Lm 745.00
high, GINISAPU local timber fixed complete
with necessary screws, preparing and painting
with one coat of primer and two coats of
enamel paint

Insulation Foil
J-37 Furnishing and laying 3 way reinforced single sqr. 1,006.00 sqm 108.00
side Aluminium foil
J-38 Furnishing and laying 3 way reinforced sqr. 1,482.00 sqm 160.00
Double side Aluminium foil
J-39 Furnishing and laying gauge 17, 3"x3" sqr. 2,244.00 sqm 242.00
Galvanized roof mesh
Roof Timber
J-40 Furnishing and fixing of 2"x6" Imported Lft. 313.00 Lm 1,027.00
treated timber and apply one coat of wood
preservative

J-41 Furnishing and fixing of 3"x4" Imported Lft. 306.00 Lm 1,004.00


treated timber and apply one coat of wood
preservative

Page 31 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
J-42 Furnishing and fixing of 2"x4" Imported Lft. 195.00 Lm 640.00
treated timber and apply one coat of wood
preservative

J-43 Furnishing and fixing of 3"x5" Imported Lft. 433.00 Lm 1,420.00


treated timber and apply one coat of wood
preservative
J-44 Furnishing and fixing of 4"x6" Imported Lft. 811.00 Lm 2,660.00
treated timber and apply one coat of wood
preservative

J-45 Furnishing and fixing of 7"x2" Class I timber Lft. 198.00 Lm 649.00
and apply one coat of wood preservative

J-46 Furnishing and fixing of 4"x8" Imported Lft. 1,090.00 Lm 3,575.00


treated timber and apply one coat of wood
preservative
J-47 Furnishing and fixing of 2"x2" Imported Lft. 95.00 Lm 312.00
treated timber and apply one coat of wood
preservative
J-48 Furnishing and fixing of 2"x1" Imported Lft. 53.00 Lm 174.00
treated timber and apply one coat of wood
preservative

J-49 Supplying and fixing of Coconut rafters 3"x2" Lft. 63.00 Lm 207.00

J-50 Supplying and fixing of Coconut rafters 4"x2" Lft. 88.00 Lm 289.00

J-51 Supplying and fixing beadings for ceiling Lft. 32.00 Lm 105.00
J-52 Supplying and fixing molding for ceiling Lft. 51.00 Lm 167.00
Maintenance
J-53 Corrugated G.I. sheet 24 BWG, fixed to roof, sqr. 5,952.00 sqm 641.00
walls or fence with necessary cup washers and
hook bolts or screws (timber framing paid for
separately)

J-54 Leaks (up to 5 in numbers) in roofs of single no. 140.00 no. 140.00
storied building made good

J-55 Leaks (above 5 in numbers) in roof of single no. 35.00 no. 35.00
storied building made good
J-56 Leaks (up to 5 in numbers) in roofs of two or no. 175.00 no. 175.00
above storied building made good
J-57 Leaks (above 5 in numbers) in roof of two or no. 70.00 no. 70.00
above storied building made good

Page 32 of 75
Building Rates - 2010- NCP

J-58 Leaks in corrugated sheet roof made good with no. 198.00 no. 198.00
bitumen washers and G.I. bolts and nuts

Page 33 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
J-59 Ridging, Calicut pattern removed and re-laid in L.ft 131.00 Lm 430.00
cement mortar 1:1:4 and colour to match tile

J-60 Tiles, Calicut pattern, flat supplied and laid up no. 49.00 no. 49.00
to 5 tiles in single storied building
J-61 Tiles, Calicut pattern, flat supplied and laid no. 38.00 no. 38.00
above 5 tiles and up to 25 in single storied
building
J-62 Tiles Calicut pattern supplied and laid on roofs sqr. 4,342.50 sqm 467.00
- single storied building
J-63 Tiles Calicut pattern supplied and laid on roofs sqr. 4,762.50 sqm 513.00
- two storied building

K - CAPENTER AND JOINER

Rates for carpentry work shall include for:


(a) All Labour in framing together all work in accordance with the best practices, complete with
all necessary nails, spikes, screws etc.
(b) Hoisting and fixing in position.
(c) Drilling and making good.
(d) Applying two coats of and approved wood preservative before fixing.
(e) Testing to establish properties to conformity to specification.
Rates for joinery work shall include for:
(a) Framing together all works in accordance with the best practices.
(b) Nails Screws, Glue, plugs etc.
(c) Priming backs before fixing.
(d) Drilling and making goods.
(e) Rawtering all squares.
Rates for Glazing shall include for:
(a) Straight cutting and grinding edges where required.
(b) External miters to polishing and leveled edges.
(c) Curving edges.

Page 34 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO DESCRIPTION
UNIT RATE UNIT RATE
K-1 Supply and fix Front door, 3 3/4" x 2 3/4" sqft. 1,420.00 sqm 15,279.00
frame in MAHOGANI and 1 1/8" thick sash
with designs in TEAK timber (Fit panels)
complete with brass furniture, 2 nos. 6" barrel
bolts and 3 nos. hinges including preparation
of surface and application of two coats of
Varnish

K-2 Supply and fix Front door, 3 3/4" x 2 3/4" sqft. 905.00 sqm 9,738.00
frame and 1 1/8" thick sash with designs in
MAHOGANI timber (Fit panels) complete
with brass furniture, 2 nos. 6" barrel bolts and
3 nos. hinges including preparation of surface
and application of two coats of Varnish

K-3 Door or Window, ledge braced and battened sqft. 797.00 sqm 8,576.00
with grooved and tongued joints, 3 3/4" x 2
3/4" frame and 3/4" to 7/8" thick sashes in
class 1 timber complete with brass furniture 2
nos. 6" barrel bolts and 3 nos. hinges including
preparation of surface and application of two
coats of Varnish

K-4 Door or window glazed and / or paneled with sqft. 1,066.00 sqm 11,470.00
3 3/4" x 2 3/4" frame and 1 1/8" thick sash in
class 1 timber fixed complete with brass
furniture, 2 nos. 6" barrel bolts and 6 nos.
hinges including preparation of surface and
application of two coats of Varnish - Double
sash

K-5 Supply and fix Plywood door -GINTOTA or sqft. 793.00 sqm 8,533.00
equilant with 3 3/4" x 2 3/4" frame and
complete with brass furniture, 2 nos. 6" barrel
bolts and 3 nos. hinges including preparation
of surface and application of two coats of
Varnish
K-6 Supply and fix PVC door with frame sqft. 378.00 sqm 4,067.00
complete with 3 hinges and lock/barrel bolt
K-7 Door or window glassed with 3 3/4" x 2 3/4" sqft. 679.00 sqm 7,306.00
frame comprising 2 no. of openable sashes
with 4" x 1 1/8" outer frame and non-openable
5" x 1 1/8" timber strips area complete with
brass mongers including preparation of surface
and application of two coats of varnish

Page 35 of 75
Building Rates - 2010- NCP

K-8 Door or windows glazed and / or paneled, sqft. 754.00 sqm 8,113.00
sash only 1 1/8" thick in class 1 timber with
brass furniture, 2 nos. 6" barrel bolts and 3 nos.
hinges

Page 36 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
K-9 Supplied and fixed plywood door sash 1 1/8" sqft. 443.00 sqm 4,767.00
thick (GINTOTA or equilant) to the existing
frame
K-10 Door frame 4"x3" class 1 timber supplied and sqft. 252.00 sqm 2,712.00
fixed in position

K-11 Door or window sash, removing, easing and no. 401.00 no. 401.00
re-fixing
K-12 Door or window sash easing only no. 158.00 no. 158.00
K-13 Door or window frames renewed in short no. 390.00 no. 390.00
length with class 1 timber

K-14 Door or window, glazing bars renewed in class Lft. 205.00 Lm 672.00
1 timber
K-15 Door sash, swing, removed and re-fixed in no. 536.00 no. 536.00
new position
K-16 Louver blade 3/8" thick in class 1 timber 4" Lft. 125.00 Lm 410.00
wide
K-17 Louver blade 3/8" thick in class 1 timber 6" Lft. 193.00 Lm 633.00
wide
K-18 Wicket gate at entrance 3' 6" x 3' 0" double sqft. 786.00 sqm 8,457.00
hinge fittings to include 2 pairs of 4"x2 1/2"
butt hinges and 4" iron barrel bolts post and
sash with 1 1/2"x1 1/2"x 1/4" angle iron and
2" SWG 10 welded mesh complete with 2
coats of anticorrosive paint

K-19 Glass panes 3 mm thick supplied and fixed sqft. 153.00 sqm 1,646.00
with class 1 timber beading

K-20 Glass panes 5 mm thick supplied and fixed sqft. 193.00 sqm 2,077.00
with class 1 timber beading

K-21 Beading or filleting for glass panes fixed Lft. 13.00 Lm 43.00
complete with brass panel pins ( with class 1
timber)

K-22 Door or window frame altered, existing, rebate no. 2,929.00 no. 2,929.00
fillets using class 1 timber with screws and
sash re-hung on opposite side

K-23 Supplying and fix mortice lock - Union 678- no. 5,451.00 no. 5,451.00
24-95CH or equivalent, with 5 years
guarantee. (guarantee certificate should be
submitted with bills)

Page 37 of 75
Building Rates - 2010- NCP

K-24 Supplying and fix switch lock - Bird or no. 2,259.00 no. 2,259.00
equivalent

Page 38 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
Iron furniture
K-25 Supply and fix barrel bolt 4" - Iron with brass no. 220.00 no. 220.00
screws
K-26 Supply and fix barrel bolt 3" - Iron with brass no. 206.00 no. 206.00
screws
K-27 Supply and fix Hasp and staples 4" - Iron with no. 194.00 no. 194.00
brass screws
K-28 Supply and fix Hasp and staples 6" - Iron with no. 370.00 no. 370.00
brass screws
K-29 Supply and fix Casement fasteners - Iron with no. 203.00 no. 203.00
brass screws
K-30 Supply and fix Casement stays, 10" - Iron no. 265.00 no. 265.00
heavy quality with brass screws
K-31 Supply and fix door closer approved type with no. 3,888.00 no. 3,888.00
brass screws

K-32 Supply and fix Butt Hinge, 4" - Iron with brass no. 587.00 no. 587.00
screws
K-33 Supply and fix Butt Hinge, 5" - Iron with no. 661.00 no. 661.00
brass screws
Brass Furniture
K-34 Supply and fix Barrel bolts 6" - brass, heavy no. 394.00 no. 394.00
quality with brass screws
K-35 Supply and fix Casement fasteners -brass with no. 423.00 no. 423.00
mortice plate, heavy quality with brass screws

K-36 Supply and fix Casement stays, 10" - brass no. 384.00 no. 384.00
heavy quality with brass screws
K-37 Supply and fix Butt Hinge, 4" - brass heavy no. 757.00 no. 757.00
quality with brass screws

K-38 Bolts, casement fasteners or stays removed and no. 79.00 no. 79.00
refixed including making good to holes in
frames and sashes

L - IRON WORK

Rates for Metal work shall include for:


(a) To make good ground at balusters on completion.
(b) Welding where necessary.
(c) Wire brush and clean metal surfaces prior to painting.

Page 39 of 75
Building Rates - 2010- NCP

(d) All fabricating work handling, hosting, fitting and fixing in position.
(e) Preparing surfaces and painting as specified or directed.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
L-1 Supply and fix Iron grill with 20x6 mm flat sqft. 523.00 sqm 5,627.00
iron outer frame and horizontal bracings at 300
mm intervals complete with 12x6 mm flat iron
verticals at 75 mm c/c as per given design
including two coats of anticorrosive paint and
enamel paint

L-2 Iron grill with 6 mm mild steel rods welded sqft. 434.00 sqm 4,670.00
diagonally at 100 mm cts. both way and outer
frame with 20x6 mm flat iron fabricated and
fixed complete including two coats of
anticorrosive paint and enamel paint.

L-3 2"x2" G.I weld mesh fixed to existing frame sqft. 123.00 sqm 1,323.00
with staple including painting (Beading paid
separately)

L-4 2"x2" G.I weld mesh supplied and fixed to sqft. 272.00 sqm 2,927.00
window frame with 2"x1/2" class 1 timber
beadings and, painted weld mesh with 2 coats
of anticorrosive paint and beading with primer
coat and 2 coats of enamel paint including
making opening for bolts and casement stays

L-5 2"x2" G.I weld mesh fixed to 40 x40 x5 mm sqft. 324.00 sqm 3,486.00
angle iron frame fabricated and fixed to wall
with rawl plugs and screws including painting
with enamel paint and anticorrosive paint

L-6 Supply and fix gate with Zink Alum gate clad sqft. 555.00 sqm 5,972.00
sheet (colour) with 1 1/4" heavy duty GI pipe
frame work, 3/4" heavy duty squire tube
bitterns and vertical members at the top,
including application of two coats of
anticorrosive primer and finishing coat of
enamel paint complete with stap hinges, hasp
and staples as per given design

Page 40 of 75
Building Rates - 2010- NCP

L-7 Supply and place in position steel roof truss no 40,306.00 no. 40,306.00
(WEB) - span 15 - 20 lft. - complete with
double member exterior and single member
interior, 6 mm gusset plate, 16mm dia. rag
bolts, 6 mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

Page 41 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
L-8 Supply and place in position steel roof truss no. 47,677.00 no. 47,677.00
(WEB) - span 21 - 25 lft. - complete with
double member exterior and single member
interior, 6 mm gusset plate, 16mm dia. rag
bolts, 6 mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

L-9 Supply and place in position steel roof truss no. 63,196.00 no. 63,196.00
(WEB) - span 26 - 30 lft. - complete with
double member exterior and single member
interior, 6 mm gusset plate, 16mm dia. rag
bolts, 6 mm base plate welded and application
of two coats of anti-corrosive paint all as per
detail drawing given by the Department

L-10 Supplying and fixing Angle iron purling 40 x Lft. 187.00 Lm 613.00
40 x 5 mm to trusses with 10 mm dia. bolts
and nuts including application of anticorrosive
paint

L-11 Supplying and fixing Angle iron purling 50 x Lft. 189.00 Lm 620.00
50 x 5 mm to trusses with 10 mm dia. bolts
and nuts including application of anticorrosive
paint

L-12 Supplying and fixing Angle iron purling 65 x Lft. 280.00 Lm 918.00
65 x 5 mm to trusses with 10 mm dia. bolts
and nuts including application of anticorrosive
paint

L-13 Supplying and fixing End rafters, 50 x 50 x 5 Lft. 621.00 Lm 2,037.00


mm (double) angle iron on gable ends with
purling cleats including application of
anticorrosive paint

L-14 Furnishing and fixing 100mm x 50mm Lft. 309.00 Lm 1,014.00


(Thickness - 2mm) C- Purlins as per
Manufacturer's Specifications

L-15 Furnishing and fixing 150mm x 65mm Lft. 447.00 Lm 1,466.00


(Thickness - 2mm) C- Purlins as per
Manufacturer's Specifications

Page 42 of 75
Building Rates - 2010- NCP

L-16 Furnishing and fixing 75mm x 38mm Lft. 258.00 Lm 846.00


(Thickness - 2mm) C- Purlins as per
Manufacturer's Specifications

Page 43 of 75
Building Rates - 2010- NCP

M - PAINTER AND DECORATOR

Rates for painting shall include for:


(a) Preparation of surfaces, cleaning down.
(b) Smoothing, knotting, stopping etc.
(c) Protecting floors and fittings etc.
(d) Removing and replacing doors furniture and cleaning upon completion.
(e) Providing samples and specification of all paints to be used in the works.
(f) Providing painting to an approved colour scheme design.
(g) All the paints are to be done up to the manufacturers specification.
(h) Preparation sample panels of different finishes for the approval of the Engineer. Each panel
not less than 0.5 sqm in area.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
M-1 Prepare and apply one coat of Alkali resistant sqr. 2,295.00 sqm 247.00
primer and two coats of emulsion paint to
walls - up to first floor level

M-2 Prepare and apply one coat of Alkali resistant sqr. 2,512.00 sqm 270.00
primer and two coats of emulsion paint to
walls - up to second floor level

M-3 Prepare and apply one coat of Alkali resistant sqr. 2,728.00 sqm 294.00
primer and two coats of emulsion paint to
walls - up to third floor level

M-4 Prepare and apply one coat of Acrylic wall sqr. 2,756.00 sqm 297.00
filler and two coats of weather proof white and
colour paint - up to first floor level

M-5 Prepare and apply one coat of Acrylic wall sqr. 2,972.00 sqm 320.00
filler and two coats of weather proof white and
colour paint - up to second floor level

M-6 Prepare and apply one coat of Acrylic wall sqr. 3,188.00 sqm 343.00
filler and two coats of weather proof white and
colour paint - up to third floor level

M-7 Prepair and apply one coat of Acrylic wall sqr. 2,578.00 sqm 278.00
filler and two coats of bathroom paint, white
and colour paint - up to first floor level

M-8 Prepair and apply one coat of Acrylic wall sqr. 2,794.00 sqm 301.00
filler and two coats of bathroom paint, white
and colour paint - up to second floor level

Page 44 of 75
Building Rates - 2010- NCP

M-9 Prepair and apply one coat of Acrylic wall sqr. 3,010.00 sqm 324.00
filler and two coats of bathroom paint, white
and colour paint - up to third floor level

Page 45 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
M-10 Prepare and apply two coats of floor paint, red, sqr. 2,435.00 sqm 262.00
gray or black

M-11 Prepare and apply one coat of wood sqr. 1,870.00 sqm 201.00
preservative to structural timber work,
including touching up cut end etc. after fixing

M-12 Varnishing two coats after sand papering of the sqr. 2,512.00 sqm 270.00
surface

M-13 Preparing and painting wood work with primer sqr. 3,079.00 sqm 331.00
and two coats of enamel paint

M-14 Painting aluminium paint 1 coat to metal sqr. 1,200.00 sqm 129.00
surfaces

M-15 Painting steel on new work with 2 coats of sqr. 1,899.00 sqm 204.00
anti-corrosive paint

M-16 Painting walls with Emulsion paint, 2 coats, sqr. 2,101.00 sqm 226.00
including preparation of surface

M-17 Painting walls with Weather shield paint, 2 sqr. 2,420.00 sqm 260.00
coats, including preparation of surface

M-18 Wall, scraped to original plaster, sand papering sqr. 1,845.00 sqm 199.00
and lime putting to cracks and defects,
applying plaster of Paris and preparing surface
for new or similar application of emulsion,
snowcem or similar application

M-19 Preparing and painting wood work with 2 coats sqr. 4,122.00 sqm 444.00
of enamel paint.
M-20 White or colour washing two coats to walls sqr. 579.00 sqm 62.00
with SAMARA

M-21 Water - Proofing of Bathrooms with approved sqr. 3,398.00 sqm 366.00
materials as per Instructions

N - PLUMBER
Rates for Plumbing shall include for:
(a) Excavation of trenches for services, pipes or drain pipes shall include for deepening and
widening as necessary to enable the barrels of pipes, ducts etc. to rest on firm ground and to
facilitate jointing .
(b) Testing installations on completion.
(c) Chasing in brickwork / block work / concrete floor / concrete columns and make good.
(d) Fixing pipes to brickwork / block work.
(e) Solder rivets, screws, nails, clips, brackets, straps etc.

Page 46 of 75
Building Rates - 2010- NCP

(f) Testing installations on completion.


(g) Sterilization, of “Drinking water” pipes on completion.

Page 47 of 75
Building Rates - 2010- NCP

FIXTURES, APPLIANCES AND EQUIPMENT


Rates for sanitary fixtures shall include for:
(a) Installation complete with plugs.
(b) Grated waste outlets.
(c) Brackets and all fixings including jointing to pipes.
Instructions
(a) Guarantee certificates of fittings should be submitted to the Department with the bills. No
payment is done without bills.
(b) All the UPVC pipes to be SLS certified products.
(c) Some trade names are used only for the purpose of indicating the minimum level of quality
and standards.
IMPERIAL METRIC
NO. DESCRIPTION UNIT RATE UNIT RATE
N-1 Supply and lay PVC Pipe 1/2"- type 1000 Lft. 25.00 Lm 82.00
including all necessary fittings

N-2 Supply and lay PVC Pipe 3/4"- type 1000 Lft. 59.00 Lm 194.00
including all necessary fittings

N-3 Supply and lay PVC Pipe 1"- type 1000 Lft. 85.00 Lm 279.00
including all necessary fittings

N-4 Supply and lay PVC Pipe 1 1/4"- type 600 Lft. 94.00 Lm 308.00
including all necessary fittings

N-5 Supply and lay PVC Pipe 1 1/2"- type 600 Lft. 112.00 Lm 367.00
including all necessary fittings

N-6 Supply and lay PVC Pipe 2"- type 400 Lft. 155.00 Lm 508.00
including all necessary fittings

N-7 Supply and fix Ball valve PEGLER or no. 936.00 no. 936.00
equivalent - for overhead tanks - 1/2" - all
complete

N-8 Supply and fix Ball valve PEGLER or no. 1,116.00 no. 1,116.00
equivalent - for overhead tanks - 3/4" - all
complete

N-9 Supply and lay 4" drainage pipe PVC - special Lft. 203.00 Lm 666.00
for drainage - with necessary fittings complete

Page 48 of 75
Building Rates - 2010- NCP

N-10 Wash basin, ceramic, with pedestal (Chinese no. 10,560.00 no. 10,560.00
made) with 15 years guarantee complete with
mono type, chromium plated basin tap -
(Momali, Huai or equivalent) - with 5 years
guarantee including all necessary fittings
(Guarantee certificates should be submitted
with the bill)

Page 49 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
N-11 Supply and fix closet, closed couple, Chinese no. 16,991.00 no. 16,991.00
made with 15 years guarantee complete with
hard seat cover and all necessary fittings.
(Guarantee certificate should be submitted
with the bill)

N-12 Supply and fix 2 PC set, closed couple with no. 26,471.00 no. 26,471.00
hard seat cover, (Chinese made) with 15 years
guarantee complete with mono type,
chromium plated basin tap - (Momali, Huai or
equivalent) - with 5 years guarantee with all
necessary fittings.(Guarantee certificate should
be submitted with the bill)

N-13 Supply and fix Closet Squatting type (Indian) no. 5,291.00 no. 5,291.00
with foot rest ceramic, medium, with trap

N-14 Supply and fix stainless steel kitchen Sink, no. 8,376.00 no. 8,376.00
PRINCE or equivalent - with single bawl, one
side drain board including chromium plated
long neck type sink tap - Momali, Huai or
equivalent - with 5 years guarantee complete
with all necessary fittings - (overall size
36"x18") - (Guarantee certificate should be
submitted with the bill)

N-15 Supply and fix stainless steel kitchen Sink, no. 6,240.00 no. 6,240.00
PRINCE or equivalent with single bawl,
without drain board including chromium plated
long neck type sink tap - Momali, Huai or
equivalent - with 5 years guarantee complete
with all necessary fittings (overall size
18"x15") - (Guarantee certificate should be
submitted with the bill)

N-16 Supply and fix Ceramic Sink, 24"x15"x7" no. 9,090.00 no. 9,090.00
complete with mono type, chromium plated
long neck type sink tap - (Momali, Huai or
equivalent) - with 5 years guarantee including
all necessary fittings (Guarantee certificates
should be submitted with the bill)

Page 50 of 75
Building Rates - 2010- NCP

N-17 Supply and fix corner wash basin complete no. 5,166.00 no. 5,166.00
with mono type, chromium plated basin tap -
(Momali, Huai or equivalent) - with 5 years
guarantee including all necessary fittings

Page 51 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
N-18 Supply and fix bidet spray - (Momali, Huai or no. 2,712.00 no. 2,712.00
equivalent) - with 5 years guarantee with all
necessities. (Guarantee certificate should be
submitted with the bill)

N-19 Supply and fix Urinal bawl type no. 3,480.00 no. 3,480.00

N-20 Supply and fix bath room accessories set no. 3,450.00 no. 3,450.00
(plastic) - 4 pcs. (mirror, mirror shelf, towel
bar and soap holder) all complete

N-21 Supply and fix bath room accessories set no. 4,440.00 no. 4,440.00
(plastic) - 6 pcs. (mirror, mirror shelf, towel
bar, soap holder, tooth brush holder and toilet
paper holder) all complete

N-22 Supply and fix Mirror, bathroom type, oval no. 2,430.00 no. 2,430.00
shape, 20" x 16" with plastic back and shelves

N-23 Supply and fix Plastic Shower rose, with no. 199.00 no. 199.00
guarantee

N-24 Supply and fix head shower,chromium plated no. 2,310.00 no. 2,310.00
heavy with 5 years guarantee

N-25 Supply and fix Telephone shower, chromium no. 2,880.00 no. 2,880.00
plated heavy with 5 years guarantee
including flexible cable

N-26 Supply and fix Soap tray, chromium plated no. 2,670.00 no. 2,670.00
(Chinese), (Momali, Huai or equivalent) with 5
year guarantee (Guarantee certificate should
be submitted with the bill)

N-27 Supply and fix towel bar, chromium plated - no. 4,338.00 no. 4,338.00
(Momali, Huai or equivalent) - with 5 year
guarantee (Guarantee certificate should be
submitted with the bill)

N-28 Supply and fix concealed stop cock - Mono no. 2,790.00 no. 2,790.00
type (Momali, Huai or equivalent) with 5
years guarantee (Guarantee certificate should
be submitted with the bill)

Page 52 of 75
Building Rates - 2010- NCP

N-29 Supply and fix Angle valve (Momali, Huai or no. 1,500.00 no. 1,500.00
equivalent) with 5 years guarantee (Guarantee
certificate should be submitted with the bill)

Page 53 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
N-30 Supply and fix Long neck type Sink tap, no. 2,970.00 no. 2,970.00
chromium plated - (Momali, Huai or
equivalent) - with 5 years guarantee
(Guarantee certificate should be submitted
with the bill)

N-31 Supply and fix bib tap 1/2" dia. - (Momali, no. 1,680.00 no. 1,680.00
Huai or equivalent) - with 5 years guarantee
(Guarantee certificate should be submitted
with the bill)

N-32 Supply and fix 1/2" dia. plastic Bib tap - no. 384.00 no. 384.00
Water Tec or equivalent - all complete
N-33 Supply and fix stop cock/gate valve PVC no. 336.00 no. 336.00
Water Tec or equilant with SLS standards -
1/2" dia.
N-34 Supply and fix stop cock/gate valve PVC no. 382.00 no. 382.00
Water Tec or equilant with SLS standards -
3/4" dia.
N-35 Supply and fix stop cock/gate valve PVC no. 493.00 no. 493.00
Water Tec or equilant with SLS standards - 1"
dia.
N-36 Supply and fix stop cock/gate valve PVC no. 402.00 no. 402.00
Water Tec or equilan with SLS standards - 1
1/4" dia.
N-37 Plastic shell water tank with 10 years no. 13,860.00 no. 13,860.00
guarantee of capacity 500 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-38 Plastic shell water tank with 10 years no. 20,820.00 no. 20,820.00
guarantee of capacity 1000 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards
N-39 Plastic shell water tank with 10 years no. 34,980.00 no. 34,980.00
guarantee of capacity 2000 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-40 Plastic shell water tank with 10 years no. 71,280.00 no. 71,280.00
guarantee of capacity 5000 ltr. Including
transporting, placing in position and fixing to
the accepted Engineering standards

N-41 Supply and fix Cover and seat for WC - no. 1,110.00 no. 1,110.00
plastic
N-42 Supply and fix Chromium plated flexible cable no. 810.00 no. 810.00
(Momali, Huai or equivalent)

Page 54 of 75
Building Rates - 2010- NCP

N-43 Flushing cistern, plastic low level, with flush no. 4,560.00 no. 4,560.00
pipe and bracket supplied and fixed complete

Page 55 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
N-44 Basin, sink, or urinals including all fittings no. 1,038.00 no. 1,038.00
removed and wall made good

N-45 Closet, pedestal type, available at site fixed no. 1,700.00 no. 1,700.00
with cement concrete after breaking concrete
floor and making good and making connection

N-46 Closet Squatting type, removed, sewer no. 1,701.00 no. 1,701.00
connection plugged and floor made good

N-47 Supply and fix PVC specials with SLS no. 99.00 no. 99.00
standards - 1/2" dia. ( Elbow, Bend, Socket)

N-48 Supply and fix PVC specials with SLS no. 109.00 no. 109.00
standards - 3/4" dia. ( Elbow, Bend, Socket)

N-49 Supply and fix PVC specials with SLS no. 121.00 no. 121.00
standards - 1" dia. ( Elbow, Bend, Socket)

N-50 Supply and fix PVC specials with SLS no. 146.00 no. 146.00
standards - 1 1/4" dia. ( Elbow, Bend,
Socket)

N-51 Supply and fix PVC specials with SLS no. 188.00 no. 188.00
standards - 1 1/2" dia. ( Elbow, Bend,
Socket)

N-52 Supply and fix PVC specials with SLS no. 257.00 no. 257.00
standards - 2" dia. ( Elbow, Bend, Socket)

N-53 Supply and fix PVC specials with SLS no. 78.00 no. 78.00
standards - 1/2" dia. Tees

N-54 Supply and fix PVC specials with SLS no. 107.00 no. 107.00
standards - 3/4" dia. Tees

N-55 Supply and fix PVC specials with SLS no. 128.00 no. 128.00
standards - 1" dia. Tees

N-56 Supply and fix PVC specials with SLS no. 172.00 no. 172.00
standards - 1 1/4" dia. Tees

N-57 Supply and fix PVC specials with SLS no. 231.00 no. 231.00
standards - 1 1/2" dia. Tees

N-58 Supply and fix PVC specials with SLS no. 319.00 no. 319.00
standards - 2" dia. Tees

Page 56 of 75
Building Rates - 2010- NCP

O - DRAINLAYER
Rates for underground drainage shall include for:
(a) Short lengths, joints and cutting at Manholes.
(b) Cutting and fixing pipe work to fittings.
(c) Testing.
(d) Grading to slopes and falls.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
O-1 Connection to existing sewer or manhole Item 1,328.00 Item 1,328.00
O-2 Drainage pipe 4"dia. (type 400) PVC laid on Lft. 477.00 Lm 1,565.00
cement concrete 6" up to 2' 0" depth of invert
including excavation and cement concrete
hunching 1:3:6 (1")

O-3 Furnishing and fixing of Multi-floor trap no. 1,502.00 no. 1,502.00
including 6" plastic grating
O-4 Gulley pit with internal dimension 1'-0"x1'- no. 4,074.00 no. 4,074.00
0"x1'-0" deep, 6" thick 1:3:6(11/2") concrete
foundation, 9" thick brick work in 1:5 ct. sand,
1/2" thick cement sand rendering in 1:2 with
forming canals and 3" thick R.C.C. slab as per
Drawings

O-5 Manhole with internal dimension 1'-6"x1'- no. 9,217.00 no. 9,217.00
6"x2'-0" deep, 6" thick 1:3:6(1 1/2") concrete
foundation ,9" thick brick work in 1:5 ct. sand,
1/2" thick cement sand rendering in 1:2 with
forming cannels and 3" thick R.C.C. slab as
per Drawings

O-6 Manhole with internal dimension 2'-0"x2'- no. 12,307.00 no. 12,307.00
0"x2'-0" deep, 6" thick 1:3:6(11/2") concrete
foundation, 9" thick brick work in 1:5 ct. sand,
1/2" thick cement sand rendering in 1:2 with
forming canals and 3" thick R.C.C. slab as per
Drawings

O-7 Manhole with internal dimension 2'-6"x2'-6" no. 16,657.00 no. 16,657.00
x2'-0" deep, 6" thick 1:3:6(11/2") concrete
foundation, 9" thick brick work in 1:5 ct. sand,
1/2" thick cement sand rendering in 1:2 with
forming canals and steel grating with 16mm
dia. MS rod welded at 50mm centers to 25 x
25 x 5 mm angle iron frame including
application of anti-corrosive paint.

Page 57 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
O-8 Septic tank with internal dimensions 7'-9"x3'- no. 77,438.00 no. 77,438.00
0"x7'-0", partition with same wall, all
complete including excavation, 4" thick base
slab with 1:3:6 (1 1/2"), 9" brick work, 3/4 "
thick 1:3 cement rendering including 3" cover
slab with 10mm bars at 9"c/c both way and 2"
vent pipe. (Refer relevant Drawings) - for 30
persons

O-9 Septic tank with internal dimensions 10'-9"x3'- no. 96,483.00 no. 96,483.00
0"x7'-0", partition with same wall, all
complete including excavation, 4" thick Base
slab with 1:3:6 (1 1/2"), 9" brick work, 3/4"
1:3 cement rendering including 3" cover slab
with 10mm bars at 9"c/c both way and 2" vent
pipe. (Refer relevant Drawings) - for 60
persons

O-10 Septic tank with internal dimensions 13'-9"x3'- no. 121,276.00 no. 121,276.00
6"x7'-0", partition with same wall, all
complete including excavation, 4" thick Base
slab with 1:3:6 (1 1/2"), 9" brick work, 3/4"
1:3 cement rendering including 3" cover slab
with 10mm bars at 9"c/c both way and 2" vent
pipe. (Refer relevant Drawings) - for 100
persons

O-11 Soakage pit with internal dia. 4'-0" and depth no. 69,990.00 no. 69,990.00
5'-0", all complete including excavation, ring
beam with 4 Nos. 10 mm bars & 6 mm dia.
stirrups at 9" spacing at bottom of wall, 9"
brick work and 3" thick cover slab with 12mm
bars in 6" c/c both way (as per detail drawing)

O-12 Soakage pit with internal dia. 4'-0" and depth no. 117,360.00 no. 117,360.00
10'-0", all complete including excavation, ring
beam with 4 Nos. 10 mm bars & 6 mm dia.
stirrups at 9" spacing at bottom of wall, 9"
brick work and 3" thick cover slab with 12mm
bars in 6" c/c both way (as per detail drawing)

O-13 Supply and fix 3'x8' ready made RCC septic no. 30,479.00 no. 30,479.00
tank

Page 58 of 75
Building Rates - 2010- NCP

P - ELECTRICAL INSTALLATION
Rates for Electrical Installations shall include for:
(a) All necessary conduits, cables, fittings, screws, nails clips, brackets straps, and the like.
(b) Giving notices, obtaining permits, paying fees etc.
(c) Provision of drawings or circuit diagrams etc.
(d) Labeling switch and switches or other fittings.
(e) Providing samples of switches or other fittings.
(f) Earthening and testing installation as required.
Instructions
(a) Before conduit pipes are laid on concrete floor slabs, a conduit layout drawing shall be
prepared by the contractor for the approval of consultant.
(b) All electrical installation shall be for 400 volts / 230 volts 50 Hz.
(c) 5 Amp final sub-circuits shall be carried out by the looping-in method.
(d) No joints are permitted in the runs of cables.
(e) Fixing heights from finished floor level, unless directed otherwise shall be as follows,
Main switches (switch fuses) - 1.5 m Distribution boards - 1.7 m
Lamp fittings - 2.4 m Ceiling fans - 2.5 m
Switches and fan regulators - 1.4 m Socket outlets - 0.2 m
(f) Current operated ELCB’s.
(g) Earth resistance shall be less than 5 Ohms, tested on a dry day.
(h) All fan regulators to be earthen.
(i) Some trade names are used only for the purpose of indicating the minimum level of quality
and standards.
IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
P-1 Supply and install Earth electrode G.I. Pipe 2" no. 1,663.00 no. 1,663.00
Dia. heavy duty, 6' long fixed on ground with
connection

P-2 Supply and install 65 x 65 x6 mm angle iron, no. 3,238.00 no. 3,238.00
service bracket, D bracket and Insulator with
necessary nuts and bolts for main wire fixed to
wall or roof frame - Single Phase

P-3 Supply and install 65 x 65 x6 mm angle iron, no. 4,420.00 no. 4,420.00
service bracket, D bracket and Insulator with
necessary nuts and bolts for main wire fixed to
wall or roof frame - Three Phase

P-4 Supply and fix 7/1.35 mm main wire - (single) Lft. 267.00 Lm 876.00

Page 59 of 75
Building Rates - 2010- NCP

P-5 Supply install MCB 6 way, 40 A, 2 pole no. 7,028.00 no. 7,028.00
Isolator, 40 A ELCB 2-pole and box fixed with
7/1.35mm single core cable - Single Phase

Page 60 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
P-6 Supply install MCB 8 way, 40 A, 2 pole no. 7,751.00 no. 7,751.00
Isolator, 40 A ELCB 2-pole and box fixed with
7/1.35mm single core cable - Single Phase

P-7 Supply install MCB 10 way, 40 A, 2 pole no. 8,534.00 no. 8,534.00
Isolator, 40 A ELCB 2-pole and box fixed with
7/1.35mm single core cable - Single Phase

P-8 Supply install MCB 6 way, 63 A. 4 pole no. 20,544.00 no. 20,544.00
Isolator, 63 A ELCB 4-pole and box fixed with
7/1.35mm single core cable - Three Phase

P-9 Supply install MCB 8 way, 63 A. 4 pole no. 22,713.00 no. 22,713.00
Isolator, 63 A ELCB 4-pole and box fixed with
7/1.35mm single core cable - Three Phase

P-10 Supply install MCB 10 way, 63 A. 4 pole no. 24,882.00 no. 24,882.00
Isolator, 63 A ELCB 4-pole and box fixed with
7/1.35mm single core cable - Three Phase

P-11 Supply and install Electric bell and bell push no. 2,787.00 no. 2,787.00
complete with necessary wiring

P-12 Supply and install Ceiling fan 56",(230 V, 80 no. 8,941.00 no. 8,941.00
W) KDK or equivalent with SLS certificate
complete with regulator and other fittings

P-13 Supply and install Wall fan 16" KDK or no. 11,796.00 no. 11,796.00
equivalent all complete

P-14 Supply and install Exhaust fan 12" KDK or no. 11,400.00 no. 11,400.00
equivalent all complete

P-15 Supply and install Florescent lamp 20 W, 2' 0" no. 3,044.00 no. 3,044.00
single, with plastic cover including switch and
necessary wiring

P-16 Supply and install Florescent lamp 40 W, 4' 0" no. 3,188.00 no. 3,188.00
single, with plastic cover including switch and
necessary wiring

P-17 Supply and install Florescent lamp 40 W, 4' 0", no. 3,854.00 no. 3,854.00
double, with plastic cover including switch and
necessary wiring

Page 61 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
P-18 Supply and install Ceiling lamp barrel type, no. 3,116.00 no. 3,116.00
dia. 6" - including CFL bulb with guarantee,
switch and necessary wiring

P-19 Supply and install Batten lamp including no. 1,780.00 no. 1,780.00
switch and necessary wiring

P-20 Supply and install Pendent lamp including no. 1,957.00 no. 1,957.00
switch and necessary wiring

P-21 Supply and install CFL bulb - 20w ( spiral or no. 2,369.00 no. 2,369.00
globe) - with guarantee - including switch and
necessary wiring

P-22 Supply and install Wall lamp bracket type with no. 2,153.00 no. 2,153.00
single glass globe including switch and
necessary wiring

P-23 Supply and install 5A Switch Socket outlet no. 2,792.00 no. 2,792.00
including necessary wiring

P-24 Supply and install 13A Switch Socket outlet no. 3,772.00 no. 3,772.00
including necessary wiring

P-25 Supply and install 15A Switch Socket outlet no. 4,220.00 no. 4,220.00
including necessary wiring

P-26 Replacing lamp holders no. 64.00 no. 64.00


P-27 Replacing Florescent lamp 4'0" with shade no. 1,111.00 no. 1,111.00
P-28 Replacing florescent lamp 2' 0" with plastic no. 993.00 no. 993.00
shade
P-29 Replacing 1/1.13 mm cables Lft. 16.00 Lm 52.00
P-30 Replacing 7/1.35 mm Cables Lft. 87.00 Lm 285.00
P-31 Conduit PVC - 3/4" laid in brick or con. Lft. 71.00 Lm 233.00
Walls
AC MACHINES
P-32 Supply and install wall mounted AC machine no. 68,652.00 no. 68,652.00
split type - 9000 btu - LG or equivalent - with
one year guarantee to all and five year
guarantee for compressor including free
service

P-33 Supply and install wall mounted AC machine no. 83,384.00 no. 83,384.00
split type - 12000 btu - LG or equivalent - with
one year guarantee to all and five year
guarantee for compressor including free
service

Page 62 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
P-34 Supply and install wall mounted AC machine no. 95,170.00 no. 95,170.00
split type - 18000 btu - LG or equivalent -
with one year guarantee to all and five year
guarantee for compressor including free
service

P-35 Supply and install wall mounted AC machine no. 122,758.00 no. 122,758.00
split type - 24000 btu - LG or equivalent - with
one year guarantee to all and five year
guarantee for compressor including free
service

Q - MISCELLANEOUS

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
Q-1 Barbed wire fence on concrete posts - (height Lft. 248.00 Lm 813.00
6') - reinforced with 4 nos. 10mm bars, 2
supports on corner posts, 2 supports for mid of
every 6 intervals and 6 nos. wire lines to the
accepted Engineering standard. (Posts should
be fixed on a concrete pad of 1'x1'x1') -
Distance between two posts 8' - 10'

Q-2 Barbed wire fence on concrete posts - (height Lft. 309.00 Lm 1,014.00
8') - reinforced with 4 nos. 10mm bars, 2
supports on corner posts, 2 supports for mid of
every 6 intervals and 8 nos. wire lines to the
accepted Engineering standard. (Posts should
be fixed on a concrete pad of 1'x1'x1') -
Distance between two posts 8' - 10'

Q-3 Furnishing, laying and fixing 1' dia. RCC Lft. 887.00 Lm 2,909.00
Hume pipes with collars

Q-4 Furnishing, laying and fixing 1 1/2' dia. RCC Lft. 1,345.00 Lm 4,412.00
Hume pipes with collars

Q-5 Furnishing, laying and fixing 2' dia. RCC Lft. 1,866.00 Lm 6,120.00
Hume pipes with collars

Page 63 of 75
Building Rates - 2010- NCP

R - Aluminium Work

Specifications

(a) All the Aluminium members used for work should have following properties

1. Temper - T5
2. Tensile Strength - 155 Mpa
3. Elongation - 7% (Minimum)
(b) Surface Treatment to be done to get following thicknesses

1. Anodizing - Coating Thickness - 10-15 Microns


2. Powder Coating - Coating Thickness - 60-80 Microns

(c) Glass should be float with thickness 5 mm

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
Anodized
R-1 Supply and fix Aluminium Sliding window sqft. 780.00 sqm 8,393.00
with 5mm float glass, rubber beading stick
with silicon gum Brown/Silver Aluminium
members complete to the accepted Engineering
standards

R-2 Supply and fix Aluminium Casement window sqft. 972.00 sqm 10,459.00
with 5mm float glass, rubber beading stick
with silicon gum Brown/Silver Aluminium
members complete to the accepted Engineering
standards

R-3 Supply and fix Alumimium window Fixed sqft. 660.00 sqm 7,102.00
type, beading stick with silicon gum
Brown/Silver Aluminium members complete
to the accepted Engineering standards

R-4 Supply and fix Aluminium Louvered frame, sqft. 1,110.00 sqm 11,944.00
beading stick with silicon gum Brown/Silver
Aluminium members complete to the
accepted Engineering standards

Page 64 of 75
Building Rates - 2010- NCP

R-5 Supply and fix Aluminium Door with 5mm sqft. 1,140.00 sqm 12,266.00
float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading stick
with silicon gum Brown/Silver Aluminium
members including tie rod and lock complete
to the accepted Engineering standards

Page 65 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
R-6 Supply and fix Aluminium Door with 5mm sqft. 1,260.00 sqm 13,558.00
float glass on top and 0.47 mm Zn-Al covered
plywood board at bottom, rubber beading stick
with silicon gum Brown/Silver Aluminium
members including tie rod and lock complete
to the accepted Engineering standards

R-7 Supply and fix Aluminium Partition with 5mm sqft. 456.00 sqm 4,907.00
float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading stick
with silicon gum Brown/Silver Aluminium
members complete to the accepted
Engineering standards

R-8 Supply and fix Aluminium Partition with 5mm sqft. 600.00 sqm 6,456.00
float glass rubber beading stick with silicon
gum Brown/Silver Aluminium members
complete to the accepted Engineering
standards

R-9 Supply and fix Roller shutter door with sqft. 1,110.00 sqm 11,944.00
necessary fittings, beading stick with silicon
gum Brown/Silver Aluminium members
complete to the accepted Engineering
standards

Powder coated
R-10 Supply and fix Aluminium Sliding window sqft. 990.00 sqm 10,652.00
with 5mm float glass, rubber beading stick
with silicon gum Powder coated Aluminium
members complete to the accepted Engineering
standards

R-11 Supply and fix Aluminium Casement window sqft. 1,290.00 sqm 13,880.00
with 5mm float glass, rubber beading stick
with silicon gum Powder coated Aluminium
members complete to the accepted Engineering
standards

Page 66 of 75
Building Rates - 2010- NCP

R-12 Supply and fix Alumimium window Fixed sqft. 630.00 sqm 6,779.00
type, beading stick with silicon gum Powder
coated Aluminium members complete to the
accepted Engineering standards

Page 67 of 75
Building Rates - 2010- NCP

IMPERIAL METRIC
NO. DESCRIPTION
UNIT RATE UNIT RATE
R-13 Supply and fix Aluminium Louvered frame, sqft. 1,260.00 sqm 13,558.00
beading stick with silicon gum Powder coated
Aluminium members complete to the
accepted Engineering standards

R-14 Supply and fix Aluminium Door with 5mm sqft. 1,581.25 sqm 17,014.00
float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading stick
with silicon gum Powder coated Aluminium
members including tie rod and lock complete
to the accepted Engineering standards

R-15 Supply and fix Aluminium Door with 5mm sqft. 1,753.75 sqm 18,870.00
float glass on top and 0.47 mm Zn-Al covered
plywood board at bottom, rubber beading stick
with silicon gum Powder coated Aluminium
members including tie rod and lock complete
to the accepted Engineering standards

R-16 Supply and fix Aluminium Partition with 5mm sqft. 630.00 sqm 6,779.00
float glass on top and PVC coated 5mm
plywood board at bottom, rubber beading stick
with silicon gum Powder coated Aluminium
members complete to the accepted
Engineering standards

R-17 Supply and fix Aluminium Partition with 5mm sqft. 750.00 sqm 8,070.00
float glass rubber beading stick with silicon
gum Powder coated Aluminium members
complete to the accepted Engineering
standards

R-18 Supply and fix Roller shutter door with sqft. 1,638.00 sqm 17,625.00
necessary fittings, beading stick with silicon
gum Powder coated Aluminium members
complete to the accepted Engineering
standards

Page 68 of 75
Building Rates - 2010- NCP

UNITS PRICES OF MATERIAL, LABOUR AND PLANT FOR 2010

Labour

No. Item Unit Price (Rs.)


01 Special Skilled Labour Days 1,000.00
02 Skilled Labour Days 850.00
03 Semi Skilled Labour Days 800.00
04 Unskilled Labour Days 700.00

Plant
No. Item Unit Price (Rs.)
01 Concrete Mixer Day 4,500.00
02 Porker Vibrator Day 3,500.00

Construction Materials
No. Item Unit Size/Gauge Price (Rs.)
01 Cement - excluding transport 50 kg. 740.00
02 Rubble 6"-9" - excluding transport Cube 2,800.00
03 Metal - 1 1/2" - excluding transport Cube 4,800.00
04 Metal - 1 " -excluding transport Cube 4,850.00
05 Metal - 3/4 " - excluding transport Cube 6,200.00
06 Engineering Brick - including transport No. 7.20
07 Lime - slaked, standard - excluding transport 20 kg 285.00
08 River sand - including transport Cube 8,000.00
09 Earth - excluding transport Cube 1,600.00
10 Asbestos Corrugated Sheet No. 1.75 m 750.00
11 Asbestos Corrugated Sheet No. 2.5 m 1,050.00
12 Asbestos Corrugated Sheet No. 3.0 m 1,250.00
13 Asbestos Corrugated Sheet No. 3.5 m 1,560.00
14 Asbestos ceiling Sheet No. 4'x4' 348.00
15 Asbestos Ridging - 3' No. 210.00
17 Cement sand hollow blocks 1:12, 16"x8"x4" No. 34.00
18 Cement sand hollow blocks 1:12, 16"x8"x8" No. 78.00
19 Calicut tiles No. 23.22
20 Ridge tiles No. 35.17
21 Skim coat 20 kg 900.00
22 Glass pan - 3 mm sqft. 47.00
23 Glass pan - 5 mm sqft. 77.50
24 Paint brush 6" No. 790.00
25 Red cement kg 465.00

Page 69 of 75
Building Rates - 2010- NCP

No. Item Unit Size/Gauge Price (Rs.)


26 Enamel Paint ltr. 667.50
27 Emulsion Paint ltr. 565.00
28 Weather shield Paint ltr. 742.50
29 Anticorrosive Paint ltr. 481.25
30 Wall filler ltr. 244.75
31 Wood preservative - Black ltr. 144.00
32 Wood preservative - Clear ltr. 303.25
33 Floor paint ltr. 627.50
34 Aluminium paint ltr. 746.25
35 Reinforcement Steel -Tore Ton 109,450.00

36 Reinforcement Steel -Mild Ton 107,450.00

37 Barbed wire 25 kg 12.5 bwg 4,550.00


38 Binding wire 16 bwg lb 88.53
39 25x25x5 mm Angle Iron Lft. 62.55
40 40X40X5 mm Angle iron Lft. 100.00
41 50X50X5 mm Angle iron Lft. 118.40
42 50X50X6 mm Angle iron Lft. 131.55
43 65X65X6 mm Angle iron Lft. 194.73
44 1"x 1/4" Flat Iron Lft. 800.00
45 3/4"x 1/4" Flat Iron Lft. 700.00
46 1/2"x 1/4" Flat Iron Lft. 450.00
47 Iron Square Tube 3/4" Lft. 33.33
48 Iron Square Tube 1" Lft. 44.44
49 Zink alum colour sheet sqft. 141.26
50 Zink alum non-colour sheet sqft. 115.61
51 Zink alum ridging -colour lft. 165.54
52 Zink alum ridging - non colour lft. 145.73
53 Zink Alum gutter - colour lft. 167.68
54 Zink Alum gutter - non-colour lft. 147.50
55 Zink Alum down pipe -colour lft. 101.21
56 Zink Alum down pipe - non-colour lft. 117.37
57 Zink Alum gutter box - colour no 644.00
58 Zink Alum gutter box - non-colour no 595.00

Page 70 of 75
Building Rates - 2010- NCP

59 Zink Alum wall flashing - colour lft. 176.82


60 Zink Alum wall flashing - non- colour lft. 151.21
61 Zink Alum roofing screws no. 10.50
62 Zink Alum valley gutter - colour lft. 168.90
63 Zink Alum valley gutter -non- colour lft. 145.73
64 Aluminium foil - double side sqft. 9.30
65 Aluminium foil - single side sqft. 5.94
66 Lab Sink -Large No. 3,950.00
67 Lab Sink -Small No. 2,950.00

Page 71 of 75
Building Rates - 2010- NCP

Prepared and Checked by :-

1. Eng. H.M.J. Herath Deputy Director(Buildings)

2. Eng. D.M.U.S.B. Dissanayake Engineer

3. Eng. Waruna Jayasundara Engineer

4. Eng. B.K. Mathupala Engineer

5. Arch. Susantha Wijithaweera Architect

6. Palitha Samaraweera Divisional Assistant

7. W.J. Gunawardena Drawing Office Assistant

8. U.L.R.G. Weragoda Technical Officer

9. Upali Karunarathne Technical Officer

10. D.G. Rupa Malini Draughtsman

11. G.D.S. Shyamalee Draughtsman

12. Duminda Ponnamperuma Auto Cad Draughtsman

13. Manjula Amarasena Auto Cad Draughtsman

Cover Page Designed by :


Arch. Susantha Wijithaweera

Recommended by :-

…………………………………………..
Eng. H.M.J. Herath
Deputy Director (Buildings) - PED

Approved by :-

…………………………………………..
Eng. P.H. Sunil Bandara
Deputy Chief Secretary (Engineering)
Provincial Engineering Department
North Central Province
Anuradhapura.

Page 72 of 75
Building Rates - 2010 - NCP

METRIC CONVERSIONS
INCHES FEET YARDS MILES CHAINS LINKS MM CM M
1 0.08333 0.02777 - 0.001262 0.12626 25.4 2.54 0.0254
12 1 0.33333 - 0.01515 1.51515 304.8 30.48 0.3048
36 3 1 - 0.04545 4.54545 914.4 91.44 0.9144
63360 5280 1760 1 80 8000 - 160934.4 1609.344
LENGTH

792 66 22 0.0125 1 100 20116799 2011.6799 20.1168


7.92 0.66 0.22 - 0.01 1 201.16799 20.116799 0.2011679
0.03937 0.0032808 - - - 0.004971 1 0.1 0.001
0.03937 0.032808 0.01093 - 0.000497 0.04971 10 1 0.01
39.3701 3.28084 1.09361 0.000621 0.04971 4.97096 1000 100 1
39370.08 3280.84 1093.61 0.621371 49.70969 4970.969 1000000 100000 1000

Sq.Inch. Sq.Feet Sq.Yard Sq.Miles Acres Sq.mm Sq.cm Sq.m Sq.km


1 0.006944444 0.0007716 - - 645.16 6.4516 - -
144 1 0.111111 - - - 929.03 0.092903 -
1296 9 1 - 0.000206 - 8361.274 0.836127 -
- - 3097600 1 640 - - 2589987 2.58999
AREA

- 43560 4840 0.00156 1 - - 4046.85 0.0040468


0.00155 - - - - 1 - - -
0.155002 0.0010764 0.0001196 - - - 1 0.0001 -
1550.002 10.7639 1.19599 - - - 10000 1 1E-06
- - 1195990 0.386102 247.105 - - 1000000 1
- 107639.1 11959.9 0.003861 2.47105 - - 10000 0.01

Cu.Inch. Cu.Feet Cu.Yard Ac.Feet Gallons Pints Bushels Litre Cu.cm


1 0.0005787 - - 0.0036168 0.0289351 0.0004506 0.0164422 16.3871
1728 1 0.037 - 6.25 50 0.778604 28.3173 28317.38
46656 27 1 - 168.75 1350 21.022308 764.584 464584
VOLUME

- 43560 - 1 272.25 - - - -
276.48 0.16 0.00592 - 1 8 0.1245766 4.54609 4546.09
34.5601 0.02 0.0007707 - 0.125 1 0.015572 0.5683612 568.261
2219.356 1.284349 0.047568 - 8.0271856 64.21748 1 36.3687 36368.7
61.0236 0.035314 0.0013079 - 0.219969 1.759754 0.027496 1 1000
0.061024 - - - - 0.0017597 - 0.001 1
61023.6 35.3147 1.30795 0.000811 220.71687 1765.7349 27.496166 1000 1000000

Metric Mertic
Gram(g) kg Grains OZ Lbs Cwts Ton
Carrots Ton
1 0.2 0.0002 - 3.08647 0.0070547 0.0004409 - -
5 1 0.001 1E-06 15.4324 0.0352739 0.0022046 - -
DISCHARGE
WEIGHT

5000 1000 1 0.001 15432.4 35.273984 2.204624 0.0196841 0.0009842


5000000 1000000 1000 1 15432400 35273.984 2204.624 19.684142 0.9843071
0.323995 0.0647989 0.0000648 - 1 0.0022857 0.0001429 - -
141.7476 28.349523 0.0283495 - 437.50117 1 0.0625 0.0005580 0.0000279
2267.962 453.59237 0.4535924 0.000454 7000.0187 16 1 0.0089285 0.0004404
254011.7 50802.345 50.802345 0.0508023 784002.08 1792 112 1 0.05
5080235 1016046.9 1016.0469 1.0160469 15680041 35840 2240 20 1

Lb.F Ton.F N KN Lb.F/Sq.in Lb.F/Sq.ft Ton.F/Sq.ft N/Sq.mm


FORCE

1 - 4.448 - 1 - - 0.006601
- 1 9964 9.964 - 1 - -
0.2248 - 1 - - - 1 1.1073
FORCE
Building Rates - 2010 - NCP

- 0.1004 - 1 145 - - 1
g = 9.81m/sec 2
- 0.02089 - -
Building Rates - 2010 - NCP

Reinforcement : Weights, Specified Spacings and Unit Weights

Weights of metric (millimetre)bars in kilograms per square metre

Size Weight Length


Spacing of bars in millimetres
(mm) per m per tonne
(kg) (m) 75 100 125 150 175 200 225 250 275 300
6 0.222 4505 2.960 2.220 1.776 1.480 1.269 1.110 0.987 0.888 0.807 0.740
8 0.395 2532 5.267 3.950 3.160 2.633 2.257 1.975 1.756 1.580 1.436 1.317
10 0.616 1623 8.213 6.160 4.928 4.107 3.520 3.080 2.738 2.464 2.240 2.053

12 0.888 1126 11.84 8.880 7.104 5.920 5.074 4.440 3.947 3.552 3.229 2.960
16 1.579 633 21.05 15.79 12.63 10.53 9.023 7.895 7.018 6.316 5.742 5.263
20 2.466 406 32.88 24.66 19.73 16.44 14.09 12.33 10.96 9.864 8.967 8.220

25 3.854 259 51.39 38.54 30.83 25.69 22.02 19.27 17.13 15.42 14.01 12.85
32 6.313 158 63.13 50.5 42.09 36.07 31.57 28.06 25.25 22.96 21.04
40 9.864 101 78.91 65.76 56.37 49.32 43.84 39.46 35.87 32.88

Basic weight = 0.00785 kg/mm2 per metre


Weight per metre = 0.006165 ø2 kg
Weight per mm2 at spacing s(mm) = 6.165ø2/skg
ø = diameter of bar in millimetres