Design Basis For Nht/Unit 02: Snamprogetti

This document provides a design basis for the Naphtha Hydrotreating Unit (NHT)/Unit 02 of the Bandar Abbas Gas Condensate Refinery Project. It refers to the process design basis in the Axens Process Books document, with an exception specifying battery limit conditions and utilities/site information which are defined in another referenced design document. The battery limit conditions table lists the operating pressures and temperatures for incoming and outgoing fluids at the unit boundaries.

Uploaded by

mohsen ranjbar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
293 views2 pages

Design Basis For Nht/Unit 02: Snamprogetti

This document provides a design basis for the Naphtha Hydrotreating Unit (NHT)/Unit 02 of the Bandar Abbas Gas Condensate Refinery Project. It refers to the process design basis in the Axens Process Books document, with an exception specifying battery limit conditions and utilities/site information which are defined in another referenced design document. The battery limit conditions table lists the operating pressures and temperatures for incoming and outgoing fluids at the unit boundaries.

Uploaded by

mohsen ranjbar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CONT. No.

:
REF.No.:3034-PR-DBS-AA013 (A1)
PERSIAN GULF 316800 / 02-ZA-E-02004008
STAR OIL
COMPANY DOCUMENT CODE PAGE 1 OF 2

B AGCR JV PROJECT:
PLAN/PRJ UNIT PHASE DISC. DOC. TYPE SER. No. REV. No DATE

Snamprogetti BANDAR ABBAS


GAS CONDENSATE 3034 02 ED PR DBS AA013 A1 09 JUN ‘08
Bina
Consulting
Golden Group
EP GmbH
REFINERY PROJECT
Engineers

DESIGN BASIS FOR


NHT/UNIT 02

A1 09 JUN ‘08 FINAL ISSUE L.F. G.C. A.C.


A0 17 APR’ 08 IFA L.F. G.C. A.C.
REV. DATE DESCRIPTION PREPARED CHECKED APPROVED
B AGCR JV
316800 / 02-ZA-E-02004008 REF. No.:3034-PR-DBS-AA013 (A1)
Snamprogetti
PROJECT:
Bina
BANDAR ABBAS GAS CONDENSATE PAGE 2 OF 2
Golden Group
Consulting
Engineers
EP GmbH
REFINERY

For the Process Design Basis For Naphtha Hydrotreating Unit (NHT)/Unit 02, refer to the Axens
Process Books Doc.No 02/EB-PR/PRO-OO-0001-0, Paragraph 1.1.1 with the following exception:

Axens Paragraph 1.1.1.4: Battery limit conditions

Origin or Operating Operating


Fluid Destination pressure temperature
o
(barg) ( C)
Income
Stripped water Refinery 6.9 45
Caustic Soda Refinery 11.7 40
Outgoing
Sour water SWS unit 7.2 40
Light Naphtha ISOM unit 8.5 40
Medium naphtha Storage 7.2 40
Heavy Naphtha Gasoline pool 6.2 40
LPG Merox unit 8.0 40

Axens Paragraph 1.1.1.5: “Utilities conditions and site information”

Refer to the document 3034-00-ED-PM-DBS-AA002 (contractor number 00-ZA-E-00009002) - Basic


Engineering Design Data.