This document is a fit-up report for pipe welding at the NPK Chemical Plant. It details 10 pipe joints that were welded, including the component, material specification, welding procedure, pipe size and joint number. All 10 joints passed visual inspection and met the required 7.11mm thickness. The report was prepared by PT. Indo Fuji Energi and reviewed and approved by PT. Pupuk Iskandar Muda.

Uploaded by

Fendik Newbie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
333 views41 pages

Fit Up Report

This document is a fit-up report for pipe welding at the NPK Chemical Plant. It details 10 pipe joints that were welded, including the component, material specification, welding procedure, pipe size and joint number. All 10 joints passed visual inspection and met the required 7.11mm thickness. The report was prepared by PT. Indo Fuji Energi and reviewed and approved by PT. Pupuk Iskandar Muda.

Uploaded by

Fendik Newbie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 41

Date :

NPK CHEMICAL PLANT 500.000 MTPY Report No:


NPK-000-FIT-IFE-

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ

10

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date


Signature Signature Signature Signature
Date :
18-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-001

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE 126089 A333
1 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 01 6 40 7.11 √ -
ELBOW DB615 A333
ELBOW 126098 A333
2 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 02 6 40 7.11 √ -
PIPE DB615 A333
ELBOW 126098 A333
3 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 04 6 40 7.11 √ -
PIPE DB615 A333
PIPE DB615 A333
4 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 05 6 40 7.11 √ -
ELBOW 126098 A333
ELBOW 126098 A333
5 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 06 6 40 7.11 √ -
PIPE DB615 A333
ELBOW 126098 A333
6 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 08 6 40 7.11 √ -
PIPE DB615 A333
PIPE DB615 A333
7 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 09 6 40 7.11 √ -
ELBOW 126098 A333
PIPE DB615 A333
8 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 11 6 40 7.11 √ -
ELBOW 126098 A333
ELBOW 126098 A333
9 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 12 6 40 7.11 √ -
PIPE DB615 A333
ELBOW 126098 A333
10 004-WPS-ASME-PP-2021 6"-NHG-55005-A1Q2-C60 14 6 40 7.11 √ -
PIPE DB615 A333
Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date


Signature Signature Signature Signature
Date :
19-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-002

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE 124021 A333-6
1 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 01 2 40 3.91 √ -
ELBOW 63E01M019-1 WPL6
ELBOW 63E01M019-1 WPL6
2 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 02 2 40 3.91 √ -
PIPE 124021 A333-6
ELBOW 63E01M019-1 WPL6
3 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 04 2 40 3.91 √ -
PIPE 124021 A333-6
ELBOW 63E01M019-1 WPL6
4 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 06 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
5 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 06A 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
6 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 07 2 40 3.91 √ -
ELBOW 63E01M019-1 WPL6
PIPE 124021 A333-6
7 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 09 2 40 3.91 √ -
ELBOW 63E01M019-1 WPL6
ELBOW 63E01M019-1 WPL6
8 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 10 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
9 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 11 2 40 3.91 √ -
ELBOW 63E01M019-1 WPL6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date


Signature Signature Signature Signature
Date :
21-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-003

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE J9LC146 A106
1 003-PB-IFE-WPS 6"-PRW-A1A-001D Sheet 1of 3 19 6 40 7.11 √ -
PIPE J9LC146 A106
PIPE J9LC146 A106
2 003-PB-IFE-WPS 6"-PRW-A1A-001D Sheet 1of 3 21 6 40 7.11 √ -
PIPE J9LC146 A106

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date


Signature Signature Signature Signature
Date :
19-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-004

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE J9LC146 A106
1 003-PB-IFE-WPS 6"-PRW-A1A-001E Sheet 1of 3 002 6 40 7.11 √ -
PIPE J9LC146 A106
PIPE J9LC146 A106
2 003-PB-IFE-WPS 6"-PRW-A1A-001E Sheet 1of 3 004 6 40 7.11 √ -
PIPE J9LC146 A106
PIPE J9LC146 A106
3 003-PB-IFE-WPS 6"-PRW-A1A-001E Sheet 1of 3 006 6 40 7.11 √ -
PIPE J9LC146 A106

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date


Signature Signature Signature Signature
Date :
23-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-005

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE J9LC146 A106 6"-NHG-55005-A1Q2-C60 Sheet
1 004-WPS-ASME-PP-2021
1of 3
029 6 40 7.11 √ -
PIPE J9LC146 A106
PIPE J9LC146 A106 6"-NHG-55005-A1Q2-C60 Sheet
2 004-WPS-ASME-PP-2021
1of 3
030 6 40 7.11 √ -
PIPE J9LC146 A106
PIPE J9LC146 A106 6"-NHG-55005-A1Q2-C60 Sheet
3 004-WPS-ASME-PP-2021
1of 3
034 6 40 7.11 √ -
PIPE J9LC146 A106

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date


Signature Signature Signature Signature
Date :
23-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-006

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
1 004-WPS-ASME-PP-2021
1of 3
029 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
2 004-WPS-ASME-PP-2021
1of 3
030 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
3 004-WPS-ASME-PP-2021
1of 3
034 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
24-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-007

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
1 004-WPS-ASME-PP-2021
1of 3
027 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
2 004-WPS-ASME-PP-2021
1of 3
028 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
3 004-WPS-ASME-PP-2021
1of 3
031 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
4 004-WPS-ASME-PP-2021
1of 3
032 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
5 004-WPS-ASME-PP-2021
1of 3
033 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
24-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-008

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
1 004-WPS-ASME-PP-2021
1of 3
027 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
2 004-WPS-ASME-PP-2021
1of 3
028 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
3 004-WPS-ASME-PP-2021
1of 3
031 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
4 004-WPS-ASME-PP-2021
1of 3
032 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
5 004-WPS-ASME-PP-2021
1of 3
033 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
25-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-009

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60
1 004-WPS-ASME-PP-2021
Sheet4of4
016 12 40 10.31 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
2 004-WPS-ASME-PP-2021
4of4
017 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
3 004-WPS-ASME-PP-2021
4of4
019 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
4 004-WPS-ASME-PP-2021
2of4
020 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
5 004-WPS-ASME-PP-2021
2of4
023 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
6 004-WPS-ASME-PP-2021
2of4
025 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
7 004-WPS-ASME-PP-2021
2of4
026 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
25-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-010

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
1 004-WPS-ASME-PP-2021
3of4
016 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
2 004-WPS-ASME-PP-2021
3of4
017 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
3 004-WPS-ASME-PP-2021
3of4
019 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
4 004-WPS-ASME-PP-2021
3of4
020 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
5 004-WPS-ASME-PP-2021
2of4
023 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
6 004-WPS-ASME-PP-2021
2of4
025 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
7 004-WPS-ASME-PP-2021
2of4
026 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
26-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-011

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
1 004-WPS-ASME-PP-2021
4of4
015A 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
2 004-WPS-ASME-PP-2021
4of4
015B 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
3 004-WPS-ASME-PP-2021
3of4
018 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
4 004-WPS-ASME-PP-2021
3of4
021 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
5 004-WPS-ASME-PP-2021
3of4
022 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
6 004-WPS-ASME-PP-2021
2of4
024 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
26-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-012

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
1 004-WPS-ASME-PP-2021
4of4
013B 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
2 004-WPS-ASME-PP-2021
4of4
014 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
3 004-WPS-ASME-PP-2021
4of4
015 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
4 004-WPS-ASME-PP-2021
3of4
018 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
5 004-WPS-ASME-PP-2021
3of4
021 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
6 004-WPS-ASME-PP-2021
3of4
022 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
7 004-WPS-ASME-PP-2021
2of4
024 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-013

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
1 004-WPS-ASME-PP-2021
4of4
01A 6 40 7.11 √ -
PIPE 126089 A333-6
PIPE 126089 A333-6 6"-NHG-55005-A1Q2-C60 Sheet
2 004-WPS-ASME-PP-2021
4of4
03 6 40 7.11 √ -
ELBOW DB615 A333-6
PIPE 126089 A333-6 6"-NHG-55005-A1Q2-C60 Sheet
3 004-WPS-ASME-PP-2021
4of4
06A 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
ELBOW DB615 A333-6 6"-NHG-55005-A1Q2-C60 Sheet
4 004-WPS-ASME-PP-2021
4of4
07 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE 126089 A333-6 6"-NHG-55005-A1Q2-C60 Sheet
5 004-WPS-ASME-PP-2021
4of4
08A 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
6 004-WPS-ASME-PP-2021
4of4
08B 6 40 7.11 √ -
PIPE 126089 A333-6
ELBOW DB615 A333-6 6"-NHG-55005-A1Q2-C60 Sheet
7 004-WPS-ASME-PP-2021
4of4
10 6 40 7.11 √ -
PIPE 126089 A333-6
PIPE 126089 A333-6 6"-NHG-55005-A1Q2-C60 Sheet
8 004-WPS-ASME-PP-2021
4of4
12A 6 40 7.11 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 6"-NHG-55005-A1Q2-C60 Sheet
9 004-WPS-ASME-PP-2021
4of4
12B 6 40 7.11 √ -
PIPE 126089 A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature


Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-014

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
1 004-WPS-ASME-PP-2021
4of4
01 8 40 8.18 √ -
PIPE 134354 A333-6
PIPE 134354 A333-6 8"-NHL-55004-A1Q2-C35 Sheet
2 004-WPS-ASME-PP-2021
4of4
02 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
3 004-WPS-ASME-PP-2021
4of4
03 8 40 8.18 √ -
PIPE 134354 A333-6
PIPE 134354 A333-6 8"-NHL-55004-A1Q2-C35 Sheet
4 004-WPS-ASME-PP-2021
4of4
04 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
5 004-WPS-ASME-PP-2021
4of4
05 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
6 004-WPS-ASME-PP-2021
4of4
06 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
7 004-WPS-ASME-PP-2021
4of4
07 8 40 8.18 √ -
PIPE 134154 A333-6
PIPE 134354 A333-6 8"-NHL-55004-A1Q2-C35 Sheet
8 004-WPS-ASME-PP-2021
4of4
08 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE 134354 A333-6 8"-NHL-55004-A1Q2-C35 Sheet
9 004-WPS-ASME-PP-2021
4of4
09 8 40 8.18 √ -
PIPE 134354 A333-6
PIPE 134154 A333-6 8"-NHL-55004-A1Q2-C35 Sheet
10 004-WPS-ASME-PP-2021
4of4
10 8 40 8.18 √ -
ELBOW EXISTING MATERIAL A333-6
Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 21 of 41
Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-014

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
11 004-WPS-ASME-PP-2021
4of4
11 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
12 004-WPS-ASME-PP-2021
4of4
12 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
13 004-WPS-ASME-PP-2021
4of4
13 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
14 004-WPS-ASME-PP-2021
4of4
13A 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 22 of 41
Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-015

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 2"-NHG-41206-A1Q2-C50 Sheet
1 004-WPS-ASME-PP-2021
1of1
01A 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
2 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 03 2 40 3.91 √ -
ELBOW 63E01M019-1 WPL6
PIPE 124021 A333-6
3 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 04A 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
4 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 05 2 40 3.91 √ -
ELBOW 63E01M019-1 WPL6
PIPE 124021 A333-6
5 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 06A 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
6 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 06B 2 40 3.91 √ -
PIPE 124021 A333-6
ELBOW 63E01M019-1 WPL6
7 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 08 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
8 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 11 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6
9 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 12 2 40 3.91 √ -
PIPE 124021 A333-6
PIPE 124021 A333-6
10 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 12A 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6
Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 23 of 41
Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-015

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6
11 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 13 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6
12 004-WPS-ASME-PP-2021 2"-NHG-41206-A1Q2-C50 14 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 24 of 41
Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-016

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6
1 004-WPS-ASME-PP-2021 2"-NHG-41201-A1Q2-C50 01 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6
2 004-WPS-ASME-PP-2021 2"-NHG-41201-A1Q2-C50 02 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 25 of 41
Date :
27-09-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-017

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6
1 004-WPS-ASME-PP-2021 2"-NHG-41202-A1Q2-C50 01 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6
2 004-WPS-ASME-PP-2021 2"-NHG-41202-A1Q2-C50 02 2 40 3.91 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 26 of 41
Date :
01-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-018

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
1 004-WPS-ASME-PP-2021
3of4
17A 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
2 004-WPS-ASME-PP-2021
3of4
17B 8 40 8.18 √ -
PIPE EXISTING MATERIAL A333-6
PIPE EXISTING MATERIAL A333-6 8"-NHL-55004-A1Q2-C35 Sheet
3 004-WPS-ASME-PP-2021
3of4
16A 1 40 3.38 √ -
PIPE EXISTING MATERIAL A333-6

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 27 of 41
Date :
01-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-019

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
FLANGE 38920 A105
1 002-PB-IFE-WPS 4"-SA-AVA-001 01 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-001 02 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
3 002-PB-IFE-WPS 4"-SA-AVA-001 03 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
4 002-PB-IFE-WPS 4"-SA-AVA-001 04 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
5 002-PB-IFE-WPS 4"-SA-AVA-001 05 5 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
6 002-PB-IFE-WPS 4"-SA-AVA-001 06 4 40 6.02 √ -
ELBOW 3854 A234
ELBOW 3854 A234
7 002-PB-IFE-WPS 4"-SA-AVA-001 07 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
8 002-PB-IFE-WPS 4"-SA-AVA-001 07A 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
9 002-PB-IFE-WPS 4"-SA-AVA-001 08 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
10 002-PB-IFE-WPS 4"-SA-AVA-001 09 4 40 6.02 √ -
PIPE 126173 A53-B
Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 28 of 41
Date :
01-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-020

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
FLANGE 38920 A105
1 002-PB-IFE-WPS 4"-SA-AVA-002 01 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-002 02 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
3 002-PB-IFE-WPS 4"-SA-AVA-002 03 4 40 6.02 √ - OST WELD
PIPE 126173 A53-B
PIPE 126173 A53-B
4 002-PB-IFE-WPS 4"-SA-AVA-002 04 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
5 002-PB-IFE-WPS 4"-SA-AVA-002 05 5 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
6 002-PB-IFE-WPS 4"-SA-AVA-002 06 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
7 002-PB-IFE-WPS 4"-SA-AVA-002 07 4 40 6.02 √ -
ELBOW 3854 A234
ELBOW 3854 A234
8 002-PB-IFE-WPS 4"-SA-AVA-002 08 4 40 6.02 √ -
PIPE 126173 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 29 of 41
Date :
01-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-021

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
FLANGE 38920 A105
1 002-PB-IFE-WPS 4"-SA-AVA-003 01 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-003 12 4 40 6.02 √ -
FLANGE 38920 A105
PIPE 126173 A53-B
3 002-PB-IFE-WPS 4"-SA-AVA-003 14 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
4 002-PB-IFE-WPS 4"-SA-AVA-003 15 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
5 002-PB-IFE-WPS 4"-SA-AVA-003 16 4 40 6.02 √ -
TEE 3944 A234
TEE 3944 A234
6 002-PB-IFE-WPS 4"-SA-AVA-003 17 4 40 6.02 √ -
PIPE 126173 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 30 of 41
Date :
01-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-022

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE 126173 A53-B
1 002-PB-IFE-WPS 4"-SA-AVA-004 02 4 40 6.02 √ -
FLANGE 38920 A105
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-004 03 4 40 6.02 √ -
FLANGE 38920 A105
PIPE 126173 A53-B
3 002-PB-IFE-WPS 4"-SA-AVA-004 04 4 40 6.02 √ -
TEE 3944 A234
TEE 3944 A234
4 002-PB-IFE-WPS 4"-SA-AVA-004 05 4 40 6.02 √ -
PIPE 126173 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 31 of 41
Date :
03-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-023

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
FLANGE 38920 A105
1 002-PB-IFE-WPS 4"-SA-AVA-005 14 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-005 15 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
3 002-PB-IFE-WPS 4"-SA-AVA-005 15A 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
4 002-PB-IFE-WPS 4"-SA-AVA-004 17 4 40 6.02 √ -
ELBOW 3854 A234
PIPE 126173 A53-B
5 002-PB-IFE-WPS 4"-SA-AVA-004 19 4 40 6.02 √ -
ELBOW 3854 A234
ELBOW 3854 A234
6 002-PB-IFE-WPS 4"-SA-AVA-004 20 4 40 6.02 √ -
PIPE 126173 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 32 of 41
Date :
03-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-024

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
REDUCER 3751 A234
1 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 1OF2 11 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 1OF2 13 4 40 6.02 √ -
FLANGE 38920 A105

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 33 of 41
Date :
02-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-025

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
FLANGE 38920 A105
1 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 14 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 15 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
3 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 16 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
4 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 18 4 40 6.02 √ -
ELBOW 3854 A234
ELBOW 3854 A234
5 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 19 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
6 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 22 4 40 6.02 √ -
TEE 3944 A234
TEE 3944 A234
7 002-PB-IFE-WPS 4"-SA-AVA-006 Sheet 2OF2 22 4 40 6.02 √ -
PIPE 126173 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 34 of 41
Date :
03-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-026

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
ELBOW 3854 A234
1 002-PB-IFE-WPS 4"-SA-AVA-007 Sheet 1OF1 02 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-007 Sheet 1OF1 03 4 40 6.02 √ -
FLANGE 38920 A105
FLANGE 38920 A105
3 002-PB-IFE-WPS 4"-SA-AVA-007 Sheet 1OF1 04 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
4 002-PB-IFE-WPS 4"-SA-AVA-007 Sheet 1OF1 05 4 40 6.02 √ -
TEE 3944 A234
TEE 3944 A234
5 002-PB-IFE-WPS 4"-SA-AVA-007 Sheet 1OF1 06 4 40 6.02 √ -
PIPE 126173 A53-B
FLANGE 38920 A105
6 002-PB-IFE-WPS 4"-SA-AVA-007 Sheet 1OF1 08 4 40 6.02 √ -
PIPE 126173 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 35 of 41
Date :
03-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-027

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE 126173 A53-B
1 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 02 4 40 6.02 √ -
ELBOW 3854 A234
PIPE 126173 A53-B
2 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 04 4 40 6.02 √ -
ELBOW 3854 A234
ELBOW 3854 A234
3 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 05 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
4 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 06 4 40 6.02 √ -
ELBOW 3854 A234
PIPE 126173 A53-B
5 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 09 4 40 6.02 √ -
ELBOW 3854 A234
PIPE 126173 A53-B
6 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 11 4 40 6.02 √ -
ELBOW 3854 A234
ELBOW 3854 A234
7 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 12 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
8 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 13 4 40 6.02 √ -
ELBOW 3854 A234
PIPE 126173 A53-B
9 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 15 4 40 6.02 √ -
ELBOW 3854 A234
Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 36 of 41
Date :
03-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-027

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
ELBOW 3854 A234
10 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 16 4 40 6.02 √ -
PIPE 126173 A53-B
PIPE 126173 A53-B
11 002-PB-IFE-WPS 4"-SA-AVA-008 Sheet 1OF1 17 4 40 6.02 √ -
ELBOW 3854 A234

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 37 of 41
Date :
04-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-028

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE J0L4163 A53-B
1 002-PB-IFE-WPS 2"-NG-B1A-001 29 2 40 3.91 √ -
PIPE J0L4163 A53-B
PIPE J0L4163 A53-B
2 002-PB-IFE-WPS 2"-NG-B1A-001 112 2 40 3.91 √ -
PIPE J0L4163 A234
PIPE J0L4163 A234
3 002-PB-IFE-WPS 2"-NG-B1A-001 113 2 40 3.91 √ -
PIPE J0L4163 A53-B
PIPE J0L4163 A53-B
4 002-PB-IFE-WPS 2"-NG-B1A-001 114 2 40 3.91 √ -
PIPE J0L4163 A234
PIPE J0L4163 A53-B
5 002-PB-IFE-WPS 2"-NG-B1A-001 115 2 40 3.91 √ -
PIPE J0L4163 A234
PIPE J0L4163 A53-B
6 002-PB-IFE-WPS 2"-NG-B1A-001 116 2 40 3.91 √ -
PIPE J0L4163 A234
PIPE J0L4163 A234
7 002-PB-IFE-WPS 2"-NG-B1A-001 118 2 40 3.91 √ -
PIPE J0L4163 A53-B
PIPE J0L4163 A53-B
8 002-PB-IFE-WPS 2"-NG-B1A-001 120 2 40 3.91 √ -
PIPE J0L4163 A234
PIPE J0L4163 A53-B
9 002-PB-IFE-WPS 2"-NG-B1A-001 121 2 40 3.91 √ -
PIPE J0L4163 A234
Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 38 of 41
Date :
04-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-028

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE J0L4163 A53-B
10 002-PB-IFE-WPS 2"-NG-B1A-001 140 2 40 3.91 √ -
PIPE J0L4163 A53-B
PIPE J0L4163 A53-B
11 002-PB-IFE-WPS 2"-NG-B1A-001 141 2 40 3.91 √ -
PIPE J0L4163 A234

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 39 of 41
Date :
05-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-029

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE M44953 A53-B
1 002-PB-IFE-WPS 1"-PRW-A1A-071A 02 1 80 4.55 √ -
ELBOW AGVP A105
ELBOW AGVP A105
2 002-PB-IFE-WPS 1"-PRW-A1A-071A 03 1 80 4.55 √ -
PIPE M44953 A53-B
PIPE M44953 A53-B
3 002-PB-IFE-WPS 1"-PRW-A1A-071A 04 1 80 4.55 √ -
ELBOW AGVP A105
PIPE M44953 A53-B
4 002-PB-IFE-WPS 1"-PRW-A1A-071A 06 1 80 4.55 √ -
ELBOW AGVP A105
ELBOW AGVP A105
5 002-PB-IFE-WPS 1"-PRW-A1A-071A 07 1 80 4.55 √ -
PIPE M44953 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 40 of 41
Date :
05-10-2021
NPK CHEMICAL PLANT 500.000 MTPY Report No:
NPK-000-FIT-IFE-030

FIT-UP REPORT

Material Dia. Thickness FIT-UP


No COMPONENT OF PIPE HEAT No. WPS No. LINE No. JOINT No. Sch. REMARKS
Spec. Inch mm ACC REJ
PIPE M44953 A53-B
1 002-PB-IFE-WPS 1"-PRW-A1A-071B 02 1 80 4.55 √ -
ELBOW AGVP A105
ELBOW AGVP A105
2 002-PB-IFE-WPS 1"-PRW-A1A-071B 03 1 80 4.55 √ -
PIPE M44953 A53-B
PIPE M44953 A53-B
3 002-PB-IFE-WPS 1"-PRW-A1A-071B 04 1 80 4.55 √ -
ELBOW AGVP A105
PIPE M44953 A53-B
4 002-PB-IFE-WPS 1"-PRW-A1A-071B 06 1 80 4.55 √ -
ELBOW AGVP A105
ELBOW AGVP A105
5 002-PB-IFE-WPS 1"-PRW-A1A-071B 07 1 80 4.55 √ -
PIPE M44953 A53-B

Prepared by Checked by Withness & Reviewed Review & Approved

PT.INDO FUJI ENERGI PT.INDO FUJI ENERGI PT.PEMBANGUNAN PERUMAHAN PT.PUPUK ISKANDAR MUDA

Date Date Date Date

Signature Signature Signature Signature

Page 41 of 41