Project Title: Top Slope Barge Access

This document provides details for a drawing titled "Bathymetric Outfall Area" that shows the underwater layout for discharging cooling water from a proposed 2x1000 MW coal fired power plant. The drawing was prepared by subcontractor P.T. Anugerah Samuderamadanindo for the main contractor for the central Java power plant project.

Uploaded by

candra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Project Title: Top Slope Barge Access

This document provides details for a drawing titled "Bathymetric Outfall Area" that shows the underwater layout for discharging cooling water from a proposed 2x1000 MW coal fired power plant. The drawing was prepared by subcontractor P.T. Anugerah Samuderamadanindo for the main contractor for the central Java power plant project.

Uploaded by

candra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project Title

1344.644 CENTRAL JAVA PROJECT 2X 1000


1340 MW COAL FIRED POWER PLANT

1320
Drawing Title

1300
BATHYMETRIC OUTFALL AREA

1280

Sub Contractor

1260 P.T ANUGERAH SAMUDERA MADANINDO

1240 Contractor

1220
1

1200
1
1

1180

TOP SLOPE BARGE ACCESS


KEY PLAN
1160 (Not to Scale)
1340

1344
.644
132
0

1300

1280

1260

124
0

1220

120
0

1180

1
1160

1140

112
0

TO
P
1100 SL
OP
E

108
0

106
0

1040
TO
P
SL
OP
102 E
0
BA
RG
E
AC
CE
1000 SS

980

960

940

920

900

880

BO
860 TT BO
OM TT
SL OM
OP SL
E OP
840 E
BA
RG
E
AC
820
CE
SS

1140
800

780

TO
P
SL
760 OP
E
BA
RG
E
740
AC
CE
SS

720

700

680

660

640

620

600

580

560

540

520

BO
500 TT
OM
SL
OP
E
480

460

440

TO
P
SL
420 OP
E
BA
RG
E
AC
400 CE
SS

380

360

340

320

300

280

260

TO
P
SL
240 OP
BO E
TT
OM
SL
220 OP
E

200

180

160

140

1
120 1

100

80

60

40 2 ②



2

20

TO
P


SL

OP
E


0.00 ②

0 ②





1120




BO
TT
OM


SL
OP
E

General Notes
1100

1. Surface positioning by CHC P3DT RTK Glonass GPS


2. Sounding acquired by Teledhyne T50P
1080
3. Depth are referenced to MSL
4. Coastline detail are indicative only
5. All measurement are in metres and decimeters below MSL
6. Coordinates are in DGN95
7. Bathymetric survey valid only inside boundary area

1060
Colour Legend Bar

1040

1020

1000

Drawing No.
980
BOTTOM SLOPE BARGE ACCESS
ASM-CJ-SRV-DWG-003-21

Scale
1 : 3500
960
Survey Date
BOTTOM SLOPE 5 September 2021

Surveyed By
940
PT.ANUGERAH SAMUDERA MADANINDO

Drawn By
920 CNK
Checked By

NB
900 Approved By

FMA
920

Project Title
900

CENTRAL JAVA PROJECT 2X 1000


MW COAL FIRED POWER PLANT

880

Drawing Title
860
TOP SLOPE BARGE ACCESS

BATHYMETRIC OUTFALL AREA


840

820
Sub Contractor

P.T ANUGERAH SAMUDERA MADANINDO

800

Contractor

780

760

740

720

KEY PLAN
(Not to Scale)

700
1340

1344
.644
132
0

1300

1280

1260

124
0

1220

120
0

1180

1
1160

1140

112
0

TO
P
1100 SL
OP
E

108
0

106
0

1040
TO
P
SL
OP
102 E
0
BA
RG
E
AC
CE
1000 SS

980

960

940

920

900

880

BO
860 TT BO
OM TT
SL OM
OP SL
E OP
840 E
BA
RG
E
AC
820
CE
SS

800

780

TO
P
SL
760 OP
E
BA
RG
E
740
AC
CE
SS

720

700

680

660

640

620

600

580

560

540

680
520

BO
500 TT
OM
SL
OP
E
480

460

440

TO
P
SL
420 OP
E
BA
RG
E
AC
400 CE
SS

380

360

340

320

300

280

260

TO
P
SL
240 OP
BO E
TT
OM
SL
220 OP
E

200

180

160

140

1
120 1

100

80

60

40 2 ②



2

20

TO
P


SL

OP
E


0.00 ②

0 ②








BO
TT
OM


SL
OP
E

660

General Notes

640

1. Surface positioning by CHC P3DT RTK Glonass GPS


2. Sounding acquired by Teledhyne T50P
3. Depth are referenced to MSL

620 4. Coastline detail are indicative only


5. All measurement are in metres and decimeters below MSL
6. Coordinates are in DGN95
7. Bathymetric survey valid only inside boundary area

600 Colour Legend Bar

BOTTOM SLOPE
580

560

540

Drawing No.
TOP SLOPE BARGE ACCESS ASM-CJ-SRV-DWG-003-21
520
Scale
1 : 3500

Survey Date
500
5 September 2021

Surveyed By

PT.ANUGERAH SAMUDERA MADANINDO


480

Drawn By

CNK
460 Checked By

NB
Approved By
440
FMA
460
Project Title

440 CENTRAL JAVA PROJECT 2X 1000


MW COAL FIRED POWER PLANT

420

Drawing Title
400

BATHYMETRIC OUTFALL AREA

380

TOP SLOPE
Sub Contractor
360

P.T ANUGERAH SAMUDERA MADANINDO

340
Contractor

320
BOTTOM SLOPE

300

280

260
KEY PLAN
(Not to Scale)
1340

1344
.644
132
0

1300

1280

1260

124
0

1220

120
0

1180

1
1160

1140

112
0

TO
P
1100 SL
OP
E

108
0

106
0

240
1040
TO
P
SL
OP
102 E
0
BA
RG
E
AC
CE
1000 SS

980

960

940

920

900

880

BO
860 TT BO
OM TT
SL OM
OP SL
E OP
840 E
BA
RG
E
AC
820
CE
SS

800

780

TO
P
SL
760 OP
E
BA
RG
E
740
AC
CE
SS

720

700

680

660

640

620

600

580

560

540

520

BO
500 TT
OM
SL
OP
E
480

460

440

TO
P
SL
420 OP
E
BA
RG
E
AC
400 CE
SS

380

360

340

320

300

280

260

TO
P
SL
240 OP
BO E
TT
OM

220
SL
220 OP
E

200

180

160

140

1
120 1

100

80

60

40 2 ②



2

20

TO
P


SL

OP
E


0.00 ②

0 ②








BO
TT
OM


SL
OP
E

200 General Notes

180
1
1

1. Surface positioning by CHC P3DT RTK Glonass GPS


2. Sounding acquired by Teledhyne T50P
3. Depth are referenced to MSL
4. Coastline detail are indicative only
5. All measurement are in metres and decimeters below MSL
6. Coordinates are in DGN95
160 7. Bathymetric survey valid only inside boundary area

Colour Legend Bar

140

120
TOP SLOPE



2
2

100
2
2


80

Drawing No.

ASM-CJ-SRV-DWG-003-21


Scale
60

1 : 3500

Survey Date


5 September 2021
40
BOTTOM SLOPE

Surveyed By

PT.ANUGERAH SAMUDERA MADANINDO




20 Drawn By


CNK
Checked By
0.000
NB
Approved By

FMA